S02. VA MRI Final Volume 2 Drawings (FP,MG,P,M,E,T) Updated.pdf
PDF 17 MB Posted
- Attached to
- Y1DZ--Expand MRI Suite Project 541-CSI-103
- Solicitation number
- 36C25020B0043
About this file
This pre-solicitation notice describes an upcoming federal contract opportunity to expand an MRI suite at the Louis Stokes VA Medical Center in Cleveland, Ohio. The Department of Veterans Affairs Network Contracting Office 10 seeks to add a third 3T MRI machine and renovate connecting areas of the existing suite. Interested service-disabled veteran-owned small businesses must be registered in Vendor Information Pages and SAM.gov. The estimated period of performance is 548 calendar days from notice to proceed. The North American Industry Classification System code assigned is 236220 for commercial and institutional building construction. A site visit will be scheduled and questions must be submitted by email with the project number in the subject line. The solicitation documents will be posted to SAM.gov on or around June 5, 2020 with proposals due approximately 30 days later. Bonds will be required in the form of bid, payment, and performance.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
74490
L.D. HENDRIX, JR
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
Expand MRI Suite 541-CSI-103
CLEVELAND, OHIO
19026
Z M y D o c u m e n ts
\1
F
F H
C F
R
D
L e v a n d u s k i.
rv t
/1
/2
:2
:5
P M
F-001
FIRE PROTECTION LEGEND, DETAILS,
AND GENERAL NOTES
11/15/2019 LDH DML
FIRE SUPPRESSION PIPING LEGEND
SPRINKLER RISER DETAIL
FSTS
ZONE DRAIN VALVE
UNION
SIGHT GLASS
TEST VALVE
TO SYSTEM
F
D
FS
TS
EXISTING TO REMAIN
EXISTING TO BE REMOVED
X
XR
MANUAL AIR VENT
VALVED AND CAPPED FIRE DEPARTMENT VALVE
MAV
FIRE DEPARTMENT VALVE
STAND PIPE
FIRE RISER
FIRE SUPPRESSION PIPING
FLOW SWITCH
TAMPER SWITCH ON VALVE
PRESSURE GAUGE
ELECTRICAL CONTRACTOR
HVAC CONTRACTOR
FIRE SUPPRESSION CONTRACTOR
GENERAL CONTRACTOR
ISOLATION VALVE
GC
FSC
HC
EC
FDV
SP
FR
F
THIS PROJECT CONSISTS OF MULTIPLE TRADES OF WORK PERFORMED WITHIN AN EXISTING
BUILDING AND ADDITION, ALL OF WHICH ALLOWS VERY LITTLE PERMISSIBLE RANGE
OF VARIATION. THE CONTRACTOR SHALL TAKE CAREFUL CONSIDERATION WITH THE
COORDINATION AND INSTALLATION OF THE MULTITUDE OF NEW SYSTEMS WHILE ALSO
ACCOMMODATING ANY EXISTING SYSTEMS TO REMAIN.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED WITH
THIS PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE
OF CONSTRUCTION.
THE COORDINATION DRAWINGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. NO EXCEPTIONS!
THE CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN
ORDER TO ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.
IF CONFLICTS ARE IDENTIFIED DURING THE DEVELOPMENT OF COORDINATION PLANS, THE
CONTRACTOR SHALL NOTIFY THE VA COR, ARCHITECT, AND/OR ENGINEER OF ANY
CONDITIONS WHICH WILL NOT PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THE
PROJECT PLANS.
A COMPLETED SET OF COORDINATION PLANS ISSUED FOR REVIEW SHALL CONFIRM THAT THE
CONTRACTOR FULLY UNDERSTANDS THE PROJECT CONSTRAINTS AND ALL KNOWN CONFLICTS
HAVE BEEN ADDRESSED.
LOCATIONS AND ROUTING OF EXISTING PIPING, DUCTWORK AND EQUIPMENT IS PRESUMED FROM
EXISTING DRAWINGS. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL PRIOR TO
COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT
PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.
COORDINATE ALL SHUT-DOWNS OF EXISTING SYSTEMS WITH VA A MINIMUM OF TEN
WORKING DAYS IN ADVANCE.
PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW WALL MOUNTED DEVICES WITH
VA AND ARCHITECT. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR PRECISE
LOCATION OF CEILING MOUNTED DEVICES.
PROVIDE ADEQUATE SERVICE CLEARANCE FOR ALL EQUIPMENT. REFER TO INSTRUCTIONS FROM
THE EQUIPMENT MANUFACTURER.
NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL
DRAWINGS FOR LOCATION OF PANELS.
THE FIRE SUPPRESSION CONTRACTOR SHALL PROVIDE DETAILED DESIGN OF THE SPRINKLER
SYSTEM. REFER TO SPECIFICATIONS.
UNLESS OTHERWISE NOTED NEW SPRINKLERS SHALL BE AS FOLLOWS:
G.1. AREAS WITH CEILINGS: SEMI-RECESSED CONCEALED STYLE WITH CHROME PLATE.
G.2. EXPOSED STRUCTURE: UPRIGHT OR PENDENT TYPE.
G.3. MRI SCAN ROOM: SEMI-RECESSED CONCEALED STYLE WITH CHROME PLATE.
ALL MATERIALS WITHIN MRI SHIELDED SPACE SHALL BE NON-FERROUS.
THE FIRE PROTECTION SYSTEM IS PERFORMANCE SPECIFIED. ALL SPRINKLER PIPE SIZES
SHALL BE DETERMINED BY FIRE PROTECTION CONTRACTOR, BASED ON HYDRAULIC
CALCULATIONS.
PROVIDE SUPPLEMENTAL DRAINS AS NECESSARY TO PROVIDE 100% SYSTEM DRAINAGE. LOCATE
DRAINS ABOVE ACCESSIBLE CEILINGS.
REFER TO ARCHITECTURAL PLANS FOR EXACT PHASING REQUIREMENTS.
REFER TO SPECIFICATIONS FOR FIRE SUPPRESSION HAZARD OCCUPANCY CLASSIFICATIONS.
SPRINKLER PIPING SHALL BE A MINIMUM OF ONE INCH.
UNLESS OTHERWISE STATED ON DRAWINGS OR IN THE SPECIFICATIONS, ALL SPRINKLER HEADS
SHALL BE QUICK RESPONSE.
ALL HEADS SHALL BE UL LISTED AND FM APPROVED.
ALL SPRINKLER HEADS LOCATED IN CEILING TILES SHALL BE LOCATED IN CENTER OF THE
CEILING TILE.
ALL SPRINKLER ZONES SHALL MATCH SMOKE COMPARTMENTS. REFER TO ARCHITECTURAL
PLANS FOR INFORMATION ON SMOKE COMPARTMENTS, SMOKE PARTITIONS AND FIRE BARRIERS.
CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILES AND GRID AS REQUIRED TO
COMPLETE DEMOLITION AND NEW WORK IN AREAS OUTSIDE OF RENOVATION PROJECT.
CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY TILES OR GRID DAMAGED DUE TO
THIS WORK.
LIMIT OF DEMOLITION
CONNECT TO EXISTING
SCALE: NONE
PROJECT COORDINATION NOTES:
FIRE SUPPRESSION GENERAL NOTES:
A.
B.
C.
D.
E.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
L LIGHT HAZARD OCCUPANCY
OH1 ORDINARY HAZARD GROUP 1 OCCUPANCY
OH2 ORDINARY HAZARD GROUP 2 OCCUPANCY
2-1/2" FDV
Revisions: Date:
CC.1
CC.8
DD
CC.2
28.928.8 30.129.1 32.2 34.6 35.9 37.138.235.635.3
CC.5
CC.7
CC.10 CC.11
OFFICE
BB620
OFFICE
BB618
OFFICE
BB616
TOILET
BB614
TOILET
BB612
CORRIDOR
BB621
STAIR 12
BS12
CORRIDOR
BB552
ELEC.
BB551
CORRIDOR
BB610
MICRO
RECEIVING
BB611
OFFICE
BB615
OFFICE
BB617
EMS
BB554
STAFF
LOUNGE
BB553
TOILET
BB587
OFFICE
PHYS
BC574
TELECOMM
BC505
CT
BB583
CORRIDOR
BC570
CT
STORAGE
BB588
TS
FS
XR-FDV
TS
CC.1
CC.8
DD
CC.6
CC.2
28.8 30.129.1 32.2 34.6 35.9 37.138.235.635.3
CC.7
CC.10 CC.11
OFFICE
1C531
OFFICE
1C532
MRI SCAN
1B538
MRI SCAN
1B555
MRI
EQUIPMENT
1B556
DRESS
1B536
DRESS
1B535
GOWNED
WAITING
1B534
STAIR 12
1S12
CORRIDOR
1C558
ENGINEERING
ROOM
1C521
MRI
EQUIPMENT
1B539
CONTROL
1B533
TELECOMM
IC519
MRI
EQUIPMENT
1B531
MRI SCAN
1B532
X-PACKAGED
PREACTION SYSTEM
(VIKING TOTALPAC 2)
X-FIRE TO PRE-
ACTION SYSTEM
X-SPRINKLER
LINE TO
SERVE HEADS
X-FIRE DN
X-F-4"
TS
FS
X - 4" F
X - 4" F
XR - 4"
EXISTING SPRINKLER BRANCH PIPING AND SPRINKLER HEADS IN OUTLINED AREA TO BE
REMOVED. EXISTING SPRINKLER MAIN PIPING TO BE REMOVED UPON INSTALLATION OF
NEW MAIN PIPING SO AS TO MAINTAIN SERVICE TO ADJACENT SPACES WHILE MINIMIZING
SYSTEM SHUTDOWN. BRANCHES AND MAINS FED FROM ACTIVE AREAS SHALL BE
REMOVED TO OUTSIDE OF SHADED AREA AND CAPPED OR REWORKED. AREAS OUTSIDE
OF SHADED AREA SHALL REMAIN 100% SPRINKLERED. REFER TO ARCHITECTURAL PLANS
FOR ADDITIONAL PHASING INFORMATION.
74490
L.D. HENDRIX, JR
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
Expand MRI Suite 541-CSI-103
CLEVELAND, OHIO
19026
Z M y D o c u m e n ts
\1
F
F H
C F
R
D
L e v a n d u s k i.
rv t
/1
/2
:2
:5
P M
F-101
PARTIAL BASEMENT AND FIRST FLOOR
FIRE PROTECTION DEMOLITION PLANS
11/15/2019 LDH DML
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL BASEMENT FIRE PROTECTION
DEMOLITION PLAN 1
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL FIRST FLOOR FIRE PROTECTION
DEMOLITION PLAN 2
FIRE SUPPRESSION LEGEND # CODED NOTES
1 EXISTING ZONE VALVE W/TAMPER SWITCH AND FLOW SWITCH TO BE REPLACED WITH NEW. MAINTAIN OPERATION UNTIL INSTALLATION OF NEW IN ORDER TO MINIMIZE SPRINKLER SERVICE SHUTDOWN. REFER
TO NEW PLAN.
EXISTING 4"F RISER SHALL BE MAINTAINED UNTIL INSTALLATION OF NEW IN ORDER TO MINIMIZE SPRINKLER
SERVICE SHUTDOWN. REFER TO NEW PLAN.
EXISTING F MAIN SERVING PRE-ACTION SYSTEM SHALL BE MAINTAINED UNTIL NEW FEED IS ROUTED TO
SYSTEM FOR RECONNECTION. REFER TO NEW PLAN.
RELOCATE EXISTING 4" STANDPIPE CONTROL VALVE (W/TS), IF NECESSARY
ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A
WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND
VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS
TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER
HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,
REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION
NOTES FOR ADDITIONAL INFORMATION.
NN
DD
CC.2
28.8 30.129.1 32.2 34.6 35.9 38.235.635.3
CC.7
CC.9
CC.10 CC.11
STORAGE
BB622
OFFICE
BB620
OFFICE
BB618
OFFICE
BB616
TOILET
BB614
TOILET
BB612
CORRIDOR
BB621
STAIR 12
BS12
CORRIDOR
BB552
ELEC.
BB551
CORRIDOR
BB610
MICRO
RECEIVING
BB611
OFFICE
BB615
OFFICE
BB617
EMS
BB554
STAFF
LOUNGE
BB553
TOILET
BB587
OFFICE
PHYS
BC574
TELECOMM
BC505 CT
BB583
CT
STORAGE
BB588
OH2
L
L
TS
FS
2-1/2" FDV
GG
29.5
31.5
EE
CC.1
CC.8
DD
CC.6
CC.2
28.8 30.129.1 32.2 34.6 35.9 38.235.635.3
CC.7
CC.10 CC.11
TS
FS
2-1/2" FDV
4" F
L
L L
L
L
L
L
L
LL
GG
29.5
31.5
EE
MRI SCAN
1B555
OFFICE
1C531
OFFICE
1C532
CORRIDOR
1C558
ENGINEERING
ROOM
1C521
TELECOMM
IC519
CONTROL
1B537 CORRIDOR
1B541
HOLDING
1B550
DRESS/TOILET
1B551
CONTROL
1B554
ANTE
ROOM
1B552
MRI
EQUIPMENT
1B556
MRI SCAN
1B538
GOWNED
WAITING
1B534DRESS
1B536
DRESS
1B535
MRI SCAN
1B532
MRI
EQUIPMENT
1B531
CORRIDOR
1B530
ANTE
ROOM
1B540
MRI
EQUIPMENT
1B539
Under
Construction
1B559
Corridor
1B550
W.H.
Soiled
1B558
W.H.
Office
1B557
Office
1B556 Office
1B555
W.H.
Office
1B553
W.H. Work
Room
1B551
W.H.
Office
1B548
W.H.
Office
1B546 W.H.
Office
1B545
W.H.
Office
1B544
PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO ACCOMMODATE
RENOVATIONS AND ADDITION AND INSTALLATION OF ALL NEW TRADES. PROVIDE ALL
NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE WITH ARCHITECTURAL
REFLECTED CEILING PLAN. OUTLINED AREA TO BE SERVED BY NEW REPLACEMENT
ZONE VALVE SERVING FIRST FLOOR.
PROVIDE NEW SPRINKLER MAIN PIPING IN OUTLINED AREA TO ACCOMMODATE
RENOVATIONS AND ADDITION AND INSTALLATION OF ALL NEW TRADES. PROVIDE ALL
NEW BRANCH PIPING. COORDINATE HEADS AND CEILING TYPE WITH ARCHITECTURAL
REFLECTED CEILING PLAN. OUTLINED AREA TO BE SERVED BY NEW REPLACEMENT
ZONE VALVE SERVING BASEMENT.
PROVIDE NEW SPRINKLER PIPING AND HEADS IN OUTLINED AREA. AREA SHALL BE
SERVED FROM EXISTING PREACTION SYSTEM IN ADJACENT SPACE. PROVIDE NEW
HEAT/SMOKE DETECTION FOR ZONE. COORDINATE HEADS AND CEILING TYPE WITH
ARCHITECTURAL REFLECTED CEILING PLAN.
74490
L.D. HENDRIX, JR
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
Expand MRI Suite 541-CSI-103
CLEVELAND, OHIO
19026
Z M y D o c u m e n ts
\1
F
F H
C F
R
D
L e v a n d u s k i.
rv t
/1
/2
:2
:0
P M
F-201
PARTIAL BASEMENT AND FIRST FLOOR
FIRE PROTECTION PLANS
11/15/2019 LDH DML
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL BASEMENT FIRE PROTECTION PLAN 1
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL FIRST FLOOR FIRE PROTECTION PLAN 2
FIRE SUPPRESSION LEGEND # CODED NOTES
1 PIPE 2"F DOWN WALL AND RECONNECT TO EXISTING PREACTION SYSTEM.
4"F MAIN DOWN TO BASEMENT.
EXTEND PREACTION SPRINKLER SYSTEM TO SERVE MRI SCAN ROOM, CONTROL/ANTE ROOM, AND
EQUIPMENT ROOM.
CONNECT NEW BRANCH SERVICE TO SERVE ADDITION. CONNECT AT MAIN SERVICE LINE NEAR PREACTION
CABINET.
ALL MATERIALS IN MRI SCAN ROOM SHALL BE NON-FERROUS.
EXTEND EXISTING SPRINKLER ZONE TO SERVE ADDITION ROOMS INDICATED.
NEW REPLACEMENT ZONE VALVE (W/TAMPER) AND FLOW SWITCH REFER TO TYPICAL DETAIL. PIPE DRAIN
LINE TO EXISTING DRAIN MAIN. FIELD VERIFY EXISTING LOCATION.
4"F MAIN UP TO FIRST FLOOR.
ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A
WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND
VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS
TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER
HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,
REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION
NOTES FOR ADDITIONAL INFORMATION.
NN
GENERAL NOTES
CONTRACTOR SHALL COORDINATE ALL PENETRATIONS ON RF SHIELD WITH SHIELD MANUFACTURER.
PROVIDE PENETRATIONS PER MANUFACTURER'S DETAILS AND SPECIFICATIONS.
A.
DD
CC.6
CC.2
28.8 30.129.1 32.2 34.6 35.9 38.235.635.3
CC.7
CC.10 CC.11
EXISTING
PENTHOUSE
2B501
X-TAMPER
AND FLOW
SWITCH
X-F-4"
X-FDV
OH1
GG
29.5
31.5
EE
SPRINKLER PIPING SHALL ACCOMMODATE NEW DUCTWORK LAYOUT IN MECHANICAL
PENTHOUSE. SEE HVAC PLANS FOR NEW DUCTWORK LAYOUT. PROVIDE UPRIGHT
SPRINKLER HEADS. PROVIDE FULL COVERAGE ABOVE AND BELOW ALL DUCTWORK,
EQUIPMENT, ETC. WHERE SPRINKLERS ARE LOCATED BELOW 8'-0" AFF OR ARE
SUBJECT TO DAMAGE, PROVIDE PROTECTIVE CAGE AROUND HEADS. SPRINKLER PER
NFPA 13. ORDINARY HAZARD GROUP 1 OCCUPANCY.
74490
L.D. HENDRIX, JR
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
Expand MRI Suite 541-CSI-103
CLEVELAND, OHIO
19026
Z M y D o c u m e n ts
\1
F
F H
C F
R
D
L e v a n d u s k i.
rv t
/1
/2
:2
:0
P M
F-202
PENTHOUSE FIRE PROTECTION PLAN
11/15/2019 LDH DML
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PENTHOUSE FIRE PROTECTION PLAN 1
FIRE SUPPRESSION LEGEND # CODED NOTES
1 EXTEND SPRINKLER SERVICE FROM ADJACENT PENTHOUSE MAIN INTO PENTHOUSE ADDITION.
ALL OUTLINED AREAS SHALL BE 100% FULLY SPRINKLERED WITH A
WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND
VA SPECIFICATIONS. SPRINKLER HEADS SHALL BE INSTALLED SO AS
TO ACCOMMODATE ANY NEW CEILINGS. COORDINATE SPRINKLER
HEAD LAYOUT WITH ARCHITECTURAL REFLECTED CEILING PLAN,
REFER TO MECHANICAL SPECIFICATIONS AND FIRE SUPPRESSION
NOTES FOR ADDITIONAL INFORMATION.
N
CABLEACCESS
Minimumcloset depth
Minimumcloset depth
With ISC against left side of ICC
C o n d itio n
C o n d itio n
C o n d itio n
K e e p o u tsid e
G
R F
RF
CC.1
CC.8
DD
CC.6
CC.2
28.8 30.129.1 32.2 34.6 35.9 37.135.635.3
CC.7
CC.10 CC.11
X - 3/4" MV
X - 1/2" MA
X - 1/2" OX
1/2" OX
1/2" MA
3/4" MV
Z V
B
1/2" OX
1/2" MA
3/4" MV
1/2" OX
3/4" MV
GG
29.5
31.5
EE
WG
74490
L.D. HENDRIX, JR
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
Expand MRI Suite 541-CSI-103
CLEVELAND, OHIO
19026
Z M y D o c u m e n ts
\1
F
F H
C F
R
D
L e v a n d u s k i.
rv t
/1
/2
:2
:1
P M
MG-101
PARTIAL FIRST FLOOR MEDICAL GAS
PLAN
11/15/2019 LDH DML
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL FIRST FLOOR MEDICAL GAS PLAN 1
# CODED NOTES
1 CUT AND PATCH WALL AS REQUIRED IN ORDER TO CONNECT TO EXISTING OX, MA, AND MV MAINS.
EXTEND UP ABOVE CEILING AND ROUTE TO NEW ZVB-3. PAINT WALL (CORNER TO CORNER) TO MATCH.
PROVIDE 1/2" OX, 3/4" MV, AND 1/2" MA OUTLETS. PROVIDE VACUUM SLIDE FOR EACH MV OUTLET.
PROVIDE 1/2" OX, AND 3/4" MV OUTLETS. PROVIDE VACUUM SLIDE FOR EACH MV OUTLET.
N
MEDICAL GAS SYMBOLS:MEDICAL GAS SYMBOLS:
THIS PROJECT CONSISTS OF MULTIPLE TRADES OF WORK PERFORMED WITHIN AN EXISTING
BUILDING AND ADDITION, ALL OF WHICH ALLOWS VERY LITTLE PERMISSIBLE RANGE OF
VARIATION. THE CONTRACTOR SHALL TAKE CAREFUL CONSIDERATION WITH THE
COORDINATION AND INSTALLATION OF THE MULTITUDE OF NEW SYSTEMS WHILE ALSO
ACCOMMODATING ANY EXISTING SYSTEMS TO REMAIN.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED WITH
THIS PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE
OF CONSTRUCTION.
THE COORDINATION DRAWINGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. NO EXCEPTIONS!
THE CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN
ORDER TO ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.
IF CONFLICTS ARE IDENTIFIED DURING THE DEVELOPMENT OF COORDINATION PLANS, THE
CONTRACTOR SHALL NOTIFY THE VA COR, ARCHITECT, AND/OR ENGINEER OF ANY
CONDITIONS WHICH WILL NOT PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THE
PROJECT PLANS.
A COMPLETED SET OF COORDINATION PLANS ISSUED FOR REVIEW SHALL CONFIRM THAT THE
CONTRACTOR FULLY UNDERSTANDS THE PROJECT CONSTRAINTS AND ALL KNOWN CONFLICTS
HAVE BEEN ADDRESSED.
PIPE DOWN
PIPE RISE UP
PIPE CAP
BRANCH CONNECTION
EXISTING TO BE REMAIN
EXISTING TO BE REMOVED
ISOLATION VALVE
MEDICAL OXYGEN
MEDICAL AIR
MEDICAL VACUUM
X
XR
LOCKABLE SERVICE/INLINE VALVE
MEDICAL ZONE VALVE BOX
LIMIT OF DEMOLITION
CONNECT TO EXISTING
NORMALLY OPEN
NORMALLY CLOSED
ADJUSTABLEADJ.
N.C.
N.O.
PROVIDE MEDICAL GAS PIPING SYSTEMS AND PIPE LABELS COMPLYING WITH REQUIREMENTS
OF NFPA 99 "STANDARD FOR HEALTH CARE FACILITIES", LATEST EDITION.
INSTALLATION AND CERTIFICATION SHALL COMPLY WITH ASSE/ANSI SERIES 6000,
"PROFESSIONAL QUALIFICATIONS STANDARDS FOR MEDICAL GAS SYSTEMS INSTALLERS,
INSPECTORS AND VERIFIERS".
PROVIDE COMPATIBLE ACCESSORIES, TUBE, FITTING, AND VALVES FOR EACH SYSTEM.
1. OUTLET / INLET STYLE: DISS
2. MEDICAL GAS TUBE, FITTINGS AND JOINTS: PRE-CLEANED AND SEALED COPPER TUBE:
ASTM B 88, TYPE K OR TYPE L, WATER TUBE, SEAMLESS, DRAWN TEMPER, CLEANED
FOR MEDICAL GAS USE, PURGED, AND WITH ENDS SEALED.
3. MEDICAL SYSTEM ACCESSORIES: PROVIDE THE MEDICAL GAS SYSTEM ACCESSORIES FROM
MANUFACTURER OF EXISTING ACCESSORIES, COMPATIBLE WITH EXISTING SYSTEMS.
4. SERVICE OUTLETS: INCLUDE BRASS VALVE AND BODY BLOCK WITH SEALS IN ROUGH-IN
AND FINISHING ASSEMBLIES, STEEL OUTLET BOX AND COVER PLATE; 3/8 INCH TYPE K
OR L COPPER TUBE BRAZED TO VALVE; AND PRESSURE OUTLETS WITH AUTOMATIC
SECONDARY SERVICE VALVE TO PREVENT GAS FLOW WHEN PRIMARY VALVE IS REMOVED.
DISS COUPLING SHALL BE INDEXED TO PREVENT INTERCHANGE BETWEEN SERVICES,
CONSTRUCTED TO PERMIT ONE HANDED CONNECTION AND REMOVAL OF EQUIPMENT WITH
POSITIVE LOCKING RING WHICH RETAINS EQUIPMENT STEM IN VALVE DURING USE.
OUTLET/INLET TYPE OF CONNECTION SHALL BE COORDINATED WITH THE VA PRIOR
TO ORDERING EQUIPMENT.
INSTALL LABELING ON VALVES, VALVE BOX COVERS, AND ALARM PANELS IN ACCORDANCE
WITH REQUIREMENTS OF NFPA 99 AND VA STANDARDS. CAPTIONS AND COLOR CODING: PER
THE REQUIREMENTS OF NFPA 99 AND VA STANDARDS.
LOCATIONS AND ROUTING OF EXISTING PIPING, DUCTWORK AND EQUIPMENT IS PRESUMED
FROM EXISTING DRAWINGS. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL PRIOR TO
COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT
PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.
COORDINATE ALL SHUT-DOWNS IF EXISTING MEDICAL GAS AND VACUUM SYSTEMS WITH
VA A MINIMUM OF TEN WORKING DAYS IN ADVANCE.
PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW WALL MOUNTED DEVICES WITH
VA AND ARCHITECT.
PROVIDE ADEQUATE SERVICE CLEARANCE FOR ALL EQUIPMENT. REFER TO INSTRUCTIONS
FROM THE EQUIPMENT MANUFACTURER.
NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL
DRAWINGS FOR LOCATION OF PANELS.
WHERE EXISTING FIXTURES ARE TO BE REMOVED, REMOVE ALL ASSOCIATED BRANCH PIPING
WHICH IS NOT TO BE REUSED. REMOVE PIPING TO MAINS AND CAP REMAINING PIPES.
REFER TO ARCHITECTURAL PLANS FOR PROJECT PHASING REQUIREMENTS.
CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILES AND GRID AS REQUIRED TO
COMPLETE DEMOLITION AND NEW WORK IN AREAS OUTSIDE OF RENOVATION PROJECT.
CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY TILES OR GRID DAMAGED DUE TO
THIS WORK.
CONTRACTOR SHALL COORDINATE ALL PENETRATIONS ON RF SHIELD WITH SHIELD
MANUFACTURER. PROVIDE PENETRATIONS PER MANUFACTURER'S DETAILS AND
SPECIFICATIONS.
MV
MA
OX
L
V B
Z
MEDICAL GAS GENERAL NOTES:
PROJECT COORDINATION NOTES:
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
A.
B.
C.
D.
E.
MARK
ZVB-3
SERVICE SIZE TO VALVE BOX
OX MA MV WAGD NO
1/2" 1/2" 3/4" - -
IA
CO2
MEDICAL GAS ZONE VALVE BOX SCHEDULE
NOT TO SCALE
MA
MV
MA
MV
OXOX
PROVIDE LOCKABLE
SERVICE VALVES
UPSTREAM OF ZONE
VALVE BOX
MEDICAL GAS
VALVE BOX
"PATIENT SIDE"
DETAIL NOTES:
1. REFER TO ARCHITECTURAL PLANS FOR
VALVE BOX AND ALARM PANEL LOCATIONS.
SEE ARCHITECTURAL ELEVATIONS FOR
MOUNTING HEIGHTS OF VALVE BOXES AND
ALARM PANELS.
2. REFER TO FLOOR PLANS FOR ROUTING
OF MEDICAL GAS PIPING.
3. REFER TO SCHEDULE FOR PIPE SIZES
TO ZONE VALVE BOX.
FLOOR
CEILING
UPSTREAM
"SOURCE SIDE"
DOWNSTREAM
L
L
L
MEDICAL GAS ZONE VALVE BOX DETAIL
1/2"
1/2"
3/4"
X - 6" SAN
X - 2" V
X - 1 1/2" V
X - 6" SAN
2" V
2" V
3" V
3" V
X - 2" V
X - 4" SAN
4" SAN
X - 4" SAN
CO
CO
CO
CO
CO
VTR
P-103
P-418
P-418
X-FS
X-FS
X-FSX-FS
FD-B FD-B
3" VTR
X-VTR
2" V
2" SAN4" SAN
FD-B
4" SAN
2" V
74490
L.D. HENDRIX, JR
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
Expand MRI Suite 541-CSI-103
CLEVELAND, OHIO
19026
Z M y D o c u m e n ts
\1
F
F H
C F
R
D
L e v a n d u s k i.
rv t
/1
/2
:3
:3
P M
P-001
PLUMBING LEGEND, SCHEDULE, AND
GENERAL NOTES
11/15/2019 LDH DML
PLUMBING SYMBOLS:
PLUMBING FIXTURE CONNECTION SCHEDULE
MARK FIXTURE
CW
BRANCH PIPE SIZE
HW WASTE VENT
FD-B - - 4" 2"FLOOR DRAIN
LOCATIONS AND ROUTING OF EXISTING PIPING, DUCTWORK AND EQUIPMENT IS PRESUMED FROM
EXISTING DRAWINGS. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL PRIOR TO
COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT
PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.
COORDINATE ALL SHUT-DOWNS OF EXISTING MECHANICAL SYSTEMS WITH VA A MINIMUM OF TEN
WORKING DAYS IN ADVANCE. SHUT-DOWNS SHALL BE SCHEDULED DURING OFF-HOURS.
PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW WALL MOUNTED DEVICES WITH VA
AND ARCHITECT.
PROVIDE ADEQUATE SERVICE CLEARANCE FOR ALL MECHANICAL EQUIPMENT. REFER TO
INSTRUCTIONS FROM THE EQUIPMENT MANUFACTURER.
NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL
DRAWINGS FOR LOCATION OF PANELS.
WHERE EXISTING FIXTURES ARE TO BE REMOVED, REMOVE ALL ASSOCIATED BRANCH PIPING WHICH
IS NOT TO BE REUSED. REMOVE PIPING TO MAINS AND CAP.
CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILES AND GRID AS REQUIRED TO COMPLETE
DEMOLITION AND NEW WORK IN AREAS OUTSIDE OF RENOVATION PROJECT. CONTRACTOR SHALL
BE RESPONSIBLE FOR REPLACING ANY TILES OR GRID DAMAGED DUE TO THIS WORK.
CONTRACTOR SHALL PROVIDE NEW CHASE ENCLOSURE WHERE EXISTING STORM, SANITARY,
WATER, VENT RISERS ARE TO REMAIN, BUT ARE UNCOVERED/EXPOSED DURING CONSTRUCTION.
ENCLOSURE SHALL FULLY CONCEAL PIPING. COORDINATE REQUIREMENTS WITH GENERAL TRADES.
PLUMBING PIPING SYSTEMS SHALL BE SUPPORTED FROM STRUCTURE INDEPENDENTLY OF OTHER
SYSTEMS.
DOMESTIC HOT WATER LINES SHALL BE MAINTAINED AT OR ABOVE 125°F.
PROVIDE MIXING VALVES AT OR NEAR ALL FAUCETS, SHOWERS, TUBS, AND EMERGENCY FIXTURES.
MOUNT IN ACCESSIBLE LOCATION. NOTE FIXTURES WITH INTEGRAL MIXING VALVES IN
SPECIFICATION SECTION 22 40 00.
ALL NEW DOMESTIC WATER LINES (CW, HW, HWR) SHALL BE FLUSHED AND DISINFECTED BY THE CONTRACTOR PRIOR TO FINAL INSPECTION. REFER TO SPECIFICATION SECTION 22 11 00 FOR
ADDITIONAL INFORMATION.
DEAD LEGS IN DOMESTIC WATER PIPING ARE NOT PERMITTED.
DO NOT USE AERATORS ON LAVATORIES OR SINKS.
DOMESTIC WATER BRANCH SHUT-OFF VALVES SHALL BE LOCATED NO MORE THAN 6 INCHES OFF OF
MAIN.
B.
C.
D.
E.
CHECK VALVE
PIPE EXPANSION ANCHOR
BALANCING VALVE
X
PIPE GUIDE
STRAINER
REDUCER
UNION
RAIN WATER CONDUCTOR
RD
FD
RWC
ISOLATION VALVE
ROOF DRAIN
FLOOR DRAIN
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER SUPPLY
DOMESTIC COLD WATER SUPPLY
SANITARY WASTE
GENERAL CONTRACTOR
PLUMBING CONTRACTOR
CONNECT TO EXISTING
PLUMBING VENT
SAN
ST
V
GC
STORM WATER PIPING
PC
CTE
EQUIPMENT OR FIXTURE MARK
REFERENCE TO CODED NOTE
PXXX
CW
HW
HWR
EXISTING TO REMAIN
XR
X
EXISTING TO BE REMOVED
LIMIT OF DEMOLITION
CONNECT TO EXISTING
VENT THROUGH ROOFVTR
DOMESTIC TEMPERED WATER SUPPLYTW
OST STORM OVERFLOW PIPING
ORD OVERFLOW ROOF DRAIN
PLUMBING GENERAL NOTES:
X
A.
NOTES:
1. PIPE 1/2" CW AND 1/2" HW TO MIXING VALVE BENEATH COUNTER. PIPE
TEMPERED WATER TO FIXTURE P-418.
RD-1 - - - -
STORM
4"
P-418 1/2" 1/2" 1-1/2" 1-1/2"
WALL-HUNG
LAVATORY
P-103 1-1/4" 3/4" 4" 2"
WALL-HUNG
WATER CLOSET
ROOF DRAIN
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
CLEANOUTCO
FS FLOOR SINK
P-804 3/4" - - -HOSE BIBB -
NOT TO SCALE
SANITARY ISOMETRIC 1
DD
CC.6
CC.2
28.8 30.129.1 32.2 34.6 35.9 37.135.635.3
CC.7
CC.10 CC.11
EXISTING
PENTHOUSE
2B501
XR-RD
X-RD
XR-RD
X-FD
X-FPWH
X-FPWH
X-S
X-RD
X-FD
X-FSX-FS
X-FSX-FS
X - 4" STX - 2" V
CC.1
CC.8
DD
CC.6
CC.2
28.8 30.129.1 32.2 34.6 35.935.635.3
CC.7
CC.10 CC.11
OFFICE
1C531
OFFICE
1C532
MRI SCAN
1B538
MRI SCAN
1B555
MRI
EQUIPMENT
1B556
DRESS
1B536
DRESS
1B535
GOWNED
WAITING
1B534
STAIR 12
1S12
CORRIDOR
1C558
ENGINEERING
ROOM
1C521
MRI
EQUIPMENT
1B539
CONTROL
1B533
TELECOMM
IC519
MRI
EQUIPMENT
1B531
MRI SCAN
1B532
X - 6" ST
X - 4" SAN
XR - 4"
X - 4" SAN
X - 4" SAN
X - 4" SAN
X - 2" V
X - 2" SAN
X - 4" ST
X - 2" V
X - 4" ST
74490
L.D. HENDRIX, JR
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
Expand MRI Suite 541-CSI-103
CLEVELAND, OHIO
19026
Z M y D o c u m e n ts
\1
F
F H
C F
R
D
L e v a n d u s k i.
rv t
/1
/2
:2
:4
P M
P-101
PARTIAL PENTHOUSE/ROOF PLUMBING
DEMOLITIONS PLANS
11/15/2019 LDH DML
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL PENTHOUSE/ROOF DEMOLITION
PLUMBING PLAN 1 N
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL FIRST FLOOR PLUMBING DEMOLITION
PLAN 2N
DD
CC.6
CC.2
28.8 30.129.1 32.2 34.6 35.9 37.1 38.235.635.3
CC.7
CC.10 CC.11
STORAGE
BB622
OFFICE
BB620
OFFICE
BB618
OFFICE
BB616 TOILET
BB614 TOILET
BB612
CORRIDOR
BB621
STAIR 12
BS12
CORRIDOR
BB552
ELEC.
BB551
CORRIDOR
BB610
MICRO
RECEIVING
BB611
OFFICE
BB615
OFFICE
BB617
EMS
BB554
STAFF
LOUNGE
BB553
TOILET
BB587
OFFICE
PHYS
BC574
TELECOMM
BC505 CT
BB583
CT
STORAGE
BB588
6" SAN
1 1/2" CW
2" V
3/4" HW
3/4" HWR
2" CW
2" V
1" HW
3/4" HWR
BALANCE TO
0.5 GPM
1 1/4" CW
1/2" HW
1/2" HWR
CO
GG
29.5
31.5
EE
CO
2" V
4" SAN
2" V UP
CC.1
CC.8
DD
CC.6
CC.2
28.8 30.129.1 32.2 34.6 35.9 37.135.635.3
CC.7
CC.10 CC.11
X - 4" ST
X - 1" CW
X - 4" ST
X - 4" ST
X - 3/4" CW
X - 1" CW
X - 3/4" CW
2" V
3" V
3" VTR
P-103
P-418
P-418
X-CO
CO
X - 4" SAN
X - 6" ST
X - 4" SAN
X - 4" SAN
X - 4" SAN
X - 2" SAN
X - 4" SAN
X - 2" V
X - 4" SAN
X - 2" V
CO
CO
CO
2" V
3" ST
1" CW
4" ST
4" ST
FD-B
2" V
X-2" V UP
TYP. OF 3
4" SAN
X-4" SAN UP
TYP. OF 4
GG
29.5
31.5
EE
1/2" CW
MRI SCAN
1B555
OFFICE
1C531
OFFICE
1C532
CORRIDOR
1C558
ENGINEERING
ROOM
1C521
TELECOMM
IC519
CONTROL
1B537
CORRIDOR
1B541
HOLDING
1B550
DRESS/TOILET
1B551
CONTROL
1B554
ANTE
ROOM
1B552
MRI
EQUIPMENT
1B556
MRI SCAN
1B538
GOWNED
WAITING
1B534
DRESS
1B536
DRESS
1B535
MRI SCAN
1B532
MRI
EQUIPMENT
1B531
CORRIDOR
1B530
ANTE
ROOM
1B540
MRI
EQUIPMENT
1B539
Under
Construction
1B559
Corridor
1B550
W.H.
Soiled
1B558
W.H.
Office
1B557
Office
1B556 Office
1B555
W.H.
Office
1B553
W.H. Work
Room
1B551
W.H.
Office
1B548
W.H.
Office
1B546 W.H.
Office
1B545
W.H.
Office
1B544
2" V DN
74490
L.D. HENDRIX, JR
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
Expand MRI Suite 541-CSI-103
CLEVELAND, OHIO
19026
Z M y D o c u m e n ts
\1
F
F H
C F
R
D
L e v a n d u s k i.
rv t
/1
/2
:3
:0
P M
P-201
PARTIAL BASEMENT AND FIRST FLOOR
PLUMBING PLANS
11/15/2019 LDH DML
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL BASEMENT PLUMBING PLAN 1
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL FIRST FLOOR PLUMBING PLAN 2NN
# CODED NOTES
1 2" CW AND 4" SAN UP TO WATER CLOSET ON SECOND FLOOR.
2" SAN, 3/4" CW AND 3/4" HW UP TO LAVATORY ON SECOND FLOOR.
ROUTE 2" SAN IN WALL TO 4" SAN RISER.
4" SAN DOWN TO FIRST FLOOR.
1" CW DN TO GE CRYO COOLER. PROVIDE BACKFLOW PREVENTER (PER DETAIL, DWG P-501). PROVIDE
SHUT-OFF BALL VALVE AT POINT OF CONNECTION. COORDINATE WITH GE.
4" ST UP TO PENTHOUSE ADDITION.
1" CW DN TO BASEMENT.
1" CW UP TO FIRST FLOOR.
2" V UP TO PENTHOUSE.
DD
CC.6
CC.2
28.928.8 30.129.1 32.2 34.6 35.9 37.135.635.3
CC.7
CC.10 CC.11
EXISTING
PENTHOUSE
2B501
X-RD
X-FD
X-FPWH X-FPWH
X-FS
X-FS
X-FSX-FS
X - 4" ST
X-RD
X-CO
X-3" VTR
4" ST
4" ST
4" ST
3" VTR
3" VTR
P-804
FD-BFD-B
RDRD
CO
4" ST DN
1 1
GG
29.5
31.5
EE
3/4" CW
3/4" CW
1/2" CW
CC.1
CC.8
DD
CC.6
CC.2
CC.7
RDRD
GG
29.5
31.5
EE
74490
L.D. HENDRIX, JR
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
Expand MRI Suite 541-CSI-103
CLEVELAND, OHIO
19026
Z M y D o c u m e n ts
\1
F
F H
C F
R
D
L e v a n d u s k i.
rv t
/1
/2
:2
:5
P M
P-202
PARTIAL PENTHOUSE/ROOF PLUMBING
PLANS
11/15/2019 LDH DML
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PENTHOUSE PLUMBING PLAN 1N
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PENTHOUSE ROOF PLUMBING PLAN 2
N
# CODED NOTES
1 PROVIDE TRAP PRIMER AND PIPE TO SERVE FLOOR DRAIN TRAP. PLACE TRAP PRIMER IN AN ACCESSIBLE LOCATION. TIE CW BRANCH LINE INTO EXISTING LOCAL CW MAIN IN PENTHOUSE. CONTRACTOR SHALL
FIELD VERIFY EXACT LOCATION. PROVIDE DEDICATED ISOLATION VALVE FOR BRANCH.
CONNECT CW BRANCH LINE INTO EXISTING LOCAL CW MAIN IN PENTHOUSE TO SERVE PENTHOUSE ADDITION. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION. PROVIDE ISOLATION VALVES FOR EACH
BRANCH.
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes
Cleveland
VA Medical
Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
Expand MRI Suite 541-CSI-103
CLEVELAND, OHIO
19026
Z M y D o c u m e n ts
\1
F
F H
C F
R
D
L e v a n d u s k i.
rv t
/1
/2
:2
:5
P M
P-501
PLUMBING DETAILS
11/15/2019 LDH DML
PIPE/DUCT
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
MAXIMUM PIPE/TUBING SUPPORT SPACING
TUBING 5 FT
NOM. SIZE
PIPE
THRU (20)
6 8 10
(32)(25) (40)
(65)
(50)
(75)
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
SADDLE
WELD
1312 14 16
(125)(100)
(150)
(200)
TO 1000 LB. (453 KG) UNIFORM LOAD
TRAPEZE HANGER FOR UP
PROVIDE INSULATION SHIELD
SIDE VIEW
1 5/8" (43 MM) 12 GAGE1" (25 MM) MAX.
STRENGTH INSULATION
PROVIDE HIGH COMPRESSIVE
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
HANGER ROD
UNDER INSULATION SHIELD
AT HANGER
INSULATION SHIELD
TEMPERATURE PIPE)
REQUIRED FOR LOW
BARRIER TYPE IS
INSULATION (VAPOR
SPACING ON
36" (900 MM) MAX.
BAND
(9 PCF MIN. DENSITY)
HANGER RODS WITH
(8" (200 MM) MIN.)
CHANNEL OR 2"x2"x1/4"
(50x50x8 MM) ANGLE
864 532 2 1/21 1/21 1 1/4IN.
(MM)
(M)
FT.
FT.
(M)
(5.8)(5.2)(4.1) (4.9)(3.7)(3.0) (3.4)(2.7)(2.1)
(4.9)(4.1)(3.7) (4.0)(3.0)(2.4)(1.8)5 FT
THRU 3/4
(2.1) (2.1)
(2.1)
(2.7)
(2.4)
1/2" (15 MM) DIA.
EACH CHANNEL
AND INSERT FOR ALL PIPING
STEEL EXPANSION SHIELD FOR
THIS TYPE SHALL BE USED ONLY
INSERTS FOR NEW CONSTRUCTION
FOR EXISTING CONSTRUCTION AND
3/8" (10 MM) MIN DIA EXPANSION BOLTS
NUTS & WASHERS
HANGER RODS
3/8" (10 MM) MIN DIA
FLOOR SLAB
CLIP
ANGLE
HANGER RODS
3/8" (10 MM) MIN DIA
TURNBUCKLE
NEW CONSTRUCTION ONLY.
3/8" (10 MM) MIN DIA INSERTS
IN SLABS OR BEAMS OF
INSERTS FOR NEW CONSTRICTION
EXISTING CONSTRUCTION AND
4" (100 MM) MIN DEPTH
CONCRETE
INSULATED
PIPE OR
DUCT
DRYWALL PARTITION
3/4" [19mm] APPROVED
FIRESTOP INSULATION WITH
VAPOR BARRIER
[152mm][152mm]
FIRESTOP
MATERIAL
PARTITION SUPPORT
MASONRY
PARTITION
[152mm][152mm]
PARTITION OR CHASE PENETRATION
FLOOR OR DECK PENETRATION
WELD
1/4" [6mm]∅
ANCHOR ROD FOR
NEW CONSTRUCTION
PIPE SLEEVE
WHERE SPECIFIED
3/4" [19mm]
APPROVED FIRESTOP
INSULATION WITH
VAPOR BARRIER
FIRESTOP MATERIAL
FLOOR
INSULATED
PIPE OR DUCT
APPLICABLE TO PENETRATIONS OF
ALL FIRE RATED MEMBRANES, IN
ACCORDANCE WITH NFPA 101.
REFER TO SPECIFICATIONS SECTION
FOR FIRE STOPPING SYSTEMS.
NOTE:
1.
6"6"
6"6"
" 1
PENETRATION OF FIRE/SMOKE BARRIERS
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
TYPICAL METHOD OF SECURING HANGER RODS IN CONCRETE SLABS AND BEAMS
TYPICAL PIPE HANGERS
NOT TO SCALE
ISOLATION VALVE
BALANCE VALVECHECK VALVE
BALANCE TO FLOW INDICATED
ON PLAN.
HWR
FLOW
HW
FAUCET SEE
SPECIFICATIONS
OFFSET WASTE
TRAP PARALLEL TO WALL.
PROVIDE PROTECTIVE TRAP
COVER PER
SPECIFICATIONS.
LOOSE KEY STOP
ESCUTCHEON
FINISHED FLOOR
FOR FIXTURE HEIGHTS SEE ARCHITECTURAL
DRAWINGS
10 3/4"
8"
34"
THREADED DRAIN VALVE WITH CAP
1"
CW
REDUCED PRESSURE BACKFLOW ASSEMBLY WITH
STRAINER AND DRAIN CUP.
CONNECT TO EQUIPMENT
ROUTE INDIRECT
WASTE TO LOCAL
FLOOR DRAIN
RECIRCULATED HOT WATER DETAIL
NOT TO SCALE
ADA LAVATORY DETAIL
NOT TO SCALE
DOMESTIC WATER BACKFLOW PREVENTER DETAIL
NOT TO SCALE
M
IN
IM
U
M
FLASH VENT WITH 6 LB. LEAD
CAP AND BASE. ROLL CAP 1"
INTO TOP OF VENT. BASE TO BE
2'-0" SQUARE
VENT (SEE PLANS FOR
SIZES, MINIMUM
3-INCHES)
ROOFING
INSULATION
VENT THROUGH ROOF DETAIL
NOT TO SCALE
H W
C W
3/4" 3/4"
3/4"
T H
W
TEST PLUG
NOTE:
INSTALL IN AN ACCESSIBLE
LOCATION.
TEMPERED WATER TO HOT WATER
SUPPLY OF RESTROOM LAVS.
MIXING VALVE, SET TO DELIVER
105 DEGREES
MIXING VALVE DETAIL
NOTES:
1. ALL FLOOR DRAINS SHALL BE
PROVIDED WITH A TRAP PRIMER.
INDICATE TRAP PRIMER LOCATIONS
ON COORDINATION DRAWINGS.
LOCATIONS SHALL BE REVIEWED WITH
VA COR PRIOR TO INSTALLATION.
FLOOR DRAIN
TRAP PRIMER VALVE
ISOLATION VALVE
COLD WATER MAIN
FLOOR
1/2" CONTINUOUS
SOFT
COPPER TUBING,
(TYPICAL) NO JOINTS
FLASHING
12" MIN.
DOME STRAINER
FLASHING CLAMP WITH
GRAVEL STOP
FLASHING
GRAVEL
ROOF
UNDERDECK
CLAMP
DRAIN PIPE
ROOF DRAIN
OUTLET
NO-HUB
CONNECTOR
2.
TYPICAL ROOF DRAIN DETAIL
NOT TO SCALE
TRAP PRIMER DETAIL
NOT TO SCALE
Lmin = 4.0 x Di
Di < 11-13/16"
Di = INTERNAL WAVE GUIDE DIAMETER
L = WAVE GUIDE LENGTH
1-3/16" MAX.
CONNECTION FLANGE CONNECTION FLANGE
CONNECTION PLATE TO RF ROOM
Di
L
THE RF CABIN FEED THROUGH NEEDS TO CONFORM TO CERTAIN GEOMETRIC
CONSTRAINTS IN ORDER TO GUARANTEE THE RF INTEGRITY OF THE RF CABIN.
AS A FUNCTION OF INTERNAL PIPE DIAMETER, THE FOLLOWING APPLIES TO
MINIMUM PIPE LENGTH FOR FREQUENCIES UP TO 128 MHz AND 110 dB ATTENUATION.
BOLTS ARE PLACED AT 1 3/16" TO ENSURE RF SHIELDING.
DEPENDING ON RF CABIN DESIGNS, RF SEALS CAN BE REQUIRED BETWEEN THE
MOUNTING FLANGE AND THE RF CABIN.
WAVE GUIDE DETAIL
NOT TO SCALE
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
Expand MRI Suite 541-CSI-103
CLEVELAND, OHIO
19026
Z M y D o c u m e n ts
\1
F
F H
C F
R
D
L e v a n d u s k i.
rv t
/1
/2
:2
:1
P M
M-001
HVAC LEGEND AND GENERAL NOTES
11/15/2019 LDH DML
CALL OUTS:
DUCTWORK SYMBOLS:
ABBREVIATIONS:
MECHANICAL SYMBOLS:
GENERAL SYMBOLS:
HVAC PIPING:
CONTROL SYMBOLS:
LIMIT OF DEMOLITION
(WALL TYPE)
(WALL TYPE)
DN
DN
UP
UP
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
EXHAUST OR RETURN REGISTER OR TOP GRILLE
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
AC
AD
AFF
AHU
AP
CF
CD
CO
CW
Db dB
Dp
DX
AIR CONDITIONING UNIT
ACCESS DOOR
ABOVE FINISHED FLOOR
AIR HANDLING UNIT
ACCESS PANEL
CENTRIFUGAL FAN
COOLING COIL CONDENSATE
CLEAN OUT
COLD WATER
DRY BULB TEMPERATURE
DECIBELS
DEW POINT TEMPERATURE
DIRECT EXPANSION
EA
EF
EX.
FC
FLR.
FD
HC
HP
EXHAUST AIR
EXHAUST FAN
EXISTING
FORWARD CURVED FAN
FLOOR
FIRE DAMPER
HEATING COIL
HORSEPOWER
MAX.
MIN.
NOM.
OA
PD
PF
PH
REA
RF
RH
Rh
SA
Sp. Gr.
SP
SPS
MAXIMUM
MINIMUM
NOMINAL
OUTDOOR AIR
PRESSURE DROP
PRE-FILTER
PREHEAT
RELIEF AIR
RETURN FAN
REHEAT COIL
RELATIVE HUMIDITY
SUPPLY AIR
SPECIFIC GRAVITY
STATIC PRESSURE
STATIC PRESSURE SENSOR
VD
VSMC
Wb
VOLUME DAMPER
VARIABLE SPEED MPTPR CONTROLLER
WET BULB TEMPERATURE
LIMIT OF DEMOLITION
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
COMBINATION FIRE/SMOKE DAMPER
FSD
FIRE DAMPER
FD
SS STAINLESS STEEL
N.T.S. NOT TO SCALE
TCP TEMPERATURE CONTROL PANEL
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
RA RETURN AIR
ECCENTRIC REDUCER
DIRECTION OF FLOW
GV GRAVITY VENTILATOR
CFM
CUH
CUBIC FEET PER MINUTE
CABINET UNIT HEATER
DDC DIRECT DIGITAL CONTROL
GPM GALLONS PER MINUTE
MOTORIZED DAMPER
M
HZ ZONE HUMIDIFIER
RTU ROOFTOP UNIT
X
XR
XRL
EXISTING
EXISTING TO BE REMOVED
EXISTING TO BE RELOCATED
MEDIUM PRESSURE STEAM CONDENSATE
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
MPR
MPS
CHWS
HHWS
HHWR
CHWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
MEDIUM PRESSURE STEAM
SECTION/DETAIL/ELEVATION MARK
DETAIL NO.
PRESSURE GAUGE
FLEXIBLE METAL EXPANSION LOOP ASSEMBLY
HPR HIGH PRESSURE STEAM CONDENSATE
F FIRE SUPPRESSION PIPE
STRAINER
PIPE EXPANSION ANCHOR
PIPE GUIDE
FLEXIBLE PIPE CONNECTOR
THERMOMETER IN PIPE WELL
BALANCING VALVE
X
E.L.
HEIGHT OF BOTTOM OF PIPE ABOVE FLOOR9'-2"
SHUTOFF VALVE
REDUCER OR INCREASER
UNION
CHECK VALVE
3-WAY CONTROL VALVE
GAUGE PORT (PETE'S PLUG)
DRAIN VALVE WITH HOSE FITTING
HIGH PRESSURE STEAMHPS
2-WAY CONTROL VALVE
NO
NC
MAV
CD CONDENSATE PIPING
DRAWING
PRESSURE REDUCING VALVE
D DRAIN
V VENT LINE
SHUTOFF VALVE IN VERTICAL PIPE
PROCESS CHILLED WATER SUPPLY
PROCESS CHILLED WATER RETURN
PCWS
PCWR
LOW PRESSURE STEAM CONDENSATELPR
LPS LOW PRESSURE STEAM
THIS PROJECT CONSISTS OF MULTIPLE TRADES OF WORK PERFORMED WITHIN AN EXISTING
BUILDING AND ADDITION, ALL OF WHICH ALLOWS VERY LITTLE PERMISSIBLE RANGE OF VARIATION.
THE CONTRACTOR SHALL TAKE CAREFUL CONSIDERATION WITH THE COORDINATION AND
INSTALLATION OF THE MULTITUDE OF NEW SYSTEMS WHILE ALSO ACCOMMODATING ANY
EXISTING SYSTEMS TO REMAIN.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED WITH
THIS PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE
OF CONSTRUCTION.
THE COORDINATION DRAWINGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. NO EXCEPTIONS!
THE CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN
ORDER TO ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.
IF CONFLICTS ARE IDENTIFIED DURING THE DEVELOPMENT OF COORDINATION PLANS, THE
CONTRACTOR SHALL NOTIFY THE VA COR, ARCHITECT, AND/OR ENGINEER OF ANY CONDITIONS
WHICH WILL NOT PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THE PROJECT
PLANS.
A COMPLETED SET OF COORDINATION PLANS ISSUED FOR REVIEW SHALL CONFIRM THAT THE
CONTRACTOR FULLY UNDERSTANDS THE PROJECT CONSTRAINTS AND ALL KNOWN CONFLICTS
HAVE BEEN ADDRESSED.
1-H1-1
INVERTED BUCKET STEAM TRAP SET
INCLUDING PIPING ACCESSORIES
FLOAT & THERMOSTATIC STEAM TRAP SET
INCLUDING PIPING ACCESSORIES
PRESSURE RELIEF VALVE
MANUAL AIR VENT
LOCAL DRAIN, VALVED WITH 3/4"
THREADED CONNECTOR
NORMALLY CLOSED
NORMALLY OPEN
LOCATIONS AND ROUTING OF EXISTING PIPING, DUCTWORK AND EQUIPMENT IS PRESUMED
FROM EXISTING DRAWINGS. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL PRIOR TO
COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT
PERMIT THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.
COORDINATE ALL SHUT-DOWNS OF EXISTING MECHANICAL SYSTEMS WITH VA A MINIMUM
OF TEN WORKING DAYS IN ADVANCE.
PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW WALL MOUNTED DEVICES WITH
VA AND ARCHITECT. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR PRECISE
LOCATION OF CEILING MOUNTED DEVICES. COORDINATE ROOF MOUNTED EQUIPMENT WITH
ARCHITECT PRIOR TO INSTALLATION.
PROVIDE ADEQUATE SERVICE CLEARANCE FOR ALL MECHANICAL EQUIPMENT. REFER TO
INSTRUCTIONS FROM THE EQUIPMENT MANUFACTURER AND NATIONAL ELECTRICAL CODE.
MAINTAIN A MINIMUM OF 18 INCH CLEARANCE AT CONTROLS FOR VARIABLE AIR VOLUME
TERMINALS.
NEW DUCTS OR PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO
ELECTRICAL DRAWINGS FOR LOCATION OF PANELS.
UNLESS NOTED OTHERWISE, BRANCH DUCTS TO DIFFUSERS SHALL BE THE SAME SIZE AS
THE NECK OF THE DIFFUSER.
ALL REFRIGERANT PIPING SHALL BE SIZED, SLOPED, TRAPPED, ROUTED AND CHARGED IN
STRICT ACCORDANCE WITH WRITTEN INSTRUCTIONS FROM THE EQUIPMENT MANUFACTURER.
SIZING AND ROUTING SHOWN ON THE DRAWINGS IS FOR BIDDING PURPOSES ONLY.
IN GENERAL, REFRIGERANT SYSTEMS SHALL BE THOROUGHLY EVACUATED, AND REFRIGERANT
CHARGE SHALL BE DETERMINED BY WEIGHT.
NO TEMPERATURE SENSING CONTROL DEVICES SHALL BE LOCATED OVER HEAT PRODUCING
DEVICES.
MECHANICAL DRAWINGS ARE DIAGRAMMATIC. WHERE DUCT SIZE SHOWN IS IN CONFLICT WITH
STRUCTURE OR OTHER BUILDING SYSTEM, CONTRACTOR MAY MODIFY DUCT SIZE AND PROVIDE
EQUIVALENT FREE AREA DUCT.
WHERE EQUIPMENT IS TO BE REMOVED, REMOVE ALL ASSOCIATED PIPING, DUCTWORK,
CONTROLS, CONCRETE PADS, SUPPORTS, ETC. PATCH WALL AND FLOOR OPENINGS TO
MATCH ADJACENT SURFACES.
CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILES AND GRID AS REQUIRED TO
COMPLETE DEMOLITION AND NEW WORK IN AREAS OUTSIDE OF RENOVATION PROJECT.
CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY TILES OR GRID DAMAGED DUE TO
THIS WORK.
MANUAL BALANCING DAMPER ON DUCT
ROUND DUCT SIZE12"∅
RECTANGULAR DUCT SIZE24x18
REFERENCE TO CODED NOTE
SUPPLY AIR DUCT
TO BE MOUNTED OVER ACCESSIBLE CEILING
SUPPLY AIR DIFFUSER
SHADING INDICATES TO PROVIDE QUADRANT BLANK-OFF
IN NECK OF DIFFUSER. TO BE FURNISHED WITH DIFFUSER.
INDICATES TRANSITION
SINGLE LINE
THERMOSTATT
RETURN AIR DUCT
EXHAUST AIR DUCT
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EQUIPMENT OR FIXTURE MARK
AIR DISTRIBUTION DEVICE
EXISTING TO BE RELOCATED
RETURN AIR GRILLE
EXHAUST AIR GRILLE
PIPE TRANSITION
TYPE
CONNECTION SIZE
AT DEVICE
EQUIPMENT
TYPE
UNIT NUMBER
PROJECT COORDINATION NOTES
HVAC GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
A.
B.
C.
D.
E.
X X-X
XXX
X
X
AIRFLOW (CFM)
Db SUMMER
OUTDOOR DESIGN
Wb SUMMER
Db WINTER
DESIGN ALTITUDE: 800 FT.
INDOOR AREA
SUMMER
Db Db
°F
TEMPERATURES
89.4°F
73.9°F
-4.0°F
WINTER
°F
DESIGN CONDITIONS RELATIVE
HUMIDITY (%)
RELATIVE
HUMIDITY (%)
CONTROL ROOM
CORRIDOR
EQUIPMENT ROOM
HVAC DESIGN DATA
TOILET
DRESSING ROOM
STORAGE ROOM
5075 70 30
NA NOT APPLICABLE
6075 70 20
6070 70 40
NANA 68 NA
NANA NA NA
MRI SCAN ROOM 5068 70 40
NANA NA NA
DD
CC.6
CC.2
28.8 30.129.1 32.2 34.6 35.9 37.1
35.635.3
CC.7
CC.10 CC.11
X - 30 x 14 RA
X - 24 x 14 SA
X x
R
A
X - 24 x 10 RA
X - 18 x 12 SA
X x
S
A
X - 10"ø SA
X - 10 x 6 SA
X - 8"ø SA
X - 6"ø SA
X - 10 x 6 SA
X - 16 x 10
X - 12"ø SA
X-ACU X-ACU
X-ACU X-ACU
T T T
CAP
MRI SCAN
1B532
CONTROL
1B533
STAIR 12
BS12
CONTROL
1B537
MRI SCAN
1B538
MRI
EQUIPMENT
1B539TELECOMM
IC519
ENGINEERING
ROOM
1C521
CORRIDOR
1C558
OFFICE
1C531
ANTE
ROOM
1B540
CORRIDOR
1B541
DRESS
1B536
DRESS
1B535
CORRIDOR
1B530
74490
L.D. HENDRIX, JR
GN
S S
A
I ON EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER &…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .