S02-Tenant Improvements Cost Summary TICS Table Exhibit K.pdf

PDF 89 KB Posted

Attached to
Campbell County Community Based Outpatient Clinic (CBOC) is to be located in Lafollette, TN.
Solicitation number
36C24924R0042
Issued by

About this file

This document is a Tenant Improvements Cost Summary (TICS) worksheet for a federal contract opportunity. The TICS worksheet details the estimated costs associated with the tenant improvements required for the Campbell County Community Based Outpatient Clinic (CBOC) in Lafollette, TN.

The TICS worksheet provides a breakdown of the estimated material and labor costs for the shell and tenant improvement (TI) work, including items such as painting, finishes, and fixtures. The worksheet includes instructions for completing the various sections, including filling out the light blue fields for project-specific information such as the ANSI-BOMA office area, general contractor fee, and architect/engineering fees. The document serves as the main deliverable for this contract opportunity and is populated by completing the various division tabs along the bottom of the worksheet.

The related federal contract opportunity is for a new real property lease contract for 6,750 rentable square feet (RSF), 5,000 ANSI/BOMA usable square feet, with a minimum of 25 parking spaces, to be used as the Campbell County CBOC. The tenant agency is the Department of Veterans Affairs Veterans Health Administration, and the facility is expected to have approximately 27 full-time federal employees with operating hours from 6:00 AM to 6:00 PM, Monday through Friday.

View the file

Other files

File Type Posted
S02-Tenant Improvements Cost Summary TICS Table Exhibit J.pdf PDF
S02 Small Business SubCon Plan Exhibit N.pdf PDF
S02-Architect and Engineering qualifications SF330 Exhibit M.pdf PDF
Global Lease 36C24924L0005 Template L100 Oct 2024.pdf PDF
S02-Seismic Offer Forms Exhibit I.pdf PDF
Global Request for Lease Proposal RLP 36C24924R0042 R100 Oct.pdf PDF
S02-Wage Determination Exhibit K.pdf PDF
S02-- Fire and Safety 12000 Exhibit H.pdf PDF
S02 Form 1217 Exhibit G.pdf PDF
S02 Past Performance Questionnaire Exhibit O.pdf PDF
S02-FAR 52.204-24 Representation Digital Exhibit L.pdf PDF
S02-- Fire and Safety 12000 Exhibit I.pdf PDF
S02-Form 1364 Proposal to Lease Space Exhibit F.pdf PDF
S02 Small Business SubCon Plan Exhibit O.pdf PDF
S02 Past Performance Questionnaire Exhibit P.pdf PDF
S02-Agency Space Requirement Exhibit B.pdf PDF
S02-Wage Determination Exhibit L.pdf PDF
S02- Security Requirement Level 2 Exhibit C.pdf PDF
S02-3517B General Clauses Oct. 2023 Exhibit E.pdf PDF
S02-Seismic Offer Forms Exhibit J.pdf PDF
S02-Security Unit Price List Exhibit G.xlsx XLSX spreadsheet
Global Request for Lease Proposal RLP 36C24924R0042 R100 Oct. 2023.pdf PDF
S02 Form 1217 Exhibit H.pdf PDF
S02- - 3516 Solicitation Provisions Dec. 2023 Exhibit D.pdf PDF
S02-Architect and Engineering qualifications SF330 Exhibit N.pdf PDF
Global Lease 36C24924L0005 Template L100 Oct. 2023 Exhibit A.pdf PDF
S02-FAR 52.204-24 Representation Digital Exhibit M.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Read and understand the 'SHELL' tab.

Material Description Accurately describe each item being priced.

Quantity List the quantity e.g., 1, 2, 3, etc.

Unit (Example) LS,EA,GAL,LF, SF, etc.

Cost Amount per one unit Total Total cost of all material.

Labor Hours Time projected to perform the task.

Labor Rate Cost per hour of labor.

Total Cost of labor.

TOTAL Combines overall materials and labor.

TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.

1.

2.

1.

2.

FOR: DATE PREPARED:

Project or Lease # 1/1/2022

QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL

1.00 GAL. $25.00 $25.00 2.50 $36.25 $90.63

$0.00 $0.00 $0.00 $0.00

Material Total: $25.00 Labor Total: $90.63

TOTAL TI MATERIAL & LABOR: $115.63

QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL

10.00 GAL. $27.00 $270.00 6.00 $36.25 $217.50

$0.00 $0.00 $0.00 $0.00

Material Total: $270.00 Labor Total: $217.50

TOTAL SHELL MATERIAL & LABOR: $487.50

INSTRUCTIONS

Shell

Fill out light blue fields categorized SHELL, inputting only costs associated with shell as defined in the 'SHELL' tab.

Input project specific information as appropriate in the light blue fields of the 'INPUT' tab, in order to auto-populate the TICS worksheet. This includes ANSI-BOMA Office Area (ABOA) square footage, General Contractor Fee, Lessor's Project Management Fee, and A/E Fees. Note that some of these fees are already established under the lease agreement and must be used when completing this worksheet.

Tenant Improvements (TI)

Fill out light blue fields categorized Tenant Improvements (TI), inputting only costs associated with TI.

Fill each division tab 1-33 as needed for the construction to be performed under the TI costs as indicated above.

Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below.

TICS tab is locked - it is the main deliverable for this workbook and is populated by completing the 'INPUT' tab and numbered Masterformat CSI division tabs along the bottom of the page.

Fill each division tab 1-33 as needed for the construction to be preformed under the SHELL cost as indicated above.

Tentant Improvement (TI) Cost Estimate for Division 9

LABOR

DIVISION 9 - FINISHES

MATERIAL

MATERIAL LABOR

DESCRIPTION

DESCRIPTION

XYZ Paint

Shell Cost Estimate for Division 9

ABC Paint

INSTRUCTIONS

File details come from the government source that posted it. Updated .