S02. VA MRI Final Volume 3 Drawings (GE,PDC,PDC) Updated.pdf

PDF 5 MB Posted

Attached to
Y1DZ--Expand MRI Suite Project 541-CSI-103
Solicitation number
36C25020B0043
Issued by

About this file

This pre-solicitation notice describes an upcoming federal contract opportunity to expand an MRI suite at the Louis Stokes VA Medical Center in Cleveland, Ohio. The project scope includes adding a third 3T MRI unit to the north of the existing suite, renovating surrounding site areas, landscaping, sidewalks and physical barriers. Connecting areas of the existing suite will also be renovated to allow full integration of support spaces. The solicitation is set aside exclusively for service-disabled veteran-owned small businesses. The North American Industry Classification System code assigned is 236220 for commercial and institutional building construction. The estimated contract value is between $1-5 million. The period of performance is expected to be 548 calendar days from notice to proceed. The solicitation is anticipated to be posted to beta.SAM.gov on June 5th, 2020 with proposals due approximately 30 days later.

View the file

Other files

File Type Posted
25 09 00 - Systems Integration.pdf PDF
Asbestos Report Jun 19 2019.pdf PDF
Revised Drawing M-202 Basement and First Floor HVAC Piping Plans.pdf PDF
Bid Opening Instructions.pdf PDF
Addendum No.1 Description.pdf PDF
Revised Drawing L103 Site Details.pdf PDF
Pre-Bid RFIs and Responses Sep 16 2020 update.pdf PDF
Revised Drawing T-301 Technology Details.pdf PDF
Revised Drawing M-701 Temperature Controls.pdf PDF
Revised Drawing E-301 One-Line Legend and Panelboard Schedules.pdf PDF
Revised Drawing E-302 Radiology One-Line Diagram.pdf PDF
26 33 53 - Static Uninterruptible Power Supply.pdf PDF
36C25020B0043 0001.docx DOCX document
Geotechnical Report Dec 15 2007.pdf PDF
Revised Drawing L100 Site Plans _ Demolition and Layout.pdf PDF
Expand MRI Suite - Site visit sign-in sheet Aug 27 2020.pdf PDF
Revised Drawing T-301 Technology Details.pdf PDF
Asbestos Report Jun 19 2019.pdf PDF
Addendum No.1 Description.pdf PDF
Revised Drawing L100 Site Plans _ Demolition and Layout.pdf PDF
Revised Drawing M-202 Basement and First Floor HVAC Piping Plans.pdf PDF
Pre-Bid RFIs and Responses Sep 16 2020 update.pdf PDF
Revised Drawing L103 Site Details.pdf PDF
Revised Drawing E-301 One-Line Legend and Panelboard Schedules.pdf PDF
Geotechnical Report Dec 15 2007.pdf PDF
Revised Drawing E-302 Radiology One-Line Diagram.pdf PDF
36C25020B0043 0001.docx DOCX document
Bid Opening Instructions.pdf PDF
Expand MRI Suite - Site visit sign-in sheet Aug 27 2020.pdf PDF
Revised Drawing M-701 Temperature Controls.pdf PDF
26 33 53 - Static Uninterruptible Power Supply.pdf PDF
25 09 00 - Systems Integration.pdf PDF
S02. VA MRI Final Volume 2 Drawings (FP,MG,P,M,E,T) Updated.pdf PDF
S02 - RFI Form .pdf PDF
36C25020B0043_1.docx DOCX document
S02. VA MRI Final Volume 1 Specs Updated.pdf PDF
Wage Determination.pdf PDF
S02. VA MRI Final Volume 2 Specs Updated.pdf PDF
36C25020B0043-001 - Site visit 08-27-2020.pdf PDF
S02. VA MRI Final Volume 1 Drawings (G,V,L,A,I, Q,S) Updated.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C1 - 01 - Cover Sheet C2 - 02 - Disclaimer - Site Readiness A1 - 03 - General Notes A2 - 04 - Equipment Layout A3 - 05 - Section Views A4 - 06 - Acoustic - Proximity Limits A5 - 07 - RF Shielding A6 - 08 - Equipment Dimensions (1) A7 - 09 - Equipment Dimensions (2) A8 - 10 - Delivery S1 - 11 - Structural Notes S2 - 12 - Structural Layout

S3 - 13 - Structural Details M1 - 14 - Mechanical Layout M2 - 15 - HVAC - Venting M3 - 16 - Chilled Water M4 - 17 - Cryogenics (1) M5 - 18 - Cryogenics (2) E1 - 19 - Electrical Notes E2 - 20 - Electrical Layout E3 - 21 - Electrical Elevation E4 - 22 - Electrical Details E5 - 23 - Power Requirements E6 - 24 - Interconnections

Cleveland, Ohio

Scott Archer

SIGNA PREMIER

TNC

GE Healthcare

GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused. All dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work due to scaling from these drawings. /24MRI-M130526-FIN-01-A.DWG

814.323.3641

Scott.archer@ge.com

KMS 5815067

USA

1/4"=1'-0"

4788060

03/Sep/2019

Louis Stokes VA Medical Center

A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.

Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning -

Drawn by Verified by PIM Manual

SheetFormat

Concession

Scale DateFile Name

RevS.O. (GON)

A3

REV DATE MODIFICATIONS

00A 06/Aug/2019 Prelim based on request DC-201291 01A 03/Sep/2019 Final based on request DC-201836

FINAL STUDY

GLOBAL SITE READINESS CHECKLIST (DI)

DOC1809666 Rev. 6

Customer Name: PMI Name:

GON/SO Number: Field Service Name:

Equipment: Country/City or City/State:

Site Visit Date for SRC: SRC Status:

Site Ready Checks at Installation

General Site Planning

Room dimensions, including ceiling height, for all Exam, Equipment/Technical & Control rooms meets GE specifications.

Ceiling support structure, if on the GE drawing, is at correct location and height according to the drawing specifications. Levelness and spacing has been measured. Overhead support Structure has been confirmed with contractor to meet GE criteria.

Rooms that will contain equipment, including staging areas if applicable, are construction debris free. Precautions must be taken to prevent debris from entering rooms containing equipment.

Finished ceiling is installed. If applicable ceiling tiles installed per PMI discretion.

Delivery route from truck to installation space has been reviewed, all communications have occurred, arrangements made for special handling (if needed). Floors along delivery route will support weight of the equipment, reinforcements arranged if needed.

System power & grounding (PDB/MDP) is available as per GE specifications, installed at point of final connection and ready to use. Lock Out Tag Out is available.

System power and grounded audit has been scheduled to be completed during installation of equipment. (If Required) GEHC PM to confirmed if needed.

Adequate room illumination installed and working.

Cableways (floor, wall, ceiling, etc.) ready for GE cables and are of correct length and diameter. Cableways routed per GE Final drawings and access openings installed as determined by GEHC PM. Surface floor duct installed at time of system installation.

HVAC systems Installed, and the site meets minimum environmental operational system requirements.

Network outlets installed and computer network available and working.

Hospital IT/connectivity contacts have been engaged and information has been added to Project management tool. (If Required)

Floor levelness/flatness is measured and within tolerance, and there are no visible defects per GEHC specifications. Floor Strength and thickness have been discussed with customer/contractor and they have confirmed GE requirements are met.

Customer supplied countertops where GE equipment will be installed are in place.

Specific for MR

RF Shield installed with possible exception of magnet entrance. RF Shield Effectivity and Ground Isolation Test needed. If GE is supplying RF shield, the RF shield Effectivity and Ground Isolation Test data is a Mandatory attachment into MyProjects.

Power and connectivity is available for magnet monitoring.

Delivery route for He dewars & gradient coil cart to the scanning room is available.

Chilled water supply for Water Cooled Compressor or Air Cooled Compressor is ready and meets GE specifications.

Water drain available in the equipment room, if applicable.

Power for MR compressor & Chiller is available.

Ensure cryogen venting system is available for magnet connection.

Exhaust fan system is installed and operational per GE requirements.

PMI Signature:

Customer Signature:

FS Signatature: optional

GENERAL SPECIFICATIONS

· GE is not responsible for the installation of developers and associated equipment, lighting, cassette trays and protective screens or derivatives not mentioned in the order.

· The final study contains recommendations for the location of GE equipment and associated devices, electrical wiring and room arrangements. When preparing the study, every effort has been made to consider every aspect of the actual equipment expected to be installed.

· The layout of the equipment offered by GE, the dimensions given for the premises, the details provided for the pre-installation work and electrical power supply are given according to the information noted during on-site study and the wishes expressed by the customer.

· The room dimensions used to create the equipment layout may originate from a previous layout and may not be accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of information.

· Dimensions apply to finished surfaces of the room.

· Actual configuration may differ from options presented in some typical views or tables.

· If this set of final drawings has been approved by the customer, any subsequent modification of the site must be subject to further investigation by GE about the feasibility of installing the equipment. Any reservations must be noted.

· The equipment layout indicates the placement and interconnection of the indicated equipment components.

There may be local requirements that could impact the placement of these components. It remains the customer's responsibility to ensure that the site and final equipment placement complies with all applicable local requirements.

· All work required to install GE equipment must be carried out in compliance with the building regulations and the safety standards of legal force in the country concerned.

· These drawings are not to be used for actual construction purposes. The company cannot take responsibility for any damage resulting therefrom.

CUSTOMER RESPONSIBILITIES

· It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final study. A detailed site readiness checklist is provided by GE. It is the responsibility of the customer to ensure all requirements are fulfilled and that the site conforms to all specifications defined in the checklist and final study. The GE Project Manager of Installation (PMI) will work in cooperation with the customer to follow up and ensure that actions in the checklist are complete, and if necessary, will aid in the rescheduling of the delivery and installation date.

· Prior to installation, a structrual engineer of record must ensure that the floor and ceiling is designed in such a way that the loads of the installed system can be securely borne and transferred. The layout of additional structural elements, dimensioning and the selection of appropriate installation methods are the sole responsibility of the structural engineer. Execution of load bearing structures supporting equipment on the ceiling, floor or walls are the customer's responsibility.

DISCLAIMER

THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.

DATE NAME SIGNATURE

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center C2 - Disclaimer - Site Readiness 02-

· Any deviation from these drawings must be communicated in writing to and reviewed by your local GE healthcare installation project manager prior to making changes.

· Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE healthcare installation project manager can supply a reference list of rigging contractors.

· New construction requires the following;

1. Secure area for equipment,

2. Power for drills and other test equipment,

3. Capability for image analysis,

4. Restrooms.

· Provide for refuse removal and disposal (e.g. crates, cartons, packing)

· It is the customer's responsibility to contract a vibration consultant/engineer to implement site design modifications to meet the GE vibration specification. Refer to the system preinstallation manual for the vibration specification.

CUSTOMER SITE READINESS REQUIREMENTS

TYPCIAL MOVING MAGNETIC MASS DISTANCE RADIALLY DISTANCE AXIALLY

Carts, Gurneys 100-400 lbs [45-182 kg] 3 Gauss line 3 Gauss line

Forklifts, small elevator, cars, minivans vans, pickup trucks, ambulances (objects greater than 400 lbs [182 kg]) 20.0 FT 6.05 M 25.0 FT 7.65 M

Buses and trucks (dump, tractor trailer, utility, fire trucks) 23.2 FT 7.10 M 29.2 FT 8.90 M

MAGNETIC INTERFERENCE SPECIFICATIONS

· The customer must establish protocols to prevent persons with cardiac pacemakers, neurostimulators, and biostimulation devices from entering magnetic fields of greater than 5 gauss (exclustion zone).

· Main power transformers must remain outside the 3 gauss field. EMI < 17.1mG AC. EMI < 4.1mG DC.

· Potential exists under fault conditions that the 5 gauss line may expand radially to 14.8 ft. [4.5 m] and axially to 19.7 ft. [6.0 m] for 8 seconds or less. It should be noted that normal rampdowns or magnet rundown unit initiated quenches will not cause the magnetic field to expand.

· It is recommended every site consider the event of a quench and plan accordingly (such as placing 5 gauss warning signs at expanded locations).

· The ferrous metal objects listed below must not move into or inside of the moving metal sensitivity line during scans.

Please refer to pre-installation checklist in pre-installation manual listed on the cover sheet for items critical to image quality.

1. The layout should be arranged so that the 5g line is contained to the magnet room. If not possible, a barrier is recommended to prevent entry to the 5g field area.

2. The spaces around, above, and below the magnet must be reviewed for effects of the 5g, 3g, 1g, and .5g fields.

Refer to the proximity limit chart in the MR pre-installation manual referenced on the cover sheet.

3. For moving metal, the restriction lines typically extend outside of the MR space. Please confirm there are no moving metal concerns within these areas. An EMI study is recommended if the restriction lines are violated.

4. For vibration, analysis to be completed as required per pre-installation manual.

5. For EMI, review the site for the location of the main electrical feeders, AC devices, or distribution systems. An

EMI study is recommended if large AC systems are nearby.

6. Details of the floor below the magnet must be reviewed. The structural engineer must verify that the quantity of steel in the volume 10ft [3.1m] x 10ft [3.1m] x 1ft [.3m] deep (below the magnet) does not exceed the allowable steel content as given in the MR pre-installation manual referenced on the cover sheet.

7. All access/computer flooring is to be removed in both the magnet room and equipment room.

Responsibility for the coordination, design, engineering, and site preparation resides with the customer and their project architects and contractors. GE does not, by providing reviews and furnishing comments and assistance, accept any responsibility beyond its obligations as defined in the MR system, sale/purchase agreement.

MRI SITE PLANNING REMINDERS

Broadband RF noise is a single transient or continuous series of transient disturbances caused by an electrical discharge. Low humidity environmental conditions will have higher probability of electrical discharge. The electrical discharge can occur due to electrical arcing (micro arcing) or merely static discharge. Some potential sources capable of producing electrical discharge include:

· Loose hardware/fasteners vibration or movement (electrical contunuity must always be maintained)

· Flooring material including raised access flooring (panels & support hardware) and carpeting

· Electrical fixtures (i.e. Lighting fixtures, track lighting, emergency lighting, battery chargers, outlets)

· Ducting for HVAC and cable routing

· RF shield seals (walls, doors, windows etc.)

For additional information regarding image quality, refer to the pre-installation manual listed on the cover sheet.

IMAGE QUALITY CONSIDERATIONS

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center A1 - General Notes 03

200 G

0.5 G

1 G

3 G

10 G 30 G

50 G 100 G

5 G

POSITION TO BE DEFINED

The GE HPI Technical Support Group is an additional resource that can provide answers for general GE product siting questions and can be reached at (877)-305-9677 or mail to:HPITechCOE@ge.com

For Accessory Sales: (866) 281-7545 Options 1, 2, 1, 2 or mail to: gehcaccessorysales@ge.com

BY ITEM DESCRIPTION

MAX HEAT

OUTPUT (btu) WEIGHT (lbs)

A 1 3T Magnet 10060 16790

A 2 Patient table - fixed - 418

A 3 Magnet rundown unit - 7

A 4 Phantom set storage cabinet - 350

A 5 Integrated Systems Penetration Panel 1023 -

A 6 Integrated Cooling Penetration Panel - -

A 7 Integrated Systems Cabinet 39215 4699

A 8 Integrated Cooling Cabinet 3410 1353

A 9 Magnet monitor 819 10

A 10 Operator console computer 4947 122.8

A 11 Operator workspace - 26

A 12 Pneumatic patient alert - 0.5

A 13 MR Elastography 480 53.4

A 14 Music system - -

A 15 Injector on pedestal - 94

A 16 Injector control 675 17

A 17 Injector power supply 660 6

B 18 Main disconnect panel 901 190

B 19 Dimplex chiller 297000 4800

B 20 Water bypass - -

B 21 Water filter - -

B 22 Remote graphic display - -

C 23 Minimum opening for equipment delivery is 40 in. w x 82 in. h, contingent on a 72

in. corridor width

C 24 Minimum opening for equipment delivery is 43 in. w x 82 in. h, contingent on a 96

in. corridor width

C 25 Counter top for equipment- provide grommeted openings as required to route cables

C 26 Base cabinet for storage of: surface coils, patient positioning pads, phantoms, etc.

C 27 Louvered doors - refer to preinstall for requirements

C 28 Magnet access 9'-0"x10'-0"

C 29 Shelf or mobile cart C 30 Warning! 5 Gauss line outside the Magnet room limits

C 31 Define RF shield's inset according to provisions made by the RF Shield vendor

LEGEND

A GE Supplied C Customer/contractor supplied and installed

B GE Supplied/contractor installed D Available from GE 200 Gauss 5 Gauss 100, 50, 30, 10 Gauss 3, 1, 0.5 Gauss

Exam room height

Finished floor to slab height

Recommended finished ceiling height

TBD

8'-9"

RF SHIELD - 100 dB ATTENUATION

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center A2 - Equipment Layout 041/4"=1'-0"

Moving metal sensitivity line for CARS, MINIVANS, PICKUP TRUCKS, AND AMBULANCES.

NOTE: Ferrous objects must not move into or inside of the moving metal sensitivity line during scans.

Moving metal sensitivity line for BUSES AND TRUCKS

(DUMP, TRACTOR TRAILER, UTILITY, FIRE TRUCKS)

ANTE

ROOM

[1B552]

ALCOVE

[1B553]

DRESS/

TOILET

[1B551]

CONTROL

ROOM

[1B554]

MAGNET ROOM

[1B555]

(considering RF shield walls)

EQUIPMENT

ROOM

[1B556]

0'-9"0' -6

6' -6

1'-0"

1'-4"

25'-0"

10'-9"

'-2

'-1

1' -1

0' -1

1"

1'-4"

0' -1

1"

1' -1

1'-0"

1'-8"

6'-10"

1' -6

'-5

18'-4"

8'-5"

'-2

3'-0"

20'-5"

1'-1" nshellhorn Highlight nshellhorn Highlight nshellhorn Highlight nshellhorn Highlight nshellhorn Highlight nshellhorn Highlight nshellhorn Highlight nshellhorn Highlight nshellhorn Highlight nshellhorn Highlight nshellhorn Highlight nshellhorn Highlight nshellhorn Highlight nshellhorn Highlight

200 G

1 G 3 G

10 G 30 G

50 G 100 G

5 G

±0'-0"

±REC.8'-9"

T.B.D.

T.B.D.

T.B.D.

3G

10G

5G

100G 50G

30G

200 G

200 G

1 G

3 G

10 G 30 G

50 G 100 G

5 G

±0'-0"

±REC.8'-9"

T.B.D.

T.B.D.

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center A3 - Section Views 051/4"=1'-0"

SIDE VIEW WITH MAGNETIC FIELD

MAGNET ROOM CONTROL ROOM

FRONT VIEW WITH MAGNETIC FIELD

MAGNET ROOM

3' -6

3' -6

2'-10"

3'-6"

4'-7"

Cable tray Unistrut

10'-9"

10'-1"

MAGNETIC PROXIMITY LIMITS

STEEL MASS LIMITS TO MAGNET ISOCENTER (3x3 m [10x10 ft] AREA UNDER MAGNET) Limits Of Steel Mass Distance From Magnet Isocenter Distance Below Top Surface Of Floor kg/m² lbs/ft² mm in mm in 0 0 0 - 1143 0-45 0 - 76 0-3

9.8 2 1143 - 1194 45-47 76 - 127 3-5

14.7 3 1194 - 1321 47-52 127 - 254 5-10

39.2 8 1321 - 1397 52-55 254 - 330 10-13

98.0 20 1397+ 55+ 330+ 13+

The actual field strength can be affected by Magnetic shielding, Earth's magnetic field, other magnetic fields and stationary or moving metal. This information must be used to evaluate potential site interaction of GE Healthcare equipment with other non-GE Healthcare equipment. Magnetic shielding can be installed to prevent interaction between the magnet and nearby sensitive devices. The GE Healthcare Project Manager of Installation (PMI) can work with the customer to coordinate the magnetic shielding site evaluation. The customer is responsible for installation of all magnetic shielding.

The customer must provide detail defining ferrous material below the magnet to the Project Manager so the GE Healthcare MR Siting and Shielding team can review for compliance.

Gauss (mT) Limit Equipment

0.5 gauss (0.05mT) Nuclear camera

1 gauss (0.1mT) Positron Emission Tomography scanner, Linear Accelerator, Cyclotrons, Accurate measuring scale, Image intensifiers, Bone Densitometers, Video display (tube), CT scanner, Ultrasound, Lithotriptor, Electron microscope, Digital X-Ray

3 gauss (0.3mT) Power transformers, Main electrical distribution transformers 5 gauss (0.5mT) Cardiac pacemakers, Neurostimulators, Biostimulation devices

10 gauss (1mT) Magnetic computer media, Line printers, Film processor, X-ray tubes, Emergency generators, Commercial laundry equipment, Food preparation area, Water cooling equipment, HVAC equipment, Major mechanical equipment room, Credit cards, watches, and clocks, Air conditioning equipment, Fuel storage tanks, Motors greater than 5 horsepower

50 gauss (5mT) Metal detector for screening, LCD panels, Telephones

No Limit Digital Detectors

ACOUSTIC SPECIFICATIONS

GE Equipment Acoustic Output Notes

Control Room 62 dBA

Equipment Room 83.6 dBA The 83.6 dBA level is for GE equipment only. The Equipment room acoustic level must not exceed 85 dBA

Magnet Bore Isocenter 127 dBA See Sound Pressure Spectral Distribution DetailFront of Magnet - 800mm from bore measurement 124 dBA

SOUND PRESSURE SPECTRAL DISTRIBUTION

1/3 Band Relative SPL

20LA

eq

(d

BA

Frequency (1/3 Octave)

20 25

.5 40 50 63 80 10

ISOGAUSS PLOTS

* The isogauss contour plots depicted on this drawing represent magnetic fringe fields resulting from the normal operation of the magnet provided with the MR system. The actual magnetic field intensity at any point in the vicinity of the magnet when installed may vary from the contour plots due to factors such as the concentrating effects of nearby ferrous objects ambient magnetic fields, including the earth's magnetic field. Therefore, the contours shown are only approximations of actual field intensities found at a corresponding distance from the magnet's isocenter.

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center A4 - Acoustic - Proximity Limits 06

MINIMUM MAGNET CEILING HEIGHT (TOP VIEW)

Shaded area within solid lines indicates floor to ceiling height - Ideal height of Magnet room suspended ceiling is 2667mm [105 in]. Minimum Magnet room suspended ceiling height is 2500 mm [98.5 in].

If the suspended ceiling height is between 2500mm and 2667mm [98.5 in and 105 in] a low ceiling height kit may be required.

SCALE 1:50

FRONT OF MAGNET

MAGNET

GEOMETRIC

ISOCENTER

[5 7.

in

[54 in]

[4 in

[3 in

[54 in]

[109 in]

PENETRATION PANEL WALL OPENINGS

m m

5m m [6

1.

3i n

2i n

468mm ±5mm [18.4in ±.2in ]

[1 7.

in

0m m m m [7

.5 in

.5 in

[7.8 in]

[2.4 in]

Finished wall

RF OVERLAY

Finished wall

RF Shield

Magnet room side

Equipment room

Magnet room

Integrated Systems Penetration Wall

FLOOR

RF vendor to supply 168 M6 bolts and nuts (per penetration panel)

Penetration Panel Adapter Plate

[23.6 in]

[6 6.

in

Penetration Panel Adapter Plate

Integrated Cooling Penetration Wall

M in

[72 in]

Min.

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center RF shielding 07

GLOBAL OPERATOR CABINET (GOC)

Center of Gravity

SCALE 1:10

TOP VIEW

FRONT VIEWSIDE VIEW

[7.64 in]

[2 3.

in

[15.79 in]755

[29.71 in]

[1 0.

in

[12.13 in]

[27.56 in]

[1

.5 in

[3

.1 in

[4 .1 in

[1

.8 in

A - Seismic Anchor

A A

AA

SCALE 1:50

[99.2 in]

[9 8.

in

Center of gravity

Note:

Center of gravity is approximate and includes the GE Healthcare supplied VibroAcoustic Dampening Kit, but does not include cryogens, gradient assembly, side mounted electronics, or enclosures.

MAGNET ENCLOSURE SIGNA PREMIER

[44.5 in]

[2 in]

[4 2.

in

[98.1 in]

[38.3 in]

[1.2 in]

[4 2.

in

[15.7 in]

Front View Side View

MAIN DISCONNECT PANEL

TOP VIEWFRONT VIEWSIDE VIEW

NOT TO SCALE

Center of gravity

[3.7 in]

[1 8.

in

[9.2 in] 492

[19.4 in]

[3 7.

in

[12.4 in] 44

[1

7.

in

[3 in

[25.4 in]

[9 .3 in

[2 in

Service clearance

PATIENT TABLE

SCALE 1:50

SIDE VIEWTOP VIEW

Center of gravity

TOP VIEW SEISMIC

(4) 13mm (0.5 in) Hilti KB-TZ Expansion Anchors (Minimum Embedment:

82.5mm (3.25 in)

[3 6.

in

[96.5 in]

[2 7.

in

[2 1.

in

[1 3.

in

[22 in]

[18.5 in]

[9 .4 in

558.8 [22 in]

469.9 [18.5 in]

[22 in]

[18.5 in]

[3 2.

in

[9 .4 in

[1 8.

in

] Table Center of Gravity (under loaded condition)

Case Weight

Distance to Expansion Anchor from center of gravity towards Head End of Table towards Foot End of Table kg lb mm in mm in

A 540 1191 610 24 419 16.5

B 400 882 175 6.9 853 33.6

C 540 1191 584 23 445 17.5

FRONT VIEW

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center A6 - Equipment Details (1) 08

INTEGRATED SYSTEMS CABINET PENETRATION WALL

TOP VIEWFRONT VIEWSIDE VIEW

NOT TO SCALE

[2 in

[2 in

[23.6 in]

[5.7 in]

[5.7 in]

[23.6 in]

[6 6.

in

INTEGRATED SYSTEMS CABINET

TOP VIEWFRONT VIEWSIDE VIEW

NOT TO SCALE

Center of gravity

Air flow clearance

Service clearance

[73.1 in]

[3 in

[4 in

[3

8.

in

[30.5 in]

[73.1 in]

[3 2.

in

[7 8.

in

Service clearance45

[1 in

[3 2.

in

[7 8.

in

[38.5 in]

[15 in]

[8 3.

in

INTEGRATED COOLING CABINET

TOP VIEWFRONT VIEWSIDE VIEW

NOT TO SCALE

[49.3 in]

[3 in

[3 3.

in

Service clearance

[43.3 in]

[1 in

[16.3 in]

Service clearance Service clearance

[7 7.

in

[4 0.

in

[20.7 in]

Center of gravity

INTEGRATED COOLING CABINET SECONDARY PENETRATION WALL

TOP VIEWFRONT VIEWSIDE VIEW

NOT TO SCALE

[23.6 in]

[10.2 in]

[7.3 in]

[23.6 in]

[6 6.

in

SERVICE

CLEARANCE

SERVICE

CLEARANCE

[2 in

[1 7.

in

[1 in

CABLE

ACCESS

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center A7 - Equipment Details (2) 09

DELIVERY

ROUTING

· The customer is solely liable for routing of components from dock to final site.

· GE must be able to move system components in or out with no need to uncrate or disassemble any of the components. The entire passageway must be cleared, adequately lighted and free from dust.

· The floor and its surfacing must be able to withstand the live load of components and handling equipment.

· Floor surfacing must be continuous.

· The customer must protect any fragile flooring surfaces.

STRAIGHT PATH

(Rigging wheels required)

PATH WITH 90 DEGREE TURN

INSTALLATION AND DELIVERY ACCEPTANCE

· A survey of the site established by the customer and GE will make the decision for the delivery time.

· This survey of the site (a form is made available by GE) is only to check if the apparent conditions of the site allow the equipment to be delivered.

· If the site is not ready, GE can delay the delivery time.

Recommended minimum opening for side (wall) delivery : 2700 (w) x 2700 (h) [108 (w) x 108 (h)]

FRONT VIEW OF MAGNET RIGHT SIDE VIEW OF MAGNET

MINIMUM SPECIFICATIONS FOR MAGNET ROUTING

· Floor must be able to withstand a moving load of 7804 daN

· Height: 2.5m (8.2 ft), width: 2.4m (7.8 ft)

[92 in]

[100 in]

.5 [9

2.

in

2291.3 [90.2 in]

[94 in]

[84.3 in]

DIMENSIONS OF THE MAIN REPLACEMENT PARTS

HEADER

DIMENSION

LxWxH WIEGHT NOTE mm in kg lbs

Split Bridge 546x1963x178 21.5x77.3x7 18 40 Gradient Cooling Unit 920x605x1445 36.2x23.8x56.9 144.5 318.6 Cabinet Cooling Unit 920x705x1550 36.2x27.8x61 195.5 431

Replacement RF Body Coil 873x896x1861 34.4x35.3x72.5 116 255 Replacement coil is shipped in a protective case.

Weight & dimensions are for coil & case.

Replacement HRMw gradient coil assembly on a shipping cradle/cart 991x2536x1499 39x99.84x59 1449 3194

Initial gradient coil assembly is shipped installed in the magnet. Shipping/installation cart is used to install re-placement coil assembly only.

Gradient Coil Replacement Tool Kit Crate 762x2184x711 30x86x28 340 750

Gradient Coil Assembly and shipping cart dimensions are with cart in lowest position. Cart can be adjusted to maximum height of 61.88 in.

(1572 mm).

< 910 [35.8 in]

[99.8 in]

[5 in

The weight bearing structure of the site should support any additional weight of the main replacement parts occurring during maintenance of the magnet, throughout the whole lifecycle of the MR.

This is only a partial list of items required for delivery of the magnet. For a complete checklist refer to the pre-installation manual referenced on cover sheet.

· 24/7 chilled water and 480v power for shield/cryo cooler

· 24/7 120v power for the magnet monitor

· Phone lines for magnet monitoring and emergency use

· Magnet room exhaust fan

· Cryogen venting (if roof hatch, completed within 24 hrs)

CRITICAL ITEMS FOR MAGNET DELIVERY

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center A8 - Delivery 10

EXCITATION FREQUENCY [Hz]

MAGNET STEADY-STATE VIBRATION SPECIFICATIONS

AC

CE

LE

RA

TI

O

N g

's (1

0¯ ⁶)

Ab ov e am bi en t b as el in e

VIBRATION SPECIFICATIONS

10 20 30 40 50

Excessive vibration can affect MR image quality. Vibration testing must be performed early in the site planning process to ensure vibration is minimized. Both steady state vibration (exhaust fans, air conditioners, pumps, etc.)

and transient vibrations (traffic, pedestrians, door slamming, etc.) must be assessed.

· The Magnet cannot be directly isolated from vibration. Any vibration issue must be resolved at the source.

Transient vibration levels above the specified limits in the MR Site Vibration Test Guidelines must be analyzed. Any transient vibration that causes vibration to exceed the steady-state level must be mitigated.

NOTE:

The customer may have to hire a vibration consultant based on the results of the analysis.

VIBRATION TRANSMITTED THROUGH VIBROACOUSTIC MAT

63 12

0.1

Pe ak

A m pl itu de En ve lo pe [m

/s ²]

1/3 Octave Frequency (Hz)

0.2

0.3

80 10

0025 16

0050 50

0025 31

5020 63

.5

0.05

0.15

0.25

· All units that are wall mounted or wall supported are to be provided with supports where necessary. Wall supports are to be supplied and installed by the customer or his contractors.

· Dimensions are to finished surfaces of room.

· Certain mr procedures require an extremely stable environment to achieve high resolution image quality.

Vibration is known to introduce field instabilities into the imaging system. The vibration effects on image quality can be minimized during the initial site planning of the mr suite by minimizing the vibration environment. See PROXIMITY LIMITS, PATIENT TABLE DOCK ANCHOR MOUNTING REQUIREMENTS AND VIBROACOUSTIC DAMPENING KIT details for additional information.

· Standard steel studs, nails, screws, conduit, piping, drains and other hardware are acceptable if properly secured. Any loose steel objects can be violently accelerated into the bore of the magnet. Careful thought should be given to the selection of light fixtures, cabinets, wall decorations, etc. To minimize this potential hazard. For safety, all removable items within the magnet room such as faucet handles, drain covers, switch box cover plates, light fixture components, mounting screws, etc. Must be non-magnetic. If you have a specific question about material, bring it to the attention of your GE project manager of installations.

· Floor levelness refer to MAGNET ROOM FLOOR SPECIFICATIONS DETAIL, this floor levelness requirement is important for accurate patient table docking.

· Non-movable steel such as wall studs or hvac components will produce negligible effect on the active shield magnet.

· Customers contractor must provide all penetrations in post tension floors.

· Customers contractor must provide and install any non-standard anchoring. Documents for standard anchoring methods are included with GE equipment drawings for geographic areas that require such documentation.

· Customers contractor must provide and install hardware for "through the floor" anchoring and/or any bracing under access floors. This contractor must also provide floor drilling that cannot be completed because of an obstruction encountered while drilling by the GE installer such as rebar etc.

· Customers contractor to provide and install appropriate supports for the storage of excess cables.

· It is the customer's responsibility to perform any floor or wall penetrations that may be required. The customer is also responsible for ensuring that no subsurface utilities (e.g., electrical or any other form of wiring, conduits, piping, duct work or structural supports (i.e. post tension cables or rebar)) will interfere or come in contact with subsurface penetration operations (e.g. drilling and installation of anchors/screws) performed during the installation process. To ensure worker safety, GE installers will perform surface penetration operations only after the customer's validation and completion of the "GE surface penetration permit"

STRUCTURAL NOTES

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center S1 - Structural Notes 11

POSITION TO BE DEFINED

ITEM DESCRIPTION

(GE SUPPLIED / CONTRACTOR INSTALLED)

1 Vibroacoustic dampening kit (see floor structural detail)

2 Opening in ceiling for cable connections

(CONTRACTOR SUPPLIED & INSTALLED)

3 Patient table dock anchoring

4 Structural wall backing for Main Disconnect Panel

5 Structural wall backing for Magnet Rundown Unit

6 Structural wall backing for Magnet Monitor

7 Structural floor support for chiller

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center S2 - Structural Layout 121/4"=1'-0"

ANTE

ROOM

[1B552]

ALCOVE

[1B553]

DRESS/

TOILET

[1B551]

CONTROL

ROOM

[1B554]

MAGNET

ROOM

[1B555]

EQUIPMENT

ROOM

[1B556]

10'-9"

'-1

7 7 6'

-6

5' -1

0"

2'-10"

MAGNET ON VIBROACOUSTIC DAMPENING KIT "VIBROMAT"

NOT TO SCALE VibroAcoustic Mat weight: 8 kg [17lbs] (each)

Vibromat

4 x Ø38mm (1.5 in) Seismic Anchor holes

[10.6 in]

[1 8.

in

] 13

[5 in

[26.5 in]

[53 in]

[3 6.

in

[15.4 in]

[1 in

[13.3 in]

[2 6.

in

[52.8 in]

[1 9.

in

102x102mm (4x4 in) Rebar-free area

CEILING OPENING FOR CABLE CONCEALMENT

NOT TO SCALE

[8.3 in]

[32.7 in]

[2 1.

in

] 10

[3 9.

in

MAGNET ROOM FLOOR SPECIFICATIONS

Magnet, Enclosure, and Patient Table areas must be flat and level within 3 mm (0.125 in) within the shaded area shown

[5 3.

in

[4

5.

in

[109 in]

[40 in]

[9 in

[59.8 in]

FEMALE ANCHOR METHOD

(CUTAWAY SIDE VIEW)

Female Anchor Insert

BOLTED METHOD

(CUTAWAY SIDE VIEW)

Removable Anchor Rod

(Male insert) Dock

Clamp bracket

Finished Floor

Filler Board or Grout

RF Shield

Conductive Fibrous Washer (RF seal)

Concrete

TABLE FRAME ANCHOR MOUNTING REQUIREMENTS

NOT TO SCALE

1. The RF Shield vendor must design and install the table frame anchor bolt

2. The table frame anchor hole must be drilled after the Magnet is delivered

3. The table frame anchor must not contact floor rebar or other structural steel

4. The table frame anchor must electrically contact the RF shield at point of entry

5. The table frame anchors must have the following properties:

a. Anchors must be two-part assembly (male/female)

b. Female side must be expansion- or epoxy-type

c. Male side must be a bolt or threaded rod with appropriate-sized nut (bolt or rod must be removable - not epoxied or cemented in place)

d. Anchors must be electrically conductive

e. Anchors must be non-magnetic

f. Anchors must not induce galvanic corrosion with the RF shield

g. Anchors must be commercially procured

h. The anchor rod hole clearance in the table anchor base is 11 mm (0.43 in). The anchor rod diameter must be sized appropriately

i. Anchors must meet the following clamping force: 2669 N (600 lbs)

j. The anchor rod must extend 40 mm ± 13 mm (1.57 in ±0.5 in) above the finished floor

k. The anchor rod must be less than 152 mm (6 in) in total length (length above the floor plus embedded length)

6. The RF shield vendor must perform a pull test on the anchor (equal to the clamping force). Results must be provided to the GE Healthcare Project Manager of Installation (PMI).

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center S3 - Structural Details 13

ITEM DESCRIPTION

1 Cryogen vent (200mm [8"] O.D.)

2 Emergency exhaust vent - refer to magnet room vent requirements (position to be defined)

3 Pressure equalization vent - refer to magnet room vent requirements (position in ceiling to be defined)

4 38mm [1.5"] NPT Male connectors, (2) 38mm [1.5"] copper lines (insulated) and (2) shut off valves. refer to chilled water block diagram

5 Closet must allow free air exchange of 400 CFM between magnet room and closet

6 Floor Drain

7 Provide as needed - low pressure rubber multipurpose hose, inside dia. 1/2" working pressure range: 250 to 499 PSI - refer to the manual city water back-up system detail

8 (2) 50mm [2"] I.D. High pressure hoses and (2) 50mm [2"] to 38mm [1.5"] Reducers

MECHANICAL/PLUMBING NOTES

· All piping, fittings, supports, hoses, clamps, ventlation systems, etc. are to be supplied and installed by the customer or his contractors.

· For complete design and requirements, specifications and guidelines refer to the pre-installation manual: system cooling, cryogen venting, waveguides and exhaust venting.

· An emergency water cooling back-up supply is recommended for continuous cryogen compressor operation. if using an open loop back-up design, ensure a drain is provided. please refer to the pre-install manual for optional back-up coolant supply requirements

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center M1 - Mechanical Layout 141/4"=1'-0"

13.76 ±.25

.9

8± .2

ANTE

ROOM

[1B552]

ALCOVE

[1B553]

DRESS/

TOILET

[1B551]

CONTROL

ROOM

[1B554]

MAGNET

ROOM

[1B555]

EQUIPMENT

ROOM

[1B556]

10'-9"

'-1

EQUIPMENT HEAT OUTPUT SPECIFICATIONS

Component Room Max kW Max

BTU/hr Magnet (MAG) and Patient Table (PT) Magnet 2.95 10060 Primary Pen Wal Magnet 0 0

Secondary Pen Wall Magnet 0.3 1023

Equipment 0.3 1023 Integrated System Cabinet (ISC) Equipment 11.5 39215 Integrated Cooling Cabinet (ICC) Equipment 1.0 3410 Main Disconnect Panel (MDP) Equipment 0.28 972 Magnet Monitor (MON) Equipment 0.24 818 Cryocooler Compressor (CRY) Equipment 0.5 1705 Operator Workspace equipment (OW) Control 1.45 4945

OPTIONS

MR Elastography (MRE) Equipment 0.48 141

TEMPERATURE AND HUMIDITY SPECIFICATIONS

Room Temperature Humidity

Range Change ¹ Range %RH Change %RH/Hr ² °C °F °C/Hr °F/Hr

Equipment room (at inlet to Equipment room) 15-32 ³ 59-89.6 ³ 3 5 30-75 5

Magnet Room 15-21 59-69.8 3 5 30-60 5 Operator Room 15-32 59-89.6 3 5 30-75 5

NOTE

In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to take measures to protect the equipment from dropping water.

AIR RENEWAL

According to local standards.

NOTE

1. Operating temperature gradient limits shall be between -5°‹ F/Hr (-3°‹ C/Hr) and 5°‹ F/Hr (3°‹ C/Hr), when averaged over 1 hour

2. Operating humidity gradient limits shall be between -5% RH/hour and 5% RH/hour, when averaged over 1 hour

3. Maximum ambient temperature is derated by 1° C (33.8°F) per 175 m (574 ft) above 950 m (3117 ft) (not to exceed 2600 m [8530 ft])

MAGNET ROOM EXHAUST FAN SCHEMATIC

Vent to outside environment

Exhaust Fan

To Facility Air Handler

AC Power (rated as required for operation of Motorized Damper and Exhaust Fan) Ground secondary of low voltage transformer to RF Room Common Ground Stud

RF Shield

Dielectric Isolator

Room ceiling Motorized Damper

Exhaust Intake Vent

MAGNET ROOM CONTROL ROOM

RF Filter

ON/OFFManual fan switches in parallel

Ductwork

Ductwork

MAGNET ROOM VENTING REQUIREMENTS

HVAC VENT REQUIREMENTS

· HVAC vendor must comply with Magnet room temperature and humidity specifications and RF shielding specifications.

· RF Shield vendor must install open pipe or honeycomb HVAC waveguides.

· All serviceable parts in the Magnet room (e.g.: diffusers) must be non-magnetic.

· Waveguides must be nonmagnetic and electrically isolated.

· Incoming air must contain at least 5% air from outside the Magnet room (inside or outside the facility) to displace residual helium.

EMERGENCY VENT REQUIREMENT

· Exhaust vent system is supplied by the customer.

· All items within the RF enclosure must be non-magnetic.

· The exhaust vent system must be tested and operational before the magnet is installed.

· The exhaust intake vent must be located near the magnet cryogenic vent at the highest point on the finished or drop ceiling.

· The Magnet room exhaust fan and exhaust intake vent must have a capacity of at least 1200 CFM (34 m³/min) with a minimum of 12 room air exchanges per hour.

· The exhaust fan must be placed above RF shielding located outside 10 gauss (1mT) and with appropriate waveguide.

· The system must have a manual exhaust fan switch near the Operator Workspace and in the Magnet room near the door (the switches must be connected in parallel).

· All system components must be accessible for customer inspection, cleaning and maintenance

PRESSURE VENT REQUIREMENT

· A pressure equalizing vent is required in the magnet room ceiling or in the wall, at the highest point possible.

· The vent minimum size must be (610 mm x 610 mm [24 in x 24 in]) or equivalent.

· The pressure equalization vent must be located so any Helium gas is not vented into occupied areas.

Note: Location may affect acoustic noise transmission into occupied spaces.

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center M2 - HVAC-Venting 15

CHILLED WATER BLOCK DIAGRAM

*FLOWMETER

*FILTER

MAGNET ROOM

Integrated System Cabinet

(ISC)

FACILITY

WATER

EQUIPMENT ROOM

* CUSTOMER SUPPLIED

Water Cooling Water Cooling

Return

Supply

Magnet

(MAG)

Gradient Coil

RF Shield

Integrated Cooling Cabinet

(ICC)

Water Cooling Water Cooling

Water Cooling Water Cooling

Penetration Panels

(PP1/PP2)

CCU GCU CRY

Supply Drain

EMERGENCY

WATER

COOLING

BACKUP

SUPPLY

CHILLED WATER SPECIFICATIONS

PARAMETER REQUIREMENTS

Chiller size Minimum 94 kW Inlet temperature 5 to 12°C (41 to 54°F) measured at the inlet to the ICC

Minimum Flow 114L/min (30 gpm)

Maximum Flow 132 L/min (35 gpm) Availability Continuous

Antifreeze no more than 50% propylene (PGW) or ethylene (EGW) glycol-water Maximum pressure drop in ICC at minimum flow 2.2 bar (32 psi) with 50% PGW, 1060 kg/m³ (66.2 lbs/ft³) density Maximum pressure drop in ICC at maximum flow 2.9 bar (42 psi) with 50% PGW, 1060 kg/m³ (66.2 lbs/ft³) density Temperature rise at Minimum Flow 14°C (25°F) with 50% PGW; 3346 J/(kg K) specific heat; 1060 kg/m³ density Temperature rise at Maximum Flow 12°C (22°F) with 50% PGW; 3346 J/(kg K) specific heat; 1060 kg/m³ density Maximum inlet pressure to ICC 6 bar (87 psi)

Minimum continuous heat load 7.5 kW Hoses to be provided by customer 38.1 mm (1.5 inch) minimum hose inside diameter pH level 6.5 to 8.2 at 25°C (77°F)

Total hardness Less than 200 ppm

Chloride Less than 200 ppm

Sulfate Less than 200 ppm

Silica Less than 50 ppm

Iron Less than 1 ppm

Ammonium Less than 1 ppm

Suspended matter Less than 10 ppm and less than 100 micron particle size

Particle size 100 micron or smaller with a field-changeable filter

Condensation protection Facility plumbing to the ICC must be properly routed and insulated to prevent equipment damage or safety hazards

INLET WATER FLOW/TEMPERATURE FOR CRYOCOOLER COMPRESSOR

*RECOMMENDED TEMPERATURE AND WATER FLOW TO CRY ENTRY

CITY WATER BACKUP SPECIFICATIONS FOR COMPRESSOR

0.5

1.0

1.5

2.0

2.5

3.0

30 40 50 60 70 9080 °F

MIN MAX

INLET TEMP

39.2°F (4°C)

82.4°F (28°C)

INLET FLOW

1.0 gpm (4 l/min)

2.6 gpm (10 l/min)

TEMP RISE

89.6°F at 1.0 gpm (32°C at 4 l/min flow)

53.6°F at 2.6 gpm (12°C at 10 l/min flow) HEAT DISSIPATION (kW) 7.2 kW

PRESSURE DROP 8.7 psi at 2.1 gpm flow (60 kPa at 8 l/min flow)

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center M3 - Chilled Water 16

CRYOGENIC VENTING ( EXTERIOR )

GROUND

VENT CAP

(customer supplied)

OUTSIDE WALL

ROOF

VENT CAP

(customer supplied)

NOT TO SCALE

[181.1 in]

Exclusion area

Warning sign

[3 in

[1

.7 in m in m in

EXHAUST AREA

10.7m x 4.6m [35ft x 15ft] (LxW)

EXHAUST AREA

10.7m x 4.6m [35ft x 15ft] (LxW)

TYPICAL CRYOGEN SIDE WALL EXIT

KEY COMPONENTS:

· RF waveguide extended from wall to magnet adapter

· Must be all same material and all welded or brazed

· Support system must withstand 11125 N (2500 lbs)

· GE ventglas must be installed in vertical section directly over magnet

Mesh screen

38mm (1.5in) insulation rigid support

203mm [8in] ventglas outside RF room

Sweep elbow R = D of pipe

RF WAVEGUIDE EXTENDED

OUTSIDE

[.39 in

1.26 in]

[9 1.

in

] 31

[1

.8 in

NOTE: for the Dielectric Break outside the Magnet room please see the Typical Cryogen Vent Pipe Detail

TYPICAL CRYOGENIC VENT PIPE DETAIL

Waveguide is contractor supplied. Minimum 812 mm [32 in]. Must extend at least 100 mm [4 in] on magnet room side of the wall/ceiling and 25±6 mm [1±0.25 in] from the GE supplied pipe below isolation joint. Magnet room end must not be more than 2969 mm [117 in]above finished floor.

1. The 203 mm [8 in] OD vent material must be one of the following materials with the wall thickness indicated:

a. SS 304: Minimum 0.89 mm [0.035 in]; Maximum 3.18 mm [0.125 in]

b. AL 6061-T6: Minimum 2.11 mm [0.083 in]; Maximum 3.18 mm [0.125 in]

c. CU DWV, M or L: Minimum 2.11 mm [0.083 in]; Maximum 3.56 mm [0.140 in]

2. Either tubes or pipes may be used and must be seamless or have welded seams

NOTE

All welds on the pipe must be ground down to a smooth 203 mm [ 8 in] diameter so that it can be clamped to the Ventglas with enough force.

3. Corrugated pipe or spiral duct must not be used

4. If required, bellows pipe less than 300 mm [12 in] in length may be used as a thermal expansion joint

5. The vent pipe must withstand the maximum pressure listed in the Pre-Installation Manual

6. Waveguide vent material must match the outside diameter of the magnet flanged vent adapter

[9 1.

in

[1

.9 in

[2 in

[4 in

[3 in su pp lie d by G

E su pp lie d by c us to m er

±6

[1 in in

~2

[8 in

.6 in

[4 in

FINISHED FLOOR

FR

O

N T

BA

CK

RF SHIELD

M

AX

M

IN

M

IN

M

IN

M

IN

[3 in

Bird screen 12.7 mm [0.5 in] mesh

Additional pipe/tubing

DIELECTRIC

BREAK

VENTGLAS

CONNECTOR

VENT PIPE

610 mm [24 in], may be cut to a minimum of 100 mm [4 in].

NOTE: for the Dielectric Break inside the Magnet room please see the Detail for the Cryogen Side Wall Exit

MAGNET VENT ADAPTER

Do not remove or modify the vent adaptor bolted to the magnet.

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center M4 - Cryogenics (1) 17

MAGNET CRYOGENIC VENT SYSTEM PRESSURE DROP MATRIX

Outer dia.

of pipe (D)

Distance of vent system component from magnet

Pressure drop for straight pipe

Std sweep 45 elbow

Long sweep 45° elbow

Std sweep 90 elbow

Long sweep 90 elbow

90 miter bend ft m psi/ft kPa/m psi kPa psi kPa psi kPa psi kPa psi kPa

8 in.

(200mm)

0- 10 0.00-3.05 0.14 3.22 1.12 7.70 0.74 5.13 2.09 14.43 1.40 9.62 4.19 28.86

10-20 3.05-6.10 0.24 5.49 1.83 12.63 1.22 8.42 3.43 23.67 2.29 15.78 6.87 47.34

20- 30 6.10-9.15 0.36 8.23 2.49 17.20 1.66 11.45 4.67 32.21 3.11 21.48 9.34 64.43

30- 40 9.15-12.2 0.47 10.65 3.11 21.42 2.07 14.26 5.82 40.11 3.88 26.74 11.64 80.23

40- 50 12.20-15.25 0.57 12.80 3.67 25.32 2.45 16.86 6.88 47.42 4.58 31.61 13.75 94.84

50- 60 15.25-18.30 0.65 14.68 4.20 28.93 2.79 19.26 7.86 54.17 5.24 36.11 15.71 108.33

60- 80 18.29-24.39 0.77 17.44 5.13 35.35 3.41 23.53 9.60 66.16 6.40 44.11 19.19 132.33

10 in.

(250mm)

0-20 0.00-6.10 0.06 1.280 0.62 4.29 0.41 2.86 1.17 8.04 0.78 5.36 2.33 16.07

20-40 6.10-12.22 0.12 2.725 1.05 7.25 0.70 4.83 1.97 13.58 1.31 9.05 3.94 27.16

40-60 12.22-18.29 0.17 3.904 1.43 9.86 0.95 6.56 2.67 18.44 1.78 12.29 5.35 36.88

60-80 18.29-24.39 0.21 4.859 1.76 12.14 1.17 8.07 3.29 22.70 2.19 15.13 6.58 45.40

80-100 24.39-30.49 0.25 5.626 2.05 14.14 1.36 9.40 3.83 26.43 2.56 17.62 7.67 52.86

12 in.

(300mm)

0-20 0.00-6.10 0.020 0.441 0.26 1.78 0.17 1.19 0.48 3.34 0.32 2.22 0.97 6.67

20-40 6.10-12.22 0.041 0.937 0.43 3.00 0.29 1.99 0.81 5.61 0.54 3.74 1.63 11.22 40-60 12.22-18.29 0.060 1.353 0.59 4.08 0.39 2.72 1.11 7.64 0.74 5.09 2.22 15.27

60-80 18.29-24.39 0.075 1.702 0.73 5.06 0.49 3.36 1.37 9.45 0.91 6.30 2.74 18.89

80-100 24.39-30.49 0.088 1.991 0.86 5.20 0.57 3.93 1.60 11.06 1.07 7.37 3.21 22.12

14 in.

(350mm)

0-20 0.00-6.10 0.008 0.180 0.123 0.85 0.082 0.57 0.231 1.59 0.154 1.06 0.462 3.18

20-40 6.10-12.22 0.017 0.380 0.206 1.42 0.137 0.95 0.386 2.66 0.257 1.77 0.771 5.32

40-60 12.22-18.29 0.024 0.552 0.281 1.94 0.187 1.29 0.525 3.62 0.350 2.42 1.051 7.25

60-80 18.29-24.39 0.031 0.699 0.349 2.41 0.232 1.60 0.652 4.50 0.435 3.00 1.304 8.99

80-100 24.39-30.49 0.036 0.824 0.411 2.83 0.272 1.88 0.766 5.28 0.511 3.52 1.533 10.57

16 in.

(400mm)

0-20 0.00-6.10 0.004 0.083 0.065 0.45 0.043 0.30 0.122 0.84 0.081 0.56 0.244 1.68

20-40 6.10-12.22 0.008 0.174 0.108 0.75 0.072 0.50 0.202 1.39 0.135 0.93 0.404 2.79

40-60 12.22-18.29 0.011 0.253 0.148 1.02 0.098 0.68 0.275 1.90 0.184 1.27 0.551 3.80

60-80 18.29-24.39 0.014 0.323 0.184 1.27 0.122 0.84 0.342 2.36 0.228 1.57 0.685 4.72

80-100 24.39-30.49 0.017 0.383 0.022 1.49 0.144 0.99 0.404 2.78 0.269 1.86 0.807 5.57

Notes

1. Elbows with angles greater than 90 deg must not be used

2. Data in Table 2 is based on the following facts and assumptions:

a. Initial flow conditions at magnet interface

b. EM energy (13MJ) is dumped to He during quench and rises He temperature to 10 Kelvin

c. Gas temperature starting at 10 Kelvin and increase with length determined by thermal energy balance

d. 90% He is assumed to be evacuated within 30 sec. None left after quench.

e. Absolute roughness is assumed to be 0.25 mm.

f. R/D = 1.0 for standard sweep elbows, R/D = 1.5 for long sweep elbows where D = outer diameter of pipe; R = radius of bend

3. The total pressure drop of the entire cryogenic vent system must be less than 20 psi (138 kPa). The calculation starts at the magnet vent interface and ends at the termination point outside the building.

DateRev /24MRI-M130526-FIN-01-A.DWG A 03/Sep/2019SIGNA PREMIERLouis Stokes VA Medical Center M5 - Cryogenics (2) 18

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text ° miter

ELECTRICAL NOTES

· All junction boxes, conduit, duct, duct dividers, switches, circuit breakers, cable tray, etc., are to be supplied and installed by customers electrical contractor.

· Conduit and duct runs shall have sweep radius bends

· Conduits and duct above ceiling or below finished floor must be installed as near to ceiling or floor as possible to reduce run length.

· Ceiling mounted junction boxes illustrated on this plan must be installed flush with finished ceiling.

· All ductwork must meet the following requirements:

1.Ductwork shall be metal with dividers and have removable, accessible covers.

2.Ductwork shall be certified/rated for electrical power purposes.

3.Ductwork shall be electrically and mechanically bonded together in an approved manner.

4.PVC as a substitute must be used in accordance with all local and national codes.

· All openings in access flooring are to be cut out and finished off with grommet material by the customers contractor.

· General contractor to insert pull cords for all cable run conduits between the equipment room and the operators control room.

· 10 foot pigtails at all junction points.

· Grounding is critical to equipment function and patient safety. Site must conform to wiring specifications shown on this plan.

1. All wires specified shall be copper stranded, flexible, thermo-plastic, color coded, cut 10 foot long at outlet boxes, duct termination points or stubbed conduit ends. All conductors, power, signal and ground, must be run in a conduit or duct system. Electrical contractor shall ring out and tag all wires at both ends. Wire runs must be continuous copper stranded and free from splices.

1.1. Aluminum or solid wires are not allowed.

2. Wire sizes given are for use of equipment. Larger sizes may be required by local codes.

3. It is recommended that all wires be color coded, as required in accordance with national and local electrical codes.

4. Conduit sizes shall be verified by the architect, electrical engineer or contractor, in accordance with local or national codes.

5. Convenience outlets are not illustrated. Their number and location are to be specified by others. Locate at least one convenience outlet close to the system control, the power distritbution unit and one on each wall of the procedure room. Use hospital approved outlet or equivalent.

6. General room illumination is not illustrated. Caution should be taken to avoid excessive heat from overhead spotlights. Damage can occur to ceiling mounting components and wiring if high wattage bulbs are used.

Recommend low wattage bulbs no higher than 75 watts and use dimmer controls (except mr). Do not mount lights directly above areas where ceiling mounted accessories will be parked.

7. Routing of cable ductwork, conduits, etc., must run direct as possible otherwise may result in the need for greater than standard cable lengths (refer to the interconnection diagram for maximum usable lengths…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .