S06 - 36C25222Q0262 0001.docx

DOCX document 29 KB Posted

Attached to
H361--Electrical Power Distribution System Inspection Federal contract opportunity
Solicitation number
36C25222Q0262
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This document is an amendment to a solicitation for an electrical power distribution system inspection at a Department of Veterans Affairs facility. The amendment extends the quote due date to March 25, 2022 and provides answers to bidders' questions. Key details include inspection and testing of medium and low voltage switchgear, panelboards, circuit breakers, and other electrical equipment to NETA standards. Testing is required on draw out circuit breakers 250 amps and above via primary injection. General working hours are from 7:30am to 4:00pm Monday through Friday, and any work outside these times requires approval. While price will be considered, the selection process emphasizes technical evaluation based on corporate capabilities, personnel qualifications and experience on similar projects.

View the file

Other files for this federal contract opportunity

Other files attached to H361--Electrical Power Distribution System Inspection, newest first.
File Type Posted
Scenario4.zip ZIP file
Scenario1.zip ZIP file
Scenario2.zip ZIP file
eventlog.zip ZIP file
102_SK-3.zip ZIP file
2017 Report.zip ZIP file
Scenario5.zip ZIP file
Scenario3.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25222Q0262 03-16-2022

X X X

X Reference solicitation 36C25222Q0262 and amend to reflect the following:

1.) Solicitation extended to March 25, with quotes due at 10:00 AM Local Time.

2.) Answers to questions provided on continuation pages.

All other terms and conditions of the solicitation remain the same.

Eileen Meyer Questions and Answers:

1. Please confirm that the testing company that will be performing the work needs to be NETA certified. Yes, the testing company that will be performing the work needs to be NETA certified.

1. Will there be a 3 phase, 480V, 100A power source available somewhere on site to power the primary injection test set or will a generator be required? There would be space available to set up this test in the machine shop of the facility with power available.

1. Please confirm all equipment is to be tested to NETA MTS standards. Yes, equipment is to be tested to NETA MTS standards.

1. Is primary injection testing required on the molded case circuit breakers or just the draw out breakers? Test to be performed on draw out breakers only.

1. If the MCCB’s are to primary injected, is it only for breakers 250A’s and up? Yes, only for 250A and up.

1. Can you please provide the test results from the last time the equipment was tested? A few samples from each type of equipment would be great if they are not easily accessible electronically. Available information has been included with this response (See attachments).

1. Can you please provide the current SKB Arc Flash Model. If the model is shared it will cut down the price dramatically for the Arc Flash Study. All new items will be included to the new study. Available information has been included with this response (See attachments).

1. Please confirm all work that will require an outage will be performed during off hours. Yes, please coordinate with the COR and electrical shop prior to outage.

1. Can the bid due date be extended until we have a chance to review the SKB model and test reports? Solicitation will be extended through March 25, 2022 with quotes due 10:00 AM Local Time

1. Please confirm work hours for this project. Are there any specific tasks or trade division that must be on overtime? General working hours for this facility are 7:30am – 4:00pm Monday-Friday. Any work outside of these times must be approved before hand and coordinated with the COR/electrical shop both for coordination with the users and to allow access.

1. Given the existence of SKM modeling, can the VA send out said documents, so we do not have to recreate them? This will be a significant cost and time savings. This was mentioned at the walk through to the facility and they had mentioned this could be provided to bidders. Please see attachments.

1. Please confirm this project is a ‘best value’ selection process where technical is more significant than price. Please see page 51 of the solicitation that states the following:

Evaluation Approach. The Government will evaluate quotations using the comparative evaluation process outlined in FAR 13.106-2 (b) (3), where quotations will be compared to one another to determine which provides the best benefit to the Government. The Government reserves the right to consider a quotation other than the lowest price that provides additional benefit(s). Quotations may exceed minimum requirements of the solicitation. The Government reserves the right to select a quotation that provides benefit to the Government that exceeds the minimum requirements of the solicitation but is not required to do so.

1. Are prime contractors to submit the quote in two parts? (1) price and (1) technical, or should they be a combined PDF? Combined in one PDF would be best.

1. Per part (2) technical capability, it states that the offeror shall submit corporate capabilities, licenses of Electrical Technicians, and NETA certifications for this work. Is it acceptable to provide the major electrical contractors qualifications for this requirement? The likelihood of a contractor having theses qualifications as a prime SDVOSB contractor is low. If a subcontractor will be doing the work related any certification, then it will be acceptable to provide their qualifications for the work they are responsible for.

1. Per part (2) technical capability, it states that offerors shall provide a list of (3) current or recent contracts for the same or similar services being sought. Are these projects to be completed and is there a minimum dollar threshold requirement that contractors are to submit? The projects should be completed with the work being related to this project. The dollar amount for the projects should be similar in size to this project.

1. How long does the VA Cyber Security Awareness and Rules of Behavior training and VA privacy training typically take? It takes approximately 15min to complete this documentation.

1. The scope lists “inspection only” for the low voltage panels. Is any testing required or is it just IR Scan per usual? The main breaker to the panel should be tested, and the overall panel inspected by IR scan. The sub breakers are part of the general facility PMI and do not require additional testing unless a critical issue is observed that needs to be reported promptly.

1. Attachment B, states that we need to perform GFCI. Can the facility give us a count on how many breakers have the ground fault protection and if this is included? There is no comprehensive list of this type of breaker, and the required testing shall be performed based on the SoW and referenced codes/standards.