S02 - SECTION 01 74 19 Construction Waste Management.pdf

PDF 111 KB Posted

Attached to
Z1DA--640-20-117 PA Replace Dental Casework B-100
Solicitation number
36C26120B0016
Issued by

About this file

This document contains a construction waste management specification and a related federal contract opportunity notice. The construction waste management specification outlines requirements for contractors to practice efficient waste management when working on a project to replace dental casework at the Veterans Affairs Palo Alto Health Care System in Palo Alto, California. Contractors must develop and implement a demolition debris management plan to reuse and recycle materials to the greatest extent feasible, and submit monthly reports quantifying all generated and diverted materials.

The related federal contract opportunity is a pre-solicitation notice for the dental casework replacement project. The solicitation will be a total Service-Disabled Veteran-Owned Small Business set-aside, with a projected award amount between $500,000 and $1,000,000. The duration of the project will be 180 calendar days from notice to proceed. A site visit is scheduled for the solicitation phase. Questions may be directed to the point of contact, with full solicitation documents expected to be available on June 19, 2020.

View the file

Other files

File Type Posted
S02 - Wage Determination - CA20200018 07.10.2020 - 36C26120Q0818.pdf PDF
36C26120B0016 0002.docx DOCX document
S05 - RFI Log - PA Dental Casework - 640-20-117.pdf PDF
S02 - RFI 001 Exhibit B_revised 7-18-20.pdf PDF
S02 - Final SOW - PA Dental Case Work_FINALv2.pdf PDF
S02 - FAR 52.211-6 Brand Name or Equal Provision.pdf PDF
S02 - RFI 008 - attachment.pdf PDF
36C26120B0016 0001.docx DOCX document
S04 - Site Walk Sign in Sheet - PA - Replace Dental_FILLED OUT.pdf PDF
S02 - SECTION 01 00 00 General Requirements.pdf PDF
S02 - SECTION 12 36 00 Countertops.pdf PDF
S02 - SECTION 09 91 00 Painting.pdf PDF
36C26120B0016_1.docx DOCX document
S02 - SECTION 12 32 00 MANUFACTURED WOOD CASEWORK.pdf PDF
S02 - Exhibit A.pdf PDF
S02 - SECTION 07 92 00 Joint Sealants.pdf PDF
S02 - SECTION 09 65 13 RESILIENT BASE AND ACCESSORIES.pdf PDF
S02 - SECTION 01 35 36 Safety Requirements.pdf PDF
S02 - SECTION 01 32 16.15 Project Schedule.pdf PDF
S02 - Exhibit B.pdf PDF
S02 - SECTION 09 06 00 Shedule Of Finishes Case Work.pdf PDF
S02 - SECTION 22 05 11 Common Results for Plumbing.pdf PDF
S02 - SOLICITATION RFI FORM.pdf PDF
S02 - SECTION 12 34 00 Manufactured Plastic Casework.pdf PDF
S02 - SECTION 06 20 00 Finish Carpentry.pdf PDF
S02 -SECTION 01 57 19 Temporary Environmental Controls.pdf PDF
S02 - SECTION 02 41 00 Demolition.pdf PDF
S02 - SECTION 09 23 00 Gypsum Plaster.pdf PDF
S02 - PG 18-14 Room Finishes Door and Hardware Schedule.pdf PDF
S02 - SECTION 01 33 32 Shop Drawings Product Data and Samples.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace Case Work in Dental 640-20-117

Palo Alto, Building 100, VA Palo Alto Health Care System Final Bid Document

10/12/2019

SECTION 01 74 19

CONSTRUCTION WASTE MANAGEMENT

1.1 DESCRIPTION

This specification covers the requirements for management of non-hazardous building construction and demolition waste.

1.2 RELATED WORK

A. Section 02 41 00, DEMOLITION.

B. Demolition and removal of roads, walks, curbs, and on-grade slabs outside buildings to be demolished: Section 31 20 00, EARTH MOVING

C. Safety Requirements: Section 00 72 00, GENERAL CONDITIONS, Article, ACCIDENT PREVENTION.

D. Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS.

E. Reserved items which are to remain the property of the Government:

Section 01 00 00, GENERAL REQUIREMENTS.

F. Asbestos Removal: Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.

G. Lead Paint: Section 02 83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.

1.3 GOVERNMENT POLICY

A. Contractor shall practice efficient waste management when sizing, cutting and installing building construction products.

B. Contractor shall use all reasonable means to divert construction and demolition waste from landfills and incinerators and facilitate their recycling.

C. Contractor shall be responsible for implementation of any special programs involving rebates or similar incentives related to recycling and any revenues or savings obtained from salvage or recycling shall accrue to the Contractor.

D. Contractor shall ensure that facilities used for recycling, reuse and disposal shall be permitted for the intended use to the extent required by federal, state and local regulations.

1.4 PLAN

A. Conduct a site assessment to estimate the types of materials that will be generated by demolition at the site. The Whole Building Design

Guide website (http://www.wbdg.org) has a Construction Waste Management

Database that contains information on companies that haul, collect, and process recyclable debris from construction projects http://www.wbdg.org/

Replace Case Work in Dental 640-20-117

Palo Alto, Building 100, VA Palo Alto Health Care System Final Bid Document

10/12/2019

B. Develop and implement procedures to reuse and recycle materials to the greatest extent feasible based upon the contract, the construction and demolition debris management plan, the estimated quantities of materials, and the availability of recycling facilities.

C. Prepare and submit to the Contracting Officer’s Representative a written demolition debris management plan. The Demolition Debris

Management Plan shall be submitted for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA AND SAMPLES 15 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted Project Schedule. The plan shall include, but not be limited to, the following information:

1. Contractor and project identification information;

2. Procedures to be used for debris management;

3. A listing of the materials to be reused, recycled, or taken to the landfill.

4. The names and locations of reuse and recycling facilities or sites.

1.5 COLLECTION

A. Provide necessary containers, bins and storage areas to facilitate effective waste management.

B. Clearly identify so that recyclable materials are separated from trash and can be transported to respective recycling facility for processing.

1.6 DISPOSAL

A. Contractor shall be responsible for transporting and disposing of materials that cannot be delivered to a source-separated or mixed materials recycling facility to a transfer station or disposal facility that can accept the materials in accordance with state law.

B. Building or demolition materials with no practical use or that cannot be recycled shall be disposed of at a landfill or incinerator.

1.7 REPORT

A. With each application for progress payment, the contractor shall submit a summary of construction and demolition debris diversion and disposal, monthly and at the end of the contract quantifying all materials generated at the work site and disposed of or diverted from disposal through recycling.

B. Any request for periodic payment shall not be processed without this report being attached.

- - - E N D - - -