This document package includes a Request for Information (RFI) response and the related federal contract solicitation. The RFI response provides answers to questions from contractors regarding a renovation and reconfiguration of clinical services project at a Department of Veterans Affairs medical center. The answers clarify details of the toilet and bath accessory schedule and partition details. The related solicitation is for the Y1DA renovation and reconfiguration project, with a bid opening date of May 7, 2021. Modification P00002 incorporates the RFI questions and answers into the solicitation with all other terms remaining the same. The project involves renovating and reconfiguring clinical services at a VA medical center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S05. RFI 04 - Response.pdf | ||
| S05. RFI 06 - Telecom Response_IMEG.pdf | ||
| S05. RFI 01-03 - Responses.pdf | ||
| S06. 36C25021B0004 0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
TO: Stanley Burdine, Contracting Specialist
RFI NO.: DATE: REFERENCE:
REPLY NEEDED BY:
INFORMATION NEEDED:
REPLY:
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
PROJECT NUMBER: 541-20-101 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the
Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate and Reconfigure Clinical
Services
PROJECT LOCATION: Department of Veterans Affairs
VA Medical center
SUBMITTED BY: City/State:
PHONE NO.:
Brigadier Construction Services Twinsburg, Ohio
216.857.4777
ASAP
05 04.26.2021 Toilet & Bath Accessory Schedule
- RFI 05 - The toilet and bath accessory schedule specifies that some are supplied and installed by contractor and others are not supplied and installied by the contractor. Please confirm that the schedule is accurate and that the Government intends on supplying and installing some accessories outside of the GC.
tkrejci Text Box Refer to the attached revised A-601 - SCHEDULES & DETAILS.
1. All partitions are type A1 unless noted otherwise.
2. Refer to the Life Safety Plans for fire barriers, fire partitions, smoke barriers and smoke partitions.
3. Fire resistance rating indicated on the Life Safety Plan shall mean the entire length and height of the partition inidcated to be fire rated. All piping, ducts cabinets etc that penetrate partitions shall be installed in a manner that will preserve the fire resistant rating of the partition.
4. Partitions are dimensioned from the face of gypsum board exclusive of finish materials such as porcelain tile or wood paneling. Coordinate finish dimensions with finish schedule.
5. Provide blocking in partitions for wall mounted accessories.
6. Provide water resistant gypsum board at plumbing locations unless cementitious backer board is specified.
7. Metals studs shall be 20 gage minimum. Maximum height is 15'-0".
Partition heights that exceed 15'-0" shall increase in gage in accordance with the Steel Stud Manufacturers Assosciation Technical Guide, Latest Edition.
Gypsum board to underside of deck -both sides
Ceiling may occur
Deck
Accoustic insulation
Gypsum board to underside of deck -one side only
Gypsum board to 6" above ceiling - On other side
Mineral wool fire blocking
Deck
Ceiling
Gypsum board to 6" above ceiling -both sides Mineral wool fire blocking
Deck
Ceiling
Gypsum board to underside of ceiling -both Sides
Deck
Ceiling
A
B
C
D
1. Power Assist Door Operator
2. RF Shielded
3. New hardware. Existing door and frame to be reused/reinstalled. PTD to match adjacent, existing.
4. Sound seals
F SM
8"
1/ 2"
3 1/2"3 1/2"
TG
N
9" 6"
3' -2
TG
F1 F2
2"
M at ch E xi st in g
Ex is tin g
M at ch 8"
2"
2"2"
F3
2" Schedule
See 2" See Schedule
2x Panel Width Schedule
See
Match Existing
08 11 13 - Hollow Metal frame
4"
EQ
Wall for wall type See plans
EQ
08 11 13 - HM frame
07920 - Sealant (typical all sides)
2"
Wall for wall type See plans
09 29 00 - Acoustical INSUL may occur
08 11 13 - HM frame2"
07 92 00 - Sealant (typical all sides)
Wall for wall type See plans
08 80 00 - Glazing
09 29 00 - Acoustical INSUL may occur
07920 - Sealant (typical all sides)
08 11 13 - HM frame2"
Wall for wall type See plans
4"
2 7/8"
2"
6 1/4"
See floor plan for partition type (typical)
06 10 00 - Wood blocking as required
08 36 16 - Aluminum frame
08 36 16 - Aluminum track cover
08 36 16 - Door - see floor plan and door schedule
Interior Room
Corridor
08 36 16 - Aluminum frame
See floor plan for partition type (typical)
09 22 16 - Double stud at jamb
08 36 16 - Door - see floor plan and door schedule
Note: Refer to floor plan for hand of door.
7/
8"
08 36 16 - Aluminum track cover above
2"2"
/1
6"
3/ 8"
08 36 16 - Aluminum frame beyond
08 36 16 - Door - see floor plan and door schedule
08 36 16 - Sill guide
07 92 00 - Sealant (typical all sides)
Gyp bd. or panel may occur - COORD w/wall type for wall type See plans
08 41 13 - ALUM framed storefront
08 41 13 - ALUM door (Wood door may occur
- see door types)
ALIGN
O - Owner C - Contractor
08 11 13 - HM frame07 92 00 - Sealant (typical all sides)
09 29 00 - Gyp bd patch;
flush w/ exist to remain
5/ 8"2"
1/2"
ETR VIF
11" +/-
09 29 00 - 5/8" Gyp bd
09 22 16 - 7/8" Mtl furring
1 1/4" Exp jt
09 29 00 - Acoustical insul may occur
New steel lintel; vif
07 84 00 - Fire safing
1 15/16"5 7/8"
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CLEVELAND, OHIO
DESIGN AND CONSTRUCTION DOCUMENTS AS INSTRUMENTS OF
SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY
OF PERSPECTUS ARCHITECTURE. THE USE OF THIS DESIGN AND
THESE CONSTRUCTION DOCUMENTS FOR PURPOSES OTHER
THAN THE SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT © 2021.
1300 East 9th St. Suite 910 Cleveland, Ohio 44114 P. 216.752.1800 F. 216.752.3833
C :\T em p\
Lo ca ls
8\
VA
M
P_ R
R C
S_ M ai n
Bu ild in g_
R
_t kr ej ci pe rs pe ct us ar ch
.c om
.rv t
4/
/2
2:
:0
PM
A-601
SCHEDULES & DETAILS RENOVATE AND RECONFIGURE
CLINICAL SERVICES
541‐20‐101
4/9/21 - -
PARTITION SCHEDULE
TAG
FRAMING SHEATHING DETAIL
TOP
RATING
STC SOUND TEST #
TOTAL
WIDTH REMARKSSIZE TYPE SIDE 1 SIDE 2 TYPE TIME UL #
A1 3 5/8" 5/8" 5/8" X A 49 4 7/8"
A2 3 5/8" 5/8" 5/8" X A 1 HR U465 49 4 7/8"
A6 3 5/8" 5/8" X C 4 1/4" F1 1 1/2" 5/8" X A 2 1/8"
G2 2 1/2" 5/8" 1" X A 2 HR U438 3 3/4"
U7 3 5/8" 5/8" (2) 5/8" X A 57 NOAL 17-0539 5 1/2" PABCO Gypsum PGD-01-10-196 with QuietRock ES MR
TOILET ACCESSORIES - PHASE 2
ROOM # ROOM NAME
MARK DESCRIPTION
PROVIDED
BY
INSTALLED
BY
1B503C EEG Clinic HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B505C Tlt FM-1 Wall Mirror C C
GB-18 Grab Bar - 18" Vertical C C GB-36 Gra Bar - 36" C C GB-42 Grab Bar - 42" C C PTD-1 Paper Towel Dispenser, C-Fold C C
SD-1 Soap Dispenser O O TTD-1 Toilet Tissue Dispenser C C
1B508 CWT Work Area HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
PARTITION SCHEDULE GENERAL NOTES
TOP OF WALL LEGEND
DOOR SCHEDULE GENERAL NOTESDOOR PANEL TYPESDOOR FRAME TYPES
DOOR SCHEDULE - PHASE 5
NUMBER
DOOR FRAME
FIRE
RATING GLAZING NOTES
OPENING SIZE NUMBER
OF
PANELS
UNEQUAL PANEL
PANEL
MATERIAL
PANEL
FINISH
FRAME
TYPE
FRAME
MATERIAL
FRAME
FINISH
HEAD
DETAIL
JAMB
DETAIL
SILL
DETAILWIDTH HEIGHT
WIDTH TYPE
PANEL1 PANEL 2 PANEL 1 PANEL 2
MB-1-FIRST FLOOR
1B430 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader
1B464 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B465 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader
Scale: 1 1/2" = 1'-0"A-601 H3 / J34
Scale: 1 1/2" = 1'-0"A-601 H2 / J25
Scale: 1 1/2" = 1'-0"A-601 H1 / J11
Scale: 1 1/2" = 1'-0"A-601 H4 / J47
Scale: 1 1/2" = 1'-0"A-601 H56
Scale: 1 1/2" = 1'-0"A-601 J58
Scale: 1 1/2" = 1'-0"A-601 S59
Scale: 1 1/2" = 1'-0"A-601 H6 / J610
DOOR SCHEDULE - PHASE 4
NUMBER
DOOR FRAME
FIRE
RATING GLAZING NOTES
OPENING SIZE NUMBER
OF
PANELS
UNEQUAL PANEL
PANEL
MATERIAL
PANEL
FINISH
FRAME
TYPE
FRAME
MATERIAL
FRAME
FINISH
HEAD
DETAIL
JAMB
DETAIL
SILL
DETAILWIDTH HEIGHT
WIDTH TYPE
PANEL1 PANEL 2 PANEL 1 PANEL 2
MB-1-FIRST FLOOR
1B402A 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B402B 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B460 3' - 6" 7' - 0" 1 3' - 6" 0" SM ALUM ALUM F2 ALUM ALUM H6 J6 TG CR and ADA Pushplate - INT Mullion, Power Assist Door Operator 1B460B 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - 1 - card reader, power assist door operator 1B462 6' - 0" 7' - 0" 2 3' - 0" 3' - 0" F F HM PTD F1 HM PTD H1 J1 - card reader
1B468 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B469 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader
1B470 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B471 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B472 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B473 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B474 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B475 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B476 3' - 6" 7' - 0" 1 3' - 6" 0" SM ALUM ALUM F2 ALUM ALUM H6 J6 TG CR and ADA Pushplate - INT Mullion, Power Assist Door Operator 1B476B 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F2 HM PTD H1 J1 - - card reader 1B477 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F3 ALUM ALUM H5 J5 S5 card reader
1B478 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B479 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B480 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B481 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B482 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B484 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B486 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F3 ALUM ALUM H5 J5 S5 card reader
1B487 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B488 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B489 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B490 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B491 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B492 4' - 0" 7' - 0" 1 4' - 0" 0" F WD STD F1 HM PTD H1 J1 - - 1 - card reader, power assist door operator 1B493 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B494 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B496 0" 0" ETR ETR ETR ETR PTD ETR ETR 3 - card reader, new hardware. Existing frame and door.
1C402 4' - 0" 7' - 0" 1 4' - 0" 0" F WD STD F1 HM PTD H1 J1 - - 1 - power assist door operator
DOOR SCHEDULE - PHASE 1
NUMBER
DOOR FRAME
FIRE
RATING GLAZING NOTES
OPENING SIZE NUMBER
OF
PANELS
UNEQUAL PANEL
PANEL
MATERIAL
PANEL
FINISH
FRAME
TYPE
FRAME
MATERIAL
FRAME
FINISH
HEAD
DETAIL
JAMB
DETAIL
SILL
DETAILWIDTH HEIGHT
WIDTH TYPE
PANEL1 PANEL 2 PANEL 1 PANEL 2
MB-1-FIRST FLOOR
1B500B 7' - 0" 7' - 0" 2 3' - 6" 3' - 6" N N WD PTD HM PTD H7 20 MIN card reader on push side with relocated intercom for remote entry
RAD-FIRST FLOOR
1C593 3' - 0" 7' - 0" 1 3' - 0" 0" N WD STD F1 HM PTD H1 J1 Rework hardware, floor stop
DOOR SCHEDULE - PHASE 2
NUMBER
DOOR FRAME
FIRE
RATING GLAZING NOTES
OPENING SIZE NUMBER
OF
PANELS
UNEQUAL PANEL
PANEL
MATERIAL
PANEL
FINISH
FRAME
TYPE
FRAME
MATERIAL
FRAME
FINISH
HEAD
DETAIL
JAMB
DETAIL
SILL
DETAILWIDTH HEIGHT
WIDTH TYPE
PANEL1 PANEL 2 PANEL 1 PANEL 2
MB-1-FIRST FLOOR
1B500A 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - 2 card reader 1B501A 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B501B 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B501C 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B501D 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B502A 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B502B 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B503A 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B503B 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B503C 4' - 0" 7' - 0" 1 4' - 0" 0" F HM PTD F1 HM PTD H1 J1 - 1, 2, 4 - card reader, power assist door operator, RF shielded, sounds seals 1B505A 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B505B 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B505C 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B505D 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B506 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader
1B506A 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B507 5' - 0" 7' - 0" 2 2' - 6" 2' - 6" F F HM PTD F1 HM PTD H1 J1 - card reader 1B508 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B590 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B591 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B592 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B593 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B594 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader
TOILET ACCESSORIES - PHASE 4
ROOM # ROOM NAME
MARK DESCRIPTION
PROVIDED
BY
INSTALLED
BY
1B492 TeleHealth HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B493 Soil HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
TOILET ACCESSORIES - PHASE 4
ROOM # ROOM NAME
MARK DESCRIPTION
PROVIDED
BY
INSTALLED
BY
1B478 Tlt.
FM-1 Wall Mirror C C
GB-18 Grab Bar - 18" Vertical C C GB-36 Gra Bar - 36" C C GB-42 Grab Bar - 42" C C PTD-1 Paper Towel Dispenser, C-Fold C C
SD-1 Soap Dispenser O O
1B479 Tlt.
FM-1 Wall Mirror C C
GB-18 Grab Bar - 18" Vertical C C GB-36 Gra Bar - 36" C C GB-42 Grab Bar - 42" C C PTD-1 Paper Towel Dispenser, C-Fold C C
SD-1 Soap Dispenser O O
1B480 Exam 2 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B481 Exam 3 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B482 Exam 1 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B487 Exam 4 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B488 Exam 5 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B489 Exam 8 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B490 Exam 7 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B491 Exam 6 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
TOILET ACCESSORIES - PHASE 4
ROOM # ROOM NAME
MARK DESCRIPTION
PROVIDED
BY
INSTALLED
BY
1B460 Blood Draw Waiting HS-1 Hand Sanitizer O O
1B468 Blood Draw 1 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B470 Blood Draw 4 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B471 Blood Draw 2 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B472 Blood Draw 5 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B473 Blood Draw 6 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B474 Blood Draw 3 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
TOILET ACCESSORIES - PHASE 5
ROOM NAME
MARK DESCRIPTION
PROVIDED
BY
INSTALLED
BY
1B464 Tlt.
GB-18 Grab Bar - 18" Vertical C C GB-36 Gra Bar - 36" C C GB-42 Grab Bar - 42" C C
HS-1 Hand Sanitizer O O PTD-1 Paper Towel Dispenser, C-Fold C C SPT-1 Specimin Pass-through C C TTD-1 Toilet Tissue Dispenser C C
1B465 Processing HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
DOOR SCHEDULE - PHASE 3
NUMBER
DOOR FRAME
FIRE
RATING GLAZING NOTES
OPENING SIZE NUMBER
OF
PANELS
UNEQUAL PANEL
PANEL
MATERIAL
PANEL
FINISH
FRAME
TYPE
FRAME
MATERIAL
FRAME
FINISH
HEAD
DETAIL
JAMB
DETAIL
SILL
DETAILWIDTH HEIGHT
WIDTH TYPE
PANEL1 PANEL 2 PANEL 1 PANEL 2
MB-1-FIRST FLOOR
1B567A 3' - 0" 7' - 0" 1 3' - 0" 0" F HM PTD F1 HM PTD H1 J1 - OH Stop, Closer Pull Side, Mag Lock - Fail Safe
TOILET ACCESSORY ABBREVIATION LEGEND
Scale: 1 1/2" = 1'-0"A-601
DOOR HEAD DETAIL H711
REVISIONS: DATE:
BID ISSUE 1/8/21
RFI01 Date 4
BID ADDENDUM 02 4/30/21
RFI05 4/29/21
| 2021.04.26 - Brigadier - RFI 05 (002) |
| A-601 - SCHEDULES & DETAILS |
| Sheets |
| A-601 - SCHEDULES & DETAILS |
File details come from the government source that posted it. Updated .