S06 36C24126R0041 0009.docx
DOCX document 121 KB Posted
- Solicitation number
- Not on record
About this file
This document is Amendment 0009 to Solicitation 36C24126R0041 for the Temporary Chiller Plant Replacement project (689-21-122) issued by the Department of Veterans Affairs, VA Connecticut Healthcare System Network Contracting Office. The amendment extends the proposal due date from April 24, 2026, to May 4, 2026, at 4:00 PM EDT and provides responses to three previously submitted Requests for Information (RFI). The solicitation is restricted to NCO 1 MATOC (Master Agreement for Other Contracts) holders only.
The RFI responses address three key areas: (1) clarification that chiller rental duration extends through project completion, with the VA confirming rental chillers must be procured by the contractor for the full project duration; (2) confirmation that Appendix E-0 referenced on page 12 of the Statement of Work (Basis of Design Equipment) is contained in the Narrative Attachments Part 1 and Part 2 from Amendment 0008; and (3) notification that drawings are to scale except for certain details, which are not necessarily to scale, and that the VA has provided photo documentation for reference but does not relieve the contractor from conducting field verification of site conditions. The amendment states that no additional RFIs will be accepted and that all other terms and conditions of the solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OneDrive_1_4-20-2026.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
03-25-2026
689-21-122 36C241 Department of Veterans Affairs VA Connecticut Healthcare System Network Contracting Office 1 950 Campbell Avenue West Haven CT 06516
36C241 Department of Veterans Affairs VA Connecticut Healthcare System Network Contracting Office 1 950 Campbell Avenue West Haven CT 06516 To all Offerors/Bidders
36C24126R0041 01-22-2026
X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 05-04-2026 4PM EDT
The purpose of this amendment for 689-21-122, Temporary Chiller Plant Replacement, is to provide the following:
1) The proposal due date is extended from April 24, 2026, to May 4, 2026, at 4:00PM.
2) See RFI responses provided.
3) No additional RFIs will be accepted.
All other terms and conditions remain unchanged.
Tamye Molinaro Contracting Officer
VA-VHA-2021-1C2D7790
AMENDMENT OF SOLICITATION 36C24126R0041 0009
RFI Responses
1. The amendment 4 answered our RFI that they want the contractor to procure the rental chillers. The issue I see is that if they want the contractor to procure the rental chillers, they don’t say for how long. It seems they would need the rental chillers for a long time because they are doing this phase so that they can then do the next project to do a new plant. I’d imagine these rental chillers will be there for years. The specs or drawings don’t say how long of a duration they want included and rental chillers are provided by the month. The VA will need to provide more information if they want these included. I don’t see how they can do a long term rental as part of this job unless they extended the POP to include the duration of the rental.
VA Response:
Chiller Rental duration is through the completion of the project.
2. Page 12 of the statement of work item 8 lists basis of design equipment and references Appendix E-0 which does not seem to be included. Please provide.
VA Response:
See Narrative Attachments Part 1 and Part 2 in Amendment 0008.
3. Please provide an updated set of drawings that are to scale if available.
VA Response:
Drawings should be to scale. Unless the contractor is referring to the details. All details are not necessarily to scale. VA does not understand the question.
Photo documentation is attached for contractor reference, however; these photos are not all inclusive and do not relieve the contractor from their responsibility to field verify the site conditions to ensure proper bidding.