This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs Network Contracting Office 17 in San Antonio, Texas for solicitation 36C25726Q0722 regarding carpet replacement services.

The amendment extends the deadline for receipt of quotes from July 20, 2026 to July 24, 2026 at 3:00 PM CDT and provides responses to 23 questions submitted by offerors. Key project requirements include carpet replacement in a chapel at a VA facility using direct glue-down installation method with broadloom carpet specifications including 100 percent nylon continuous filament pile fiber, static control capabilities, and multiple backing and construction options. The contractor must maintain Level 4 Infection Control Risk Assessment (ICRA) protocols during installation, coordinate around Sunday chapel services, handle movement and reinstallation of pews and furnishings, and provide a minimum 10-year manufacturer warranty. The Government will select the specific carpet color after contract award and will provide detailed floor plans identifying all boundary areas including aisles, altar access points, stairs, loft, and balcony areas. Additional clarifications confirm that bid bonding is not required, the exterior door will serve as the exhaust area for negative air machines, the Government will provide contractor badging requirements after award, notice to proceed will be issued immediately after contract award, the project is subject to Buy American Act requirements, and material storage locations will be determined post-award. Personnel double-hatting decisions and material storage parking for containers are at the contractor's discretion.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment CTX Chapel Carpet Replacement, newest first.
File Type Posted
Chapel Carpet Area.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4

0001 07-16-2026

36C257

Department Of Veterans Affairs Network Contracting Office 17

5441 Babcock Road Ste. 302 San Antonio TX 78240

To all Offerors/Bidders

36C25726Q0722

07-01-2026

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 07-24-2026 3:00pm CDT

See CONTINUATION Page

X 1

The purpose of this amendment is to:

a. Answer all the questions that were received before Monday, July 13, 2026 by 3:00pm CDT.

b. Extend the deadline to submit quotes from Monday, July 20 , 2026 to Friday, July 24, 2026 by 3:00pm CDT.

///SEE CONTINUATION PAGES///

Shawn R. Reinhart Contracting Officer

36C257Q0722 0001 CONTINUATION PAGES

Questions & Answers - 36C25726Q0722 – Carpet Replacement

Q1. Is there a designated laydown area and staging area for trailers? A site will be selected when contract is awarded.

Q2. Please confirm weather full-time on-site supervision is required throughout construction and identify which positions must be continuously present. The Contractor will supervise their workers. A POC will be available to the VA POC during this requirement.

Q3. Could the Government provide the required carpet specifications, including the manufacturer (or approved equal), style, color, carpet backing, cushion/pad requirements, weight, and any minimum performance criteria?

Broadloom:

a. Primary Backing: Manufacturer’s standard material // Woven polypropylene // Nonwoven, polypropylene or polyester

b. Secondary Backing: // Manufacturer's standard material // Woven polypropylene Nonwoven, polypropylene or polyester // Fiberglass

c. Backcoating: Manufacturer's standard material // SBR latex // PVC // Thermoplastic copolymer

d. The color will be selected after award.

e. Carpet Construction: Tufted // Woven // Bonded // Needlebond // Needle Felt

f. Carpet Type: Broadloom //4.6 // 4.1 // 3.65 // 1.82// m (15//13.5 //12 // 6 feet) minimum usable carpet width with exception of corridors and stairs. Modular tile 457 by 457 // 508 by 508 //610 by 610 mm square (18 by 18 // 20 by 20 // 24 by 24 inch square) with 0.15 percent growth/shrink rate in accordance with ISO 2551.

g. Pile Type: Level-loop // Multilevel loop // Cut and loop // Frieze // Cut pile // Random sheared // Level tip shear. Pile type and thickness must conform to ADA requirements.

h. Pile Fiber: Commercial 100 percent branded (federally registered trademark), nylon continuous filament.

i. Static Control: Provide static control to permanently regulate static buildup to less than 3.5 // 2.0 kV when tested at 20 percent relative humidity and 21 degrees C (70 degrees F) in accordance with AATCC 134.

Q4. Is bid bonding required for this project? No, please submit a quote as listed in Instructions of Offerors in the solicitation.

Q5. Can the government provide a blueprint of the ICRA locations for this project? Level 4 ICRA.

Q6. During installation of negative air machine, will the government provide an exhaust vent, window, or are we supposed to air out through corridors? The exterior door can be used as the exhaust area.

Q7. What ICRA level will be necessary? Level 4 ICRA.

Q8. Will the chapel operate during construction? Yes, there will be Sunday services.

Q9. Will the government provide detailed requirements for contractor badging? Please clarify the PIV process including documentation, background checks, and estimated process time. This will be clarified after contract award.

Q10. How soon after contract award does the government anticipate issuing the official notice to proceed?

Once vendor is awarded notice to proceed immediately right after.

Q11. Will this project need to meet the Buy American Act requirements? Yes

Q12. If double-hatting or triple-hatting of key personnel is allowed, what specific information or justification must the Offeror provide in the proposal regarding the individual’s qualifications and ability to perform multiple roles effectively? That is a contractor decision to manage personnel.

Q13. Please identify which key personnel positions, if any, may be combined (e.g., Superintendent, CQC System Manager, SSHO) and under what conditions. That is a contractor decision to manage personnel.

Q14. For pre-construction risk assessment, what is the determined activity type and required control measures for the overall scope of work? Contractor will follow the ICRA.

Q15. Section 6 of the Statement of Work references "the warranty period" but does not specify its duration. Please clarify the required warranty period for this project. Manufacturer Warranty:

Manufacturer shall warranty their carpet for a minimum of ten (10) years from date of installation and final acceptance by the Government.

Q16. The job description refers to carpet replacement "according to plan"; however, the plan package was not included with the tender documents we received. Could the Government please provide the referenced floor plan, clearly identifying the exact boundaries of the carpet replacement, including the main aisle, altar access, stairs, loft, balcony, and transition areas? Or could you provide some photos of the site? A site visit was conducted to allow contractors to field‑verify site conditions and gather the additional details needed to prepare competitive proposals. The Government will provide the referenced floor plan, which will clearly identify all boundaries for carpet replacement, including the main aisle, altar access points, stairs, loft, balcony areas, and transition zones.

Q17. Will new baseboards be required? No.

Q18. The solicitation states that the required Infection Control Risk Assessment (ICRA) level will be determined during the kickoff meeting. For bidding purposes, can the Government advise the anticipated ICRA level or identify the level that should be assumed when preparing our proposal? Level 4 ICRA

Q19. Will the contractor be responsible for moving and reinstalling pews, furniture, altar furnishings, or other equipment located within the work area, or will these items be removed by the Government prior to construction? What about the shelving and all the books inside the two closets at the foyer area? It is the contractor’s responsibility.

Q20. Are there any scheduled chapel services or operational restrictions that will require work to be performed in phases or outside of normal working hours? Yes, there will be Sunday services.

Q21. Because the carpet selection is an integral piece and bids are due in less than a week will the proposal due date be extended? The quotes deadline will be extended; all information will be in the amendment.

Q22. Carpet Installation Method: We understand the specific carpet type is still to be sent, as they mentioned in the meeting. However, the current specifications in the packet mention using padding and tac strips, whereas the existing carpet is glued down. Need for them to pick a direct glue-down carpet to prevent any tripping hazards?

BROADLOOM CARPET INSTALLATION

a. Install broadloom carpet direct glue down smooth, uniform, and secure, with a minimum of seams.

b. Apply regular, unnoticeable, and treated seams with a seam adhesive. Run side seams toward the light, where practical, and where such layout does not increase the number of seams. Install breadths parallel, with carpet pile in the same directions.

c. Match patterns accurately. Neatly cut and fit cutouts, at door jambs, columns and ducts securely.

d. Locate seams at doorways parallel to and centered directly under doors. Do not make seams perpendicular to doors or at pivot points.

e. Provide seams at changes in directions of corridors to follow the wall line parallel to the carpet direction. Lay the carpet lengthwise down the corridors with widths less than 1.82 m (6 feet).

EDGE STRIPS INSTALLATION

f. Install edge strips over exposed carpet edges adjacent to uncarpeted finish flooring.

g. Anchor metal strips to floor with suitable fasteners. Apply adhesive to edge strips, insert carpet into lip and press it down over carpet.

h. Anchor vinyl edge strip to floor with adhesive. Apply adhesive to edge strip and insert carpet into lip and press lip down over carpet.

Q23. Material Storage: If need where can we park a 20-foot container on-site for material storage? Yes.

TBD after award.

See attached document: Chapel Carpet Area.

(END OF QUESTIONS AND ANSWERS)

(END OF AMENDMENT)