S02 Drawings GE Optima XR646 HD Final Study.pdf

PDF 916 KB Posted

Attached to
Y1DA--Install X-Ray for ED (VA-21-00050034)
Solicitation number
36C24221R0067
Issued by

About this file

This document provides details for Solicitation Number 36C24221R0067 seeking turnkey design-build services for site preparation to install a new GE Healthcare Optima XR646 HD X-ray system. The Department of Veterans Affairs will issue a two-phase RFP for a contractor to provide all required labor, materials, equipment, supervision and construction at the VA New Jersey Health Care System campus in East Orange. Phase I proposals are due on or about April 20, 2021 and the project value is between $250,000 to $500,000. The work must be completed within 120 calendar days and is set aside for small businesses. The selected contractor will design and construct all necessary site work in accordance with GE's equipment drawings and VA requirements to install the new X-ray system in rooms 1-291 and 1-289.

View the file

Other files

File Type Posted
S02 WD - Copy.pdf PDF
36C24221R0067_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 - C1 - Cover Sheet 02 - C2 - Disclaimer - Site Readiness 03 - A1 - General Notes 04 - A2 - Equipment Layout 05 - A3 - Section Views 06 - A4 - Equipment Details & Delivery

07 - M1 - HVAC

08 - S1 - Structural Notes 09 - S2 - Structural Layout

East Orange, New Jersey

Richard Carlsen

OPTIMA XR646 HD

REK

GE Healthcare

GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused. All dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work due to scaling from these drawings. /16RAD-M202971-FIN-00-A.DWG

516.350.1082

Rick.carlsen@ge.com

REK 5643972-1EN

USA

1/4"=1'-0"

4843010

14/Sep/2020

VA New Jersey Health Care System East Orange Campus

A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.

Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning -

Drawn by Verified by PIM Manual

SheetFormat

Concession

Scale DateFile Name

RevS.O. (GON)

A3

REV DATE MODIFICATIONS

A 14/Sep/2020 Final drawing based on DC-235950

FINAL STUDY

10 - S3 - Structural Details (1) 11 - S4 - Structural Details (2) 12 - E1 - Electrical Notes 13 - E2 - Electrical Layout 14 - E3 - Electrical Elevations 15 - E4 - Details-Interconnections 16 - E5 - Power Requirements

GENERAL SPECIFICATIONS

· GE is not responsible for the installation of developers and associated equipment, lighting, cassette trays and protective screens or derivatives not mentioned in the order.

· The final study contains recommendations for the location of GE equipment and associated devices, electrical wiring and room arrangements. When preparing the study, every effort has been made to consider every aspect of the actual equipment expected to be installed.

· The layout of the equipment offered by GE, the dimensions given for the premises, the details provided for the pre-installation work and electrical power supply are given according to the information noted during on-site study and the wishes expressed by the customer.

· The room dimensions used to create the equipment layout may originate from a previous layout and may not be accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of information.

· Dimensions apply to finished surfaces of the room.

· Actual configuration may differ from options presented in some typical views or tables.

· If this set of final drawings has been approved by the customer, any subsequent modification of the site must be subject to further investigation by GE about the feasibility of installing the equipment. Any reservations must be noted.

· The equipment layout indicates the placement and interconnection of the indicated equipment components.

There may be local requirements that could impact the placement of these components. It remains the customer's responsibility to ensure that the site and final equipment placement complies with all applicable local requirements.

· All work required to install GE equipment must be carried out in compliance with the building regulations and the safety standards of legal force in the country concerned.

· These drawings are not to be used for actual construction purposes. The company cannot take responsibility for any damage resulting therefrom.

CUSTOMER RESPONSIBILITIES

· It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final study. A detailed site readiness checklist is provided by GE. It is the responsibility of the customer to ensure all requirements are fulfilled and that the site conforms to all specifications defined in the checklist and final study. The GE Project Manager of Installation (PMI) will work in cooperation with the customer to follow up and ensure that actions in the checklist are complete, and if necessary, will aid in the rescheduling of the delivery and installation date.

· Prior to installation, a structrual engineer of record must ensure that the floor and ceiling is designed in such a way that the loads of the installed system can be securely borne and transferred. The layout of additional structural elements, dimensioning and the selection of appropriate installation methods are the sole responsibility of the structural engineer. Execution of load bearing structures supporting equipment on the ceiling, floor or walls are the customer's responsibility.

RADIO-PROTECTION

· Suitable radiological protection must be determined by a qualified radiological physicist in conformation with local regulations. GE does not take responsibility for the specification or provision of radio-protection.

DISCLAIMER

THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.

DATE NAME SIGNATURE

Site Ready Checks at Installation

EHS Site Requirements

Overall access route to the scan room free from obstruction / high hazards.

Enough space to store tools, equipment, parts, install waste and the general area free from obstruction and trip hazards.

Enough necessary facilities for the GE employees available.

No 3rd parties working in the area that may affect the safety of the installation activity.

Area free from any chemical, gas, dust, welding fume exposure and has painting been completed and dry.

All emergency routes identified, signed and clear from obstruction.

Accessible single source lockable panel that LOTO can be applied to for GE equipment installation (MDP and/or PDU).

There are no other conditions or hazards that you have observed or have been made aware of by the customer or contractors on site.

Required for Mechanical Install start

Room dimensions, including ceiling height, for all Exam, Equipment/Technical & Control rooms meets GE specifications.

Ceiling support structure, if indicated on the GE drawing, is in the correct location and at the correct height according to the Original Equipment Manufacturer specifications.

Levelness and spacing has been measured, and is ready for the installation of any GE supplied components.

Overhead support Structure (unistrut) has been confirmed with customer/contractor to meet required GE provided criteria.

Finished ceiling is installed. If applicable ceiling tiles installed per PMI discretion.

Floor levelness/flatness is measured and within tolerance, and there are no visible defects per GEHC specifications.

Entry door threshold meets PIM requirement.

Rooms that will contain equipment, including staging areas if applicable, are construction debris free. Precautions must be taken to prevent debris from entering rooms containing equipment.

Cable ways (floor/wall/ceiling/Access Flooring) are available for installation of GE cables are of correct length and diameter.

Cable ways routes per GE Final drawings and cable access openings areas installed at a time determined by GEHC PM. Surface floor duct can be installed at time of system installation.

Adequate room illumination installed and working.

Customer supplied countertops where GE equipment will be installed are in place.

Required for Calibration Start

HVAC systems Installed, and the site meets minimum environmental operational system requirements.

System power & grounding (PDB/MDP) is available as per GE specifications.

System power & grounding (PDB/MDP) is installed at point of final connection and ready to use. Lock Out Tag Out is available.

PMI to confirm all feeder wires and breaker are size appropriately. EPO installed if needed.

PMI to confirm with electrician all power and signal cables are well terminated ensuring there are no loose connections.

Network outlets installed.

Computer network available and working.

Lead doors and windows complete or scheduled to be installed. If applicable, radiation protection (shielding) finished & radioprotection regulatory approval for installation obtained.

GLOBAL SITE READINESS CHECKLIST (DI)

DOC1809666 Rev. 7

Note: The details shown here are only an extract from DOC1809666. For the complete document please contact your PMI.

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus C2 - Disclaimer - Site Readiness 02-

ENVIRONMENTAL SPECIFICATIONS

MAGNETIC INTERFERENCE

To guarantee specified imaging performance :

X-ray tubes and control console equipment must be located in ambient static field of less than 10 Gauss.

LIGHT REQUIREMENTS

For the electronic ballast of fluorescent lamp in exam room, the operating frequency should be above 42 kHz.

ACOUSTIC OUTPUT

Measured 1 m [3.28 ft] from any point in system.

In-use: less than 60 dBA Stand-by: less than 55 dBA

· Any deviation from these drawings must be communicated in writing to and reviewed by your local GE healthcare installation project manager prior to making changes.

· Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE healthcare installation project manager can supply a reference list of rigging contractors.

· New construction requires the following;

1. Secure area for equipment,

2. Power for drills and other test equipment,

3. Capability for image analysis,

4. Restrooms.

· Provide for refuse removal and disposal (e.g. crates, cartons, packing)

· It is the customer's responsibility to contract a vibration consultant/engineer to implement site design modifications to meet the GE vibration specification. Refer to the system preinstallation manual for the vibration specification.

CUSTOMER SITE READINESS REQUIREMENTS

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus A1 - General Notes 03

B' B

A' A

For Accessory Sales: (866) 281-7545 Options 1, 2, 1, 2 or mail to: gehcaccessorysales@ge.com

Exam room height

Finished ceiling height 8'-11"

LEGEND

A GE Supplied C Customer/contractor supplied and installed

B GE Supplied/contractor installed D Available from GE E Existing/Reinstall

BY ITEM DESCRIPTION

MAX

HEAT

OUTPUT

(btu)*

WEIGHT

(lbs)

MAX

HEAT

OUTPUT

(W)*

WEIGHT

(kg)

B 1 Main Disconnect Panel - 80 - 36.3

A 2 Systems Cabinet - 705 - 320

A 3 Manual Wall Stand - 537 - 244

A 4 Wall Box - - - -

A 5 Access Point - 1.3 - 0.6

A 6 Grid Holder - 30.4 - 13.8

A 7 Operators Console - 56.6 - 25.7

A 8 Partial UPS - 76 - 34.5

A 9 Cable Drape Rail - 65 - 29.5

A 10 Longitudinal Stationary Rail for OTS - 138 - 62.6

A 11 OTS with 2m Bridge - 839 - 381

C 12 Minimum opening for equipment delivery is 36 in. w x 66.9 in. h, contingent on a 96 in.

corridor width (Note: Image Paste option requires an 80.9 in H opening)

C 13 Counter top for equipment with shelf below. Provide grommeted openings as required to route cables

C 14 Control wall, 7 Ft. high with lead glass viewing window

*Refer to heat dissipation detail on page M1 for system heat load information

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus A2 - Equipment Layout 041/4"=1'-0"

0' -7

1' -4

0' -2

4' -1

1"

'-0

6'-6"4'-11"

1'-1"

5'-0"

10'-9"

11'-10"

1' -6

8'

-8

4' -5

RAD EXAM

ROOM

CONTROL

2' -6

EXAM ROOM CEILING HEIGHTS

RECOMMENDED AND MINIMUM ROOM HEIGHTS

CONFIGURATION SPECIFICATIONS CEILING HEIGHT

2m or 3m Bridge Recommended 2836 mm 111.6 in 2m or 3m Bridge Minimum 2686 mm 105.75 in

2m or 3m Bridge (Cable chain) with Standard or Manual Wallstand at Foot Position Minimum 2700 mm 106.3 in

2m or 3m Bridge with Extended Wallstand at Foot Position Minimum 2750 mm 108.3 in

Note : measured from the floor to the top of the longitudinal rails

CEILING HEIGHT WITH FOOTSTOOL

CEILING HEIGHT (mm [in]) COMMENTS

2686 ~ 2966 [105.7 ~ 116.8] Patient barrier only (197 mm [7.8 in]), no need for footstool

2966 ~ 3036 [116.8 ~ 119.5] Need 267 mm [10.5 in] footstool

3036 ~ 3179 [119.5 ~ 125.2] Need 410 mm [16.1 in] footstool

FRONT VIEW A-A'

SIDE VIEW B-B'

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus A3 - Section Views 051/4"=1'-0"

0'-0"

8'-11"

9 10

11 10

0'-0"

8'-11"

121212

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus A4 - Equipment Details & Delivery 06

ACCESS POINT POSITION

AP Wall-mounting position:

· There are 6 different positions available for AP wall-mounting.

· Install at more than 2.5 m [8.2 ft] height from floor level to avoid potential blocking from human or other obstacles.

· One Ethernet cable to Magic PC and one power cable to system cabinet are connected on the back of the AP.

· Use wall mount adapter included with AP.

· AP is only provided for wireless system, it is not included in Non Wireless Configuration system.

Detector insertion direction

Pos 1

Pos 2

Pos 3 Pos 4 Pos 5

Pos 6

Cable outlet

Detector insertion direction

THE CUSTOMER/CONTRACTOR SHOULD:

· Provide an area adjacent to the installation site for delivery and unloading of the GE equipment.

· Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the movement of GE equipment from the delivery area into the definitive installation room.

· Ensure that access routes for equipment will accommodate the weights of the equipment and any transportation, lifting and rigging equipment.

· Ensure that all necessary arrangements for stopping and unloading on public or private property not belonging to the customer have been made.

DELIVERY

DIMENSIONS OF DELIVERY WITH DOLLY TRANSPORT EQUIPMENT

EQUIPMENT DIMENSIONS WEIGHT

STANDARD WALLSTAND

LENGTH 2111 mm 83.1 in 260 kg + dolly 573 lbs + dollyWIDTH 911 mm 35.9 in

HEIGHT 1860 mm 73.2 in

GLOBAL G3 TABLE

LENGTH 2350 mm 93 in 380 kg + dolly 838 lbs + dollyWIDTH 940 mm 37 in

HEIGHT 800 mm 31.5 in

THE CUSTOMER/CONTRACTOR SHOULD:

· Provide an area adjacent to the installation site for delivery and unloading of the GE equipment.

· Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the movement of GE equipment from the delivery area into the definitive installation room.

· Ensure that access routes for equipment will accommodate the weights of the equipment and any transportation, lifting and rigging equipment.

· Ensure that all necessary arrangements for stopping and unloading on public or private property not belonging to the customer have been made.

THE CUSTOMER/CONTRACTOR SHOULD:

· Provide an area adjacent to the installation site for delivery and unloading of the GE equipment.

· Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the movement of GE equipment from the delivery area into the definitive installation room.

· Ensure that access routes for equipment will accommodate the weights of the equipment and any transportation, lifting and rigging equipment.

· Ensure that all necessary arrangements for stopping and unloading on public or private property not belonging to the customer have been made.

STATIONARY RAILS (5.79 m) (set of 2 rails)

LENGTH 5920 mm 233 in

62.6 kg+ fixture

138 lbs+ fixtureWIDTH 178 mm 7 in

HEIGHT 76 mm 3 in

OTS

LENGTH 900 mm 35.4 in 217 kg 478 lbsWIDTH 940 mm 37 in

HEIGHT 1020 mm 40 in

CLEARANCE AREAS

GLOBAL G3 TABLE WITH STANDARD WALLSTAND

SCALE 1:50

[8 in]

[3 in

[2 in

[3 in

[2 in

Column service clearance, either side required

Column service clearance, either side required

*Recommended service access clearance is 915 mm [3 ft].

[94 in]

[121 in]

[3 in

[4 in fo r S ta nd ar d

W al l S ta nd fo r S ta nd ar d

W al l S ta nd

0m m

[2 in

Service clearance, right hand load

Service clearance, left hand load

[2 in]

HEAT DISSIPATION DETAILS

SYSTEM POWER CONSUMPTION

HEAT OUTPUT

STANDBY IN-USE

Standby Power 1.0 kW 3412 BTU/hr Standby Current 2.0 A

Continuous Power 2.2 kW 7507 BTU/hr

Continuous Current 4.5 A

TEMPERATURE AND HUMIDITY SPECIFICATIONS

IN-USE CONDITIONS

EXAM ROOM CONTROL ROOM

Temperature Min Max Min Max

15°C [59°F] 32°C [90°F] 15°C [59°F] 32°C [90°F] Temperature gradient < 10°C/h [< 50°F/h] < 10°C/h [< 50°F/h] Relative humidity (1) 20% to 75% 20% to 75% Humidity gradient < 30%/h < 30%/h

STORAGE CONDITIONS

Temperature -5°C [23°F] to +50°C [122°F] Temperature gradient < 20°C/h [< 68°F/h] Relative humidity (1) 10% to 85% Humidity gradient < 30%/h

Storage longer than 90 days is not recommended.

(1) Non-condensing

AIR RENEWAL

According to local standards.

NOTE

In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to take measures to protect the equipment from dropping water.

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus M1 - HVAC 07

STRUCTURAL NOTES

· Methods of support for the steelwork that will permit attachment to structural steel or through bolts in concrete construction should be favored. Do not use concrete or masonry anchors in direct tension.

· All units that are wall mounted or wall supported are to be provided with supports where necessary. Wall supports are to be supplied and installed by the customer or his contractors. See plan for suggested locations.

· Control walls shall be constructed to minimum 2130mm (7'-0") high.

· Dimensions are to finished surfaces of room.

· Customers contractor must provide all penetrations in post tension floors.

· Customers contractor must provide and install any non-standard anchoring. Documents for standard anchoring methods are included with GE equipment drawings for geographic areas that require such documentation.

· Customers contractor must provide and install hardware for "through the floor" anchoring and/or any bracing under access floors. This contractor must also provide floor drilling that cannot be completed because of an obstruction encountered while drilling by the GE installer such as rebar etc.

· It is the customer's responsibility to perform any floor or wall penetrations that may be required. The customer is also responsible for ensuring that no subsurface utilities (e.g., electrical or any other form of wiring, conduits, piping, duct work or structural supports (i.e. post tension cables or rebar)) will interfere or come in contact with subsurface penetration operations (e.g. drilling and installation of anchors/screws) performed during the installation process. To ensure worker safety, GE installers will perform surface penetration operations only after the customer's validation and completion of the "GE surface penetration permit".

· Different anchor types are used to install the components of the system. Refer to Structural Requirements Section(s) of the Pre-Installation Manual for each anchor requirement.

· Refer to the Structural Requirements Section for the required minimum embedment.

· The ground surface must be flat and leveled, maximum tolerance for leveling is ±1.5 mm per 1 m (0.2 in per 10 feet). A grout pad provided by the contractor is required to meet this specification. The maximum pad thickness is 6.3 mm (0.25 in).

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus S1 - Structural Notes 08

CEILING REQUIREMENTS

To allow installation of the stationary rail cross-members, clearance is required between the ends of the stationary rails and the walls.

It is recommended that sprinkler heads not be placed between the stationary rails. All sprinkler heads should be mounted so they do not extend downward more than 6.35 mm [1/4 in] from the ceiling while in the 'resting' position.

In addition, there should not be anything mounted in the ceiling (i.e. lights, A/C returns, etc) between the stationary rails. This is because the OTS longitudinal drive belt assembly is located on the movable bridge, approximately centered between the two stationary rails, and may come into contact with those ceiling-mounted items during normal use.

Stationary rails are designed for top (ceiling) mounting. Rails can be ordered and are supplied in the following sizes:

- 4115 mm [13 ft 6 in] - 5334 mm [17 ft 6 in]

- 4420 mm [14 ft 6 in] - 5640 mm [18 ft 6 in]

- 4724 mm [15 ft 6 in] - 5791 mm [19 ft]

- 5030 mm [16 ft 6 in]

The choice of length depends on room size, configuration and the possible presence of obstructions.

ITEM DESCRIPTION

(GE SUPPLIED / CONTRACTOR INSTALLED)

1 Area occupied by GE supplied wall stand baseplate

(CONTRACTOR SUPPLIED & INSTALLED)

2 Support backing, locate as shown.

Structural support in ceiling for fastening ceiling supported equipment. Supports to run continuous with no fittings extending below face of channel, run wall to wall, be parallel, square, and in the same horizontal plane, flush with the finished ceiling. Rails are mounted to these supports every 2'-2" and require 350 lbs. (597 lbs. In seismic regions) per bolt load.

Methods of support that permit attachment to structural steel or through bolts in concrete should be favored. Do not use screw anchors in direct tension.

Structural support in ceiling for fastening cable drape rail. Supports to run continuous with no fittings extending below face of channel, run wall to wall, be parallel, square, and in the same horizontal plane, flush with the finished ceiling. Rails are mounted to these supports every 2'-2" and require 50 lbs. Per bolt load. Methods of support that permit attachment to structural steel or through bolts in concrete should be favored. Do not use screw anchors in direct tension.

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus S2 - Structural Layout 091/4"=1'-0"

RAD EXAM

ROOM

CONTROL

5'-0"

1' -6

4' -0

0'-8"1'-4"4'-8"

0' -8

1'-7

WALLSTAND ANCHORING

Concrete area for wall stand installation should be 1 m² [39.37 ft²].

SCALE 1:10

WALLSTAND BASE

Anchors M10x150 supplied by GE

WALLSTAND AXIS

[14 in]

[9 in

[1 in

[9 in

Cable inlet area

[1 in]

[4 in]

[10 in]

FOCAL SPOT TRAVEL WITH 2M BRIDGE

Note: Focal Spot Travel depends on the length of the bridge, rails and position of bridge.NOT TO SCALE

[228 in]

[21 in]

[21 in]

[6 in

[7 in re c.

[1 in

[5 in

[114 in]

[1 in

OTS column travel range

Tube focal spot travel range

[1 in

[18 in]

[18 in]

[1 in

660.4 ±1.5 mm [26 ±1/16 in]

1422 ±3 mm [56 ±1/8 in]

OTS SUSPENSION RAILS MOUNTING SPECIFICATIONS

min. 413/rec. 442/max. 470 ±3 mm [min.16.2/rec. 17.4/max. 18.5 ±1/8 in]

Distance between holes axis 660.4 mm [26 in], Maximum load per screw is 160 kg [353 lb], however each mounting screw must not "PULL OUT" or otherwise fail under a vertically downward dead load of 635 kg [1400 lb].

Bolts for mounting stationary rails on Unistrut or equivalent supplied by GE (1/2" - 13 headed bolts)

Cable takeup support rail mounting points

Stationary rail mounting points must be parallel within ±3 mm [±1/8 in]

When a 136 kg [330 lb] load is applied vertically downward or horizontally at any stationary rail mounting point, the attachment interface must not deflect more than 1.5 mm [1/16 in]

When a 22.7 kg [50 lb] force is applied vertically upward, downward or horizontally at any support rail mounting point, the attachment interface must not deflect more than 1.5 mm [1/16 in]

When a 45.4 kg [100 lb] force is applied vertically upward at any stationary rail mounting point, the attachment interface must not deflect more than 1.5 mm [1/16 in]

All mounting points must be located on a common centerline within ±1.5 mm [±1/16 in]

All mounting points must be in the same horizontal plane within ±2.4 mm [±3/32 in]

2 m BRIDGE

Diagonals must be equal within

±6.5 mm [±1/4 in]

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus S3 - Structural Details (1) 10

Structural Supports

XT RADIOGRAPHIC SUSPENSION, INBOARD MOUNTING

DETAIL 2

NOT TO SCALE

Contractor supplied and installed structural supports flush with finished ceiling

Contractor supplied and installed finished ceiling (ceiling & supports must not extend below face of structural supports)

GE supplied spring nuts with bolts

GE supplied self-tapping screws GE supplied cable drape rail

GE supplied cable drape support

DETAIL 1

NOT TO SCALE

Contractor supplied and installed structural supports flush with finished ceiling

Contractor supplied and installed finished ceiling (ceiling & supports must not extend below face of structural supports)

GE supplied spring nuts with bolts

GE supplied longitudinal stationary rail

GE supplied cable drape support

GE supplied cable drape rail

Ceiling height as specified on installation drawings

Structural Support system is not supplied or installed by GE Healthcare

Stationary Rail

Supports to slab as required

Structural SupportsStructural Supports Stationary Rail

Reference Structural Layout for these dimensions

Reference Structural Layout for these dimensions

Contractor supplied and installed structural supports flush with finished ceiling

Contractor supplied and installed finished ceiling (ceiling & supports must not extend below face of structural supports)

GE supplied spring nuts with bolts

GE supplied self-tapping screws GE supplied cable drape rail

GE supplied cable drape support

Contractor supplied and installed structural supports flush with finished ceiling

Contractor supplied and installed finished ceiling (ceiling & supports must not extend below face of structural supports)

GE supplied spring nuts with bolts

GE supplied self-tapping screws GE supplied cable drape rail

GE supplied cable drape support

Contractor supplied and installed structural supports flush with finished ceiling

Contractor supplied and installed finished ceiling (ceiling & supports must not extend below face of structural supports)

GE supplied spring nuts with bolts

GE supplied self-tapping screws GE supplied cable drape rail

GE supplied cable drape support

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus S4 - Structural Details (2) 11

ELECTRICAL NOTES

· All junction boxes, conduit, duct, duct dividers, switches, circuit breakers, cable tray, etc., are to be supplied and installed by customers electrical contractor.

· Conduit and duct runs shall have sweep radius bends

· Conduits and duct above ceiling or below finished floor must be installed as near to ceiling or floor as possible to reduce run length.

· Ceiling mounted junction boxes illustrated on this plan must be installed flush with finished ceiling.

· All ductwork must meet the following requirements:

1.Ductwork shall be metal with dividers and have removable, accessible covers.

2.Ductwork shall be certified/rated for electrical power purposes.

3.Ductwork shall be electrically and mechanically bonded together in an approved manner.

4.PVC as a substitute must be used in accordance with all local and national codes.

· All openings in raceway and access flooring are to be cut out and finished off with grommet material by the customers contractor.

· General contractor to insert pull cords for all cable run conduits between the equipment room and the operators control room.

· 10 foot pigtails at all junction points.

· Grounding is critical to equipment function and patient safety. Site must conform to wiring specifications shown on this plan.

1. All wires specified shall be copper stranded, flexible, thermo-plastic, color coded, cut 10 foot long at outlet boxes, duct termination points or stubbed conduit ends. All conductors, power, signal and ground, must be run in a conduit or duct system. Electrical contractor shall ring out and tag all wires at both ends. Wire runs must be continuous copper stranded and free from splices.

1.1. Aluminum or solid wires are not allowed.

2. Wire sizes given are for use of equipment. Larger sizes may be required by local codes.

3. It is recommended that all wires be color coded, as required in accordance with national and local electrical codes.

4. Conduit sizes shall be verified by the architect, electrical engineer or contractor, in accordance with local or national codes.

5. Convenience outlets are not illustrated. Their number and location are to be specified by others. Locate at least one convenience outlet close to the system control, the power distritbution unit and one on each wall of the procedure room. Use hospital approved outlet or equivalent.

6. General room illumination is not illustrated. Caution should be taken to avoid excessive heat from overhead spotlights. Damage can occur to ceiling mounting components and wiring if high wattage bulbs are used.

Recommend low wattage bulbs no higher than 75 watts and use dimmer controls (except MR). Do not mount lights directly above areas where ceiling mounted accessories will be parked.

7. Routing of cable ductwork, conduits, etc., must run direct as possible otherwise may result in the need for greater than standard cable lengths (refer to the interconnection diagram for maximum usable lengths point to point).

8. Conduit turns to have large, sweeping bends with minimum radius in accordance with national and local electrical codes.

9. A special grounding system is required in all procedure rooms by some national and local codes. It is recommended in areas where patients might be examined or treated under present, future, or emergency conditions. Consult the governing electrical code and confer with appropriate customer administrative personnel to determine the areas requiring this type of grounding system.

10. The maximum point to point distances illustrated on this drawing must not be exceeded.

11. Physical connection of primary power to GE equipment is to be made by customers electrical contractor with the supervision of a GE representative. The GE representative would be required to identify the physical connection location, and insure proper handling of GE equipment.

12. GEHC conducts power audits to verify quality of power being delivered to the system. The customer's electrical contractor is required to be available to support this activity.

CONNECTIVITY REQUIREMENTS

Broadband Connections are necessary during the installation process and going forward to ensure full support from the Engineering Teams for the customers system. Maximum performance and availability for the customers system is maintained and closely monitored during the lifetime of the system. Proactive and reactive maintenance is available utilising the wide range of digital tools using the connectivity solutions listed below:

· Site-to-Site VPN/GE Solution

· Site-to-Site VPN/Customer Solution

· Connection through Dedicated Service Network

· Internet Access - connectivity for InSite 2.0

The requirements for these connectivity solutions are explained in the broadband solutions catalogue (separate document).

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus E1 - Electrical Notes 12

A B

C

Additional Conduit Runs (Contractor Supplied and Installed)

From To Qty Size

In. mm 3 phase power Main disconnect 1 as Req'd as Req'd

Main disconnect Emergency off 1 1/2 16 Systems Cabinet 1 as Req'd as Req'd

Warning light

Warning light control 1 1/2 16

1 phase power 1 as Req'd as Req'd

Systems Cabinet 1 1/2 16

Door Switch 1 1/2 16

Access Point 1 1 27 Operators Console Access Point 1 2 53

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus E2 - Electrical Layout 131/4"=1'-0"

ITEM Outlet Legend for GE Equipment

System emergency off (SEO), (recommended height 1.2m [48"] above floor)

X-Ray room warning light control panel

X-Ray ON lamp (L1) - 24V

Door interlock switch (needed only if required by state/local codes) Duplex hospital grade, dedicated wall outlet 120-v, single phase power

Dedicated telephone line(s)

Network outlet

ELECTRCAL LAYOUT ITEM LIST

1 10" x 3 1/2" Surface wall duct with minimum 2 dividers

2 Flush pull box for Access Point - size per local code

3 Main Disconnect Panel

RAD EXAM

ROOM

CONTROL

4'-6"

1'-4" 5'-0"

1' -6

4' -0

"11

C

A B

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus E3 - Electrical Elevations 141/4"=1'-0"

0' -9

5' -0

+7'-0"

3T.

B.

D.

0' -9

0'-0"

8'-11"

0'-0"

8'-11"

0'-0"

8'-11"

1111 11

0' -9

0' -9

"1

TYPICAL CABLE MANAGEMENT

Removable coverplate

WALL DUCT

Dividers as required per local code

NOT TO SCALE

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus E4 - Details-Interconnections 15

INTERCONNECTIONS

System Cabinet

BRIDGE

WS

WALL BOX

OPERATOR

CONSOLE

EXAM ROOM

CONTROL ROOM

TIB

(optional)

TABLE

Measured from the front of the bridge

19.5 m [63.98 ft]

20.5 m [67.26 ft]

15.5 m [50.85 ft]

19.5 m [63.98 ft]

14.5 m [47.57 ft]

19.5 m [63.98 ft]

15.5 m [50.85 ft]

AP

Ethernet

24.5 m [80.38 ft]

Ethernet

24.5 m [80.38 ft]

Ethernet

29.5 m [96.7 ft]

Hospital

110/220 VAC

Detector bin (optional)

Ethernet

24.5 m [80.38 ft]

17.5 m [57.41 ft]

19.5 m [63.98 ft]2.8 m [9.19 ft]

25.5 m [83.66 ft]

Ethernet

29.5 m [96.7 ft]

.......m [........ft]

.......m [........ft]

- Long usable length

- Standard usable length

FEEDER TABLE

MIN. FEEDER WIRE SIZE, AWG OR MCM

(sq. mm)/VAC

MINIMUM FEEDER WIRE LENGTH - ft (m)

50 (15) 100 (30) 150 (46) 200 (61)

(76)

(91)

(107)

(122)

(137)

480 VAC 4 (21) 4 (21) 4 (21) 2 (34 1 (45) 1/0 (54) 1/0 (54) 2/0 (68) 3/0 (85)

GENERAL NOTES

In all cases qualified personnel must verify that the feeder (at the point of take-off) and the run to the GE system meet all the requirements stated in the PIM

For a single unit installation, the minimum transformer size is 112.5 kVA, Synthesized power feed is not acceptable

Grounding conductor will be of the same size as the feeder. This ground will run from the equipment back to the power source/main grounding point and always travel in the same conduit with the feeders

· Power supply should come into a power distribution box (MDP) containing the protective units and controls.

· The section of the supply cable should be calculated in accordance with its length and the maximum permissible voltage drops.

· There must be discrimination between supply cable protective material at the beginning of the installation

(main low-voltage transformer side) and the protective devices in the MDP.

SUPPLY CHARACTERISTICS

· Power input must be separated from any others which may generate transients (elevators, air conditioning, radiology rooms equipped with high speed film changers...)

· All equipment (lighting, power outlets, etc...) installed with GE system components must be powered separately.

GROUND SYSTEM

· Equipotential : the equipotential link will be by means of an equipotential bar. This equipotential bar should be connected to the protective earth conductors in the ducts of the non GE cableways and to additional equipotential connections linking up all the conducting units in the rooms where GE units are located.

CABLES

· Power and cable installation must comply with the distribution diagram below.

· All cables must be isolated and flexible.

· Cable color codes must comply with standards for electrical installation.

Case PDB furnished by GE : The cables for signals and remote control (DLK1, SEO, XRL1...) will go to MDP with a pigtail length of 1.5m [4.9 ft], and will be connected during installation. Each conductor will be identified and isolated (screw connector).

CABLEWAYS

The general rules for laying cableways should meet the conditions laid down in current standards and regulations, with regard to:

· Protecting cables against water (cableways should be waterproof)

· Protecting cables against abnormal temperatures (proximity to heating pipes or ducts)

· Protecting cables against temperature shocks

· Replacing cables (cableways should be large enough for cables to be replaced) metal cableways should be grounded.

POWER REQUIREMENTS

POWER SUPPLY 380/400/415/440/460/480V ±10%, THREE-PHASE + G

FREQUENCIES 50/60Hz ± 3Hz POWER DEMAND 97kVA

MAXIMUM LINE RESISTANCE

PER 2 PHASES (Ohm)

380V : 0.118 / 400V : 0.131 / 415V : 0.138 440V : 0.154 / 480V : 0.185

POWER DISTRIBUTION

MDP Main Disconnect Panel SKL Generator (System Cabinet) SEO Emergency OFF button (Control Room), located 1.50m (4.9') above floor XRLC Warning Light Control XRL1 Warning Light DLK1 Door Interlock Switch (needed only if required by state/local codes)

SEO

XRLC

DLK1

MDP

Ground cable (PE)

SKL

Cable SUPPLIED BY

CUSTOMER

Equipment SUPPLIED BY GE

Equipment SUPPLIED BY

CUSTOMER

Cable SUPPLIED BY GE

XRL1

14 Black 14 White 14 Green

*Black (3) *Green (1)

14 Black 14 White 14 Green

14 Black 14 Green 14 White

2 - NO. 14 Black

14 Black 14 White 14 Green

1 phase power

14 White 14 Red

*Black (3) *Green (1)

* Wire sized per the feeder table below

Main 480 V Three Phase Supply

80 A

DateRev /16RAD-M202971-FIN-00-A.DWG A 14/Sep/2020OPTIMA XR646 HDVA New Jersey Health Care System East Orange Campus E5 - Power Requirements 16

File details come from the government source that posted it. Updated .