S02-Tenant Improvements Cost Summary TICS Table Exhibit J.pdf
PDF 78 KB Posted
- Attached to
- New Campbell County CBOC
- Solicitation number
- 36C24924R0042-A
About this file
This document appears to be a Tenant Improvements Cost Summary (TICS) table related to a federal contract opportunity for a Community Based Outpatient Clinic (CBOC) in LaFollette, TN.
The key details are: The Department of Veterans Affairs is seeking to lease approximately 5,000 ABOA/6,750 RSF square feet of office space and a minimum of 25 on-site parking spaces to be used as a CBOC. The space must be in a quality, Class A/4-5 CoStar rated building that complies with all current building, seismic, and accessibility code requirements. The government is open to considering existing buildings or new construction. The lease term will be up to 10 years with the lessor responsible for all utilities, janitorial services, facility maintenance, etc. The TICS table provides a detailed cost breakdown by CSI division for the tenant improvements, shell costs, and other lessor costs. The total price to the government and cost per ABOA SF and RSF are also included.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For: Campbell CBOC ABOA SF= 5,000.00
Agency: Veterans Affair TIA PER ABOA SF= -$
Location: LaFollette TN. TOTAL TIA= -$
Common Area Factor: 35.00% RSF= 6,750.00 Masterformat
CSI System Elements TI* SHELL**
Div 1 General Requirements -$ -$ Div 2 Existing Conditions -$ -$ Div 3 Concrete -$ -$ Div 4 Masonry -$ -$ Div 5 Metals -$ -$ Div 6 Wood, Plastics, Composites -$ -$ Div 7 Thermal and Moisture Protection -$ -$ Div 8 Openings -$ -$ Div 9 Finishes -$ -$ Div 10 Specialties -$ -$ Div 11 Equipment -$ -$ Div 12 Furnishings -$ -$ Div 13 Special Construction -$ -$ Div 14 Conveying Equipment -$ -$ Div 21 Fire Suppression -$ -$ Div 22 Plumbing -$ -$ Div 23 Heating, Ventilating, and Air Conditioning (HVAC) -$ -$ Div 26.1 Electrical -$ -$ Div 26.2 Lighting -$ -$ Div 27 Communications -$ -$ Div 28.1 Electronic Safety -$ -$ Div 28.2 Electronic Security (TI - Non-BSAC) -$ -$ Div 31 Earthwork -$ -$ Div 32 Exterior Improvements -$ -$ Div 33 Utilities -$ -$
Subtotal -$ -$ General Contractor Fee Percent -$ -$
Subtotal Construction Costs -$ -$ Architectural & Engineering Fees (NIC DID costs) Percent -$ -$ Other Lessor Costs Established Under the Lease -$ -$
Subtotal Lessor's Costs: -$ -$ Lessor's Project Management Fee Percent -$
Total Price to Government: GRAND TOTAL -$ Cost per ABOA SF -$ -$
Cost per RSF -$ -$ Notes:
* Include all subcontractors' costs.
TENANT IMPROVEMENTS COST SUMMARY (TICS)
Trade Costs
Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the 'SHELL' definitions tab, and the lease, for further information.