This document contains a request for information and responses regarding a federal contract opportunity to add chilled water metering at the Louis Stokes Cleveland VA Medical Center. The solicitation requests dimensional details and straight run lengths for existing chilled water supply and return pipes servicing seven air handling units to properly specify ultrasonic flow meters as an equivalent replacement for discontinued Flexim ADM 7407 models. Responses provide the requested pipe diameter, run length, and flow meter location information for each air handling unit, noting that dimensions should be verified in the field. The closing date for questions on Opportunity Number Y1DA remains May 19, 2021, with all other terms and conditions unchanged.

View the file

Other files

File Type Posted
S06. 36C25021R0066 0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

TO: Stanley Burdine, Contracting Specialist

RFI No. 1 DATE: 5/6/21 REFERENCE: CW Meter Location

REPLY NEEDED BY:

INFORMATION NEEDED:

Specification 23 09 23 Part 2.8 Sensors (Air, Water and Steam) section C. specifies Flexim ADM 7407 ultrasonic clamp on meters or equivalent. We are planning to offer the Flexim Model 721 since the ADM 7407 has been discontinued and is obsolete. The Flexim Model 721 exceeds the design parameters of the ADM 7407.

Since we were not able to view all project AHU’s can we please have the following information to properly specify related equipment and insulation?

1. Drawing M-602, Configuration C Diagram. Can we please have the CHW supply pipe (A-05) diameter, CHW return pipe (A-07) diameter and approximate length of straight pipe for desired flow meter location on the CHW supply pipe (A-05)?

2. Drawing M-605, Configuration J Diagram. Can we please have the CHW supply pipe (A-09) diameter, CHW return pipe (A-11) diameter and approximate length of straight pipe for desired flow meter location on the CHW supply pipe (A-09)?

3. Drawing M-606, Configuration L Diagram. Can we please have the CHW supply pipe (A-15) diameter, CHW return pipe (A-13) diameter and approximate length of straight pipe for desired flow meter location on the CHW supply pipe (A-15)?

4. Drawing M-607, Configuration M Diagram. Can we please have the CHW supply pipe (A-13) diameter, CHW return pipe (A-15) diameter and approximate length of straight pipe for desired flow meter location on the CHW supply pipe (A-13)?

5. Drawing M-609, Configuration Q Diagram. Can we please have the CHW supply pipe (A-19) diameter, CHW return pipe (A-17) diameter and approximate length of straight pipe for desired flow meter location on the CHW supply pipe (A-19)?

6. Drawing M-609, Configuration R Diagram. Can we please have the CHW supply pipe (A-15) diameter, CHW return pipe (A-13) diameter and approximate length of straight pipe for desired flow meter location on the CHW supply pipe (A-15)?

7. Drawing M-610, Configuration T Diagram. Can we please have the CHW supply pipe (A-04) diameter, CHW return pipe (A-06) diameter and approximate length of straight pipe for desired flow meter location on the CHW supply pipe (A-04)?

PROJECT NUMBER: 541-21-205 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE: Add AHU Metering PROJECT LOCATION: Department of Veterans Affairs

Louis Stokes Cleveland VA Medical center (VAMC)

SUBMITTED BY: Joe Shepard. Performance EPC City/State: Cleveland, Ohio

PHONE NO.: (216) 904-3661

REPLY:

REPLY FROM:

DATE:

ATTACHMENTS: None

COPY TO:

The Flexim F721 is an equivalent, similar option for chilled water metering.

The following dimensions and sizes are from best information available and should be verified in the field:

1: AC-26, 4” CHW. Approx. 5’ straight run.

2: AC-63, 2-1/2” CHW. Approx. 8-10’ straight run.

3: AHU S-2-2, 8” Secondary CHW. (with bypass at coil). Approx. 8-10’ straight run.

4: AC-57, 4” CHW. Approx. 13-15’ straight run.

5: AC-29, 4” CHW. Outdoors (accessible under unit’s platform).

Heat traced w/ aluminum jacket. Approx. 20’ straight run.

6: AC-14, Approx. 2-1/2” CHW. Approx. 6’ straight run.

7: AC-64, 1-1/2” CHW. Approx. 12’ straight run.

Joshua Zeigler - HEAPY 05/11/2021