Revised Drawing M-202 Basement and First Floor HVAC Piping Plans.pdf
PDF 660 KB Posted
- Attached to
- Y1DZ--Expand MRI Suite Project 541-CSI-103
- Solicitation number
- 36C25020B0043
About this file
This document provides details for a federal construction contract opportunity to expand an MRI suite at the Louis Stokes VA Medical Center in Cleveland, Ohio. The project will add a third 3T MRI unit to the north of an existing MRI suite and renovate connecting areas to integrate support spaces. Interested Service-Disabled Veteran-Owned Small Businesses must register at SAM.gov and verify their status at Vendor Information Pages and SAM.gov to be eligible for the 100% set-aside award. The solicitation is expected to be posted on or around June 5, 2020 on beta.SAM.gov with proposals due approximately 30 days later. The estimated period of performance is 548 calendar days. The North American Industry Classification System code assigned is 236220 and the small business size standard is $39.5 million. The minimum work requirement for an SDVOSB contractor or subcontractor is 15% of the construction work. Site visits will be scheduled and questions must be submitted in writing to the contracting officer. Amendments will be posted to beta.SAM.gov and offerors must check for updates.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T T
T T
T
CC.1
CC.8
DD
CC.6
CC.2
28.8 30.129.1 32.2 34.6 35.9 37.135.635.3
CC.7
CC.10 CC.11
STORAGE
BB622
OFFICE
BB620
OFFICE
BB618
OFFICE
BB616
TOILET
BB614
TOILET
BB612
CORRIDOR
BB621
STAIR 12
BS12
CORRIDOR
BB552
ELEC.
BB551
CORRIDOR
BB610
MICRO
RECEIVING
BB611
OFFICE
BB615
OFFICE
BB617
EMS
BB554
STAFF
LOUNGE
BB553
TOILET
BB587
OFFICE
PHYS
BC574
TELECOMM
BC505
CT
BB583
CT
STORAGE
BB588
X - 3" CHWS
X - 3" CHWR
X - MPS
X - LPS
VAV
1 1/4" HHWR
1 1/4" HHWS
X - HHWS
X - HHWR
3/4" HHWS
3/4" HHWR
1 1/4" HHWS
1 1/4" HHWR
CUH
GG
29.5
31.5
EE
CC.1
CC.8
DD
CC.6
CC.2
28.8 30.129.1 32.2 34.6 35.9 37.135.635.3
CC.7
CC.10 CC.11
X-ACU X-ACU
X-ACU X-ACU
X - 3" CHWS
X - 3" CHWR
X - MPS
X - LPS
X - 1 1/2" HHWRX - 1 1/2" HHWR
X - 1 1/2" HHWS
AC
VAV
VAV
VAV
1 1/4" HHWR
1 1/4" HHWS
1" HHWS
1" HHWR
1" HHWR
1" HHWR
1 1/4" HHWR
1 1/4" HHWS
1" HHWS
1" HHWS
CO
1 1/4" PCWS
1 1/4" PCWR
GG
29.5
31.5
EE
MRI SCAN
1B555
OFFICE
1C531
OFFICE
1C532
CORRIDOR
1C558
ENGINEERING
ROOM
1C521
TELECOMM
IC519
CONTROL
1B537
CORRIDOR
1B541
HOLDING
1B550
DRESS/TOILET
1B551
CONTROL
1B554
ANTE
ROOM
1B552
MRI
EQUIPMENT
1B556
MRI SCAN
1B538
GOWNED
WAITING
1B534
DRESS
1B536
DRESS
1B535
MRI SCAN
1B532
MRI
EQUIPMENT
1B531
CORRIDOR
1B530
ANTE
ROOM
1B540
MRI
EQUIPMENT
1B539
Under
Construction
1B559
Corridor
1B550
W.H.
Soiled
1B558
W.H.
Office
1B557
Office
1B556 Office
1B555
W.H.
Office
1B553
W.H. Work
Room
1B551
W.H.
Office
1B548
W.H.
Office
1B546 W.H.
Office
1B545
W.H.
Office
1B544
74490
L.D. HENDRIX, JR
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
Expand MRI Suite 541-CSI-103
CLEVELAND, OHIO
19026
Z M y D o c u m e n ts
\1
F F
H C
F R c c a m p b e ll.
rv t
/1
/2
:4
:0
P
M
M-202
PARTIAL BASEMENT AND FIRST FLOOR
HVAC PIPING PLANS
11/15/2019 LDH DML
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL BASEMENT HVAC PIPING PLAN 1
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL FIRST FLOOR HVAC PIPING PLAN 2
# CODED NOTES
1 2" PCWS/R UP TO PENTHOUSE. FIELD VERIFY EXACT ROUTING AND PENETRATION WITH STRUCTURE AND
OTHER SYSTEMS.
1-1/4" PCWS/R UP TO PENTHOUSE. FIELD VERIFY EXACT ROUTING AND PENETRATION WITH STRUCTURE
AND OTHER SYSTEMS.
RACK 1" CD ALONG WALL. PIPE TO EXTERIOR. SPILL TO SPLASH BLOCK.
2-1/2" CHILLED WATER PIPING FROM ROOF-MOUNTED CHILLER TO GE EQUIPMENT.
2-1/2" CHWS/R DOWN TO GE INTEGRATED COOLING CABINET. PROVIDE SHUT-OFF BALL VALVES AT POINT OF CONNECTION. INSTALL GE-FURNISHED FLOW METER AND FILTER. COORDINATE WORK WITH GE.
N
NN
GENERAL NOTES
REFER TO GE SITE SPECIFIC DRAWINGS AND PRE-INSTALLATION MANUAL FOR ADDITIONAL
INFORMATION.
ALL MATERIALS AND EQUIPMENT WITHIN MR SHIELD SHALL BE NON-FERROUS.
A.
B.
Revisions: Date:
Addendum #1 09 SEP 2020
| 19026 FFH CF R18_ccampbell |
| M-202 - PARTIAL BASEMENT AND FIRST FLOOR HVAC PIPING PLANS |
File details come from the government source that posted it. Updated .