S07 - Abstract of Bids OF 1419 and 1419 A - CONSTRUCTION - Fargo - Signed.pdf

PDF 299 KB Posted

Attached to
Y1DA--VHA Construction Project - EHRM Tier Two Infrastructure Upgrades at Fargo VAMC - Project # 437-21-210 Fargo, ND
Solicitation number
36C77625B0014_2
Issued by

About this file

This is an Abstract of Offers - Construction form for the EHRM Tier 2 Infrastructure Upgrades Construction Project (437-21-210) at the Fargo VAMC in North Dakota, issued by the Department of Veterans Affairs Program Contracting Activity Central (PCAC). The solicitation number is 36C77625B0014, with an issued date of 05/21/2025 and opening date of 08/07/2025. Six bids were received, with offers ranging from $13,900,600 to $26,844,472, and all bidders provided a 20% bid bond. The two documented offerors are Industrial Maintenance Services (with a bid of $22,571,109) and Bridger-Richard JV LLC (with a bid of $26,844,472), with other bidders including Huot Construction and Services Inc., Greenstone Construction, MDM Construction, and AmeriTech Contracting. The government's estimate for the general construction base item was $13,981,000, and the Contracting Officer confirmed that none of the six bids contained erasures, strikeouts, or changes at the time of opening.

View the file

Other files

File Type Posted
S03-36C77625B0014_2-Posting of Abstract of Bids.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

Department of Veterans Affairs Program Contracting Activity Central (PCAC) 6100 Oak Tree Blvd, Suite 490 Independence OH 44131

EHRM Tier 2 Infrastructure Upgrades Construction Project 437-21-210 Fargo VAMC, Fargo ND

ITEM I, GENERAL CONSTRUCTION, BASE

The Contracting Officer confirms that none of the 6 bids received in response to this solicitation contain any erasures, strikeouts, or changes at the time of opening

JB1 22,571,109.00 22,571,109.00 13,981,000.0013,981,000.00 26,844,472.00 26,844,472.00

36C77625B0014 1 2

Katherine Gibney, Contracting Officer

Industrial Maintenance Services Bridger-Richard JV LLC

Bid Bond-20% Bid Bond-20%

Yes Yes

08/07/202505/21/2025

08/07/2025

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use addit ional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

36C77625B0014

EHRM Tier 2 Infrastructure Upgrades Construction project 437-21-210

Bid Bond-20% Bid Bond-20% Bid Bond-20% Bid Bond-20%

Yes Yes Yes Yes

1 1 JB 18,430,345.77 14,704,800 14,704,800 13,900,600 13,900,600 16,100,000 16,100,000

2 2

3 4 5 6

Huot Construction and Services Inc.

Greenstone Construction MDM Construction AmeriTech Contracting

18,430,345.77