S02 Sources Sought 36C26023Q0704.pdf
PDF 215 KB Posted
- Solicitation number
- 36C26023Q0704
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sources Sought Notice
*= Required Field Sources Sought Notice
SUBJECT* Life Safety CAD Updates American Lake
GENERAL INFORMATION
CONTRACTING OFFICE’S ZIP CODE* 98661
SOLICITATION NUMBER* 36C26023Q0704
RESPONSE DATE/TIME/ZONE 06-19-2023 15:00 EASTERN TIME, NEW YORK, USA
ARCHIVE 0 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS N
SET-ASIDE
PRODUCT SERVICE CODE* R420
NAICS CODE* 541340
CONTRACTING OFFICE ADDRESS NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661
POINT OF CONTACT*
Adam Hill adam.hill3@va.gov
PLACE OF PERFORMANCE
ADDRESS American Lake VA Medical Center 9600 Veterans Dr SW Joint Base Lewis-McChord, WA
POSTAL CODE 98493
COUNTRY
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
THIS IS A SOURCES SOUGHT NOTICE ONLY. This is not a solicitation for bids, proposals, proposal abstracts, or quotations. The purpose of this Sources Sought Notice is to obtain information regarding the availability and capability of all qualified sources to perform a potential requirement. The responses received from interested contractors will assist the Government in determining the appropriate acquisition method.
The Department of Veterans Affairs (VA), Network Contracting Office (NCO) 20, is conducting market research to identify potential small business manufactures that can provide the following commodities:
This requirement is for updating existing life safety drawings using CAD and life safety analysis at the American Lake VA Medical Center. The following tasks will need to be required.
Task# Deliverable Title Format Number Calendar Days After CO Start
Updated CAD drawings of each building, and each floor of each building for
AMERICAN
LAKE campus up to 1.1M square feet.
CAD file, digital 1 Approx. 4 weeks for Task 1
Update to CAD from Task 1 to include layer for life safety. This will reflect the existing life safety drawings and known information.
CAD file, digital 1 Approx 2 weeks for Task 2
Update to CAD from Task 2 to include updated layer for life
CAD file, digital 1 Approx 4 weeks for Task 3 safety.
Deficiency report
– report shall list each deficiency.
Deficiency shall also be reflected in dedicated deficiency layer of life safety drawing from Task 3.
1. CAD file, digital
2. Print out of Life Safety
Drawing, layers to be determined
1. 1 copy
2. 2 copies
Approx 3 weeks for Task 4
| Number |
| Format |
| Deliverable Title |
File details come from the government source that posted it. Updated .