Sources Sought Notice

*= Required Field Sources Sought Notice

SUBJE

CT*

Project 603-20-201-Mobile Sterilization Trl.-Assoc. with Rep. SPS Air Handler

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE* 37129

SOLICITATION NUMBER* 36C24921Q0483

RESPONSE DATE/TIME/ZONE 08-20-2021 12:00 EASTERN TIME, NEW YORK,

USA

ARCHIVE 15 DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS N

SET-ASIDE

PRODUCT SERVICE CODE* 6515

NAICS CODE* 236220

CONTRACTING OFFICE ADDRESS Department of Veterans Affairs

Network Contracting Office 9 (90C) c/o: Roxie Ann Keese, CO

1639 Medical Center Parkway, Suite 400

Murfreesboro TN 37129

POINT OF CONTACT* Roxie Ann Keese

FAC-C Level III, FE-C

Warrant No. VA-VHA-2020-11BF2E0E

Construction Team-West

615.873.6341

PLACE OF PERFORMANCE

ADDRESS Robley Rex VA Medical Center

800 Zorn Avenue

Louisville Kentucky

POSTAL CODE 40206

COUNTRY United States

ADDITIONAL INFORMATION

AGENCY’S URL https://vaww.v09.va.gov/louisville

URL DESCRIPTION Agency's Intranet website

AGENCY CONTACT’S EMAIL ADDRESS roxie.keese@va.gov

EMAIL DESCRIPTION CO's email address

DESCRIPTION

The Robley Rex VA Medical Center located at 800 Zorn Avenue in Louisville, Kentucky intends to sole source in award to the Steris Corporation. The purpose of this RFI is for market research purposes only to see if there are capable vendors/contractors able to meet the subject requirement. The requirement is for a Mobile Sterilization Trailer for the medical center’s Sterile Processing Services (SPS).

The specifications of this equipment are as follows:

Power Requirements (Normal Power) Electrical Service: 480VAC, 3-phase, (2) 250 AMP Configuration: 4 wire (L1,L2,L3,G) Frequency: 60hz Shoreline Cable: (2) 75’ lengths provided; facility end hard wired Earth ground provided; installation per NEC Article 250

(1) single point female bayonet type located directly under the roadside power connection

(1) 20’ ground cable with (2) clamps provided

Cold Water Supply Requirements 1 ¼ inch connection (#5 Roadside Belly Box) Cold Weather Protection: Internal lines are weather protected. External lines must be facility protected 1,000 GPH minimum at 40-60 psi 120 PPM (parts per million) of water hardness maximum

Hot Water Supply Requirements 1 ¼ inch connection (#5 Roadside Belly Box) 300 GPH minimum at 40-60 psi Temperature: 140°F nominal. External lines must be facility protected 120 PPM (parts per million) water hardness maximum

Waste Water 4 inch waste water connection External lines must be facility protected

Fire Sprinkler – Wet System ONLY Sprinkler supply: 2 inch Victaulic coupling (rear of unit) External lines must be facility protected 100 GPM hose stream outside = 330 GPM water supply required for system Supply required: Static 44.8 psi minimum

Residual Pressure 49 psi Flow 219

Fire Alarm Connection Aegis conventional fire alarm system with trouble, supervisory and alarm contacts in panel (can be hard wired to remote dry contacts) 2 zones with detection and pull stations 1 zone with supervisory tamper switch on sprinkler water control valve 1 zone for water flow switch on sprinkler system Notification alarm circuit – local audible-visual, horn-strobe alarm devices inside the unit for occupant warning

Telephone and Data Connections 14 connections located strategically throughout the unit; (6) dedicated to STERIS equipment 8 to customer supplied switch 6 to STERIS supplied switch

Heating and Cooling Connections / HVAC Condensate Drain Terminations Nominal ¾” pipe(s) at front and rear of unit

Unit Anchoring / Tie Downs

(8) at 5,000 lb. tensile capacity (2 each per corner) Locations are field specific Anchor points to be located on the ground at 30-45 degrees from the unit tiedown points

COLD WEATHER INSULATION PACKAGE FACILITY REQUIREMENTS (Per Unit)

When deploying the mobile central sterile processing unit in climates where the ambient temperature routinely drops and stays below 40 degrees Fahrenheit, the cold weather insulation package is a requirement.

Power Requirements (Normal Power) Electrical Service: 240VAC, 2 pole

(4) 4000 watt 240V heaters with NEMA 6-30P plugs A total of (4) circuits must be provided to feed the heaters including:

- (1) 20 amp breaker

- A length of 12 gauge wire (exposed to weather)

- A proper receptacle to receive the heater’s plugs

Frequency: 60hz

Heater Requirements Cable used to power heat: 10-2 Romex (non-metallic sheathed cable) Breaker: 2 pole, 30 AMP

*Thermostats are mounted to each individual heater controlling the on/off cycle.

Additional Salient Qualities include:

Chassis

Mobile SPD that is a 1 to 3 expandable Approximately 53 feet long by 23 feet wide when deployed 3 axles Single point connections with manifolds and pressure regulators for hot and cold water Single point connection for drain Single point connection for fire sprinkler system 8 anchor points (2 per corner) that meets 5,000 lb tensile strength for wind / seismic ratings

SPD Equipment

1 – AMSCO 120 inch 3 Well Sink with compressed air and pure water guns

1 – AcusinQ chemistry dosing pump

2 – STERIS Vision Passthrough Washers Electric with a 35 min cycle or less and 4 transfer carts and manifolds

1 - Pass Thru Window with power open and close

1 – Innowave PCF Sonic Cleaner with robotic reprocessing capability and baskets

1 – Rack return

4 – ErgoStat Prep and Pack tables with bins, computer holder and light

2 – AMSCO 400 36 inch Passthrough sterilizers with 4 loading carts/carriages

1 – V-PRO Max Low Temperature VHP Sterilizer

2 – 75 KW Steam Generators

1 - Hot blow down tank for the steam generators

1 – AmeriWater Critical pure water system that meets TIR34

Safety

2 – Hand wash and eye wash sinks that meet ANZI and FGI standards (1 – Decontamination, 1 – Prep and Pack)

1 – Emergency exit door

1 - Fully engineered wet fire sprinkler system

1 – Stand alone fire panel with capability to communicate with main facility fire system

General Construction and Design

Design

3-stage design in a single unit utilizing passthrough sterilizers and has the following dedicated space for:

o Decontamination Vestibule o Decontamination o Prep and pack o Sterilizer Load o Sterilizer unload and cooling o Sterile vestibule o Mechanical space

Floors

Homogenous with pattern from top layer to bottom.

All floor seams welded Tightly sealed transitions over hinges of expandable panels.

Cove molding that is tight to the floor and wall.

Walls

Fire rated High impact Antimicrobial No gaps or holes

Ceiling

Surgical grade ceiling tiles that are washable and cleanable Clipped in or provide enough pounds per square inch to meet FGI guidelines

Sinks / eyewash

Solid surface countertops Sink made of stainless steel or other nonporous material.

Eyewash single movement that meets ANZI requirements for time and temperature

HVAC that meets - ASHRAE 170

Dedicated HVAC unit for Decontamination o Maintain negative pressure relating to prep and pack and sterilization o Meets or exceeds ASHRAE 170 6 air exchanges per hour 2 external air exchanges per hour 60 to 73 degrees 10 to 55 percent humidity.

Dedicated HVAC for Sterilizer room o Maintain negative relationship to clean and sterile rooms

In duct humidifier system

Other Considerations

Should provide as part of its Mobile SPD / SPS solution o Clinical consulting to aid with the operational workflow while using the

Mobile unit Onsite visit to be prior to deploying the unit Follow up go live support o Inservice on all Mobile equipment as part of startup o Equipment service to include preventive and corrective maintenance on all equipment and the Mobile unit itself.

o Biweekly status calls during deployment

If you have the capabilities to meet or exceed these specifications, please provide detail information with product brochures, specifications, drawings, etc. Send all information to the Contracting Officer via email at roxie.keese@va.gov.