This document is Amendment 0002 to an Invitation for Bid (IFB) for a federal contracting opportunity, issued by the Department of Veterans Affairs Network Contracting Office 23. The amendment publishes a Questions & Answers document for IFB 36C26326B0040 related to project 618-26-702 EHRM Install DDPO-2 at Minneapolis VA Health Care System (MVAHCS). The contracting officer is Dwayne Brauch, and the contract specialist point of contact is Timothy Wanamaker. The proposal due date remains unchanged at 10:00 AM CST on August 25, 2026, submitted to dwayne.brauch@va.gov. The purchase order number is to be determined.

The Q&A document addresses 28 technical questions regarding the scope of work for CAT-6A data and power cabling installation across 40+ patient rooms and other facility locations. Key specifications include: 117 individual CAT-6A cables to be run through conduit and cable trays (not fiber trays) with blue cable, Blackjack keystone jacks, and beige faceplates; new power drops to be flush-mounted on separate circuits; existing racks and panel openings to be utilized with new panels provided only if needed; high-density patch panels per ISTS standards; and conduit runs limited to 20 feet before new cable tray installation is required. Additional requirements include contractor responsibility for room preparation, PIV card security clearance for all subcontractors, Minnesota Power-Limited Technician (PLT) licensing for Division 27 low-voltage communications work, and compliance with all applicable federal, state, and local codes including NEC and NFPA standards.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 6

0002 08-20-2026

618-26-4-6957-0010

618-26-702

36C263

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 23

Dwayne Brauch, Contracting Officer

316 ROBERT STREET N, SUITE 506

SAINT PAUL MN 55101

36C263

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 23

Dwayne Brauch, Contracting Officer

316 ROBERT STREET N, SUITE 506

SAINT PAUL MN 55101

To all Offerors/Bidders

36C26326B0040

07-22-2026

X

X X

618-3660162-6957-854200-3223 23EHRMW69

Purchase Order Number: To Be Determined

X 1

Project Number and Name: 618-26-702 EHRM Install DDPO2 - Minneapolis VA Health Care System (MVAHCS) Point Of Contact: Timothy Wanamaker, Contract Specialist; Email: timothy.wanamaker@va.gov.

The purpose of Amendment 0002 is as follows:

1. Publish the "Questions & Answers" document as Invitation for Bid (IFB) 36C26326B0040 618-26-702 DDPO-2 Install, MPLS Technical Questions.

The due date for proposals is unchanged, due not later than 10:00am (CST), August 25, 2026, to Contracting Officer, Dwayne Brauch, dwayne.brauch@va.gov.

Dwayne Brauch Contracting Officer

VA-VHA-RPOC-2025-000326

618-26-702 DDPO-2 Install, MPLS

Invitation for Bid (IFB) 36C26326B0040 618-26-702 DDPO-2 Install, MPLS – Technical Questions

Questions and Answers

# Reference (i.e., specification section)

Question Answer

1. Scope of Work (SOW)/Specific ations

Is there a preferred manufacturer for CAT-6A cabling?

Refer to Specifications section 27 1500.

2. SOW/Specificati ons

Can the cabling be run above ceiling open air in J-Hooks?

No, cabling is to be run through conduit.

3. SOW/Specificati ons

Is there a preferred color for jacks, cables, and faceplates?

Yes. Blue Cable, Blackjack (Keystone), Beige Faceplates.

4. SOW/Specificati ons

Is the contractor to include Patch panels, switches, racks, etc.?

Existing Racks in TR’s will be utilized.

Existing openings in panels to be utilized where possible. If there are not enough openings in existing panels, then contractor to provide new panels to support required drops.

5. Schedule/locatio n/Site Visit

Is the intent for bidders to price strictly from the documents as issued, with any field-condition discrepancies handled through the RFI process? The walkthrough did not cover all locations, and the contractor is left to bid on a variety of unknown variables that could impact the project timeline and performance.

The contractor is to provide pricing based on issued documents, during the walkthrough all contractors that attended were asked if they wanted to see any locations as to be able to understand all field conditions.

6. Schedule Can this work be performed during 2nd or 3rd shift hours including the weekend?

Yes.

7. SOW/Specificati ons

Are the existing cable trays available for our CAT 6A, and have pathway capacity already been verified?

Existing Cat 6A pathways and cable trays are to be used wherever possible.

Pathway capacity should not be impacted based on the number of required drops in any given location.

See specifications for pathway requirements once leaving cable trays.

8. SOW/Specificati ons

Does the 117 CAT 6A quantity mean 117 individual cables, or 117 outlet/drop locations containing multiple cables?

117 individual cables.

9. Point of Contact/Specific

Who is responsible if the existing emergency circuit fails the required load

The VA will be responsible.

ations test?

10. Point of

Contact/Specific ations

Is there anything that previous contractors or VA facilities personnel know about these pathways, emergency circuits, TRs, or interstitial spaces that aren’t shown on the drawings and that we should account for in our bid?

No.

11. Security/Badgin g Requirements

What is the security/badging requirements for subcontractors?

The contractor shall comply with MVAHCS security, access, and badging requirements. Contractors must be fingerprints and be able to pass a background check so they can obtain a PIV (Personal Identity Verification) Card.

12. Schedule/Site Visit

Who is to supply the electrical plans/schedule? We don’t have any panel schedules to verify load requirements and currently existing circuit capacity. During the site visit (in addition to the interstitial) only the telecom room and a patient room were shown as reference for the remaining 40+ rooms. We did not verify existing electrical panels feeding these patient rooms, so with that information not available:

The contractors had the ability to see all locations during the site walk and didn’t ask or want to see any additional locations after being asked by the COR.

13. SOW/Specificati ons

Will the new power drops (outlets) be surface mounted or flush mounted?

New power drops to be flush mounted.

14. SOW/Specificati ons

What will the new power drops be used for? (Can you please specify the appliance and provide cutsheet so contractor can determine load requirements such as voltage, amps, etc.?

Outlets will be used for standard IT equipment and hospital use. Printers, Laptops, Monitors, etc.

15. SOW/Specificati ons

Will new power drops require separate circuits? If so, and existing panel schedule has no remaining spaces available, can we tap power from existing outlet in patient room or is an upgraded panel required? If testing existing circuits fail the 80% load test, is providing additional capacity part of our scope?

New drops will require separate circuits.

16. SOW/Specificati ons/Drawings/A ttachments

When can we receive more recent drawings or are these the current existing conditions?

Current conditions are provided. The room number changes in the 4L Ward that changed to 4K will be provided after awarding of contract.

17. SOW/Specificati ons

Can we verify panel locations, directories, nameplates, total load and circuit breaker

Contractor is to verify.

capacity?

18. SOW/Specificati ons/Attachments Can you please provide prints covering electrical connections for the OCE?

VA will provide after contract is awarded if proper justification is provided.

19. SOW/Specificati ons

Are the 50 Emergency Receptacle circuits part of the Essential Electrical System

(EES)?

Yes

20. SOW/Specificati ons

Is the contractor or VA responsible for emptying out and refurnishing rooms for data and power drops?

Contractor

21. SOW/Specificati ons/Site Visit

During the site visit, the VA Liaison stated that an anteroom would not be required if data and/or power drop installation time is less than one day. Can you please provide clarification?

There is no need to provide an anti-room or vent air to outer building with

ICRA.

22. SOW/Specificati ons

Can we verify which outlets will be the special use locations with non-standard heights?

No

23. SOW/Specificati ons

Cat6A cables are routed outside of the cable trays in the interstitial hanging nearly on everything and some in orange innerduct

a. Is this the standard practice or are the new Cat6a cables for this project to be routed in all cable trays?

b. Can the Cat6A cables run in with the fiber already in existing cable trays?

c. If we are to add cable trays because they do not go where we need them without running extended conduit, are we to add new cable trays?

d. If yes, what is the max length the conduit can go before we add new cable tray to existing?

A. Cat6A is to be run through cable trays, from cable tray to conduit and conduit to penetrate through the interstitial.

B. Cat6A cannot be run through fiber cable tray.

C. New cable tray is to be provided if existing can’t be used.

D. Conduit can run up to 20’ through the interstitial before new cable tray is to be installed.

24. SOW/Specificati ons

Is it expected that the Cat6A cable be routed in conduit from the edge of where the Cat6A cable exits the cable tray to within 20’ of the room outlet location and penetrated through the interstitial?

a. It was formerly required that only 20’

Yes

a. Yes maximum of exposed Cat6A cable was allowed to be free aired in Velcro, hooks or straps below the interstitial, above the room ceiling grid into the wall conduit feeding the outlet.

Is this still required?

25. Specifications Specifications is not clear as to what manufacturer cables, inserts or faceplates would be required for this project.

Formerly used to be Panduit Mini Comm.

This was also the patch panels manufacturer as well.

a. Would you like it to stay consistent or change to what is most used in existing comm rooms?

Yes, but new cabling needs to comply with Specifications section 27 1500.

26. SOW/Specificati ons

Do you have a preference for the patch panels to be angled or flat?

High density per ISTS standards.

27. SOW/Specificati ons

What exact specific Hilti UL system part number do you prefer to be used for firewall penetrations as during the site visit, it appears the VA has several types used in the past. Specs says to use Hilti Manufacturer. Any model number or standard size preferred?

No.

28. Licensing/Specif ications

6. Minnesota Low-Voltage / PLT Licensing Requirement.

a. The contract documents require the work to be performed in compliance with all applicable federal, state, and local codes and laws. The IFB specifically states that the contractor shall perform the DDPO-2 work in accordance with the Scope of Work, contract documents, NEC, NFPA requirements, and all applicable federal, state, and local codes and law.

b. Specification Section 01 35 26 also requires compliance with applicable federal, state, and local laws, ordinances, criteria, rules, and regulations, with the more stringent requirement governing where requirements differ.

i. No, contractor needs to have a Power- Limited Technician License.

e. Yes.

f. No, contractors need to have a PLT License.

c. Division 27 further requires, as part of closeout documentation, evidence of compliance such as a low-voltage certificate of inspection.

d. However, the contract documents do not expressly identify a requirement that the low-voltage contractor or individual communications installers hold a Minnesota Power Limited Technician (PLT) license.

i. Question: Please confirm whether the Contractor performing the Division 27 communications/data cabling scope is required to hold a Minnesota Technology Systems Contractor license and/or have a Minnesota-licensed Power Limited Technician (PLT) serving as the responsible, licensed individual for this work?

e. Additionally, can you please clarify whether Specification Section 01 35 26, which states that “all qualified persons performing electrical work under this contract shall be licensed journeyman or master electricians,” is intended to apply to the Division 27 CAT6A communications cabling scope, or whether properly licensed Minnesota PLT-supervised communications personnel are acceptable for the Division 27 work?

f. Requested Clarification: can you please identify the required Minnesota contractor license and individual installer/supervision qualifications applicable to the Division 27 low-voltage communications work so all bidders may price the required labor classifications consistently?