This document is a set of construction drawings and technical specifications for the replacement of the fire pump controller and associated equipment at the John D. Dingell VA Medical Center in Detroit, Michigan.
The key details are:
- The project involves directly replacing the existing horizontal split case fire pump, in-line jockey pump, fire pump controller with automatic transfer switch, and all associated accessories.
- The contractor shall provide a temporary fire pump system, piping, and all appurtenances as required for a fully functional system during construction.
- All new fire protection equipment shall be UL listed or FM approved. The fire pump system shall comply with NFPA 20, NFPA 70, and VA fire protection requirements.
- The solicitation number is 36C25024B0054, the project title is "Z1DA--Replace Fire Pump-Controller and ATS5 553-22-231", and the agency is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 10.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 Wage Determination - MI20240101 04 05 2024 - 553-22-231.pdf | ||
| S02 Specifications - 553-22-231.pdf | ||
| 36C25024B0054_1.docx | DOCX document | |
| S02 RFI Form - 553-22-231.pdf | ||
| S02 Contractor EMR Certification Form - 553-22-231.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B ru sh S t
E Hancock St
Joh n R
S t
W oo d w ard A ve
C a s s A ve
E Canfield St
S t A n to in e
Mack Ave
In terstate 7
E W arre n Ave
Department of Veteran Affairs Medical Campus
N
102 101
Brush St
John R St
E C a n fie ld S t
E H a n c o c k S t
Building Key:
100 MAIN HOPSITAL
101 SOUTH PARKING GARAGE
- SOUTH GENERATING STATION
102 NORTH PARKING GARAGE
103 ENERGY CENTER
MEDICAL CENTER DIRECTOR
VA APPROVAL
DATE
DATEASSOCIATE MEDICAL CENTER DIRECTOR
DATECHIEF, FACILITY MANAGEMENT SERVICES
DATEASSISTANT CHIEF, FMS
DATESAFETY AND OCCUPATIONAL HEALTH MANAGER
DATEENERGY MANAGER
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SOLE SOURCE LIST
BRAND ITEM SPECIFICATION SECTION NOTES
HILTI FS1-FIRESTOP 07 84 00 BOTH SIDES OF FIRE-RATED WALLS, SMOKE BARRIERS, AND
FLOOR REGARDLESS OF FIRE RATING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
BRAND ITEM SPECIFICATION SECTION NOTES
SIEMENS BUILDING
TECHNOLOGIES
HVAC AUTOMATION
AND CONTROLS
23 09 23 ALL PROGRAMMING, CONNECTIONS, AND CONTROL PANELS
ASSOCIATED WITH CONNECTION TO AND MONITORING OF
THE STEAM SYSTEM BY THE CENTRAL MONITORING SYSTEM.
ST
A
T E O F F L O R
ID
A
RE
G
IS
T E R E D A R C H
IT
EC
T
ROGE
R A R E P
ST
IEN
A R
VA Project No.
RDC/JPA Project No.
Department of Veterans Affairs Medical Center
ARCHITECTURE PLANNING INTERIOR DESIGN
524 FERNWOOD AVENUE
ALTAMONTE SPRINGS, FLORIDA 32701
407.830.6522 P
937.461.0260 F
RDC / JOHN POE ARCHITECTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
ABOVE GROUP
ENGINEERING
70 BIRCH ALLEY, SUITE 240
BEAVERCREEK, OHIO 45440
70 Birch Alley, Suite 240 Beavercreek OH, 45440
PH: 937.795.4440
www.abovegroupinc.com COA/CA Lic. No. 31120
:1
:4
P
M
FIRE PUMP CONTROLLER
REPLACEMENT
06.23.2023
COVER SHEET
G-001
MDMD
533-22-231
DETROIT VAMC
FIRE PUMP CONTROLLER REPLACEMENT
4646 JOHN R STREET DETROIT, MI 48201-1916 PROJECT #:533-22-231
John D. Dingell VA Medical
Center
BID DOCUMENTS 22017.00
GENERAL CONSTRUCTION NOTES
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,
INTERNATIONAL BUILDING CODE, AND OTHER COES AS IDENTIFIED IN VHA
PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE
ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,
TECHNICAL INFORMATION LIBRRARY WEBSITE.
2. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS
SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A
PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS
INDICATED AT SIMILAR CONDITIONS.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT
EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH
ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT
ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF
NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO
REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT
SURFACES TO REMAIN.
DRAWING INDEX
VICINITY MAP
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW
MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO
BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE
SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT
THROUGH FINISHED OPENINGS.
8. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO
AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER
RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS
RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS
IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY
FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.
9. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL
SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE
THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE
NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR
SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
10. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED
WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF
THE WALL.
Revisions Date
G-000 Cover Sheet
FP-001 Fire Protection Legends, Symbols & General Notes
FP-101 Fire Protection Basement Plan-Boiler Rm
FP-801 Fire protection Schedules
E-001 Electrical Legends, Symbols & General Notes
EP101 Electrical 1st Floor Plan & Basement Plan – Boiler Room
E-601 Electrical Schedules, Detail and Oneline Diagram
G-001 Cover Sheet
FP-001 Fire Protection Legends, Symbols & General Notes
FP-100 Fire Protection Site Plan
FP-101 Fire Protection Basement Plan-Boiler Rm
FP-801 Fire protection Schedules
E-001 Electrical Legends, Symbols & General Notes
EP101 Electrical 1st Floor Plan & Basement Plan – Boiler Room
E-601 Electrical Schedules, Detail and Oneline Diagram
FIRE PROTECTION LEGEND
NOTE: SOME ABBREVIATIONS AND SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT
GENERAL LEGEND
SYMBOL DESCRIPTION
OS&Y VALVE FIRE DEPARTMENT CONNECTION
FIRE PROTECTION RISER
GATE VALVE
ALARM CHECK VALVE
BALL VALVE
PRESSURE REGULATING VALVE
BUTTERFLY VALVE
FLOW SWITCH
SYMBOL DESCRIPTION
PIPE TURNING DOWN
PIPE TURNING UP
FS FLOW SWITCH
TS TAMPER SWITCH
HOSE HOSE LINE CABINET
LH LIGHT HAZARD
OH-1 ORDINARY HAZARD - GROUP 1
OH-2 ORDINARY HAZARD - GROUP 2
POINT OF CONNECTION
FLUSHING CONNECTION OR CAP
A
B
SIM
FP
SECTION SYMBOL:
A = IDENTIFYING LETTER
B = SHEET WHERE SECTION IS SHOWN
SIM = SIMILAR
(ONLY NOTED IF IT APPLIES)
FIRE PROTECTION RISER DESIGNATION:
A = RISER IDENTIFYING SYSTEM TYPE
1 =
REVISION CLOUD AND
REVISION NUMBER
A
TITLE SYMBOL ON SHEET WHERE SHOWN
A = IDENTIFYING NUMBER/LETTER
RISER IDENTIFYING SYSTEM NUMBER
SYMBOL DESCRIPTION
FIRE PROTECTION COMPLIANCE NOTES
FIRE PROTECTION ABBREVIATIONS
AS ABOVE SLAB
AFF ABOVE FINISHED FLOOR
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ASTM AMERICAN STANDARDS TESTING MATERIALS
ATS AUTOMATIC TRANSFER SWITCH
BFP BACKFLOW PREVENTER
BOR BOTTON OF RISER
BS BELOW SLAB
CAP CAPACITY
CONN CONNECTION
CONT CONTINUOUS
CV CHECK VALVE
DIA DIAMETER
DN DOWN
ELEV ELEVATION
ºF DEGREES FAHRENHEIT
FDC FIRE DEPARTMENT CONNECTION
FDV FIRE DEPARTMENT VALVE
FM FACTORY MUTUAL
FP FIRE PROTECTION
FP FIRE PUMP
FPC FIRE PUMP CONTROLLER
FS FLOW SWITCH
FT FEET
GA GAUGE
GAL GALLON(S)
GALV GALVANIZED
GPM GALLONS PER MINUTE
HD HEAD
HP HORSEPOWER
HR HOUR
HYD HYDRANT
HZ HERTZ
ID INTERNAL DIAMETER
IN INCHES
IPS INTERNATIONAL PIPE STANDARD
ABBR. DESCRIPTION ABBR. DESCRIPTION
JP JOCKEY PUMP
KW KILOWATT
MAX MAXIMUM
MIN MINIMUM
NA NOT APPLICABLE
NC NORMALLY CLOSED
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
OS&Y OUTSIDE SCREW AND YOLK
P PUMP
PH PHASE
POC POINT OF CONNECTION
PSI POUNDS PER SQUARE INCH
PS PRESSURE SWITCH
RPM REVOLUTIONS PER MINUTE
SF SQUARE FEET
SPEC SPECIFICATIONS
STD STANDARD
TEMP TEMPERATURE
TDH TOTAL DYNAMIC HEAD
TOR TOP OF RISER
TS TAMPER SWITCH
TYP TYPICAL
UG UNDERGROUND
UL UNDERWRITER'S LABORATORY
UNO UNLESS NOTED OTHERWISE
V VOLTS
VA U.S. DEPARTMENT OF VETERAN AFFAIRS
VLV VALVE
VOL VOLUME
W/ WITH
FIRE PROTECTION GENERAL NOTES
SCOPE OF WORK:
FIRE PROTECTION SPRINKLER CONTRACTOR SHALL DIRECTLY REPLACE THE EXISTING HORIZONTAL SPLIT CASE FIRE PUMP, IN-LINE JOCKEY PUMP, FIRE PUMP CONTROLLER WITH AUTOMATIC TRANSFER SWITCH, AND ALL ASSOCIATED ACCESSORIES. THE FIRE PUMP SYSTEM IS SERVING THE JOHN D. DINGELL VA MEDICAL CENTER AND IS
LOCATED IN THE ENERGY CENTER BASEMENT WATER SERVICE ROOM.
ALL EXISTING FIRE PROTECTION SHALL REMAIN FULLY ACTIVE AND ANY SPRINKLER IMPAIRMENTS SHALL COMPLY WITH NFPA 25 SECTION 15.5.2. CONTRACTOR SHALL PROVIDE A TEMPORARY FIRE PUMP SYSTEM, PIPING, AND ALL APPURTENANCES AS REQUIRED FOR A FULLY FUNCTIONAL SYSTEM . CONTRACTOR SHALL COORDINATE ANY REQUIRED SHUT-DOWNS WITH COR PRIOR TO START OF DEMOLITION. REFER TO SHEET FP100 FOR ADDITIONAL
INFORMATION.
FIRE PROTECTION SPRINKLER CONTRACTOR SHALL COORDINATE THE DESIGN AND INSTALLATION OF THE FIRE PROTECTION SPRINKLER SYSTEM AND DELIVER A COMPLETE, FULLY FUNCTIONAL, AND TESTED FIRE PUMP SYSTEM THAT MEETS THE REQUIREMENTS OF THE FIRE PROTECTION DRAWINGS, FIRE PROTECTION SPECIFICATIONS, LISTED CODES AND STANDARDS, AND THE REQUIREMENTS OF THE VA. THE FIRE PROTECTION SPRINKLER CONTRACTOR SHALL PROVIDE AND INSTALL NEW MATERIALS THAT ARE UL LISTED AND/OR FM APPROVED AS REQUIRED BY THE FIRE PROTECTION DRAWINGS AND THE FIRE PROTECTION SPECIFICATIONS. THE FIRE PROTECTION SPRINKLER CONTRACTOR SHALL INTEGRATE THE FIRE PUMP SYSTEM WITH THE EXISTING FIRE ALARM SYSTEM.
FLOW TEST DATA:
THE NEW FIRE PUMP AND JOCKEY PUMP SHALL BE DIRECT REPLACEMENTS OF THE EXISTING FIRE PUMP AND JOCKEY PUMP. THE PUMPS ARE SIZED BASED ON THE FOLLOWING FIRE PUMP TEST RESULTS PERFORMED BY JOHNSON CONTROLS FIRE PROTECTION PEERLESS MIDWEST, INC. ON 08/30/2022. CONTRACTOR SHALL OBTAIN THE LATEST FIRE PUMP TEST RESULTS WITHIN THE PREVIOUS 12 MONTHS PRIOR TO CONSTRUCTION.
INCOMING WATER SUPPLY: 46 PSI AT CHURN (NO FLOW); 46 PSI AT 100% FLOW; 44 PSI AT 150% FLOW.
FIRE PUMP: 123 PSI NET (169 PSI TOTAL) AT CHURN (NO FLOW); 121 PSI NET (167 PSI TOTAL) AND 756 GPM AT 100%
FLOW; 89 PSI NET (133 PSI TOTAL) AND 1134 GPM AT 150% FLOW.
QUALITY AND PERFORMANCE SPECIFICATIONS OF ALL FIRE PROTECTION COMPONENTS:
ALL NEW FIRE PROTECTION EQUIPMENT SHALL BE UL LISTED OR FM APPROVED.
ACCEPTANCE TEST CRITERIA:
THE FIRE PUMP SHALL BE DEDICATED AND LISTED FOR FIRE PROTECTION SERVICE. FIRE PUMP SHALL BE DESIGNED PER NFPA 20, 2022 EDITION AND COMPLY WITH THE LOCAL FIRE MARSHAL AND THE VA. THE FIELD ACCEPTANCE TEST OF THE FIRE PUMP AND IT'S COMPONENTS SHALL CONSIST OF ALL APPLICABLE ITEMS SHOWN ON THESE FORMS, NFPA 20 ANNEX A (FIGURE A.14.1.3) CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR FIRE PUMP SYSTEMS. SEE NFPA 20 CHAPTER 14 FOR SYSTEM
ACCEPTANCE, INSPECTION TESTING, AND MAINTENANCE.
1. NFPA 20 2022 CHAPTER 14, ACCEPTANCE TESTING, PERFORMANCE, AND MAINTENANCE
A. 14.1 HYDROSTATIC TESTS AND FLUSHING
B. 14.2 FIELD ACCEPTANCE TESTS
C. 14.3 RECORD DRAWINGS, TEST REPORTS, MANUALS, SPECIAL TOOLS, AND SPARE PARTS
D. 14.4 PERIODIC INSPECTION, TESTING, AND MAINTENANCE
E. 14.5 COMPONENT REPLACEMENT
APPLICABLE NFPA AND VA STANDARDS TO BE APPLIED:
1. VA FIRE PROTECTION DESIGN MANUAL - 8TH EDITION
2. INTERNATIONAL BUILDING CODE 2021 EDITION
3. NFPA 13, 2022 EDITION, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
4. NFPA 20, 2022 EDITION, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION
5. NFPA 25, 2023 EDITION, INSPECTION, TESTING AND MAINTENANCE OF WATER BASED FIRE PROTECTION SYSTEM
6. NFPA 70, 2023 EDITION, NATIONAL ELECTRICAL CODE
1. THE FIRE PUMP SYSTEM SHALL COMPLY WITH NFPA 20, NFPA 70, AND VA FIRE PROTECTION MANUAL.
INSPECTION, TESTING, AND MAINTENANCE SHALL COMPLY TO NFPA 20 CHAPTER 14. IN ADDITION, INSTALLATION AND INSPECTION, TESTING, AND MAINTENANCE SHALL COMPLY WITH THE PROJECT
SPECIFICATIONS AND ALL APPLICABLE VA REQUIREMENTS.
2. FINAL INSPECTION AND APPROVAL BY THE VA.
3. CUTTING OF STRUCTURAL AND/OR ARCHITECTURAL MEMBERS IS PROHIBITED.
4. FITTINGS REQUIRED FOR PROPER INSTALLATION, COORDINATION WITH OTHER EXISTING TRADES, AND/OR TO
MAINTAIN PROPER CLEARANCES SHALL BE PROVIDED. VERIFY STRUCTURAL, MECHANICAL, ELECTRICAL
INSTALLATIONS AND AVOID AN/ALL OBSTRUCTIONS OR INTERFERENCES WITH FIRE PUMP.
5. IMMEDIATELY NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES FOUND BETWEEN THESE PLANS, OTHER ENGINEERING PLANS, THE ARCHITECTURAL PLANS AND/OR FIELD CONDITIONS PRIOR TO FINAL BID
PRICE OR FINAL PERMITTING.
6. IN CASE OF DISPUTE OR DOUBT AS TO INTENT OF DRAWINGS OR SPECIFICATIONS, OBTAIN ARCHITECT/ENGINEER'S WRITTEN DECISION BEFORE PROCEEDING WITH BID OR WORK INVOLVED.
7. ALL EXPOSED PIPING SHALL BE SHALL BE PAINTED RED.
8. BEFORE SUBMITTING PROPOSAL OR BID, EXAMINE ALL DRAWINGS AND SPECIFICATIONS RELATING TO THIS
PROJECT, THE AMOUNT OF SPACE AVAILABLE FOR PIPING AND CONNECTING SERVICES, THE SCOPE OF SITE OF THE WORK, THE REQUIREMENTS TO CORRELATE THE FIRE PROTECTION WORK WITH THAT OF OTHER
TRADES AND THE TIME SCHEDULE NECESSARY TO PERFORM THAT WORK.
9. PIPE SHALL BE REAMED AND CLEANED BEFORE ASSEMBLY, AND AFTER ASSEMBLY THE ENTIRE PIPING
SYSTEM SHALL BE HYDROSTATICALLY TESTED AND FLUSHED PER NFPA 20 CHAPTER 14.1.
10. ALL EXISTING FIRE PROTECTION SHALL REMAIN ACTIVE AT ALL TIMES. CONTRACTOR SHALL COORDINATE ANY REQUIRED SHUT-DOWN WITH COR PRIOR TO START OF DEMOLITION. UPON SPRINKLER SYSTEM IMPAIRMENT, 2023 NFPA 25 SECTION 15.5.2 SHALL BE FOLLOWED DURING SPRINKLER SYSTEM DOWNTIME.
THE COR OR APPROVED PERSONNEL BY THE VA SHALL COORDINATE REQUIREMENTS PER NFPA 25, SUCH AS AN APPROVED FIRE WATCH IF REQUIRED. IMPAIRMENT PROCEDURES REQUIRED TO BE TAKEN SHALL BE
INCLUDED IN CONTRACTOR'S BUDGET.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
B
IM
/0
R e p la c e
F ir e
P u m p
C o n tr o lle r D e s ig n /0
R e p la c e
F ir e
P u m p C o n tr o lle r
R
E
.r v t
/2
/2
:3
:5
P
M
FP001
FIRE PROTECTION LEGENDS,
SYMBOLS & GENERAL NOTES
FIRE PUMP CONTROLLER
REPLACEMENT
DETROIT, MICHIGAN
553-22-231
06/23/2023 ADL KDB
100% BID DOCUMENTS
SHEET LIST
SHEET NUMBER SHEET NAME
FP001 FIRE PROTECTION LEGENDS, SYMBOLS & GENERAL NOTES
FP100 FIRE PROTECTION SITE PLAN
FP101 FIRE PROTECTION BASEMENT PLAN - BOILER RM
FP801 FIRE PROTECTION SCHEDULES
Revisions Date
S
EXISTING CENTRAL ENERGY PLANT
E H
A N
C O
C K
S T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
B
IM
/0
R e p la c e
F ir e
P u m p
C o n tr o lle r D e s ig n /0
R e p la c e
F ir e
P u m p C o n tr o lle r
R
E
.r v t
/2
/2
:3
:5
P
M
FP100
FIRE PROTECTION SITE PLAN FIRE PUMP CONTROLLER
REPLACEMENT
DETROIT, MICHIGAN
553-22-231
06/23/2023 ADL KDB
100% BID DOCUMENTS
Revisions Date
1/16" = 1'-0"
TEMPORARY FIRE PROTECTION SITE PLAN
CODED NOTES:
DRAWING NOTES:
1. THIS PLAN IS TO DISPLAY THE PREPLANNED IMPAIRMENT PROGRAM FOR A TEMPORARY WATER SUPPLY PER NFPA 25 - 15.5.2(4)(C). TEMPORARY PIPING IS SHOWN DIAGRAMMATICALLY AS A SINGLE
LINE. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH TEMPORARY FIRE PUMP
MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND
PROVIDED FOR EQUIPMENT FURNISHED.
2. CONTRACTOR SHALL PROVIDE THE VA WITH A TEMPORARY WATER SUPPLY IMPAIRMENT PROGRAM.
IMPAIRMENT PROCEDURES REQUIRED TO BE TAKEN SHALL BE INCLUDED IN CONTRACTOR'S
BUDGET. THE PROGRAM SHALL BE APPROVED BY THE VA AND SHALL INCLUDE, BUT IS NOT LIMITED
TO:
A. 750-HP TEMPORARY MOBILE FIRE PUMP SYSTEM, TEMPORARY PIPING, AND ALL ANCILLARY
EQUIPMENT REQUIRED FOR A COMPLETE AND PROPER OPERATION. TEMPORARY PIPING SHALL
BE CONNECTED TO THE NEAREST FIRE HYDRANT. REFER TO THE TEMPORARY FIRE PROTECTION
SITE PLAN FOR PROPOSED PIPING. TEMPORARY PIPING SHALL CONNECT TO THE EXISTING
SPRINKLER SYSTEM UTILIZING THE EXISTING SYSTEM ISOLATION VALVES. NEW BYPASS
ISOLATION VALVE AND CHECK VALVE (SHOWN VIEW 4 / FP101) SHALL BE REPLACED PRIOR TO
OPERATING THE TEMPORARY FIRE PUMP.
B. TEMPORARY FIRE PUMP SYSTEM SHALL INTERFACE WITH THE EXISTING FIRE ALARM SYSTEM IN
ACCORDANCE WITH NFPA 72 CHAPTER 23.8 "SYSTEM REQUIREMENTS" OR PROVIDE A
TEMPORARY ALARM NOTIFICATION APPROVED BY THE VA.
C. MAKE ALTERATIONS TO THE EXISTING FACILITY AS REQUIRED FOR THE PROPER AND COMPLETE
OPERATION OF THE TEMPORARY WATER SUPPLY. ALTERNATIONS SHALL NOT INTERFERE WITH
THE NORMAL OPERATIONS OF THE FACILITY OR WITH THE ARCHITECTURAL AND STRUCTURAL
INTEGRITY OF THE BUILDING. ALL ALTERATIONS SHALL BE APPROVED AND COORDINATED WITH
THE VA PRIOR TO THE COMMENCEMENT OF WORK.
D. IF AT ANY TIME IT IS FOUND THAT THE TEMPORARY WATER SERVICE DOES NOT MEET THE VA
APPROVED TEMPORARY WATER SERVICE PROGRAM AND THERE WAS NO VARIANCE APPROVAL,
THE CONTRACTOR SHALL CORRECT IT AT NO ADDITIONAL COST OR TIME TO THE GOVERNMENT.
EXISTING FIRE PUMP TEST HEADER.
EXISTING FIRE DEPARTMENT CONNECTION (FDC).
TEMPORARY FIRE PUMP. PUMP SHALL MATCH NEW PUMP SPECIFICATIONS. FINAL TEMPORARY PUMP LOCATION SHALL BE COORDINATED WITH THE VA. ESTIMATED FIRE PUMP TRAILER SIZE: 30' x 10'.
EXISTING FIRE HYDRANT.
TEMPORARY PIPING FROM FIRE HYDRANT TO TEMPORARY FIRE PUMP. TEMPORARY FIRE PUMP SHALL
BE EQUIPPED WITH A DOUBLE CHECK BACKFLOW PREVENTER. APPROXIMATELY 200 FT. OF
TEMPORARY PIPING. FINAL PIPING LAYOUT SHALL BE COORDINATED WITH VA.
TEMPORARY PIPING FROM TEMPORARY FIRE PUMP TO EXISTING FDC.
TEMPORARILY REMOVE EXISTING FENCING AS REQUIRED FOR TEMPORARY PIPING. FENCING SHALL BE
SAFELY STORED DURING CONSTRUCTION AND RE-INSTALLED AFTER TEMPORARY FIRE PUMP IS
DISCONNECTED. PAINT, REPAIR, OR REPLACE DAMAGED FENCING AS REQUIRED FOR LIKE-NEW
CONDITION.
0 8' 16' 32' 48'
1/16" = 1'-0"
N
BID ALTERNATE:
1. CONTRACTOR SHALL SUBMIT A BID ALTERNATE FOR A FIRE WATCH IMPAIRMENT PROGRAM. THE ALTERNATE PROGRAM SHALL BE APPROVED BY THE VA AND SHALL INCLUDE, BUT IS NOT LIMITED TO:
A. FIRE WATCH PERSONNEL SHALL MONITOR THE OPERATION OF THE JOCKEY PUMP AT ALL TIMES
WHEN THE FIRE PROTECTION SYSTEM IS OUT OF SERVICE FOR MORE THAN 10 HOURS IN A 24
HOUR PERIOD PER NFPA 25 CHAPTER 15. FIRE WATCH PERSONNEL SHALL BE TRAINED TO BE
FAMILIAR WITH THE FACILITIES AND PROCEDURES. TRAINING AT A MINIMUM SHALL INCLUDE:
a. SOUNDING AN ALARM IN THE EVENT OF A FIRE.
b. FIRE-EXTINGUISHING USE AND FIRE-EXTINGUISHING EQUIPMENT SHALL BE READILY
AVAILABLE.
c. INVESTIGATING THE SYSTEM PRESSURE IF THE JOCKEY PUMP DOES NOT CEASE OPERATION
AT THE END OF ITS ANTICIPATED RUN TIME.
d. NOTIFYING THE FIRE DEPARTMENT, THE BUILDING OCCUPANTS, OR BOTH OF AN EMERGENCY
IF THE SYSTEM PRESSURE DROPS BELOW A SET POINT.
B. 7.5-HP TEMPORARY JOCKEY PUMP SYSTEM, TEMPORARY PIPING, AND ALL ANCILLARY
EQUIPMENT AS REQUIRED TO MAINTAIN JOCKEY PUMP OPERATION DURING CONSTRUCTION. THE
TEMPORARY JOCKEY PUMP SYSTEM SHALL BE USED DURING THE REMOVAL OF THE EXISTING
FIRE PUMP SYSTEM AS SHOWN ON THE DRAWINGS. ONCE THE NEW FIRE PUMP SYSTEM IS
INSTALLED AND FULLY TESTED PER 2022 NFPA 20 CHAPTER 14, ALL TEMPORARY EQUIPMENT AND
PIPING SHALL BE COMPLETELY REMOVED.
C. IF AT ANY TIME IT IS FOUND THAT THE FIRE WATCH DOES NOT MEET THE VA APPROVED FIRE
WATCH PROGRAM AND THERE WAS NO VARIANCE APPROVAL, THE CONTRACTOR SHALL
CORRECT IT AT NO ADDITIONAL COST OR TIME TO THE GOVERNMENT.
FP100
N.T.S.
EXISTING FIRE SPRINKLER CONNECTIONS PHOTO #1
DN
F
EX
FP-1
EX
JP-1
EX 8" FM
EX 8" FM
EX 8" FM
F M
(U /G
FP101
EX 2" FM
FP101
KEY PLAN - BASEMENT
F
EX 8" FM
EX 8" FM
EX 6" FM
EX 8" FM EX 6" FM
EX 8" FM
FP-1
EX 8" FM
FPC-1
JPC-1
F
FP101
EX 8" FM
EX 2" FM
EX 8" FM
EX 8" FM
F M
(U /G
JP-1 FP-1
FPC-1
6" FM
6" FM
JPC-1
FP101
F
EX 6" FM
EX 6" FM
EX 2" FM
JP-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
B
IM
/0
R e p la c e
F ir e
P u m p
C o n tr o lle r D e s ig n /0
R e p la c e
F ir e
P u m p C o n tr o lle r
R
E
.r v t
/2
/2
:3
:0
P
M
FP101
FIRE PROTECTION BASEMENT
PLAN - BOILER RM
FIRE PUMP CONTROLLER
REPLACEMENT
DETROIT, MICHIGAN
553-22-231
06/23/2023 ADL KDB
100% BID DOCUMENTS
1/4" = 1'-0"1
FIRE PROTECTION PLAN - BASEMENT - WATER SERVICE RM - DEMO
CODED NOTES:
DRAWING NOTES:
1. CONTRACTOR SHALL COORDINATE REQUIRED SHUT-DOWNS WITH FACILITY PRIOR TO START OF DEMOLITION. UPON SPRINKLER SYSTEM IMPAIRMENT, NFPA 25 CHAPTER15.5.2 SHALL BE FOLLOWED DURING SPRINKLER SYSTEM DOWNTIME. COORDINATE WITH FACILITY ON THE REQUIREMENTS OF
NFPA 25, SUCH AS AN APPROVED TEMPORARY WATER SUPPLY OR FIRE WATCH. IMPAIRMENT
PROCEDURES REQUIRED TO BE TAKEN SHALL BE INCLUDED IN CONTRACTOR'S BUDGET.
2. NOT ALL PIPING SYSTEMS ARE SHOWN ON THIS DRAWING.
3. EXISTING FIRE PROTECTION PIPING IS SHOWN FOR REFERENCE ONLY AND IS BASED ON LIMITED EXISTING DOCUMENTATION AND FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM SIZE OF ALL EXISTING PIPING LOCATED WITHIN THE PROJECT SCOPE BOUNDARY PRIOR TO FABRICATION OF
ANY PIPING SHOWN ON PLANS.
REPLACE EXISTING FIRE PUMP, TRANSITION FITTINGS, AND PUMP APPURTENANCES. 1
0 2' 4' 8' 12'
1/4" = 1'-0"
N
1/4" = 1'-0"
FIRE PROTECTION WATER SERVICE ROOM - BASEMENT - SECTION 1
1/4" = 1'-0"2
FIRE PROTECTION PLAN - BASEMENT - WATER SERVICE RM - NEW WORK
N.T.S.
EXISTING FIRE PUMP PHOTO #1
REPLACE EXISTING JOCKEY PUMP AND PUMP APPURTENANCES. 2
REPLACE EXISTING FIRE PUMP CONTROLLER WITH ATS. REFER TO ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
EXISTING CONCRETE PAD TO REMAIN. CLEAN AND REPAIR EXISTING PAD AS REQUIRED FOR NEW FIRE
PUMP SYSTEM.
EXISTING (3) 2-1/2" OUTLET PUMP TEST HEADER.5
EXISTING 2-1/2"x2-1/2"x2-1/2"x6" FLUSH FDC.6
Revisions Date
REPLACE FAILING 8" BYPASS CHECK VALVE AND 8" BYPASS GROOVED BUTTERFLY VALVE WITH TAMPER SWITCH. REFER TO FIRE PUMP TEST REPORT PERFORMED BY JOHNSON CONTROLS FIRE PROTECTION
PEERLESS MIDWEST, INC. FOR TEST COMMENTS.
1/4" = 1'-0"
FIRE PROTECTION WATER SERVICE ROOM - BASEMENT - SECTION 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
B
IM
/0
R e p la c e
F ir e
P u m p
C o n tr o lle r D e s ig n /0
R e p la c e
F ir e
P u m p C o n tr o lle r
R
E
.r v t
/2
/2
:3
:0
P
M
FP801
FIRE PROTECTION SCHEDULES FIRE PUMP CONTROLLER
REPLACEMENT
DETROIT, MICHIGAN
553-22-231
06/23/2023 ADL KDB
100% BID DOCUMENTS
PUMP SCHEDULE
MARK
BASIS OF DESIGN
SYSTEM
FLUID DATA PUMP DATA ELECTRICAL DATA
MANUFACTURER MODEL NO. FLOW (GPM) HEAD (PSI)
FLUID TEMP.
(°F) TYPE MOTOR HP MOTOR RPM NPSHR (FT)
IMPELLER
DIA. (IN.) % EFF.
SUCT. SIZE
(IN.)
DISCH. SIZE
(IN.) DISCONNECT V/PH/HZ
FP-1 AC FIRE PUMP 6x6x9F 8100 SERIES FIRE MAIN 750 120 49 HORIZONTAL SPLIT CASE 75 3550 8.26 9.24 68.8 6 6 FPC-1 460/3/60
JP-1 GRUNDFOS CR 10-7 FIRE MAIN 60 130 49 VERTICAL MULTISTAGE 7.5 3461 12.1 3.66 68.5 2 2 JPC-1 460/3/60
NOTES:
1. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.
2. PROVIDE MOTOR STARTER WITH DISCONNECTING MEANS. REFER TO CONTROLLER SCHEDULE.
3. FIRE PUMP SHALL FURNISH NOT LESS THAN 150% OF THE RATED FLOW CAPACITY AT NOT LESS THAN 65% OF RATED NET PRESSURE.
4. PROVIDE STAINLESS STEEL IMPELLER.
FIRE PUMP CONTROLLER SCHEDULE
MARK
BASIS OF DESIGN
TYPE
DIMENSIONS
(WxDxH)
AUTOMATIC
TRANSFER
SWITCH TEST BUTTON
START/STOP
BUTTON HORN BUTTON
ELECTRICAL
NOTESMANUFACTURER MODEL NO. ENCLOSURE MOTOR HP V/PH/HZ
FPC-1 METRON MP435 AUTOMATIC SOLID STATE SOFT STARTER W/ ATS 74"x16"x71" YES YES YES YES NEMA 2 75 460/3/60 1,2,3,4,5,6,7
JPC-1 METRON MP15 ACROSS-THE-LINE STARTER 16.5"x10"x22" NO NO MANUAL HOA NO NEMA 2 7.5 460/3/60 1,2,4
NOTES:
1. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.
2. PROVIDE MOTOR STARTER WITH DISCONNECTING MEANS.
3. PROVIDE ATS INTEGRAL TO FIRE PUMP CONTROLLER FOR USE WITH GENSET.
4. PROVIDE TERMINALS FOR REMOTE MONITORING AND USB PORT FOR INFORMATION DOWNLOAD.
5. PROVIDE DIGITAL DISPLAY WITH READOUTS FOR VOLTAGE, AMPERAGE, AND FREQUENCY.
6. PROVIDE VOLTAGE SURGE SUPPRESSION.
7. PROVIDE AUDIBLE HORN WITH SILENCING FEATURE FOR TESTING.
1PH SINGLE-PHASE
3PH THREE-PHASE
4W FOUR-WIRE
A/E ARCHITECT/ENGINEER
AF AMPERE FRAME OR AMP FUSE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMP AMPERE
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BLDG BUILDING
C CONDUIT
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CKT CIRCUIT
CLG CEILING
COAX COAX CABLE
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUE
COORD COORDINATE
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CU COPPER
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DISC DISCONNECT
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DS DISCONNECT SWITCH
DWG DRAWING
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
ETR EXISTING TO REMAIN
ELECTRICAL ABBREVIATIONS
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FLA FULL LOAD AMPS
FP FIRE PROTECTION
FT FEET OR FOOT
GND GROUND
G OR GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HZ HERTZ
IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH AMERICA
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LRA LOCKED ROTOR AMPS
LTG LIGHTING
LV LOW VOLTAGE
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT MICROWAVE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NEUT OR N NEUTRAL
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OL OVERLOAD
P POLE
PA PUBLIC ADDRESS
PCB POLYCHLORINATED BIPHENYL
PH PHASE
PNL PANEL
POD POWER OPERATED DAMPER
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
REQD REQUIRED
SCC SHORT CIRCUIT CAPACITY
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
W WATT
WH WATER HEATER
WP WEATHERPROOF
XFER TRANSFER
XFMR TRANSFORMER
ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION
AWG AMERICAN WIRE GAUGE
KCMIL ONE-THOUSAND CIRCULAR MILS
NA NOT APPLICABLE
HD HEAT DETECTOR
ABC
PANELBOARD MAIN CIRCUIT BREAKER TYPE, ONE-LINE
### - INDICATES BREAKER RATING
ABC - INDICATES PANEL DESIGNATION
ABC
PANELBOARD MAIN LUG TYPE, ONE-LINE
### - INDICATES BUS RATING
ABC - INDICATES PANEL DESIGNATION
###A CIRCUIT BREAKER
### - INDICATES BREAKER RATING
GND GROUND BUS BAR
EARTH GROUND
ELECTRICAL SYMBOLS
DESCRIPTION
TRANSFORMER, ONE-LINE
FUSIBLE DISCONNECT SWITCH, ONE-LINE
###AF - INDICATES FUSE RATING
###AS - INDICATED SWITCH RATING
###AF
G
ABC
M
ABC
SPD SURGE PROTECTIVE DEVICE
SYMBOL
DOUBLE TUB PANELBOARD, ONE-LINE
ABC - INDICATES PANEL DESIGNATION
ISOLATION POWER PANELBOARD, ONE-LINE
ABC - INDICATES PANEL DESIGNATION
###AS
METER, ONE-LINE
TRANSFER SWITCH, ONE-LINE
GENERATOR, ONE-LINE
UNINTERRUPTIBLE POWER SUPPLY (UPS), ONE-LINE
ELECTRICAL ONE-LINE
###A
DRAWOUT CIRCUIT BREAKER
### - INDICATES BREAKER RATING
###A
BRANCH CIRCUIT BREAKER
### - INDICATES BREAKER RATING
###AS NON-FUSIBLE DISCONNECT SWITCH, ONE-LINE
###AS - INDICATED SWITCH RATING
ELECTRICAL GENERAL NOTES ELECTRICAL DEMOLITION NOTES
WHERE THERE IS A DISCREPANCY BETWEEN ABOVE GENERAL NOTES AND SPECIFICATIONS, WHERE APPLICABLE, SPECIFICATIONS SHALL BE FOLLOWED
APPLICABLE CODES
1. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL CODE (NEC), NFPA 70 - 2017
b. NATIONAL FIRE ALARM CODE, NFPA 72 - 2013
c. NATIONAL FIRE ALARM CODE, NFPA 25 - 2020
d. NATIONAL FIRE ALARM CODE, NFPA 101 - 2021
2. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL SAFETY CODE, ANSI C2
3. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
4. FEDERAL COMMUNICATION COMMISSION (FCC)
5. NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
6. INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
7. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
8. NATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
9. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
10. ANTI-FRICTION BEARING MANUFACTURERS ASSOCIATION (AFBMA)
11. BUILDING OFFICIALS AND CODE ADMINISTRATORS INTERNATIONAL, INC. (BOCA)
12. INTERNATIONAL CODE COUNCIL (ICC):
a. INTERNATIONAL BUILDING CODE (IBC)
13. UNIFORM BUILDING CODE (UBC)
14. INTERNATIONAL CONFERENCE OF BUILDING OFFICIALS (ICBO)
a. INTERNATIONAL ENERGY CONSERVATION CODE (IECC), ENDORSED BY THE U.S. DEPARTMENT OF
ENERGY (DOE)
15. NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION INSTALLATION STANDARDS (NECA)
16. AMERICANS WITH DISABILITIES ACT (ADA)
17. APPLICABLE STATE AND LOCAL CODES, AMENDMENTS, REGULATIONS, AND PRACTICES.
18. APPLICABLE REGULATORY REQUIREMENTS AND ADVISORY PRACTICES OF APPROPRIATE
a. AUTHORITIES HAVING JURISDICTION (AHJs).
19. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER.
1. THE DRAWINGS AND APPLICABLE SPECIFICATIONS SHALL BE CONSIDERED SUPPLEMENTARY,
ONE TO THE OTHER AND ARE CONSIDERED THE "CONTRACT DOCUMENTS". ALL WORKMANSHIP,
METHODS AND/OR MATERIALS DESCRIBED OR IMPLIED BY ONE AND NOT DESCRIBED OR
IMPLIED BY THE OTHER SHALL BE PROVIDED, FURNISHED OR PERFORMED AS IF IT HAD
APPEARED IN BOTH SECTIONS. THE TERM "CONTRACT DOCUMENTS" DESCRIBED HEREIN IS
NOT LIMITED SOLELY TO THE ELECTRICAL PORTION OF THE DRAWINGS AND SPECIFICATIONS,
BUT ENCOMPASSES THE DRAWINGS AND SPECIFICATIONS OF ALL DIVISIONS AS A WHOLE.
2. PROVIDE AN OPERATING AND MAINTENANCE MANUAL TO OWNER PRIOR TO THE FINAL
ACCEPTANCE. THE MANUAL SHALL INCLUDE, AS A MINIMUM, (1) SUBMITTAL DATA STATING
EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING
MAINTENANCE. ALSO PROVIDE TWO OPERATIONS AND MAINTENANCE MANUALS FOR EACH
PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS
AND METHOD OF OPERATION FOR EQUIPMENT SHALL BE CLEARLY IDENTIFIED, AND THE NAME,
PHONE NUMBER AND ADDRESS OF AT LEAST ONE QUALIFIED SERVICE AGENCY.
3. INCLUDE IN BID ALL COSTS ASSOCIATED WITH TEMPORARY ELECTRICAL SERVICE AS REQUIRED
FOR USE BY ALL TRADES DURING CONSTRUCTION. REMOVE TEMPORARY POWER AT THE
COMPLETION OF THE PROJECT. OBTAIN AND PAY FOR ALL REQUIRED PERMITS FOR
TEMPORARY POWER. ENGINEER OF RECORD SHALL BE PROVIDED WITH ADDITIONAL
COMPENSATION FROM THE CONTRACTOR WHERE SIGNED & SEALED DRAWINGS ARE
REQUESTED BY THE CONTRACTOR TO THE ENGINEER OF RECORD IF REQUIRED BY THE AHJ
FOR THE TEMPORARY POWER.
4. INCLUDE IN BID THE TRANSPORT AND DISPOSAL OR RECYCLING OF ALL WASTE MATERIALS
GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL RULES,
REGULATIONS AND GUIDELINES APPLICABLE. COMPLY FULLY WITH STATUTES REGARDING
MERCURY-CONTAINING DEVICES, AND WITH ALL DEP AND EPA APPLICABLE GUIDELINES AT THE
TIME OF DISPOSAL. PROVIDE OWNER WITH WRITTEN CERTIFICATION OF ACCEPTED DISPOSAL.
5. ALL BRANCH CIRCUITS SHALL BE FURNISHED WITH A DEDICATED NEUTRAL. SHARED NEUTRALS
ARE NOT ALLOWED UNLESS SPECIFICALLY NOTED ON THE DRAWINGS.
6. VERIFY AND COORDINATE LOCATIONS OF ANY MISCELLANEOUS EQUIPMENT REQUIRING
ELECTRICAL CONNECTIONS WITH APPROVED SHOP DRAWINGS, OWNER-PROVIDED CUT
SHEETS, MANUFACTURER'S INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION,
PRIOR TO ROUGH IN, AND PROVIDE ALL NECESSARY ELECTRICAL REQUIRED.
7. VERIFY AND COORDINATE LOCATIONS AND EXACT ELECTRICAL REQUIREMENTS FOR ALL FIRE
PROTECTION EQUIPMENT PRIOR TO SUBMITTAL OF SHOP DRAWINGS OF ELECTRICAL
EQUIPMENT. PROVIDE ALL NECESSARY RACEWAYS, CONDUCTORS, BOXES, EQUIPMENT,
ACCESSORIES, ASSOCIATED DISCONNECT SWITCHES, CIRCUIT BREAKERS, CONTROL
TRANSFORMERS, FIRE ALARM SHUTDOWN, ETC. REQUIRED FOR A COMPLETE AND
OPERATIONAL SYSTEM. COORDINATE WITH APPROPRIATE TRADE'S APPROVED SHOP
DRAWINGS, MANUFACTURER'S INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION,
PRIOR TO ROUGH IN, AND PROVIDE ALL NECESSARY ELECTRICAL REQUIRED, UNLESS
OTHERWISE NOTED.
8. ALL WORK ON THE ELECTRICAL SYSTEM REQUIRED BY THE CONTRACT DOCUMENTS SHALL BE
COORDINATED WITH THE WORK OF ALL OTHER DIVISIONS/TRADES PRIOR TO COMMENCEMENT
OF WORK. AVOID INTERFERENCES WITH THE PROGRESS OF OTHER DIVISIONS/TRADES.
9. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS.
PROVIDE COMPONENTS INDICATED ON RISER DIAGRAMS WHETHER OR NOT INDICATED ON
PLANS AND VICE VERSA.
10. ROUTING OF CONDUIT IS DIAGRAMMATIC AND NOT INTENDED TO SHOW REQUIRED OFFSETS
AND DETAILS. COORDINATE EXACT ROUTING WITH FIELD CONDITIONS AND OTHER TRADES.
11. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR
BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER
IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT REQUIREMENT SHALL
GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR OWNER'S
DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL GOVERN.
12. COORDINATE ALL PROJECT SCHEDULING AND PHASING REQUIREMENTS WITH
ARCHITECT/ENGINEER AND OWNER PRIOR TO SUBMITTING BID PRICE. THIS PROJECT MAY
REQUIRE PHASING SEQUENCES AND POTENTIAL PREMIUM TIME WORK AND ALL COSTS FOR
SUCH SHALL BE INCLUDED IN THE BID PRICE. PROVIDE ADEQUATE WORK FORCE AND
EQUIPMENT, AND INCLUDE PREMIUM TIME AS MAY BE REQUIRED IN ORDER TO ADHERE TO THE
PROJECT SCHEDULE. ADDITIONALLY, ENSURE THAT LONG LEAD ITEMS DO NOT IMPACT THE
PROJECT'S SCHEDULE OR PHASING.
13. ANY TEMPORARY INTERRUPTION ON POWER REQUIRED FOR THE SYSTEM TIE-IN OR
SWITCHOVER FOR ANY PORTION OF THE ELECTRICAL SYSTEM SHALL BE PRE-APPROVED IN
WRITING BY THE OWNER AND SCHEDULED IN ADVANCE.
14. CONDUCT WORK OPERATIONS AND DEBRIS REMOVAL IN A MANNER THAT ENSURES MINIMUM
INTERFERENCE WITH NORMAL BUSINESS OPERATIONS, TRAFFIC, PARKING, ETC. ONGOING IN
ADJACENT OCCUPIED SPACES OR FACILITIES. PROVIDE ALL THAT IS REQUIRED TO
EFFECTIVELY PROTECT SURROUNDING OCCUPANTS, EQUIPMENT, FINISHES, FURNITURE, ETC.
FROM DAMAGE OR EXCESSIVE NOISE THROUGHOUT THE DURATION OF THIS PROJECT.
CONTRACTOR IS RESPONSIBLE FOR ANY LOSSES OR DAMAGE. ANY DAMAGE RESULTING FROM
THE FAILURE TO ADHERE TO THIS REQUIREMENT. RESTORE DAMAGED ELEMENTS TO ORIGINAL
CONDITION BY THE CONTRACTOR TO THE SATISFACTION OF THE ARCHITECT/ENGINEER AND
OWNER, AT NO ADDITIONAL COSTS. REPORT OF ANY SUCH OCCURRENCE TO THE
ARCHITECT/ENGINEER AND OWNER IMMEDIATELY AND AWAIT WRITTEN DIRECTION PRIOR TO
PROCEEDING WITH REPAIRS.
15. THE EXCLUSIVELY DEDICATED SPACE EXTENDING FROM FLOOR TO 6' ABOVE EQUIPMENT OR
STRUCTURAL CEILING, WHICHEVER DISTANCE IS LOWER, WITH A WIDTH AND DEPTH OF THE
PANELBOARD OR SWITCHBOARD MUST BE CLEAR OF ALL PIPING, DUCTS, EQUIPMENT FOREIGN
TO THE ELECTRICAL EQUIPMENT OR ARCHITECTURAL APPURTENANCES IN ACCORDANCE WITH
NEC.
16. PROVIDE ALL TEMPORARY NORMAL LIGHTING, EMERGENCY LIGHTING AND EXIT SIGNAGE
REQUIRED DURING THE PROJECT CONSTRUCTION PHASE.
17. UNLESS NOTED AS EXISTING, ALL ELECTRICAL INDICATED ON THE CONTRACT DOCUMENTS
SHALL BE NEW, SHALL BE U.L. LISTED, AND SHALL BEAR A U.L. LABEL. WHERE NO U.L. LABEL OR
LISTING IS AVAILABLE, THE MATERIAL SHALL BE LISTED WITH AN APPROVED, NATIONALLY
RECOGNIZED ELECTRICAL TESTING AGENCY.
18. PROVIDE EXPERIENCED, QUALIFIED AND RESPONSIBLE SUPERVISION FOR ALL WORK
REQUIRED BY THE CONTRACT DOCUMENTS. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED
IN A NEAT AND WORKMANLIKE MANNER, TO THE SATISFACTION OF THE ARCHITECT/ENGINEER
AND OWNER.
19. THE ELECTRICAL PORTION OF THE CONTRACT DOCUMENTS ARE COORDINATED WITH THE
DESIGN BASIS EQUIPMENT SPECIFIED BY DIVISION 26 AND OTHER DIVISIONS. WHERE THE
CONTRACTOR ELECTS TO SUBSTITUTE A PRODUCT IN LIEU OF PROVIDING THE DESIGN BASIS,
AND SAID SUBSTITUTION IS ACCEPTED BY THE A/E AND OWNER, THE CONTRACTOR SHALL MAKE
ALL CORRECTIONS TO THE ELECTRICAL SYSTEM NECESSARY IN ORDER TO ENSURE A
COMPLETE AND OPERATIONAL INSTALLATION OF THE EQUIPMENT AT NO ADDITIONAL COSTS.
WHERE THE CONTRACTOR'S DESIGN SUBSTITUTION RESULTS IN THE NEED FOR THE ENGINEER
TO REVISE THE CONTRACT DOCUMENTS, THE ENGINEER RESERVES THE RIGHT TO REQUEST
COMPENSATION FROM THE CONTRACTOR FOR SAID SERVICES.
20. MAINTAIN A CURRENT AND ACCURATE SET OF PROJECT RECORD DOCUMENTS (AS-BUILTS) AT
THE SITE THROUGHOUT THE DURATION OF THE PROJECT. RECORD DRAWINGS SHALL BE
UPDATED EACH DAY TO REFLECT THE ACTUAL LOCATIONS, SIZES, ROUTING, ETC. OF EACH
PORTION OF THE ELECTRICAL SYSTEM AFFECTED BY THIS WORK. A FINAL SET OF RECORD
DOCUMENTS SHALL BE ISSUED TO THE A/E FOR REVIEW AND THEN SUBMITTED TO THE OWNER
WITHIN 30 DAYS AFTER THE DATE OF FINAL ACCEPTANCE. PROVIDE RECORD DRAWINGS OF
THE ACTUAL INSTALLATION INCLUDING SINGLE LINE DIAGRAM, POWER RISER DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM, SITE PLANS AND ALL ELECTRICAL FLOOR PLANS, DETAILS, PANEL SCHEDULES, ETC.
21. OWNER FURNISHED EQUIPMENT: VERIFY AND COORDINATE ELECTRICAL ROUGH IN
REQUIREMENTS FOR OWNER FURNISHED EQUIPMENT PRIOR TO ROUGH IN.
22. WHERE SUBMITTED EQUIPMENT REQUIRES REVISION TO OVERCURRENT PROTECTION,
CONDUIT OR WIRING, MAKE CHANGES IN ACCORDANCE WITH APPLICABLE CODES.
D1. THE FACILITY WILL REMAIN OCCUPIED DURING RENOVATIONS.
D2. EQUIPMENT SHOWN IN DASHED LINE TYPE ARE EXISTING TO BE DEMOLISHED; DEVICES, LIGHT
FIXTURES AND EQUIPMENT SHOWN IN LIGHT SOLID LINE TYPE ARE EXISTING TO REMAIN,
UNLESS OTHERWISE NOTED.
D3. EXISTING EQUIPMENT SHOWN ARE BASED ON FIELD SURVEYS AND RECORD DRAWINGS
PROVIDED BY THE OWNER, AND IS NOT NECESSARILY ALL INCLUSIVE IN EVERY AREA AS FAR AS
EXISTING ELECTRICAL EQUIPMENT. EXISTING CIRCUITING SHOWN IS BASED ON RECORD
DRAWINGS AND THE SURVEYED PANEL DIRECTORIES, WHERE THEY WERE AVAILABLE. THE
ACTUAL CONDITIONS MAY VARY. ALL EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID.
THE CONDITIONS SHOWN ARE INTENDED TO SHOW THE LOCATIONS OF EXISTING EQUIPMENT,
WHERE SHOWN ON THE PLAN DRAWINGS, AND IN NO WAY RELIEVES THE CONTRACTOR FROM
PROVIDING ANY AND ALL COORDINATION NECESSARY TO COMPLETE THE NEW WORK. FIELD
CONDITIONS SHALL GOVERN.
D4. PRIOR TO DEMOLITION, FIELD VERIFY CONDUIT AND WIRING WHICH SERVES AREAS OUTSIDE
THE SCOPE OF WORK AND PASSES THROUGH THE AREA OF WORK. MAINTAIN CONTINUITY OF
SYSTEMS.
D5. WHERE EXISTING DEVICES ARE TO REMAIN, CONTRACTOR MUST EXTEND EXISTING CIRCUITING
WHERE NECESSARY TO MAINTAIN CONTINUITY OF CIRCUIT.
D6. COORDINATE WITH THE OWNER FOR DISPOSITION OF ELECTRICAL ITEMS TO BE DEMOLISHED.
OWNER SHALL HAVE THE OPTION TO RETAIN REUSABLE ITEMS NOT BEING USED IN
THE FINISHED WORK. COORDINATE WITH THE OWNER PRIOR TO START OF DEMOLITION.
PROPERLY AND LEGALLY DISPOSE OF ALL EQUIPMENT AND MATERIALS BEING REMOVED.
D7. WHERE EXISTING DEVICES, EQUIPMENT ARE INDICATED TO BE DEMOLISHED, REMOVE
ASSOCIATED CONDUIT AND WIRING BACK TO SOURCE PANEL OR TO NEAREST JUNCTION BOX
TO MAINTAIN CIRCUIT CONTINUITY OF DEVICES TO REMAIN AND EQUIPMENT TO REMAIN. WHERE
PANELS ARE TO BE REMAIN, TURN BREAKER TO "OFF" POSITION AND LABEL THE CIRCUIT AS
"SPARE" ON THE PANEL DIRECTORY.
D8. ALL AREAS OUTSIDE THE SCOPE OF CONSTRUCTION ARE TO REMAIN ENERGIZED. COORDINATE
PHASING WITH CONSTRUCTION MANAGER AND OWNER PRIOR TO DEMOLITION WHICH MAY
RESULT IN INTERRUPTION OF POWER.
D9. REFER TO ELECTRICAL PLANS FOR EXTENT OF AREA REQUIRING DEMOLITION AND ADDITIONAL
INFORMATION ON ELECTRICAL DEMOLITION WITHIN THAT AREA. DISCONNECT ELECTRICAL
SERVICE TO ALL EQUIPMENT BEING REMOVED. DEMOLITION SHALL BE PHASED AS
REQUIRED BY DIVISION 1, OR DIRECTED BY THE OWNER.
D10. REMOVE ALL CONDUIT LEFT EXPOSED BY REMOVAL OF WALLS AND CEILINGS IN REMODELED
OR RENOVATED AREA. CAP BOTH ENDS OF REMAINING CONDUIT IN WALL OR FLOOR WHERE
CUT. REMOVE ALL ASSOCIATED SUPPORTS. REMOVE WIRING BACK TO SOURCE OF VOLTAGE.
D11. ELECTRICAL DEVICES WITHIN THE AREA OF WORK., AND NOT NOTED ON THE DEMOLITION
DRAWINGS, WHETHER DUE TO CONCEALMENT BY STORAGE SHELVING, CASEWORK,
FURNITURE OR FOR OTHER REASONS, ARE TO BE REMOVED AS REQUIRED, UNLESS SHOWN AS
EXISTING TO REMAIN.
D12. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING ALL OPENINGS IN EXISTING
CONSTRUCTION AFTER REMOVAL OF EQUIPMENT AND ELECTRICAL DEVICES, UNLESS
OTHERWISE NOTED ON ARCHITECTURAL PLANS. REPAIRS ARE TO BE DONE TO LOGICAL EDGES
OF SURFACES AFFECTED AND SHALL MATCH IMMEDIATE ADJACENT AREAS IN CONSTRUCTION,
MATERIAL, FIRE RATING, FINISH AND COLOR.
D13. PROVIDE BLANK COVERPLATES WHERE DEVICES ARE BEING REMOVED FROM EXISTING WALLS
TO REMAIN. MATCH COLOR OF NEW ADJACENT DEVICE COVERPLATES.
D14. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF
WORK AND OBTAIN CLARIFICATIONS FROM ARCHITECT/ENGINEER IF NECESSARY.
D15. COORDINATE SERVICE INTERRUPTION WITH CONSTRUCTION MANAGER, OWNER, LANDLORD,
AND UTILITY COMPANY, WHERE APPLICABLE, AND DO NOT INTERRUPT POWER WITHOUT
WRITTEN PERMISSION. PROVIDE A MINIMUM OF ONE WEEK'S WRITTEN NOTIFICATION WHEN
POWER IS DESIRED TO BE INTERRUPTED.
D16. EXERCISE EXTREME CAUTION WHEN REMOVING/ RELOCATING WIRING AND EQUIPMENT. IT IS
THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT OTHER WIRING DEVICES, EQUIPMENT
AND LIGHT FIXTURES THAT MAY BE CONNECTED TO THE SAME CIRCUIT REMAIN OPERATIONAL
AND ACTIVE.
D17. INFORMATION INDICATED IN THE DEMOLITION PORTION OF THE CONTRACT DRAWINGS IS
DIAGRAMMATIC IN NATURE. FIELD VERIFY ELECTRICAL CIRCUIT HOMERUNS TO ALL ELECTRICAL
ITEMS SCHEDULED TO BE DEMOLISHED AND PERFORM THE WORK AS INTENDED AND DEPICTED
ON THE DRAWINGS.
D18. UPDATE ALL EXISTING ELECTRICAL EQUIPMENT NAMEPLATES AND DIRECTORIES AS
NECESSARY TO REFLECT FINAL AS-BUILT CONDITIONS AT THE END OF CONSTRUCTION.
D19. STORE ITEMS INDICATED TO BE RETURNED TO THE OWNER IN A DRY, CLEAN AND PROTECTED
AREA. NOTIFY OWNER WHEN ITEMS ARE READY TO BE REMOVED.
D20. COORDINATE ANY ALTERATION AND CHANGES TO THE ELECTRICAL SERVICE WITH THE LOCAL
UTILITY COMPANY AND THE OWNER PRIOR TO COMMENCEMENT OF WORK.
D21. SCHEDULE ALL POWER INTERRUPTION WITH OWNER FOR EXACT DATE, TIME AND DURATION.
PROVIDE A MINIMUM OF 72 HOURS NOTICE PRIOR TO DISCONNECTING ANY POWER TO ANY
PORTION OF THE BUILDING, AND MAKE ARRANGEMENTS TO MAINTAIN POWER TO ALL CRITICAL
EQUIPMENT AS NEEDED AND REQUESTED BY THE OWNER PRIOR TO COMMENCEMENT OF
WORK.
D22. PROVIDE ANY NECESSARY REPROGRAMMING OF EXISTING BUILDING FIRE ALARM SYSTEMS TO
DISABLE FIRE ALARM DEVICES THAT ARE BEING DISCONNECTED AND REMOVED, AND FOR ANY
NEW DEVICES THAT ARE ADDED, AS PART OF BID PRICE.
D23. THE DEMOLITION PLAN IS NOT INCLUSIVE OF ALL ELECTRICAL DEVICES WITHIN THE PROJECT
AREA. IT IS INTENDED TO PROVIDE A GENERAL KNOWLEDGE OF THE EXISTING CONDITIONS
WITHIN THE PROJECT AREA. ANY DISCREPANCIES OR CONDITIONS NOT SHOWN ON THE PLAN
SHALL BE BROUGHT TO THE ATTENTION OF THE A/E. THE CONTRACTOR IS RESPONSIBLE FOR
ALL REQUIRED ELECTRICAL DEMOLITION WHETHER INDICATED ON THE PLANS OR NOT.
D24. ALL CONDUITS SERVING OTHER SPACES THAT RUN THROUGH THE PROJECT AREA SHALL
REMAIN ACTIVE DURING CONSTRUCTION SO AS NOT TO CAUSE DISRUPTION TO THESE OTHER
SPACES. ENSURE THAT ALL CONDUITS, NEW OR EXISTING WITHIN THE PROJECT AREA ARE
PROPERLY SUPPORTED IN ACCORDANCE WITH THE NEC. ANY EXISTING CONDUIT IS INSTALLED
BELOW THE HEIGHT OF THE NEW CEILING SHALL BE RELOCATED TO ABOVE THE NEW CEILING
HEIGHT.
D25. REMOVE ALL ABANDONED WIRING AND CONDUIT THAT IS WITHIN THE PROJECT AREA PRIOR TO
THE END OF CONSTRUCTION.
D26. UPDATE PANELBOARD DIRECTORIES WHICH ARE MODIFIED BY THIS PROJECT.
D27. REPAIR DISTURBED AREAS TO MATCH EXISTING CONDITIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
B
IM
/0
R e p la c e
F ir e
P u m p
C o n tr o lle r D e s ig n /0
R e p la c e
F ir e
P u m p C o n tr o lle r
R
E
.r v t
/2
/2
:5
:5
A
M
E-001
ELECTRICAL LEGENDS, SYMBOLS
& GENERAL NOTES
FIRE PUMP CONTROLLER
REPLACEMENT
DETROIT, MICHIGAN
553-22-231
06/23/2023 JFR KEM
100% BID DOCUMENTS
SHEET LIST
SHEET NUMBER SHEET NAME
E-001 ELECTRICAL LEGENDS, SYMBOLS & GENERAL NOTES
EP101 ELECTRICAL 1ST FLR, PENTHOUSE & BASEMENT PLAN
E-601 ELECTRICAL SCHEDULES, DETAIL AND ONE-LINE DIAGRAM
SEC11
CHILLERS
EC104
BOILERS
EC105
AC SHOP
EC103
SWITCHBOARD
SUBSTATION
EC101
EMERGENCY
GENERATOR
EC102
KEY PLAN - 1ST FLR
KEY PLAN - BASEMENT
F
EX. SWITCHGEAR
SUBSTATION #14
EX. SWITCHGEAR
SUBSTATION #15
EX. SUBSTATION
SWITCHGEAR #13
EX. GENERATOR
EX. GENERATOR
EX. GENERATOR
EX. GENERATOR
SWITCHBOARD
SUBSTATION RM EC101
EMERGECNY GENERATOR
RM EC102
EX. PP-EQEC
EX. RC-CECA
EX. LP-CEC1
EX. RP-EECA
EX. LP-CECA
EX. LP-EEC1
EX. PP-EEC
EX. TEECA
EX. ENCLOSED CIRCUIT BREAKER "FIRE PUMP"
EX. ESA
FIRE RATED WALL
37 36 35
F
EX. EMERGENCY
SWITCHBOARD "ESA"
LOCATED IN PENTHOUSE
ON THE ROOF. REFER TO
DETAIL 2 THIS SHEET.
EX. SWITCHGEAR
SUBSTATION #14
LOCATED ON LEVEL
ABOVE
EXISTING NORMAL FEEDER SHALL BE REUSED
EXISTING EMERGENCY FEEDER SHALL BE REUSED.
NOTE : CONDUIT ROUTING SHOWN THIS PLAN IS AN
APPROXIMATION ONLY. FIELD VERIFY EXACT LOCATION.
EX. MCC-EQEC1
JP-1
FP-1
EP101
JOCKY PUMP CONTROLLER
FIRE PUMP
CONTROLLER
JPC-1
FPC-1
EP101
DEMO WORK
NEW WORK
EX. ENCLOSED CIRCUIT
BREAKER "FIRE PUMP"
LOCATED ON LEVEL ABOVE
FP-1
FP-1
JP-1
JPC-1
ETR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
B
IM
/0
R e p la c e
F ir e
P u m p
C o n tr o lle r D e s ig n /0
R e p la c e
F ir e
P u m p C o n tr o lle r
R
E
.r v t
/2
/2
:5
:5
A
M
EP101
ELECTRICAL 1ST FLR,
PENTHOUSE & BASEMENT PLAN
FIRE PUMP CONTROLLER
REPLACEMENT
DETROIT, MICHIGAN
553-22-231
06/23/2023 JFR KEM
100% BID DOCUMENTS
CODED NOTES:
DRAWING NOTES:
1. REFER TO FIRE PROTECTION DRAWINGS FOR INFORMATION ON THE TEMPORARY WATER SUPPLY
IMPAIRMENT PROGRAM.
2. WIRING METHODS IN THE FIRE PUMP ROOM SHALL BE IN ACCORDANCE WITH NEC 695.6 D.
3. CONTRACTOR TO ORDER AND HAVE ALL EQUIPMENT AND MATERIALS ON SITE BEFORE BEGINNING CONSTRUCTION. PERIOD OF PERFORMANCE INCLUDING LEAD TIMES IS SIX (6) MONTHS. ADJUST
CALENDAR DAYS BASED ON P.O.P.
0 2' 4' 8' 12'
1/4" = 1'-0"
N
1 NEW FIRE PUMP CONTROLLER SHALL BE PROVIDED BY FIRE PROTECTION AND WIRED BY ELECTRICAL.
RECONNECT EXISTING POWER CIRCUIT, FIRE ALARM CIRCUIT AND CONTROL WIRING TO NEW FIRE
PUMP AND PAD MOUNT FIRE PUMP CONTROLLER PROVIDED BY FIRE PROTECTION TO MATCH
EXISTING. REFER TO DIV 21 FOR SPECIFICATION. COORDINATE LOCATION AND REQUIREMENTS
PRIOR TO WORK.
2 THE FOLLOWING EQUIPMENT SERVED AS THE OLD SWITCHBOARD ESA. IT IS CURRENTLY GUTTED AND LEFT IN PLACE AS A LARGE SPLICE BOX. REFER TO DETAIL 4 THIS SHEET FOR CURRENT
LOCATION OF SWITCHBOARD ESA.
3 DE-ENERGIZE, DISCONNECT FIRE PUMP AND FIRE PUMP CONTROLLER. EXISTING CIRCUIT AND
CONTROL WIRING SHALL BE REUSED FOR NEW FIRE PUMP CONTROLLER AND NEW FIRE PUMP.
MAINTAIN CIRCUIT CONTINUITY DURING DEMO PHASE.
4 DE-ENERGIZE, DISCONNECT JOCKEY PUMP AND JOCKEY PUMP CONTROLLER. EXISTING CIRCUIT
SHALL BE REUSED FOR NEW JOCKEY PUMP AND JOCKEY PUMP CONTROLLER. MAINTAIN CIRCUIT
CONTINUITY DURING DEMO PHASE.
5 NEW JOCKEY PUMP CONTROLLER SHALL BE PROVIDED BY FIRE PROTECTION AND WIRED BY
ELECTRICAL. RECONNECT EXISTING CIRCUIT TO NEW JOCKEY PUMP AND WALL MOUNTED JOCKEY PUMP CONTROLLER PROVIDED BY FIRE PROTECTION TO MATCH EXISTING. REFER TO DIV 21 FOR
SPECIFICATION.
1/8" = 1'-0"
ENLARGED PLAN - 1ST FLOOR - ELECTRICAL RM
1/16" = 1'-0"
OVERALL PLAN - BASEMENT
0 8' 16' 32' 48'
1/16" = 1'-0"
1/4" = 1'-0"
ENLARGED PLAN - BASEMENT - FIRE PUMP ROOM - NEW WORK
0 4' 8' 16' 24'
1/8" = 1'-0"
Revisions Date
1/4" = 1'-0"
ENLARGED PLAN - BASEMENT - FIRE PUMP ROOM- DEMO WORK
LOCATED ON PENTHOUSE LEVEL ABOVE
FIRE PUMP CONTROLLER/ATS
CONTRACTOR SHALL RECONNECT AND TEST
EXISTING START/STOP SIGNAL AND COMMUNICATION
WIRING TO ENSURE FULLY OPERATIONAL SYSTEM.
IF TESTING OF WIRING FAILS, NOTIFY ENGINEER ON
RECORD. VERIFY EXACT REQUIREMENT WITH
MANUFACTURER SPECIFICATIONS PRIOR TO WORK.
EX. EMERGECNY
SWITCHBOARD "ESA"
MASTER CONTROLLER
PANEL
EX. EMERGENCY SWITCHBOARD ESA
FPC-1
FIRE PUMP CONTROLLER
FIRE PUMP
75 HP
REUSE EXISTING
REUSE EXISTING
4000 A
277/480V, 3-PHASE, 4 WIRE
13.2kV-480/277V, 3PH
600A
EX. SWITCHGEAR #14
5000 A
277/480V, 3-PHASE, 4 WIRE
EX. MCC-EQEC1
JPC-1
JOCKEY PUMP
CONTROLLER
JOCKEY PUMP
7.5 HP
REUSE EXISTING
5000 A
277/480V, 3-PHASE, 4 WIRE
EX. SWITCHGEAR #15
ATS-6
480V, 600A, 3P
EX. ENCLOSED CIRCUIT BREAKER
"FIRE PUMP"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
B
IM
/0
R e p la c e
F ir e
P u m p
C o n tr o lle r D e s ig n /0
R e p la c e
F ir e
P u m p C o n tr o lle r
R
E
.r v t
/2
/2
:5
:5
A
M
E-601
ELECTRICAL SCHEDULES, DETAIL
AND ONE-LINE DIAGRAM
FIRE PUMP CONTROLLER
REPLACEMENT
DETROIT, MICHIGAN
553-22-231
06/23/2023 JFR KEM
100% BID DOCUMENTS
N.T.S.
FIRE PUMP CONTROL WIRING DETAIL
EQUIPMENT CONNECTION SCHEDULE
TAG IDENTIFICATION HP FLA / MCA
VOLT / PH / LOAD
(kVA) CB AMPS PANEL CKT # FEEDER SIZE CONDUIT DISC MEANS CONTROL NOTES
FP-1 FIRE PUMP 75 480 V/3-79.7 kVA REUSE EXISTING REUSE EXISTING BY FIRE PROTECTION BY FIRE PROTECTION
JPC-1 JOCKEY PUMP 7.5 480 V/3-9.1 kVA REUSE EXISTING REUSE EXISTING BY FIRE PROTECTION BY FIRE PROTECTION
REUSE EXISTING
REUSE EXISTING
REUSE EXISTING
REUSE EXISTING
REUSE EXISTING
REUSE EXISTING