S06 36C25526R0129 0004.docx
DOCX document 164 KB Posted
- Solicitation number
- 36C25526R0129-0004
About this file
This is a solicitation amendment document for the construction of a new campus chiller plant at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The project, identified as P/N 657A5-21-401, is designated as solicitation 36C25526R0129-0004 and represents modification number 0004 to the original solicitation.
The document appears to be a formal amendment to the existing solicitation package, though the specific substantive changes, revised requirements, or updated terms are not detailed in the provided file excerpt. Contractors should review this amendment in conjunction with the original solicitation documents and any previous amendments to ensure full understanding of all current requirements, specifications, and submission deadlines for the chiller plant construction project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 657A5-21-401 Marion Energy Center Bid RFIs List with Answers.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
08-19-2026
657A5-21-401 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048 To all Offerors/Bidders
36C25526R0129 07-27-2026
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 08-31-2026 12:00 PM CDT
Project No. 657A5-21-401, Construct New Campus Chiller Plant at Marion VA Medical Center, Illinois.
a. The purpose of this amendment is to provide a revised Instruction to Offerors dated 08-17-2026 in response to the RFI submissions at the pre-proposal conference/site visit. The attached Instruction to Offerors supersedes previous copies. Please use this in preparing your proposal.
b. The proposal due date is extended to September 2, 2026.
c. Illinois DBA Wage Determination is attached.
d. To provide the answers to RFIs received from site visit pre-proposal conference as attached.
e. All other terms and conditions remain unchanged.
CONTINUATION PAGE
A.1 INSTRUCTIONS TO OFFERORS
PROPOSAL SUBMITTAL INSTRUCTIONS
COMPETITIVE NEGOTIATED ACQUISITION-TRADEOFF APPROACH
SOLICITATION: 36C25526R0129
PROJECT: CONSTRUCT NEW CAMPUS CHILLER PLANT, P/N 657A5-21-401
LOCATION: Marion VA Medical Center, Illinois
1. PREPARATION AND SUBMITTAL OF PROPOSALS
a. GENERAL INFORMATION.
Selection of an offeror for contract award will be made on the basis of an assessment of each offeror’s response to the Request for Proposal (RFP). The proposal will be evaluated in accordance with the Revolutionary Federal Acquisition Regulation Overhaul (RFO) FAR Part 15.103-1. The tradeoff approach to source selection is appropriate when it may be in the Government’s best interest to consider the award to other than the lowest priced offeror or other than the highest technically rated offer. All non-price evaluation factors, when combined, are significantly more important than price.
The five (5) evaluation factors for determination of technical acceptability consist of:
1. Technical Construction and Relevant Construction Experience of the Prime Contractor (Non-price)
2. Past Performance (Non-Price)
3. Technical Qualifications and Relevant Experience of Mechanical Subcontractor (Non-price)
4. Technical Qualifications of Prime Contractor’s Proposed Key Staffing (Non-price)
5. Prime Contractor’s Safety Plan (Non-price)
NOTE: Failure to comply with the RFP requirements may be grounds to eliminate the proposal from further consideration for contract award. A rating of Unacceptable for any factor makes the offeror ineligible for award.
b. THE OFFER.
The submission of the documentation specified below will constitute the Offeror’s acceptance of the terms and conditions of the RFP, including the Plans & Specifications for the construction of this project. These instructions prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.
c. AWARD BASED ON INITIAL OFFERS.
Pursuant to RFO clause 52.215-1 (included by reference) and RFO Part 15.105-2, the Government intends to evaluate proposals and award a contract with or without conducting negotiations with offerors whose proposals have been determined to be within the competitive range. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical qualifications standpoint. The VA reserves the right to conduct negotiations if the Contracting Officer later determines such negotiations to be necessary.
d. NUMBER OF COPIES TO SUBMIT. OFFERORS WILL BE REQUIRED TO ELECTRONICALLY SUBMIT PROPOSAL BY EMAIL TO THE CONTRACTING OFFICER, Jeanette Mathena and Contract Specialist: Maria Hoover. Documents must be submitted as pdf attachments to the email (20 MB limit per email).
Contracting Officer email: jeanette.mathena@va.gov and Contract Specialist: maria.hoover@va.gov (CONTRACTOR WILL BE REQUIRED TO VERIFY THAT THE EMAIL HAS BEEN RECEIVED WITH ATTACHED PROPOSAL DOCUMENTS BY THE CONTRACTING SPECIALIST AT 913-946-1130.)
Submit one pdf document for Volume 1 Technical Proposal, One pdf document for Volume 2 Price Proposal and one pdf document for Volume 3 Bid Bond.
Marked: ORIGINAL - RESPONSE TO RFP – 36C25526R0129 Project # 657A5-21-401, Construct New Campus Chiller Plant These documents are to contain the signed original copy of the documents listed below:
2. DOCUMENTS TO SUBMIT.
The original documents to be included in the document identified above consist of:
| a. | VOLUME 1-TECHNICAL Proposal. |
| b. | VOLUME 2-PRICE PROPOSAL. STANDARD FORM 1442. Submit the SF 1442 issued under this solicitation, with Blocks 10 (SAM EUI) and Blocks 14 through 20 properly filled out by the Offeror. Include the completed price schedule in this volume and acknowledgment of any and all Amendments that may have been issued, either by: (1) listing them in Block 19 of the SF 1442, or (2) including copies of the Amendment document(s) (Standard Form 30) with Blocks 8 and 15 filled in and signed, or (3) including signed acknowledgement in the form of a separate letter that includes a reference to the solicitation and amendment numbers. NOTE: Failure to acknowledge any and all Amendments issued pursuant to this solicitation may be cause for rejection of your offer. |
Appendix 1- Price Breakdown Calculation of Self Performed and Subcontracted work for each bid item shall be included in volume 2.
c. VOLUME 3-OFFER GUARANTEE (BID BOND). In accordance with solicitation provision RFO Part 52.228-1, Bid Guarantee. Failure to furnish a bid guarantee, in the proper form and amount, by the deadline established for submitting offers, may be cause for rejection of the offer.
d. DOCUMENTATION OF TECHNICAL ACCEPTABILITY. Proposals received in response to this solicitation will be evaluated in accordance with procedures outlined in RFO Part 15.103-1 and RFO Part 15.202 for the Best Value – Trade Off process. The significant Evaluation Factors to be used as the basis for determining Technical Acceptability are indicated in paragraph below.
NOTE: There is a realistic possibility that some offerors may choose to submit the same construction project as a qualifying example for both the past performance and the technical experience evaluation factors. This is not prohibited, but the supporting documentation must demonstrate that the submitted projects absolutely do comply with the specific minimal requirements, identified below, for each separate evaluation factor.
Technical Evaluation Factors:
FACTOR 1: Technical Construction and Relevant Experience of the Prime Contractor.
The Offerors must provide evidence that they possess the technical qualifications and relevant experience needed to meet the performance requirements of this project. To demonstrate this, the Offerors shall submit no less than two (2) and no more than five (5) examples of their previously awarded and completed construction contracts that are similar in scope, size, and complexity to this project. Example projects which are as similar as possible to the requirements of this project will be given the most consideration. Example projects completed for private commercial or institutional entities will be acceptable, however, higher ratings will be given when the contracts are completed for either Federal, State or Local Government Agencies with the highest ratings going to similar projects completed at a hospital or medical facility setting.
For the submitted experience to be deemed relevant, the example contracts submitted shall include:
a. Work which occurred under NAICS codes 236210 – Industrial Building Construction and/or 236220 - Commercial and Institutional Building Construction as a prime contractor that is similar in scope of work required under this contract.
b. Work which occurred at a hospital or in-patient medical facility. Work performed at non-medical facilities may be considered, if they explain how the work conducted involved technical requirements equivalent to that described within the plans and specifications of this solicitation.
c. Work which consisted of the construction of entirely new buildings, as opposed to additions, alterations or renovations of existing buildings, will receive additional consideration.
d. Work for which the total contract cost valued at $10,000,000 or more.
e. Work which was 100% completed within a period of no more than ten (10) years prior to the submittal date of their proposal. Contract work, which is yet to begin, incomplete at the time of submittal or which was completed over ten (10) years from the time of submittal will be deemed irrelevant and will not be considered.
f. Additionally, to be considered technically acceptable, the example contracts shall include the following information, at a minimum:
| i. | The project name, location and the contract ID number. |
| ii. | The name of the awarding agency or organization. |
| iii. | The date of award and the award amount in dollars. |
| iv. | The date of contract completion and the final contract amount in dollars. |
| v. | A description of the work completed on the contract as well as narrative on: |
| (a.) | The parallels between the example project and this project. |
| (b.) | Some of the challenges faced on the example project as well as the resolution to those challenges. |
vi. The percentage of total labor self-performed by the offeror’s employees. In accordance with VAAR 852.219-73, for general construction contracts, the SDVOSB prime contractor shall ensure that no more than 85% of the amount paid by the government to the prime contractor for contract performance, excluding materials costs, is paid to firms that are not certified SDVOSBs listed in the SBA certification database. The offeror is required to perform at least fifteen percent (15%) of the project labor on-site using their own employees or employees of other eligible SDVOSB concerns.
vii. At least one point-of-contact (POC) within the awarding body or project owner who can speak to the contractor’s effectiveness. The POC shall include the current address, phone number and email address.
Example projects listed which do not include all the previously identified data will be deemed unacceptable and will not be considered.
SPECIAL NOTE: If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit experience for all Joint Venture partners will receive no further consideration.
FACTOR 2: PAST PERFORMANCE
Due to the complexity associated with the construction of a new building and the intricacy of the mechanical system, the past performance of the prime contractor will be assessed collectively.
The Offeror’s performance on the contracts supplied must be established as satisfactory or better. The offerors themselves are encouraged to provide supplemental information on their performance throughout the previous contracts, such as CPARS evaluations, Past Performance Questionnaires (PPQ’s) (see attached PPQ form), testimonials or other documentation to aid the Government in establishing its rating. However, the Government will also be free to consider both the thoughts and opinions of the project POC’s listed on the examples as well as all other formal ratings and evaluations made available to it (and not necessarily limited to the projects listed within their proposal) when making its final determination. The Government may consider information provided by the offeror, as well as information obtained from any other sources.
Special note:
(i) No past performance information. An offeror without a record of relevant past performance or for whom information on past performance is not available may not be evaluated favorably or unfavorably on past performance. However, the proposal of an offeror with no relevant Past Performance history, while rated “Neutral” in past performance, may not represent the most advantageous proposal to the Government and thus, the Government may in its tradeoff analysis determine that highly rated past performance is more beneficial than a neutral past performance rating. Offerors with no past performance information may submit relevant past performance information regarding predecessor companies; key personnel who have relevant experience; or subcontractors that will be performing major or critical aspects of this requirement; provided that such information is relevant to the construction in this solicitation. Offerors may provide information on problems encountered on the identified contracts and the offeror’s corrective action, which may be considered by the government
(ii) The past performance of the joint venture, when evaluating an offer from a joint venture. If the joint venture does not demonstrate past performance for award, the past performance of each party to the joint venture must be considered.
FACTOR 3: Technical Construction and Relevant Experience of the Mechanical Subcontractor.
The Offerors must provide evidence that their mechanical subcontractor possesses the technical qualifications and relevant experience needed to meet the performance requirements of this project. To demonstrate this, the Offeror shall submit no less than two (2) and no more than five (5) examples of their mechanical subcontractor’s previously awarded and completed construction contracts of similar size, scope and complexity to this project. Example projects which are as similar as possible to the requirements of this project will be given the most consideration. Work performed for Federal, State or Local Government Agencies will receive additional consideration with higher consideration for US Department of Veteran’s Affairs projects. For the submitted experience to be deemed relevant, the construction contracts submitted shall include:
| a. | Work which occurred under NAICS codes 221330 - Steam and Air Conditioning Supply, 236210 - Industrial Building Construction, 236220 - Commercial and Institutional Building Construction, and/or 238220 - Plumbing, Heating, and Air Conditioning Contractors. |
| b. | Work which focused on new installation, replacement, or alteration of centralized chilled water generation and distribution systems. Consideration will be given to work which involved the installation, alteration, or replacement of key equipment within centralized chiller plants (e.g. chillers, cooling towers, heat exchangers, etc.) with the most consideration given to work which involved the installation and/or replacement of a whole centralized chilled water generation and distribution system. |
| c. | Work for which the mechanical contract cost valued at $5,000,000 or more. |
| d. | Work which was 100% completed within a period of no more than six (6) years prior to the submittal date of their proposal. Contract work which is yet to begin, incomplete at the time of submittal or which was completed over six (6) years from the time of submittal will be deemed irrelevant and will not be considered. |
| e. | Work on which they installed equipment and/or systems which have performed satisfactorily for at least one (1) year before the date of this submittal. |
| f. | Additionally, to be considered relevant experience, the example contracts shall include the following information, at a minimum: |
| i. | The project name, location and the contract ID number. |
| ii. | The name of the awarding agency or organization. |
| iii. | The date of award and the award amount in dollars. |
| iv. | The date of contract completion and the final contract amount in dollars. |
| v. | A description of the work completed on the contract. |
| vi. | At least one point-of-contact (POC) within the awarding body or project owner who can speak to the contractor’s effectiveness. The POC shall include the current address, phone number and email address. |
Example projects listed which do not include all the previously identified data will be deemed unacceptable and will not be considered for award.
g. The mechanical subcontractor shall submit a narrative which clarifies details pertaining to the company’s history, operations and staff as required below:
| i. | The subcontractor shall demonstrate that they are established and are regularly engaged in the design, fabrication and/or installation of boiler, chiller and HVAC systems and components currently as well as at least three (3) continuous years before the date of this submittal. | |
| ii. | The subcontractor shall demonstrate that their key project staff possess the qualifications and experience needed to fulfill the requirements of the subject project. They shall include resume for their proposed Project Manager as well as their Superintendent/Foreman. The resume shall include: | |
| (a.) | Education and qualifications, including any certifications received. | |
| (b.) | Employment history indicating a minimum of five (5) years of related experience. | |
| (c.) | Project history indicating work experience which is similar in scope to the proposed work. |
Special Note: When an offeror submits its proposal in response to this Request for Proposals, and the name and experience of a specific subcontractor is a required evaluation factor, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove his qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.
FACTOR 4: TECHNICAL QUALIFICATIONS OF PROPOSED KEY PERSONNEL.
To be considered technically acceptable on this factor, the Offerors must submit a detailed resume for each key individual on the Prime Contractor’s Team. These resumes will be evaluated for the appropriate training, knowledge and experience to maximize Government confidence of a successful project outcome. A single individual may fill up to two (2) of the key positions indicated below:
| a. | Project Manager (PM) – Must have a minimum of five (5) years’ experience as a project manager and provide at least three (3) example projects where they acted as PM with scopes similar to this project. The resume shall include the following details on each of the example projects: |
| i. | The project name, location and the contract ID number. |
| ii. | The name of the awarding agency or organization. |
| iii. | The date of award and the award amount in dollars. |
| iv. | The date of contract completion and the final contract amount in dollars. |
| v. | A brief description of work completed on the contract. |
| vi. | At least one point-of-contact (POC) within the awarding body or project owner who can speak to the person’s effectiveness in the role. The POC information shall include the current address, phone number and email address. If POC references cannot be verified, then Factor 4 will receive a rating less than acceptable. It is incumbent on the offeror to validate and provide up-to-date POC information. Verification is required for all Key Personnel under this factor. |
Note: Project Manager will be required to attend weekly project meetings in person at the station facilities office.
| b. | Quality Control Manager (QCM) – Must have a minimum of five (5) years’ experience as a project quality control manager and provide at least three (3) example projects where they worked as a QCM with scopes similar to this project. The resume shall include the following details on each of the example projects: |
| i. | The project name, location and the contract ID number. |
| ii. | The name of the awarding agency or organization. |
| iii. | The date of award and the award amount in dollars. |
| iv. | The date of contract completion and the final contract amount in dollars. |
| v. | A brief description of work completed on the contract as well as the QC program that was implemented. |
| vi. | At least one point-of-contact (POC) within the awarding body or project owner who can speak to the person’s effectiveness in the role. The POC shall include the current address, phone number and email address. |
| c. | Site Safety and Health Officer (SSHO) – Must have completed the OSHA 30-hour safety training within the last five (5) years and provide the certificate with resume. In addition, provide a comprehensive list of OSHA-approved, task-specific trainings they have completed. This list must include the following modules, at a minimum; Life-Safety, Excavation Safety, Fall Protection Safety, Scaffold Safety, Crane/Rigging Safety and Control of Hazardous Energy Sources (Lock Out/Tag Out). They must also have filled the role of SSHO for a minimum of five (5) years and provide for at least three (3) example projects where they work as the SSHO with scopes similar to this project. The resume shall include the following details on each of the example projects: |
| i. | The project name, location and the contract ID number. |
| ii. | The name of the awarding agency or organization. |
| iii. | The date of award and the award amount in dollars. |
| iv. | The date of contract completion and the final contract amount in dollars. |
| v. | A brief description of work completed on the contract. |
| vi. | At least one point-of-contact (POC) within the awarding body or project owner who can speak to the person’s effectiveness in the role. The POC shall include the current address, phone number and email address. Again, you are reminded that if references cannot be verified for any Key Personnel, then Factor 3 will receive a rating less than acceptable. |
| d. | Site Superintendent – Note that the site superintendent for this project is required to attend weekly project meetings on-site as well as being present on-site when any work is being done. Must have completed the OSHA 30-hour safety training within the last five (5) years and provide the certificate with resume. They must also have filled the role of Site Superintendent for a minimum of five (5) years on at least three (3) example projects with scopes similar to this project. The resume shall include the following details on each of the example projects: |
| i. | The project name, location and the contract ID number. |
| ii. | The name of the awarding agency or organization. |
| iii. | The date of award and the award amount in dollars. |
| iv. | The date of contract completion and the final contract amount in dollars. |
| v. | A brief description of work completed on the contract. |
| vi. | At least one point-of-contact (POC) within the awarding body or project owner who can speak to the person’s effectiveness in the role. The POC shall include the current address, phone number and email address. If references cannot be verified, then Factor 3 will receive a rating less than acceptable. |
Resume example projects submitted which do not include all the previously identified data will be deemed unacceptable and will not be considered. The Government is also free to consider the thoughts and opinions of the example project POC’s when determining technical acceptability of the individuals proposed to fill each role.
Note: No one individual can perform more than two of the key staffing positions above. The project manager and superintendent cannot be the same person. If references cannot be verified for any of the key personnel you identify, then Factor 4 will receive a rating that is less than acceptable (i.e., marginal if one reference can’t be verified and unacceptable if more than one reference can’t be verified). It is the offeror’s responsibility to make sure the references provided know that they may be contacted by VA for a reference and that if the reference doesn’t timely respond to VA, that it may have an adverse impact on the offeror’s rating under this factor.
On Site Superintendent will be required to attend weekly project meetings in person at the station facilities office and must be on site when work is being completed.
FACTOR 5: PRIME CONTRACTOR SAFETY PLAN
To be evaluated under this factor, the Prime Contractor shall provide a construction safety plan that is deemed acceptable, at a minimum, and meets the following requirements:
a. The contractor's Safety Plan shall be evaluated for its compliance with local/State/Federal rules and regulations and the company's consideration of safety of its employees and the general public. The contractor's Safety Plan at the minimum shall address their safety policy, commitment to safety, detailed disciplinary action to be taken with respect to employees violating safety requirements, personnel safety responsibilities, personnel safety training, personal protective equipment, accident / incident reporting procedure and investigations, emergency procedures guidelines.
b. The contractor’s Safety Plan shall address their plan for completing all required contract work on and around an active hospital without impact to patient care and facility operations.
If the safety plan does not address the requirements listed above (a and b), the proposal will be deemed unacceptable and will not receive further consideration for award.
e. PRICE PROPOSAL.
Price is to be submitted in Volume 2. Offerors must provide a price that is fair and reasonable for the bid item. In addition, offerors shall include a breakdown of material and labor costs, by specification division for the bid item. Overhead, profit and bond costs shall be added after a subtotal of materials and labor costs has been calculated, see Appendix 1. Your proposal will be rejected if there is not a completed Appendix 1 submitted.
3. BASIS OF AWARD. All non-price evaluation factors, when combined, are significantly more important than price. In accordance with RFO Part 15.103-1, Tradeoff approach is appropriate when it may be in the Government’s best interest to consider award to other than the lowest priced offeror or other than the highest technically rated offeror. This process permits tradeoffs among cost or price and non-cost or non-price factors. The anticipated benefits of a higher priced proposal must merit the additional costs. Please note that proposals receiving an unacceptable rating in any factor will not be considered eligible for award.
4. SPECIAL CONTRACT REQUIREMENTS.
A. SUBSTITUTIONS OF SUBCONTRACTORS AND / OR KEY PERSONNEL
(1) When an offeror submits its proposal in response to this Request for Proposals, and key personnel who are proposed to work on the project are required to be submitted, those personnel who are offered must be the same personnel who will actually perform on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute personnel for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute employee. The Contracting Officer shall have the right to review the qualifications of the proposed substitute employee and to approve or disapprove his or her qualifications. If the proposed substitute employee's qualifications are disapproved by the Contracting Officer, the contractor will propose another employee who does possess equivalent qualifications.
(2). When an offeror submits its proposal in response to this Request for Proposals, and the name and experience of a specific subcontractor is a required evaluation factor, then that subcontractor who is offered must be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.
5. Determination of Responsibility. A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make the Determination of Responsibility. Failure to affirm being within the guidelines above or submit this information will result in a determination of “Non-Responsibility” for the bidder/offeror. NOTE: Any information received by the Government that would cause for a negative Determination of Responsibility will make the bidder/offeror ineligible for award.
This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.
END OF PROPOSAL SUBMITTAL INSTRUCTIONS.
A.2 DBA WAGE DETERMINATION-
"General Decision Number: IL20260002 05/18/2026
State: Illinois
Construction Types: Building
Counties: Illinois Counties of Alexander, Champaign, Christian, Clark, Clay, Coles, Crawford, Cumberland, De Witt, Douglas, Edgar, Edwards, Effingham, Fayette, Ford, Franklin, Gallatin, Hamilton, Hardin, Iroquois, Jackson, Jasper, Jefferson, Johnson, Lawrence, Marion, Massac, Moultrie, Perry, Piatt, Pope, Pulaski, Richland, Saline, Shelby, Union, Vermilion, Wabash, Wayne, White and Williamson
Modification Number Publication Date 3 01/23/2026 4 05/18/2026
ASBE0001-004 10/07/2024
Rates Fringes
ASBESTOS WORKERS/INSULATOR: INCLUDES THE
APPLICATION, INSTALLATION, AND CLEANUP OF ALL
INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL
SYSTEMS (ALEXANDER, CHRISTIAN, DE WITT, FAYETTE,
JACKSON, JEFFERSON, MARION, MOULTRIE, PERRY, PIATT,
SHELBY, AND UNION COUNTIES).........................$ 43.48 27.24
ASBE0017-001 06/01/2024
Rates Fringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING,
BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS,
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM
MECHANICAL SYSTEMS).................................$ 41.27 32.76
FIRE STOP TECHNICIAN................................$ 44.02 32.76
ASBESTOS WORKER/INSULATOR (INCLUDES THE APPLICATION
OF ALL INSULATING MATERIALS, PROTECTIVE
COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF
MECHANICAL SYSTEMS).................................$ 55.02 35.75
ASBE0017-006 06/01/2024
Rates Fringes
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING,
BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS,
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM
MECHANICAL SYSTEMS (FORD AND IROQUOIS COUNTIES).....$ 41.27 32.76
FIRE STOP TECHNICIAN (FORD AND IROQUOIS COUNTIES)...$ 44.02 32.76
ASBESTOS WORKER/INSULATOR: INCLUDES THE APPLICATION
OF ALL INSULATING MATERIALS; PROTECTIVE
COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF
MECHANICAL SYSTEMS (FORD AND IROQUOIS COUNTIES).....$ 55.02 35.75
ASBE0018-002 06/01/2025
Rates Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES
APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE
COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF
MECHANCIAL SYSTEMS (CHAMPAIGN, CLARK, DOUGLAS,
EDGAR, AND VERMILION COUNTIES)......................$ 40.20 26.78
ASBE0037-003 04/07/2025
Rates Fringes
ASBESTOS WORKERS/INSULATOR: INCLUDES THE
APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE
COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF
MECHANICAL SYSTEMS (CLAY, COLES, CRAWFORD,
CUMBERLAND, EDWARDS, EFFINGHAM, FRANKLIN, GALLATIN,
HAMILTON, HARDIN, JASPER, JOHNSON, LAWRENCE,
MASSAC, POPE, PULASKI, RICHLAND, SALINE, WABASH,
WAYNE, WHITE, AND WILLIAMSON COUNTIES)..............$ 38.19 24.24
BOIL0060-003 01/01/2025
Rates Fringes
BOILERMAKER (CHAMPAIGN, DE WITT, FORD, IROQUOIS,
AND VERMILION COUNTIES).............................$ 45.23 32.76
BOIL0363-002 01/01/2025
Rates Fringes
BOILERMAKER (ALEXANDER, CHRISTIAN, CLARK, CLAY,
COLES, CRAWFORD, CUMBERLAND, DOUGLAS, EDGAR,
EDWARDS, EFFINGHAM, FAYETTE, FRANKLIN, GALLATIN,
HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON,
JOHNSON, LAWRENCE, MARION, MASSAC, MOULTRIE, PERRY,
PIATT, POPE, PULASKI, RICHLAND, SALINE, SHELBY,
UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON
COUNTIES)...........................................$ 45.50 35.30
BRIL0006-007 06/01/2016
Rates Fringes
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON
(DE WITT COUNTY)....................................$ 30.59 23.19
BRIL0006-011 06/01/2017
Rates Fringes
MARBLE, TILE & TERRAZZO WORKERS (DE WITT COUNTY)....$ 32.87 21.09
MARBLE, TILE & TERRAZZO FINISHER (DE WITT COUNTY)...$ 31.13 21.09
BASE MACHINE MEN (DE WITT COUNTY)...................$ 31.13 21.09
BRIL0006-015 06/01/2019
Rates Fringes
BRICKLAYER (FORD (NORTH OF ROBERTS), AND IROQUOIS
COUNTIES)...........................................$ 44.37 24.70
BRIL0006-021 06/01/2017
Rates Fringes
MARBLE SETTER (FORD (NORTH OF ROBERTS) & IROQUOIS
COUNTIES)...........................................$ 42.98 21.79
BRIL0008-001 05/01/2019
Rates Fringes
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON
(ALEXANDER, CLAY, EDWARDS, FRANKLIN, GALLATIN,
HAMILTON, HARDIN, JACKSON, JEFFERSON, JOHNSON,
LAWRENCE, MASSAC, PERRY, POPE, PULASKI, RICHLAND,
SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON
COUNTIES)...........................................$ 30.79 21.69
BRIL0008-003 05/01/2019
Rates Fringes
MARBLE, TERRAZZO AND TILE FINISHER (CHAMPAIGN,
CLARK, COLES, CRAWFORD, CUMBERLAND, DOUGLAS, EDGAR,
EFFINGHAM, FORD, JASPER, PIATT, AND VERMILION
COUNTIES)...........................................$ 31.03 19.38
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER
(CHAMPAIGN, CLARK, COLES, CRAWFORD, CUMBERLAND,
DOUGLAS, EDGAR, EFFINGHAM, FORD, JASPER, PIATT, AND
VERMILION COUNTIES).................................$ 32.53 19.38
BRIL0008-004 05/01/2020
Rates Fringes
MARBLE, TERRAZZO AND TILE FINISHER (CHRISTIAN
COUNTY).............................................$ 32.13 20.70
MARBLE & TILE SETTER AND TERRAZZO WORKER (CHRISTIAN
COUNTY).............................................$ 33.65 20.70
BRIL0008-005 08/01/2017
Rates Fringes
BRICKLAYER: BRICKLAYER, STONEMASON, MARBLE MASON,
TILE LAYER, POINTER, CLEANER, AND CAULKER (FAYETTE
AND MARION COUNTIES)................................$ 33.13 22.05
BRIL0008-015 05/01/2019
Rates Fringes
BRICKLAYER (CHAMPAIGN, COLES, DOUGLAS, EDGAR,
FORD(SOUTH OF ROBERTS), PIATT & VERMILION COUNTIES).$ 32.45 24.43
BRIL0008-017 05/01/2020
Rates Fringes
BRICKLAYER: CAULKERS, CEMENT BLOCK LAYERS,
CLEANERS, MARBLE SETTERS, POINTERS, TERRAZZO
WORKERS, AND TILE SETTERS (MOULTRIE AND SHELBY
COUNTIES)...........................................$ 33.49 24.93
BRIL0008-020 05/01/2020
Rates Fringes
BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON
(CHRISTIAN COUNTY)..................................$ 33.49 24.93
BRIL0008-031 05/01/2020
Rates Fringes
BRICKLAYER (CLARK, CRAWFORD, CUMBERLAND, EFFINGHAM
& JASPER COUNTIES)..................................$ 31.56 22.28
CARP0237-017 05/01/2021
Rates Fringes
PILEDRIVER (DE WITT AND FORD (NORTHERN PORTION)
COUNTIES)...........................................$ 35.29 29.94
CARPENTER/LATHER (DE WITT AND FORD (NORTHERN
PORTION) COUNTIES)..................................$ 34.29 29.94
CARP0237-022 05/01/2021
Rates Fringes
PILEDRIVER (FORD COUNTY (SOUTHERN PORTION)).........$ 34.58 29.94
CARPENTER/LATHER (FORD COUNTY (SOUTHERN PORTION))...$ 33.58 29.94
CARP0243-002 05/15/2020
Rates Fringes
PILEDRIVER (CHAMPAIGN, EDGAR AND VERMILION
COUNTIES)...........................................$ 38.11 24.85
CARPENTER/LATHER (CHAMPAIGN, EDGAR AND VERMILION
COUNTIES)...........................................$ 37.11 24.85
CARP0243-005 05/15/2020
Rates Fringes
PILEDRIVER (COLES, CUMBERLAND, DOUGLAS, EFFINGHAM,
JASPER, MOULTRIE, AND SHELBY COUNTIES)..............$ 34.71 28.25
CARPENTER/LATHER (COLES, CUMBERLAND, DOUGLAS,
EFFINGHAM, JASPER, MOULTRIE, AND SHELBY COUNTIES)...$ 33.71 28.25
CARP0243-013 05/01/2017
Rates Fringes
PILEDRIVER (CLARK COUNTY)...........................$ 37.04 21.34
CARPENTER/LATHER (CLARK COUNTY).....................$ 36.04 21.34
CARP0270-003 05/01/2019
Rates Fringes
PILEDRIVER (CHRISTIAN COUNTY).......................$ 33.83 27.45
CARPENTER/LATHER (CHRISTIAN COUNTY).................$ 32.83 27.45
CARP0270-017 05/15/2020
Rates Fringes
PILEDRIVER (PIATT COUNTY)...........................$ 34.36 28.60
CARPENTER/LATHER (PIATT COUNTY).....................$ 33.36 28.60
CARP0501-001 05/01/2017
Rates Fringes
CARPENTER (CRAWFORD COUNTY).........................$ 32.14 25.24
CARP0555-014 06/01/2022
Rates Fringes
CARPENTER: CARPENTER, DRYWALLER, MILLWRIGHT,
PILEDRIVER, AND SOFT FLOOR LAYER (IROQUOIS COUNTY)..$ 42.96 39.96
CARP0634-001 05/01/2021
Rates Fringes
CARPET INSTALLER: CARPET, LINOLEUM, HARDWOOD, AND
TILE LAYER (CLAY, EDWARDS, FAYETTE, HAMILTON,
JEFFERSON, LAWRENCE, MARION, RICHLAND, WABASH,
WAYNE, AND WHITE COUNTIES)..........................$ 36.08 18.90
CARPENTER: LATHER, PILEDRIVER, AND MILLWRIGHT
(CLAY, EDWARDS, FAYETTE, HAMILTON, JEFFERSON,
LAWRENCE, MARION, RICHLAND, WABASH, WAYNE, AND
WHITE COUNTIES).....................................$ 38.62 18.90
CARP0640-001 05/01/2021
Rates Fringes
CARPET INSTALLER: CARPET, LINOLEUM, HARDWOOD, AND
TILE LAYER (ALEXANDER, FRANKLIN, HARDIN, MASSAC,
JACKSON, PERRY, POPE, JOHNSON, GALLATIN, PULASKI,
SALINE, UNION, AND WILLIAMSON COUNTIES).............$ 36.08 18.90
CARPENTER, LATHER, PILEDRIVER, AND MILLWRIGHT
(ALEXANDER, FRANKLIN, HARDIN, MASSAC, JACKSON,
PERRY, POPE, JOHNSON, GALLATIN, PULASKI, SALINE,
UNION, AND WILLIAMSON COUNTIES) DIVERS (RECEIVE
1 1/2 TIMES CARPENTER'S RATE PLUS FRINGE BENEFITS
AND $25.00 PER DAY FOR EQUIPMENT)...................$ 38.62 18.90
CARP1051-004 05/15/2020
Rates Fringes
MILLWRIGHT (CHAMPAIGN, CHRISTIAN, CLARK, COLES,
CRAWFORD, CUMBERLAND, DOUGLAS, EDGAR, EFFINGHAM,
JASPER, MOULTRIE, PIATT, SHELBY AND VERMILION
COUNTIES)...........................................$ 33.06 29.36
CARP1051-008 05/15/2020
Rates Fringes
MILLWRIGHT (DE WITT AND FORD COUNTIES)..............$ 33.06 30.04
ELEC0016-002 06/01/2025
Rates Fringes
ELECTRICIAN (WABASH COUNTY).........................$ 46.14 21.67
ELEC0146-001 06/01/2025
Rates Fringes
ELECTRICIAN (CHRISTIAN, COLES, CUMBERLAND, DE WITT
(EXCLUDING RUTLEDGE, SANTA ANNA, WAYNESVILLE, AND
WILSON TWPS), DOUGLAS (SOUTHERN HALF), EFFINGHAM
(BANNER, BISHOP, DOUGLAS, LIBERTY, LUCAS, MOCCASIN,
ST. FRANCIS, SUMMIT AND TEULOPOLIS TWPS), FAYETTE
(HURRICANE, S. HURRICANE, RAMSEY, BOWLING GREEN,
CARSON, AND LOUDON TWPS), MACON, MOULTRIE, PIATT
(EXCLUDING BLUE RIDGE, SANGAMON AND MONTICELLO
TWPS), AND SHELBY COUNTIES).........................$ 48.00 24.16
ELEC0176-009 06/01/2023
Rates Fringes
ELECTRICIAN (FORD (NORTH OF LYMAN TWP), AND
IROQUOIS (EXCLUDING ARTESIA, FOUNTAIN CRREK, LODA,
LOVEJOY, PEGEON GROVE, AND PRAIRIE TWPS) COUNTIES)..$ 50.45 44.96
ELEC0176-016 06/01/2020
Rates Fringes
CATV INSTALLER (FORD AND IROQUOIS COUNTIES).........$ 37.50 32.78
ELEC0197-004 06/01/2024
Rates Fringes
ELECTRICIAN (DE WITT COUNTY (WAYNESVILLE, WILSON,
AND RUTLEDGE))......................................$ 43.86 23.72
ELEC0197-007 09/01/2025
Rates Fringes
ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING
(DEWITT (NORTHSIDE), WESTERN (NORTHSIDE), MCLEAN
(SOUTHSIDE), AND WOODFORD (SOUTHSIDE) COUNTIES)....$ 40.63 20.47
ELEC0538-003 06/01/2025
Rates Fringes
ELECTRICIAN (IROQUOIS (FOUNTAIN CREEK, LOVEJOY &
PRAIRIE TWPS), VERMILION, AND WABASH COUNTIES)......$ 41.00 27.36
ELEC0538-007 09/01/2025
Rates Fringes
ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING
(IROQUOIS (SOUTHEASTERN SIDE), AND VERMILION
COUNTIES)...........................................$ 40.64 20.46
ELEC0601-001 09/01/2025
Rates Fringes
ELECTRICIAN (CHAMPAIGN, DE WITT (SANTA ANNA TWP),
DOUGLAS (NORTHERN HALF), FORD (SOUTH OF BENTON
TWP), IROQUOIS (ARTESIA, PIGEON GROVE & LODA TWPS),
AND PIATT (BLUE RIDGE, SANGAMON, & MONTICELLO TWPS)
COUNTIES)...........................................$ 49.63 22.51
ELEC0601-010 09/01/2024
Rates Fringes
ELECTRICAL LOW VOLTAGE WIRING INSTALLER, BUILDING
(CHAMPAIGN, DEWITT (NORTHEAST SIDE), DOUGLAS
(NORTHEAST SIDE), FORD (SOUTHSIDE), IROQUIOS
(SOUTHWEST SIDE), LASALLE (SOUTHSIDE), LIVINGSTON,
MARSHALL (EASTSIDE), PIATT (NORTHEAST SIDE), PUTNAM
(SOUTHEAST SIDE), AND WOODFORD (NORTHEAST SIDE)
COUNTIES)...........................................$ 36.25 21.65
ELEC0702-001 01/01/2025
Rates Fringes
ELECTRICIAN (ALEXANDER, CLAY, EDWARDS, EFFINGHAM
(EXCLUDING BANNER, BISHOP, DOUGLAS, LIBERTY, LUCAS,
MOCCASIN, ST. FRANCIS, SUMMIT AND TEULOPOLIS TWPS),
FAYETTE (EXCLUDING HURRICANE, S. HURRICANE, RAMSEY,
BOWLING GREEN, CARSON AND LOUDON TWPS), FRANKLIN,
GALLATIN, HAMILTON, HARDIN, JACKSON, JEFFERSON,
JOHNSON, MARION, MASSAC, PERRY, POPE, PULASKI,
SALINE, UNION, WAYNE, WHITE, AND WILLIAMSON
COUNTIES)...........................................$ 52.14 29.14
ELEC0702-016 09/01/2024
Rates Fringes
ELECTRICAL LOW VOLTAGE WIRING INSTALLER, BUILDING
(ALEXANDER, BOND (EASTSIDE), CLAY, CLINTON
(EASTSIDE), EDWARDS, EFFINGHAM (SOUTHWESTERN SIDE),
FAYETTE (SOUTHSIDE), FRANKLIN, GALLATIN, HAMILTON,
HARDIN, JACKSON, JEFFERSON, JOHNSON, MARION,
MASSAC, PULASKI, PERRY, POPE, RANDOLPH
(SOUTHEASTERN SIDE), SALINE, UNION, WASHINGTON
(SOUTHEASTERN SIDE), WAYNE, WHITE, AND WILLIAMSON
COUNTIES)...........................................$ 38.44 19.37
ELEC0725-005 10/01/2025
Rates Fringes
ELECTRICIAN (CLARK, CRAWFORD, EDGAR, JASPER,
LAWRENCE, AND RICHLAND COUNTIES)....................$ 45.00 26.70
ELEV0003-006 01/01/2025
Rates Fringes
ELEVATOR MECHANIC (ALEXANDER, CLAY, EDWARDS,
FRANKLIN, GALLATIN, HAMILTON, HARDIN, JACKSON,
JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC,
PERRY, POPE, PULASKI, RICHLAND, SALINE, UNION,
WABASH, WAYNE, WHITE AND WILLIAMSON COUNTIES)
FOOTNOTES: A) EMPLOYER CONTRIBUTES 8% OF
REGULAR BASIC HOURLY RATE AS AS VACATION PAY CREDIT
FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE,
AND 6% FOR LESS THAN 5 YEARS OF SERVICE B)
EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
FRIDAY AFTER THANKSGIVING DAY, VETERANS' DAY AND
CHRISTMAS DAY.......................................$ 62.73 38.44
ELEV0034-004 01/01/2025
Rates Fringes
ELEVATOR MECHANIC FOOTNOTES: A) EMPLOYER
CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS
VACATION PAY CREDIT FORE EMPLOYEES WITH MORE THAN 5
YEARS OF SERVICE; AND 6% FOR 6 MONTHS TO 5 YEARS OF
SERVICE B) PAID HOLIDAYS: NEW YEAR'S DAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING
DAY; VETERANS' DAY AND CHRISTMAS DAY................$ 60.17 38.44
ELEV0055-002 01/01/2025
Rates Fringes
ELEVATOR MECHANIC FOOTNOTES: A) EMPLOYER
CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS
VACATION PAY CREDIT FORE EMPLOYEES WITH MORE THAN 5
YEARS OF SERVICE; AND 6% FOR 6 MONTHS TO 5 YEARS OF
SERVICE B) PAID HOLIDAYS: NEW YEAR'S DAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING
DAY; VETERANS' DAY AND CHRISTMAS DAY................$ 57.99 38.44
ENGI0318-001 04/01/2025
Rates Fringes OPERATOR: POWER EQUIPMENT: RIVER Class 2...........$ 36.78 32.00 OPERATOR: POWER EQUIPMENT: RIVER Class 1...........$ 40.23 32.00 OPERATOR: POWER EQUIPMENT: RIVER (Class 2).........$ 36.78 32.00 OPERATOR: POWER EQUIPMENT: RIVER (Class 1).........$ 40.23 32.00
OPERATOR: POWER EQUIPMENT, CLASS C: AIR
COMPRESSOR (220 CFM OR OVER) ONE, AIR TRACK DRILL
ONE, AUTOMATIC BIN, BELT DRAG MACHINE, BULK CEMENT
PLANT W/BUILT-IN COMPRESSOR RUNNING OFF SAME MOTOR
OR ELECTRIC MOTOR, FIREMAN OR SWITCHMAN, MECHANIC
IN PERMANENT SHOPS WITHOUT SEPARATE SIGNED
COLLECTIVE BARGAINING AGREEMENTS (NOV. 1 THROUGH
MARCH 31), MECHANICAL PLASTERER APPLICATOR, PIPE
TRACT JACK, POWER BROOM, SELF-PROPELLED FROM
TAMPER, TRAC-AIR, MIXERS - LESS THAN 21 CU.FT.,
MORTAR MIXER W/SKI OR PUMP, MUD JACKS, ONE WELL
POINT PUMP, WOOD CHIPPER. ONE OPERATING ENGINEER
MAY OPERATE OR MAINTAIN ANY COMBINATION OF THE
FOLLOWING PIECES OF EQUIPMENT, NOT TO EXCEED FOUR
(4), WHICH SHALL BE WITHIN REASONABLE DISTANCE;
SUCH COMBINATION MAY INCLUDE THE EQUIPMENT IN THIS
CLASSIFICATION: AIR COMPRESSOR (UNDER 220 CFM)
FOUR, LIGHT PLANTS, GENERATORS, PUMPS, CONVEYORS,
MOTOR DRIVEN HEATERS (2), WELDING MACHINES, ULMAC
OR EQUAL SPREADER (ALEXANDER, FRANKLIN,
GALLATIN, HAMILTON, HARDIN, JACKSON, JOHNSON,
MASSAC, POPE, PULASKI, SALINE, UNION, WHITE, AND
WILLIAMSON COUNTIES) FOOTNOTE A - HAZARDOUS
WASTE PREMIUM: LEVEL (A)-RECEIVE $3.00 ABOVE RATE;
LEVEL (B)-RECEIVE $2.00 ABOVE RATE; LEVEL
(C)-RECEIVE $1.50 ABOVE RATE; LEVEL (D)-RECEIVE
$1.00 ABOVE RATE....................................$ 30.83 32.00
OPERATOR: POWER EQUIPMENT, CLASS B: OILERS
CLASSIFIED AS ASSISTANT OPERATORS, AIR TRACK
DRILL/COMPRESSOR, ALL MACHINES USED TO SWEEP,
CLEAN, BROOM OR REMOVE DEBRIS OR SNOW, ANY TYPE
TRACTOR PULLING ROLLER OR DISC, AUTOMATIC BINS OR
SCALES W/COMPRESSOR OR GENERATOR, BULK CEMENT PLANT
W/SEPARATE COMPRESSOR, CONCRETE CURB MACHINE
REQUIRING ELECTRONICS, CONCRETE PLANT ASSISTANT
OPERATORS, CONCRETE OR PUMP CRETE PUMPS, DECK HAND
ON BOATS, DREDGE ASSISTANT OPERATOR/MATE, POWER
BROOM, SELF-PROPELLED ROLLER/COMPACTOR, STRAW
MULCHER BLOWER, STUMP CUTTER MACHINE, TWO AIR
COMPRESSORS (220 CFM OR OVER), TWO AIR TRACK
DRILLS. AIR COMPRESSOR W/VALVE DRIVING PILING,
ASSISTANT OPERATOR (WHERE REQUIRED REFER TO ARTICLE
VII SECTION 9), ELEVATOR OPERATOR, FORM GRADER, MAN
LIFT (SCISSOR LIFT) WHEN LIFTING MATERIALS,
PILDRIVER ACTIVATING AIR OR HYDRAULIC VALVE
REGARDLESS OF LOCATION, RUBBER-TIRED FARM TYPE
TRACTOR W/BLADE/BULLDOZER/AUGER/HI-LIFT OF 1/2 YARD
OR LESS, SELF-PROPELLED CONCRETE SAW,
SELF-PROPELLED ROBOTICS ROLLER IN USE TWO
CONTINUOUS HOURS OR MORE SHALL BE MANNED BY AN
OPERATING ENGINEER, SELF-PROPELLED VIBRATOR, TRUCK
CRANE ASSISTANT OPERATOR, TWO CONVEYORS.
(ALEXANDER, FRANKLIN, GALLATIN, HAMILTON, HARDIN,
JACKSON, JOHNSON, MASSAC, POPE, PULASKI, SALINE,
UNION, WHITE, AND WILLIAMSON COUNTIES) FOOTNOTE
A - HAZARDOUS WASTE PREMIUM: LEVEL (A)-RECEIVE
$3.00 ABOVE RATE; LEVEL (B)-RECEIVE $2.00 ABOVE
RATE; LEVEL (C)-RECEIVE $1.50 ABOVE RATE; LEVEL
(D)-RECEIVE $1.00 ABOVE RATE........................$ 38.23 32.00
OPERATOR: POWER EQUIPMENT, CLASS A: ALL OFF ROAD
MATERIAL HAULING EQUIPMENT, ALL TERRAIN CRANE,
ARTICULATED DUMP, ASPHALT MACHINE SPREADER, ASPHALT
PLANT ASSISTANT OPERATOR, ASPHALT PLANT OPERATOR,
ASPHALT WIDENER, ASSISTANT OPERATOR ON ROTOMILLS,
AUTOGRADER, AUTOMATIC SLIPFORM PAVERS, BACKEND MAN
ON ASPHALT MACHINE, BACKHOES, BARREL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .