S02 - SECTION 09 06 00 Shedule Of Finishes Case Work.pdf

PDF 86 KB Posted

Attached to
Z1DA--640-20-117 PA Replace Dental Casework B-100
Solicitation number
36C26120B0016
Issued by

About this file

This document provides details for a federal contract solicitation to replace dental casework at the Veterans Affairs Palo Alto Health Care System in Palo Alto, California. The solicitation will request construction services including removal and replacement of casework in dental labs as well as some associated plumbing, medical gas valves, electrical outlets, and safety measures. The contract is a total SDVOSB set-aside with an estimated value between $500,000 and $1,000,000. The performance period is 180 calendar days from notice to proceed. A pre-solicitation site visit will be held on-site on a date specified in the full solicitation, which is estimated to be available on June 19, 2020. Questions may be directed to the point of contact provided. This pre-solicitation notice does not constitute a commitment and no contract will result directly from it.

View the file

Other files

File Type Posted
S02 - Wage Determination - CA20200018 07.10.2020 - 36C26120Q0818.pdf PDF
36C26120B0016 0002.docx DOCX document
S05 - RFI Log - PA Dental Casework - 640-20-117.pdf PDF
S02 - RFI 001 Exhibit B_revised 7-18-20.pdf PDF
S02 - Final SOW - PA Dental Case Work_FINALv2.pdf PDF
S02 - FAR 52.211-6 Brand Name or Equal Provision.pdf PDF
S02 - RFI 008 - attachment.pdf PDF
36C26120B0016 0001.docx DOCX document
S04 - Site Walk Sign in Sheet - PA - Replace Dental_FILLED OUT.pdf PDF
S02 - SECTION 01 74 19 Construction Waste Management.pdf PDF
S02 - SECTION 01 00 00 General Requirements.pdf PDF
S02 - SECTION 12 36 00 Countertops.pdf PDF
S02 - SECTION 09 91 00 Painting.pdf PDF
36C26120B0016_1.docx DOCX document
S02 - SECTION 12 32 00 MANUFACTURED WOOD CASEWORK.pdf PDF
S02 - Exhibit A.pdf PDF
S02 - SECTION 07 92 00 Joint Sealants.pdf PDF
S02 - SECTION 09 65 13 RESILIENT BASE AND ACCESSORIES.pdf PDF
S02 - SECTION 01 35 36 Safety Requirements.pdf PDF
S02 - SECTION 01 32 16.15 Project Schedule.pdf PDF
S02 - Exhibit B.pdf PDF
S02 - SECTION 22 05 11 Common Results for Plumbing.pdf PDF
S02 - SOLICITATION RFI FORM.pdf PDF
S02 - SECTION 12 34 00 Manufactured Plastic Casework.pdf PDF
S02 - SECTION 06 20 00 Finish Carpentry.pdf PDF
S02 -SECTION 01 57 19 Temporary Environmental Controls.pdf PDF
S02 - SECTION 02 41 00 Demolition.pdf PDF
S02 - SECTION 09 23 00 Gypsum Plaster.pdf PDF
S02 - PG 18-14 Room Finishes Door and Hardware Schedule.pdf PDF
S02 - SECTION 01 33 32 Shop Drawings Product Data and Samples.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace Case Work in Dental 640-20-117

Palo Alto, Building 100, VA Palo Alto Health Care System Final Bid Document

09 06 00 - i

SECTION 09 06 00

SCHEDULE FOR FINISHES

PART I – GENERAL

1.1 DESCRIPTION

This section contains a coordinated system in which requirements for materials specified in other sections shown are identified by abbreviated material names and finish codes in the room finish schedule or shown for other locations.

1.2 MANUFACTURERS

Manufacturer’s trade names and numbers used herein are only to identify colors, finishes, textures and patterns. Products of other manufacturer’s equivalent to colors, finishes, textures and patterns of manufacturers listed that meet requirements of technical specifications will be acceptable upon approval in writing by contracting officer for finish requirements.

1.3 SUBMITALS

Submit in accordance with SECTION 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES provide quadruplicate samples for color approval of materials and finishes specified in this section.

1.4 APPLICABLE PUBLICATIONS

A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in text by basic designation only.

B. MASTER PAINTING INSTITUTE: (MPI)

2001....................Architectural Painting Specification Manual

PART 2- PRODUCTS

2.1 DIGITAL COLOR PHOTOS

Not Used

Palo Alto, Building 100, VA Palo Alto Health Care System Final Bid Document

09 06 00 - 2

2.2 DIVISION 31 - EARTHWORK

NOT USED

2.3 DIVISION 03 – CONCRETE

NOT USED

2.4 DIVISON 04 – MASONRY

NOT USED

2.5 DIVISION 05 – METALS

2.6 DIVISION 06 WOOD, PLASTICS, AND COMPOSITES

Room No.

and Name

Component Material Finish Color

Countertop Solid surface or equivalent Smooth Standard color options

2.7 DIVISION 07 - THERMAL AND MOISTURE PROTECTION

NOT USED

2.8 DIVISION 08 - OPENINGS

Not Used

2.9 DIVISION 09 - FINISHES

Not Used.

2.10 DIVISION 10 – SPECIALTIES

Not Used.

2.11 DIVISION II – EQUIPMENT

NOT USED.

2.12 DIVISION 12- FURNISHINGS

Not Used.

Palo Alto, Building 100, VA Palo Alto Health Care System Final Bid Document

09 06 00 - 3

2.13 DIVISION 13 - SPECIAL CONSTRUCTION

Not Used.

2.15 DIVISION 22 - PLUMBING

A. SECTION 22 40 00, PLUMBING FIXTURES AND TRIM

Item Color

Sink Stainless Steel

Faucet Brushed Chrome

2.16 DIVISON 26 - ELECTRICAL

PART III EXECUTION

3.1 FINISH SCHEDULES & MISCELLANEOUS ABBREVIATIONS

Not Used.

3.2 FINSIH SCHEDULE SYMBOLS

Not Used.

3.3 ROOM FINISH SCHEDULE

Room Cabinet Plastic

Laminate Color

Wall Color as needed for repair

Rubber Base Color Floor Color as needed for repair

Dental

Surgery/Treatment

As Submittal As Submittal As Submittal As Submittal

--- E N D---

File details come from the government source that posted it. Updated .