This document is a Statement of Work (SOW) for the replacement of the nurse call system and overhead paging system at the Hot Springs VA Health Care System (HSVAHCS) in Hot Springs, South Dakota.

The SOW outlines the scope of work, which includes replacing the existing nurse call system and overhead paging system throughout the facility. The work is to be completed within 270 calendar days from the Notice to Proceed. The contract will be a Firm-Fixed-Price Task Order. The contractor is required to submit a detailed work plan, shop drawings, and maintain a set of as-built drawings. Environmental considerations include recycling materials where feasible. Any changes to the SOW must be approved in writing by the Contracting Officer.

The related federal contract opportunity is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, solicitation number 36C26324B0005, issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 23. Only verified SDVOSB firms registered in the Veteran Small Business Certification (VetCert) database at the time of bid submission will be deemed responsive.

View the file

Other files

File Type Posted
36C26324B0005 0004.docx DOCX document
36C26324B0005 0003.docx DOCX document
AS06_Site Visit Sign In Sheet.pdf PDF
36C26324B0005 0002.docx DOCX document
AS06_Solicitation Questions and Answers_10 Pages.pdf PDF
36C26324B0005 0001.docx DOCX document
S02 NARA Language for Contracts.pdf PDF
S02_VA6500 Appendix C 1 - 1 page.pdf PDF
S02_SAFETY and EMR INFORMATION.pdf PDF
S02_WDOL_General Decision Number_7 Pages.pdf PDF
S02_Drawings_Set 20240715_72 Pages.pdf PDF
S02_Specs_426 Pages.pdf PDF
36C26324B0005_1.docx DOCX document
S02 TMS 20939 VA Privacy Training - 3pp.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Replace Hot Springs Nurse Call and Overhead Paging System

HOT SPRINGS, SD

PROJECT #: 568A4-23-204

1. Background:

1.1. The Hot Springs VA Health Care System (HSVAHCS) requires the replacement of existing nurse call system in Building 12 Hospital and the overhead paging system thought the facility.

2. General

2.1. Title of Project: Replace Hot Springs Nurse Call and Overhead Paging System

2.2. Scope of Work: The contractor shall provide all resources necessary to accomplish the deliverables described in this scope of work (SOW).

Construction shall be completed according to the construction documents, specifications, and drawings.

Background: The project is located at the Hot Springs VA campus. The address for the facility is 500 N 5th St, Hot Springs, SD 57747-1480.

History:

A Rauland Borg nurse call system was installed in the basement 2009 serving three restrooms.

This system shall be replaced.

A Dukane system was installed in Primary Care (exact date unknown) that shall be replaced under this project.

There are restrooms on Pharmacy and X-Ray (both on Ground floor of hospital), installation dates unknown. These systems will be replaced.

A Rauland Borg nurse call system was installed on Ward 1 East Building 12 in 2006, approximately 50 stations. This system shall be replaced.

There is a stand-alone nurse call system on the first floor North Wing (Eye and Audiology clinics). This system will be replaced.

There is one restroom located in the Dental wing (South wing of the first floor of the hospital) that is interfaced with the 1 East nurse call system.

A Rauland Borg system was installed on the 2 North in 2007. This system shall be replaced.

A nurse call system was installed on the second-floor South wing around 1997. At the time this ward was intended as an in-patient unit. This majority of this system has been removed, only bathrooms are still on the system. This system will be replaced.

The overhead paging system is a Dukane system. There are four Dukane master control panels located in the Building 2 Electrical Room, Building 12 IT Room, Building 18 Boiler Plant and Building 43. These panels will be replaced under the project.

The following is a list of overhead paging zones and areas that will be replaced per the contract drawings.

ZONE BLDG # TYPE SECTION SERVICE

01 12 HOSPITAL WARD 1-NORTH NURSING

01 12 HOSPITAL WARD 1-EAST NURSING

01 12 HOSPITAL WARD 2-SOUTH NURSING

01 12 HOSPITAL WARD 3-NORTH NURSING

02 12 HOSPITAL AREA 3-SOUTH BIOMED

02 12 HOSPITAL AREA 4th FLOOR LABORATORY

02 12 HOSPITAL AREA 1-SOUTH DENTAL

02 12 HOSPITAL GROUND NORTH RADIOLOGY

02 12 HOSPITAL BASEMENT REHAB MEDICINE

02 12 HOSPITAL HALL BASEMENT MAIL ROOM AREA

02 12 HOSPITAL S.P.S. S.P.S.

02 53 EDUC 53 EDUCATION

02 53 EDUCAT. 53 BASEMENT EDUCATION

02 53 EDUCAT. 53 GROUND EDUCATION

02 53 EDUCAT. 53 FIRST EDUCATION

02 53 EDUCAT. 53 FIRST EDUCATION

02 43 LAUNDRY LAUNDRY EMS

02 2 DOM EMS EMS

02 65 IT IT IT

02 DOM DOM ARCADE DOM LOWER LEVEL

03 12 HOSPITAL LOBBY MEDICAL SERVICE

03 12 HOSPITAL CANTEEN CANTEEN SERVICE

03 12 HOSPITAL GROUND EAST PRIMARY CARE

03 12 HOSPITAL GROUND SOUTH PHARMACY

03 12 HOSPITAL LOADING DOCK OUTSIDE

04 12 HOSPITAL SURGERY SURGERY

05 DOM ALL UPPER FLOORS LIVING QUARTERS

05 2 DOM DINING ROOM DOM DINING ROOM

05 2 DOM SATP SATP/PSYCHIATRY

06 3 DOM BASEMENT VOLUNTARY SVC.

06 7 DOM BASEMENT ARTS and CRAFTS

06 8 DOM BASEMENT STORAGE

07 11 DOM CALL CENTER CALL CENTER

07 11 DOM AUDITORIUM AUDITORIUM

08 5 DOM CANTEEN CANTEEN

09 14 BUILDING ENGINEERING ENGINEERING

09 14 SEC. BUILDING ENGINEERING ENGINEERING

09 10 DOM ELECTRIC SHOP ENGINEERING

09 13 BUILDING PLUMBING SHOP ENGINEERING

09 13 BUILDING PAINT SHOP ENGINEERING

09 17 BUILDING EQUIP. SHOP ENGINEERING

09 18 BUILDING BOILER PLANT BOILER PLANT

09 A/B BUILDING CARPENTAR ENGINEERING

09 66 BUILDING FIRE/POLICE FIRE/POLICE

09 30 BUILDING TRANSPORT. ENGINEERING

10 1 DOM DIRECTOR DIRECTOR

10 1 DOM CHIEF OF STAFF CHIEF OF STAFF

10 1 DOM UNKNOWN UNKNOWN

10 1 DOM PSYCHOLOGY PSYCHOLOGY

10 1 DOM PSYCHIATRY PSYCHIATRY

10 1 DOM UNKNOWN UNKNOWN

10 1 DOM H.R. H.R.

10 1 DOM DOM FIELROOM DOM FILEROOM

10 1 DOM DOM CLINIC DOM CLINIC

10 1 DOM DOM SERVICE DOM SERVICE

10 1 DOM UNKNOWN UNKNOWN

10 1 DOM QUAL. ASS. QUAL. ASS.

11 4 DOM BASEMENT CALL CENTER

11 4 DOM BASEMENT CALL CENTER

11 6 DOM BASEMENT WAREHOSUE

11 9 DOM CHAPEL CHAPEL

2.3. Scope of Construction: Replace Hot Springs Nurse Call and Overhead Paging Systems shall consist of replacement of the existing nurse call system and overhead paging system at the Hot Springs facility.

2.4. Performance Period: The contractor shall complete the work required under this SOW in 270 calendar days or less from date of Notice to Proceed (NTP), unless otherwise directed by the Contracting Officer (CO). If the contractor proposes an earlier completion date, and the Government accepts the contractor’s proposal, the contractor’s proposed completion date shall prevail.

2.5. Type of Contract: Firm-Fixed-Price Task Order contract.

3. Contract Award Meeting

3.1. The contractor shall not commence performance on the tasks in this SOW until the Contracting Officer (CO) has conducted a pre-construction meeting or has advised the contractor that a kickoff meeting is waived.

4. General Requirements

4.1. This project shall have dedicated on site superintendent managing the construction effort, IAW FAR Clause 52.236-6.

4.2. For every task, the contractor shall identify in writing all necessary subtasks (if any), associated costs by task, along with associated sub-milestone dates. The contractor's subtask structure shall be reflected in the technical proposal and detailed work plan.

4.3. All written deliverables shall be phrased in layperson language. Statistical and other technical terminology shall not be used without providing a glossary of terms.

4.4. Where a written milestone deliverable is required in draft form, the VA will complete their review of the draft deliverable within 14 calendar days from the date of receipt.

The contractor shall have 14 calendar days to deliver the final deliverable from date of receipt of the Government’s comments, unless otherwise specifically outlined in the Governments response.

5. Specific Mandatory Tasks and Associated Deliverables

5.1. Task One: After Notice to Proceed (NTP) is issued, the contractor shall provide a detailed work plan for the VA project team, which presents the contractor's plan for completing the task order. The contractor's plan shall be responsive with this SOW and describe, in further detail, the approach to be used for each aspect of the task order as defined here. Shop drawings fully describing components to be installed shall be submitted for review and acceptance.

5.2. The contractor is expected to keep a complete set of official drawings on the construction site where any/all red lines are recorded. This official red lined drawing set is to be handed in at the completion of the project for the A/E to provide a complete set of as-built drawings.

5.3. Deliverable One: A detailed work plan and briefing. Shop drawings fully describing all components and work products.

5.4. Task Two: Repair various roofs according to the construction documents, specifications, and drawings.

6. Environmental

6.1. Wherever feasible, the project will incorporate “green” environmental principles. These include recycling of materials and design of systems for energy conservation.

6.2. All materials that are recycled shall be logged and the log shall be provided to the

COR.

7. Changes to Scope of Work

7.1. Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor.

8. Confidentiality and Nondisclosure

8.1. It is agreed that:

The preliminary and final deliverables, all associated working papers, and other material deemed relevant by VA and generated by the contractor in the performance of this task order, are the exclusive property of the U.S. Government and shall be submitted to the CO at the conclusion of the task order.

The CO will be the sole authorized official to release, verbally or in writing, any data, draft deliverables, final deliverables, or any other written or printed materials pertaining to this task order. No information shall be released by the contractor. Any request for information relating to this task order, presented to the contractor, shall be submitted to the CO for response.

Press releases, marketing material, or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO.

9. Training, Security and NARA Requirements

9.1. Contractor Training check if required: All contractors on-site shall complete required training. Each contractor is required to print, review, and sign the attached TMS 20939 document. Contract owner/supervisor must send signed TMS 20939 documents to the contract COR, Doug Sprinkle, (605) 745-7259.

9.2. 6500.6 Appendix C Security and NARA PRIVACY-HIPAA CLAUSE: All contractors on-site shall read and comply with attached 6500.6 Appendix C Security and NARA PRIVACY-HIPAA CLAUSE documents.

9.3. Any contractor that is required to be on site must take TMS Training 20939 and those certificates must be sent to the COR prior any work starting.

End of Statement of Work