S06-36C24626Q0892 0003.docx
DOCX document 126 KB Posted
- Attached to
- Groundskeeping
- Solicitation number
- 36C24626Q0892_2_0003
About this file
This is an Amendment to Solicitation (Standard Form 30) for a groundskeeping contract at Durham Veterans Medical Center. The amendment extends the offer submission deadline to October 12, 2026 at 12:00 PM EDT and provides responses to 22 technical questions submitted by prospective offerors. The solicitation is issued by the Department of Veterans Affairs Network Contracting Office 6, located in Hampton, Virginia, with solicitation number 36C24626Q0892.
The contract requires comprehensive landscaping and groundskeeping services for approximately 5 acres of improved turf and 186,120 square feet of parking lot at the Durham VAMC for the base period of November 1, 2026 through October 31, 2027. Key services include: mowing and weed eating (24 events annually—bi-weekly March through October, weekly June through August); monthly turf maintenance, weed control, and planting bed maintenance; annual shrub and hedge trimming, tree maintenance (42 trees, up to 65 feet high), mulching (Timberline brown at 4-inch depth), leaf removal, and fertilization (fall application only, using natural plant or animal-derived products); 18 edging events on approximately 9,101 linear feet (March through October, every two weeks); daily debris and litter removal (Monday through Friday); and seasonal planting monthly. Additional services include storm cleanup and snow removal as needed, with 24/7 weather monitoring and standby capability required during snow or ice events, using Robo-melt natural ice melter. The contract mandates organic weed control methods throughout the property, contractor-provided snow and ice materials, irrigation supplemental watering, and no chemical herbicides. The NAICS code is 561730 (Landscaping Services), with PSC code S208 (Housekeeping—Landscaping/Groundskeeping). Offerors must acknowledge receipt of this amendment prior to the submission deadline.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical questions answered, new schedule, submission extension.
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
10-01-2026
None
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders
36C24626Q0892
X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 10-12-2026 12pm EDT See CONTINUATION Page
The purpose of this amendment is to answer technical questions, submission extension and new schedule
1. The new submission date is 10/12/2026 by 12pm EST.
2. No additional site visits.
3. Please review the new schedule, this should add some clarity and this is no longer a base 4 (1 year) optoins.
4. Technical questions and answers below, please review, some answers have change since the last amendment.
Byron Brown Contracting Officer
CONTINUATION PAGE
Durham VAMC Questions
1. Mowing Frequency
a. How many mowing services should contractors anticipate annually?
Answered on new schedule
b. Is mowing expected weekly during the growing season, or strictly based on turf height/appearance?
Answered on new schedule
2. Edging
a. Please confirm that the approximately 9,101 linear feet of edging is required every other mowing cycle.
yes
b. Are there any additional areas requiring edging that are not shown in Appendix B?
no
3. Irrigation
a. Does the Government provide water for irrigation?
yes
b. Are hose bibs/water access points available throughout the improved areas?
yes
c. Approximately how many acres do not have permanent irrigation and will require portable watering?
all
d. Is the contractor responsible for irrigation system repairs, or only for supplemental watering?
no
4. Aeration
a. How many aeration services are required annually for the approximately 5 acres of improved turf?
5. Leaf Removal
a. Can the Government provide an estimate of the typical volume of leaves generated during peak fall season?
Contractor shall determine during the pre quote walk-through
b. Is there an on-site location where leaves may be temporarily staged before off-site disposal?
Leaves are blown to grass areas and mulched
c. Can a dumpster be left onsite for debris/leaf removal?
Contractor shall provide plan for debris / leaf removal but not be left on site
6. Trash and Debris
a. Are dumpsters available for contractor use, or must all debris be removed from the facility daily?
Remove daily
b. Does the five-day-per-week policing requirement apply on Federal holidays?
No holiday work
c. Does dead-animal removal include wildlife of all sizes, or will larger animals be handled by VA personnel or another contractor? VA EMS will handle this situation
7. Trees
a. Approximately how many trees are included in the 3-to-5-year pruning cycle? 42
b. What is the approximate maximum tree height? estimated 65 Ft.
c. Is aerial lift or bucket-truck work anticipated? Yes
d. Is the contractor responsible for removing large hazardous trees, or only routine pruning?
Routine pruning
e. Who is responsible for coordinating utility shutdowns or clearance when pruning near power lines?
Coronate with cor if contractor found any
8. Shrubs, Hedges, and Beds
a. How many mulch applications are required annually?
b. What mulch type, color, and required depth should be used?
Timberline, brown,4”
c. Is the contractor responsible for furnishing replacement plants, and if so, is there an allowance or maximum replacement quantity?
Yes, only the ones that are needed.
9. Fertilization
a. How many fertilizer applications are required annually?
Once in the fall
b. Is there a specified fertilizer analysis or application rate?
Natural materials derived from plants or animals bi products that feed the soil and the plants.
10. Weed Control
· Since bedding-area weeds must be controlled manually or mechanically, please confirm whether chemical weed control is prohibited only in beds or throughout the entire property.
Organic weed control
· Are herbicides permitted for turf, cracks, curbs, fence lines, or other non-bed areas?
Organic weed control
11. Snow and Ice
· Is the contractor required to provide 24/7 weather monitoring and standby capability?
Yes while there is snow or ice
· What is the required response time once accumulation reaches the Priority 1 or Priority 2 threshold?
Should be on site salting prior to snow and ice falling
· Are snow services paid as part of a monthly fixed price or per occurrence/delivery order?
occurrence
· What type of ice-melting product is approved for sidewalks, entrances, and concrete?
Robo-melt all natural ice melter
· Is the contractor responsible for furnishing all salt/deicer materials?
yes
· Are there designated on-site locations for storing snow-removal equipment and deicer?
No. Only while snow is being removed
· Can the Government provide historical snowfall/service-call data for the past three years?
· Does the 186,120 sq. ft. parking-lot quantity include roadways, or are roadways additional?
All included
12. Emergency Services
· Please clarify what types of work are historically ordered under Emergency and Special Event Services. Omit special event and emergency services, we already have line items for Storm cleanup and snow removal.
· Are emergency services separately priced through individual delivery orders? Disregard
13. Special Events
· Approximately how many special events have historically occurred annually?
· What additional grounds services are typically required before or after special events? Disregard
14. Equipment Storage
· Will the Government provide any on-site storage, staging, parking, or secured space for contractor equipment and materials?
no
15. Work Hours
· Are weekend or holiday services routinely required?
No / only in the event of snow, ice storm cleanup
· Are there any noise restrictions or areas where powered equipment cannot be operated during certain hours?
If there any, please coronate with COR
16. Incumbent / Historical Workload
· Can the Government provide the previous contract number and incumbent contractor?
No all was done in house
· Can the Government provide historical quantities for mowing, emergency calls, snow events, tree work, and plant replacement? Mowing is on the new schedule, no information on emergency calls as they are not often, tree work and plant replacement is on new schedule.
17. Restroom Access Will restroom facilities be available on-site for contractor personnel during performance of the contract?
yes
18. Frequency of cuts: will maintenance be bi-weekly, weekly or will this remain at the discretion of the individuals maintaining the grounds?
There is an updated schedule to answer this.
19. Will there be an initial clean-up fee added as a line item? No
20. Snow removal: will there be information added on a plan for the location of the snow and what would be best for the area to prevent ice from forming in highly trafficked areas occupied by pedestrians and vehicles?
Someone will be onsite to show where to push the piles
21. Equipment parking: What will be the plan for parking our equipment to prevent incidents and traffic being blocked?
There will be an area while cleanup is in progress
22. Quality Control: Will there be a quality control team or will that be a primary responsibility of the COR on the medical center grounds?
COR
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12.00 |
| MO |
| __________________ |
| __________________ |
TURF MAINTENANCE
(Once a month) Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027 PRINCIPAL NAICS CODE: 561730 - Landscaping Services PRODUCT/SERVICE CODE: S208 - Housekeeping - Landscaping/Groundskeeping
| 24.00 |
| EA |
| __________________ |
| __________________ |
MOWING AND WEED EATING
(March - October every other week) (Exception, June, July & August is weekly) Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
WEED CONTROL
Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
| 1.00 |
| EA |
| __________________ |
| __________________ |
SHRUB AND HEDGE TRIMMING
(Once a year) Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
| 1.00 |
| EA |
| __________________ |
| __________________ |
TREE MAINTENANCE
Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
| 1.00 |
| EA |
| __________________ |
| __________________ |
MULCHING
Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
SEASONAL PLANTING
Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
| 1.00 |
| EA |
| __________________ |
| __________________ |
LEAF REMOVAL
Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
| 1.00 |
| YR |
| __________________ |
| __________________ |
DEBRIS AND LITTER REMOVAL
(Daily-Monday through Friday Only) Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
| 1.00 |
| EA |
| __________________ |
| __________________ |
FERTILIZATION
Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
MAINTENANCE OF PLANTING BEDS
Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
| 18.00 |
| EA |
| __________________ |
| __________________ |
Sidewalk and Curb edging (March-Oct) every 2 weeks Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
| 0.00 |
| LT |
| __________________ |
| __________________ |
Not To Exceed Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
0013A
| 1.00 |
| EA |
| __________________ |
| __________________ |
STORM CLEAN UP
(As needed) Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
0013B
| 1.00 |
| EA |
| __________________ |
| __________________ |
Snow removal (As needed) Contract Period: Base POP Begin: 11-01-2026 POP End: 10-31-2027
| GRAND TOTAL |
| __________________ |
File details come from the government source that posted it. Updated .