S07 - Abstract of Bids - EHRM North Chicago - West Campus.pdf

PDF 276 KB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades West Campus – North Chicago - Construction Federal contract opportunity
Solicitation number
36C77623B0019
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is an abstract of bids for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin issued solicitation number 36C77623B0019 for infrastructure upgrades to the EHRM West Campus facility in North Chicago, Illinois. Three bids were received by the July 11, 2023 deadline. Michael Mullen Contracting awarded the contract to ESA South AC JV One, LLC for their bid of $40,273,825. The Richard Group submitted the second lowest bid of $44,856,014, and The Povolny Group, Inc. provided the third bid. All bidders submitted the required bid bonds and acknowledged the relevant amendments. The project involves base bid line item JB1 for upgrades to the facility. The government estimate for the work was $74,307,000.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades West Campus – North Chicago - Construction, newest first.
File Type Posted
36C77623C0089_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

Department of Veterans Affairs Program Contracting Activity Central (PCAC) 6150 Oak Tree Blvd, Suite 300 Independence OH 44131

EHRM Infrastructure Upgrades North Chicago - West Campus

1 Base Bid JB1 40,273,825.00 40,273,825.00 74,307,000.0074,307,000.00 45,429,000.00 45,429,000.00

10 Amendments

36C77623B0019 1 2

Michael Mullen Contracting Officer

ESA South AC JV One, LLC

Bid Bond - 20% Bid Bond - 20%

Yes Yes

07/10/202304/26/2023

No erasures, strikeovers, or changes in price were noted at the bid opening.

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

36C77623B0019

EHRM Infrastructure Upgrades North Chicago - West Campus

Bid Bond - 20% Bid Bond - 20%

Yes Yes

1 1 JB 44,856,014 44,856,014 42,597,900 42,597,900

2 2

3 4

The Richard Group The Povolny Group, Inc

S07 - Abstract of Bids - North Chicago West - 1
S07 - Abstract of Bids - North Chicago West - 2
2023-07-11T11:20:28-0400
MICHAEL MULLEN

File details come from the government source that posted it. Updated .