S02_Drawings 621-22-136 Update Mountain Home Site Lighting.pdf

PDF 4 MB Posted

Attached to
K062--Upgrade Site Lighting Project Number 621-22-136
Solicitation number
36C24922B0019
Issued by

View the file

Other files

File Type Posted
S02_MAP Underground Site Utilities for Reference Only (1).pdf PDF
S02_Specs 621-22-136 Construction _01.pdf PDF
36C24922B0019_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

JAMES H. QUILLEN VA MEDICAL CENTER

MOUNTAIN HOME, TENNESSEE

SITE PLAN

TITLE SHEET, AREA MAP

SITE PLAN, SHEET INDEX

GI-1

AREA MAP

SHEET INDEX

SYMBOLS ABBREVIATIONS

FIXTURE DESCRIPTIONS

PULLBOX

1/28/22

621-22-136

Update Mountain Home Site Lighting

GENERAL NOTES FOR PROJECT 621-22-136

1. AREAS OF WORK TO BE COMPLETED ARE CLOUDED.

2. DRAWINGS WITHOUT CONSTRUCTION CLOUDS ARE FOR

REFERENCE ONLY.

3. SEE CONSTRUCTION NOTES ON SHEET NUMBER ELS-7.

4. SEE FIXTURE SCHEDULES ON SHEET NUMBERS ELS-6 AND ELS-7.

5. FOR "Y" TYPE FIXTURES PROVIDE AND INSTALL SQUARE STRAIGHT

ALUMINUM POLES. MATCH NEARBY POLES IN HEIGHT, SHAFT SIZE,

COLOR, AND ACCESSORIES. PROVIDE LARGEST WALL THICKNESS

OFFERD FOR CORRESPONDING SHAFT SIZE.

621-22-136

Update Mountain Home Site Lighting

POLYMER CONCRETE PULL BOX 18" X 24" MINIMUM

LITHONIA FIXTURE #

KAD LED 40C 1000 40K R4 208

SPD12 PER5 PE1 DF DDB LPI

Y 6

OVERALL SITE PLAN

ESL-1

SITE PLAN

SEE ESL-2

SEE ESL-3

SEE ESL-5

SEE ESL-4

1/28/22

621-22-136

Update Mountain Home Site Lighting

PARTIAL SITE PLAN

ESL-2

KEY PLAN

8-44

1/28/22

621-22-136

Update Mountain Home Site Lighting

4 5

ESL-3

KEY PLAN

8-9

8-90B

1/28/22

621-22-136

Update Mountain Home Site Lighting

8-58A

8-90A

ESL-4

KEY PLAN

1/28/22

621-22-136

ESL-5

KEY PLAN

1/28/22

621-22-136

LIGHT FIXTURE SCHEDULES

ESL-6

SCHEDULE NOTES

621-22-136

Update Mountain Home Site Lighting

1/28/22

YY

8-58A 8-90A

8-90B MODERN-DOUBLE YY 282

LIGHT FIXTURE SCHEDULES

ESL-7

ANTIQUE POST FOUNDATION DETAIL

N.T.S

BOLT CENTERS FOR ANTIQUE POST

N.T.S (VERIFY EXACT SETTING WITH POLE PROVIDED)

CONSTRUCTION NOTES FOR PROJECT 621-22-136

THERE IS NO POWER AT EXISTING FIXTURE 116-1. INVESTIGATE AND TROUBLESHOOT EXISTING FIXTURE AND CIRCUITING. PROVIDE AND INSTALL NEW UNDERGROUND CONDUIT AND WIRE FROM

FIXTURE 116-2 TO 116-1. PROVIDE DIRECT BORE BENEATH ROADWAY, DO NOT CUT ASPHALT.

PROVIDE AND INSTALL POLYMER CONCRETE PULL BOX IF REQUIRED. MATCH EXISTING WIRE AND

CONDUIT SIZES.

CIRCUIT VOLTAGE FOR FIXTURES 8-35, 8-34, AND 8-30 IS ONLY 120 VOLTS BUT SHOULD BE 208 VOLTS.

INVESTIGATE AND TROUBLESHOOT EXISTING FIXTURES AND CIRCUITING. PROVIDE AND INSTALL NEW UNDERGROUND CONDUIT AND WIRE FOR THESE FIXTURES BACK TO EXISTING FIXTURE 8-37. PROVIDE AND INSTALL POLYMER CONCRETE PULL BOXES IF REQUIRED. MATCH EXISTING WIRE AND CONDUIT

SIZES.

THERE IS NO POWER AT EXISTING FIXTURE 8-44. INVESTIGATE AND TROUBLESHOOT EXISTING FIXTURE AND CIRCUITING. PROVIDE AND INSTALL NEW UNDERGROUND CONDUIT AND WIRE FROM EXISTING BROKEN POLYMER CONCRETE PULL BOX ON THE WEST SIDE OF FIXTURE 8-43. PROVIDE AND INSTALL NEW CONCRETE POLYMER PULL BOX IN PLACE OF THE BROKEN ONE. MATCH EXISTING

WIRE AND CONDUIT SIZES.

EXISTING FIXTURE 8-23 HAS BEEN REMOVED. PROVIDE AND INSTALL NEW POLE AND FIXTURES (Y).

EXTEND EXISTING CIRCUIT AS REQUIRED. MATCH EXISTING WIRE AND CONDUIT SIZES.

REPAIR DROOPING FIXTURE HEAD ON EXISTING FIXTURE 8-22.

EXISTING FIXTURE 200-17 IS LEANING. REMOVE POLE AND FIXTURES. RETURN FIXTURES TO THE VA AND REMOVE POLE FROM PREMISES. PROVIDE AND INSTALL NEW POLE AND FIXTURES (Y). EXTEND

EXISTING CIRCUIT AS REQUIRED. MATCH EXISTING WIRE AND CONDUIT SIZES.

PROVIDE AND INSTALL POLE, FIXTURES (Y), AND POLE BASE FOR NEW FIXTURES 8-90B. LOCATE AND INTERCEPT UNDERGROUND CONDUIT AND WIRE FROM EXISTING FIXTURE 8-90. PROVIDE AND INSTALL POLYMER CONCRETE PULL BOX AND FEED NEW FIXTURE. MATCH EXISTING WIRE AND CONDUIT SIZES.

DO NOT DISTURB CHRISTMAS TREE.

PROVIDE AND INSTALL POLE BASE FOR NEW FIXTURE 8-90A. ANTIQUE FIXTURE WILL BE PROVIDED BY

THE VA FOR CONTRACTOR INSTALLATION. LOCATE AND INTERCEPT UNDERGROUND CONDUIT AND

WIRE FROM EXISTING FIXTURE 8-90. PROVIDE AND INSTALL POLYMER CONCRETE PULL BOX AND FEED NEW FIXTURE. MATCH EXISTING WIRE AND CONDUIT SIZES. DO NOT DISTURB CHRISTMAS TREE.

PROVIDE AND INSTALL POLE BASE FOR NEW FIXTURE 8-58A. ANTIQUE FIXTURE WILL BE PROVIDED BY

THE VA FOR CONTRACTOR INSTALLATION. LOCATE AND INTERCEPT UNDERGROUND CONDUIT AND

WIRE FROM EXISTING FIXTURE 8-58. PROVIDE AND INSTALL POLYMER CONCRETE PULL BOX AND FEED NEW FIXTURE. MATCH EXISTING WIRE AND CONDUIT SIZES. DO NOT DISTURB CHRISTMAS TREE.

1/28/22

621-22-136

Update Mountain Home Site Lighting

SCHEDULE NOTES

MATCH EXISTING

WIRE AND CONDUIT

SIZES

" RGS

COUDUIT 60" OUT OF EACH

SIDE OF POLE BASE

VA PROVIDED ANTIQUE LIGHTING FIXTURE

MATCH EXISTING WIRE

AND CONDUIT SIZES

(1" RGS CONDUIT MINIMUM)

MATCH EXISTING WIRE

AND CONDUIT SIZES

(1" RGS CONDUIT MINIMUM)

1 #6 GND.

1" RGS CONDUIT

3/4" X 10' DRIVIEN

GROUND ROD

FINISHED GRADE

TYPE "Y" FIXTURE POLE BASE DETAIL

N.T.S.

YY

SQUARE

SIDE WITH #4 REINFORCING BARS" RGS CONDUIT (TYP)1

EXTEND 1