Revised Drawing E-302 Radiology One-Line Diagram.pdf

PDF 413 KB Posted

Attached to
Y1DZ--Expand MRI Suite Project 541-CSI-103
Solicitation number
36C25020B0043
Issued by

About this file

This document provides details for an upcoming federal construction project opportunity with the Department of Veterans Affairs to expand an MRI suite at the Louis Stokes VA Medical Center in Cleveland, Ohio. The project scope includes adding a third 3T MRI unit to the existing suite area as well as renovating connecting spaces for full integration. The pre-solicitation notice estimates the project value between $1-5 million. The NAICS code assigned is 236220 for commercial and institutional building construction. The solicitation is designated as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Interested SDVOSBs must be classified as small businesses and registered in the Vendor Information Pages and SAM databases. The contractor will be required to perform a minimum of 15% of on-site construction work. Bonds, licenses and permits will be required to perform the work in Ohio. A site visit is scheduled and questions must be submitted in writing to the contracting officer by email. When issued, the solicitation will be posted on SAM and any amendments will be provided electronically through the watch feature on that site.

View the file

Other files

File Type Posted
25 09 00 - Systems Integration.pdf PDF
Asbestos Report Jun 19 2019.pdf PDF
Revised Drawing M-202 Basement and First Floor HVAC Piping Plans.pdf PDF
Bid Opening Instructions.pdf PDF
Addendum No.1 Description.pdf PDF
Revised Drawing L103 Site Details.pdf PDF
Pre-Bid RFIs and Responses Sep 16 2020 update.pdf PDF
Revised Drawing T-301 Technology Details.pdf PDF
Revised Drawing M-701 Temperature Controls.pdf PDF
Revised Drawing E-301 One-Line Legend and Panelboard Schedules.pdf PDF
26 33 53 - Static Uninterruptible Power Supply.pdf PDF
36C25020B0043 0001.docx DOCX document
Geotechnical Report Dec 15 2007.pdf PDF
Revised Drawing L100 Site Plans _ Demolition and Layout.pdf PDF
Expand MRI Suite - Site visit sign-in sheet Aug 27 2020.pdf PDF
Revised Drawing T-301 Technology Details.pdf PDF
Asbestos Report Jun 19 2019.pdf PDF
Addendum No.1 Description.pdf PDF
Revised Drawing L100 Site Plans _ Demolition and Layout.pdf PDF
Revised Drawing M-202 Basement and First Floor HVAC Piping Plans.pdf PDF
Pre-Bid RFIs and Responses Sep 16 2020 update.pdf PDF
Revised Drawing L103 Site Details.pdf PDF
Revised Drawing E-301 One-Line Legend and Panelboard Schedules.pdf PDF
Geotechnical Report Dec 15 2007.pdf PDF
Revised Drawing E-302 Radiology One-Line Diagram.pdf PDF
36C25020B0043 0001.docx DOCX document
Bid Opening Instructions.pdf PDF
Expand MRI Suite - Site visit sign-in sheet Aug 27 2020.pdf PDF
Revised Drawing M-701 Temperature Controls.pdf PDF
26 33 53 - Static Uninterruptible Power Supply.pdf PDF
25 09 00 - Systems Integration.pdf PDF
S02. VA MRI Final Volume 2 Drawings (FP,MG,P,M,E,T) Updated.pdf PDF
S02 - RFI Form .pdf PDF
36C25020B0043_1.docx DOCX document
S02. VA MRI Final Volume 1 Specs Updated.pdf PDF
Wage Determination.pdf PDF
S02. VA MRI Final Volume 2 Specs Updated.pdf PDF
36C25020B0043-001 - Site visit 08-27-2020.pdf PDF
S02. VA MRI Final Volume 3 Drawings (GE,PDC,PDC) Updated.pdf PDF
S02. VA MRI Final Volume 1 Drawings (G,V,L,A,I, Q,S) Updated.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

59459

M.P. LONG

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TEA

H

F OO

IO

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Louis Stokes

Cleveland

VA Medical

Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consulting Engineers

BARBER & HOFFMAN, INC.

2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE

EXPRESSED WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE.

COPYRIGHT C 2019.

13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

Expand MRI Suite 541-CSI-103

CLEVELAND, OHIO

19026

Z M y D o c u m e n ts

\1

F F

H C

F R c c a m p b e ll.

rv t

/1

/2

:5

:2

A

M

E-302

RADIOLOGY ONE-LINE DIAGRAM

11/15/2019 MPL CPC

Revisions: Date:

Addendum #1 09 SEP 2020

800AF

800AT

LSIG

1200AF

1000AT

LSIG

MAIN

K

RAD2USSHV1 SUBSTATION

1000A, 480/277V, 3Ø, 4W

800AF

800AT

LSIG

400AF

400AT

LSIG

400AF

175AT

LSIG

160A

SPARE

LSIG

40E

A

S

A

S

160A

SPARE

LSIG

225AF

225AT

LSIG 1000kVA

11,400V:480Y/277V

Z=5.99%

2000AF

2000AT

LSIG

MAIN

K

225AF

225AT

LSIG

225AF

200AT

LSIG

225AF

175AT

LSIG

225AF

225AT

LSIG

160AF

LSIG

LOCKED

OUT

100E

A

S

A

S

225AF

200AT

LSIG

225AF

200AT

LSIG

800AF

600AT

LSIG

1200AF

1000AT

LSIG

TIE

K

800A-480/277V-3Ø-4W

RAD2DPNH1

100A 150A 225A

800AF

800AT

(2

.5

"C

/0

E G

225A

800A-480/277V-3Ø-4W

RAD1DPNH1

150A225A100A

800AF

800AT

225A

(2

.5

"C

/0

E G

100A 100A 150A

N

A T

S -4

A

-4 P

E 600A-480/277V-3Ø-4W

RADBDPNH1

125A80A 400A

600A

R A

D T

75kVA

480V:

208/120V

225A R A

D T

30kVA

480V:

208/120V

600A-480/277V-3Ø-4W

RAD2PGH1

40A

400AT

400AF

R A

D T

30kVA

480V:

208/120V

PHILIPS

MRI

R A

D T

.5

"C

/0

E G

.2

"C

E

G

.5

"C

/0

E G

90AS

100AF

90AS

100AF

.5

"C

/0

E G

.2

"C

E

G

.2

"C

E

G

.2

"C

E

G

.2

"C

E

G

R A

D B

T

75kVA

480V:

208/120V

75kVA

480V:

208/120V

75kVA

480V:

208/120V

R A

D B

T

CT-1 CT-2

T -R

A D

B T

45kVA

480V:

208/120V

400A-480/277V-3Ø-4W

RADBDPEH1

100AF

60AT

150AF

125AT

250AF

225AT

100AF

SPARE

400AT

400AF

T -R

A D

B T

30kVA

480V:

208/120V

150AF

125AT

400AF

400AT

LSIG

.5

"C

/0

E G

.5

"C

/0

E G

.5

"C

/0

E G

.5

"C

/0

E G

.5

"C

E

G

.7

"C

E G

.2

"C

E

G

.5

"C

E

G

.2

"C

E

G

.5

"C

/0

E G

.7

"C

E G

.5

"C

/0

E G

.2

"C

E

G

.5

"C

/0

E G

.5

"C

/0

E G

100A

80A

ST

100A 400A 200A

100A100A100A100A

RAD#2 RAD#1 CHEST

RAD

R&F#3

100A 100A 100A 100A

R&F#2 R&F#1

150A

CT#1

ISOTRAN

200A

CT#2

UPS

100A

PLANE#1

UPS

200A

CT#3

150A 100A

UPS

UTS

BIPLANE

"C

/0

/0 E

G

"C

/0

/0 E

G

"C

/0

/0 E

G

"C

E

G

IG

"C

E

G

IG

"C

E

G

"C

E

G

"C

E

G

"C

/0

E G

.5

"C

E

G

"C

/0

/0 E

G

"C

E

G ,1

I G

"C

/0

/0 E

G

"C

/0

/0 E

G

.5

"C

/0

/0 E

G

.5

"C

/0

/0 E

G

"C

/0

E G

.5

"C

E

G

I G

.5

"C

E

G

.5

"C

/0

E G

/0 I G

"C

/0

E G

.5

"C

/0

/0 E

G

.5 "C

/0

/0 E

G

.5

"C

/0

E G

"C

/0

E G

.2

"C

E

G

.5

"C

/0

E G

"C

/0

/0 E

G

"C

/0

/0 E

G

.5

"C

/0

/0 E

G

.5

"C

/0

/0 E

G

.5

"C

/0

/0 E

G

.5

"C

/0

/0 E

G

.5

"C

E

G

.5

"C

/0

E G

.5

"C

/0

E G

100A

NE

A T

S -1

A

-3 P

.2

"C

E

G

NE

A T

S -2

A

-3 P

.5

"C

E

G

.5

"C

/0

E G

.7

"C

E G

.2

"C

E

G

15A

MM

HEAT

EXCH.

"C

/0

/0 E

G

(sect 1)

(sect 2)

.5

"C

/0

E G

(sect 2)

(sect 1)

500kVA

11,400V:480Y/277V

Z=5.73%

'D9'

EOL-02

'D9'

EOL-02

'F9'

EOL-02

N

A T

S -4

A

-3 P

E

'E9'

EOL-02

.5

"C

/0

E G

3.5"C

4#500, 1#3EG

.5

"C

/0

E G

TOSHIBA

MRI

.5

"C

/0

E G

ST ST ST ST ST

ST

ST

UPS

225KVA

UPS

BYPASS

RAD2USSHV2 SUBSTATION

2000A, 480/277V, 3Ø, 4W

TO VS-8B

ON EOL-01

TO VS-18B

ON EOL-01

.5

"C

/0

E G

.5

"C

/0

E G

T -D

P L F

S

.2

"C

E

G

112.5kVA

480V:

208/120V

400A-208/120V-3Ø-4W

DPLFS1

100A 100A 100A

400AF

400AT

100A

.5

"C

/0

E G

T -A

S L

45kVA

480V:

208/120V

"C

/0

E G

.2

"C

E

G

"C

/0

E G

.5

"C

K

C M

E G

.2

"C

E

G

.2

"C

E

G

.2

"C

E

G

.2

"C

E

G

.5

"C

/0

E G

.5

"C

/0

/0 E

G

RM 1C561

RM 2B501

RM 1C561 RM BB551

RM BB551

RM BB551

RM BC563

RM 2B501RM 2B501

RM BB551

RM BB551

RM 1C561 RM BC563 RM BC563

RM BC563

RM BB551

RM BB551

RM BB551

RM BB551

RM BB551

RM AB402

RM AB402

RM AB402

RM AB405

RM AB402

RM AB402

RM AB402

RM 1C561

200A2 .5

"C

/0

E G

.5

"C

E

G

T -E

T D

75kVA

480V:

208/120V

.0

"C

/0

E G

222A-208/120V-3Ø-4W

ETD-UPS -- 80KVA MGE UPS

SYSTEM MODEL #72-160812-22

125A 200A

200AF

200AT

100A

.2

"C

E

G

.2

"C

E

G

.2

"C

E

G

.2

"C

E

G

250A3 "C

E

G

RM BC563 RM BC563

RM 1B526

RM 1B526

RM AB405

RM 2B501

RM 2B501 RM 2B501

RM SUB PH

RM SUB PH

RM SUB PH

RM 2B148-1

RM 3A133RM 3A133

RM 3A133

RM 3A133

RM 1B194

RM 3A133

RM 3A133

RM 3A133

RM 2D177 RM 2D190 RM 2D190

RM SUB PH

480/277V

MLO

250A

ASH3

480/277V

MLO

225A

ASH-J

480/277V

MCB

225A

ASH

480/277V

MCB

250A

RADBLNH2

480/277V

MLO

125A

ASH2

208/120V

MCB

150A

ASL2

208/120V

MLO

100A

LN21

208/120V

MLO

100A

LN22

208/120V

MLO

100A

LN23

208/120V

MCB

100A

ASL

208/120V

MCB

225A

RADBLNL4

480/277V

MCB

300A

ETD-MDP

480/277V

MCB

250A

RADBLCH1

208/120V

MCB

200A

ETD3

208/120V

MCB

125A

ETD2A

208/120V

MCB

125A

ETD1

208/120V

MLO

100A

ETD1A

208/120V

MCB

100A

RADBLCL1

208/120V

MCB

225A

RADBLNL3

208/120V

MCB

225A

RADBLNL2

208/120V

MCB

225A

RAD1LNL2

208/120V

MCB

100A

RAD2PGL1

208/120V

MCB

100A

RAD2PNL1

208/120V

MLO

225A

RAD1LNL1

480/277V

MLO

225A

RADBLNL2

208/120V

MCB

225A

RAD1LNL2

480/277V

MCB

225A

RADBLNH1

480/277V

MCB

225A

RAD1LNH2

480/277V

MCB

225A

RAD1LNH1

480/277V

MCB

225A

RAD2PNH1

NEW UPS

750KVA, 480V-480V

UOB

MBB

BATTERY

CABINET

RADUPS

UIB

ELECTRICAL CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FROM VA COR FOR ALL SCHEDULED SHUTDOWNS A MINIMUM OF (14) DAYS

PRIOR TO ACTUAL SHUTDOWN. CONTRACTOR SHALL COORDINATE WITH VA COR WHICH CRITICAL LOADS MUST RECEIVED TEMPORARY POWER, IF ANY. IF POSSIBLE, CONDUCT SHUTDOWNS AFTER TYPICAL BUSINESS HOURS. CONTRACTOR SHALL SUBMIT AT A MINIMUM THE

FOLLOWING INFORMATION FOR A REQUESTED ELECTRICAL POWER SYSTEM SHUTDOWN:

• IDENTIFY ALL CONNECTED LOADS AFFECTED BY THE SHUTDOWN. CONTRACTOR SHALL VERIFY WITH FACILITY'S MAINTENANCE

DEPARTMENT THE ACCURACY OF EXISTING PANELBOARD CONNECTIONS DIRECTORY.

• PROPOSED DATE, TIME, AND ESTIMATED DURATION OF THE SHUTDOWN.

• METHOD OF TEMPORARY FEEDING OF CRITICAL LOADS THAT MUST BE MAINTAINED DURING SHUTDOWN.

CONTRACTOR SHALL MINIMIZE POTENTIAL SHUTDOWNS OF EQUIPMENT BY FURNISHING AND INSTALLING NEW FEEDERS PRIOR TO

SHUTDOWN WHENEVER POSSIBLE AND UTILIZING SHUTDOWNS FOR CUTOVER TO NEW FEEDER.

X X

X

X X

X

X X X

X

X X X X X X

X

X X

X

X

X

X X

X

XXX

X X

XX

X X

XX

X

X

X X X

XX

X X

XX

X

X

X

X

X

X

X XX X

X X X X X X

XXXXX

X

X

X

X

X X

XX XX

XX X XXX

XX

X

X X

X

480V-3Ø-3W, 800A BUS

NEW

250A

LSI

NEW

150A

LSI

NEW UPS DISTRIBUTION

RAD2UPSH1

NEW

200A

LSI

.5

"C

/0

E G

"C

/0

E

G

XR

XR

1 2

X

X

1. CIRCUIT BREAKERS ARE 3-POLE UNLESS OTHERWISE NOTED

ONE-LINE GENERAL NOTE:

1A 2A 1B 2B 1C 2C 1D 2D 1E 1F1A 1B 1C 1D 1E 2E

STATIC

SWITCH

BYPASS

RECTIFIER

INVERTER

AC INPUT

AC OUTPUT

NEW MAINTENANCE BYPASS PANEL

800A, 480/277V-3Ø-4W

MBP-RADUPS

.5

"C

/0

E G

(2

S E

T S

O F

"C

/0

E G

E

A C

H

NEW

800AF

800AT

LSIG

1A

LANDING

CABINET

BATTERY

CABINET

BATTERY

CABINET

-1

/2 "C

E G

XR

3B

50A

SPARE

15A

ACU-2

X

15A

ACU-3

/4

"C

E

G

X

/4

"C

E

G

15A

ACU-8

/4

"C

E

G

X

15A

ACU-1

/4

"C

E

G

X

15A

SPARE

(4)

15A-1P

(2)

20A-1P

NEW

225A

LSI

NEW

20A

NEW

15A

NEW ESSENTIAL EQUIPMENT DISTRIBUTION

480/277V-3Ø-4W

RAD2PGH2

NEW

125A

.5

"C

/0

E G

NEW

15A

AC-3

(9.0 FLA)

.7

"C

E

G

NEW

15A

AC-2

(9.0 FLA)

.7

"C

E

G

7.5

AHU SF

(11 FLA)

VSD

/4

"C

E

G

.7

"C

E

G

AHU RF

(3.4 FLA)

VSD

/4

"C

E

G

.7

"C

E

G

MRI

CHILLER

(105 FLA)

.5

"C

/0

E G

NEW

25A

AC-1

(16.7 FLA)

.7

"C

E

G

480V-3Ø-3W, 400A BUS

NEW

200A

LSI

NEW

60A

NEW MRI UPS DISTRIBUTION

MDP

NEW

30A

INTEGRATED

SYSTEMS CABINET

(WITH MRI EQUIP.)

.5

"C

/0

/0 E

G

.2

"C

E

G

CRYOCOOLER

COMPRESSOR

(WITH MRI EQUIP.)

.7

"C

E

G

1 PROVIDE 175A TRIP ON EXISTING 400AF CIRCUIT BREAKER TO RE-FEED EXISTING LOAD.

PROVIDE NEW 800A-3Ø-4W PANELBOARD.

DURING A SINGLE, OFF-HOUR SHUTDOWN, CONTRACTOR SHALL:

DISCONNECT EXISTING LOADS TO FACILITATE REMOVAL OF BREAKERS TO CREATE SPACE FOR NEW CIRCUIT BREAKER.

REMOVE EXISTING (2) CIRCUIT BREAKERS AND BLANK PANEL AT THE TOP OF THE DISTRIBUTION SECTION.

PROVIDE (1) NEW 800AF CIRCUIT BREAKER AND MOUNTING HARDWARE. PROVIDE 800A TRIP UNIT AND CONNECT COMPLETE TO NEW LOAD INDICATED. PROVIDE ANY NECESSARY TRIM PIECES AS REQUIRED. DELIVER CIRCUIT BREAKERS TO OWNER AS SPARE.

EXISTING SWITCHGEAR IS EATON POW-R-LINE SWITCHBOARD.

PROVIDE TEMPORARY CONNECTION OF EXISTING MRI EQUIPMENT TO NEW 200A BREAKER IN NEW PANELBOARD. EXISTING MRI WILL OPERATE ON NEW PANELBOARD UNTIL NEW MRI UPS IS INSTALLED AND COMMISSIONED AND EXISTING MRI IS

RE-CONNECTED TO NEW UPS.

PERMANENTLY RE-FEED EXISTING LOAD TO EXISTING CIRCUIT BREAKER AS INDICATED.

UPON COMPLETE INSTALLATION AND COMMISSIONING OF NEW UPS SYSTEM, PROVIDE NEW FEEDERS FROM NEW UPS DISTRIBUTION

EQUIPMENT AND DURING A SINGLE, OFF-HOURS SHUTDOWN, RE-CONNECT (2) EXISTING MRI SYSTEM COMPLETE.

PROVIDE MULTI-POINT ELECTRIC POWER METER FOR NEW AHU FEEDERS. PROVIDE REQUIRED PTs AND CTs FOR METERING OF LOAD AS

INDICATED. METER SHALL BE CAPABLE OF RECORDING/TRANSMITTING METERED DATA FOR LOADS INDIVIDUALLY, AS WELL AS TOTAL

LOAD.

METERS SHALL:

• HAVE GRAPHICAL DISPLAY UNIT

• BE CAPABLE OF BAC-NET/IP COMMUNICATIONS.

• BE CAPABLE OF MONITORING SINGLE AND THREE PHASE LOADS FROM 120-600VAC.

• STORE/TRANSMIT ENERGY DATA FOR EACH METERING POINT AND COMBINED TOTALS TO BAS SYSTEM VIA COMMUNICATIONS CARD.

• BE MOUNTED ON OR ADJACENT TO EQUIPMENT VIA STEEL CHANNEL SUPPORT SYSTEM. PROVIDE NEMA 1 ENCLOSURE FOR

MOUNTING AS REQUIRED AND MAINTAIN UL LISTING.

• BE CAPABLE OF LOCALLY STORING DATA FOR DEMAND VALUES FOR ALL METERING POINTS FOR UP TO 2 YEARS @ 15MIN

INTERVALS.

PROVIDE CAT6 CABLE TO NEAREST SMART BUILDING SYSTEM (SBS) NETWORK SWITCH AND CONNECT COMPLETE. COORDINATE EXACT

SWITCH LOCATION. ASSUME 300FT OF CAT6 CABLING FOR METER FOR BIDDING PURPOSES. ROUTE VIA NEW J-HOOKS ON 5' CENTERS.

COORDINATE EXACT LOCATION OF SWITCH WITH VA PRIOR TO ROUGH-IN.

3B

3D

3E

NEW NORMAL DISTRIBUTION

RAD2DPNH2

NEW

200A

LSI

NEW

800A

LSI

"C

/0

E

G

3D

3A

3C

3C

3A

3E

ONE-LINE PHASING NOTES:

(2

"C

/0 E

G

(2) 4"C -

3 #600 & 1 #1/0 EG

RM 2B500

RM 2B502-B

RM 2B500 RM 2B500

RM 2B500

RM 2B500RM 1B556

.2

"C

E G

208/120V

MLO

60A

RAD1LNL3

NEW

22 KAIC

22 KAIC 22 KAIC

65 KAIC

42 KAIC

42 KAIC

22 KAIC

PANEL FURNISHED BY GE AND

INSTALLED BY CONTRACTOR

PROVIDE ADDITIONAL #6EG FROM MDP TO RF

COMMON GROUND STUD. COORDINATE WITH GE.

NEW

250A

LSI

480/277V-3Ø-4W, 800A BUS

480/277V-3Ø-4W, 225A BUS

METER

XX X X X X X X X X X

X X X NEW NEW X X X X X X X

X X X X X X X X X

X X X X X X X XX

X X XX X X

XXX

X

X X X

X

XXX

X

X

X

XXXX X

X XX X X XXX X X X X

XXX

X X

X

XX

XX

X

N E

W

X

X

XXXX

SHUTDOWN GENERAL NOTE:

NOTE: UNDER DEDUCT ALTERNATE #1, UPS EQUIPMENT AND ASSOCIATED

BATTERY CABINET SHALL BE REMOVED FROM THE SCOPE OF WORK.

MAINTENANCE BYPASS CABINET SHALL BE MAINTAINED FOR CONNECTION TO

FUTURE UPS EQUIPMENT. PROVIDE GE POWER CONDITIONER FOR NEW MRI

EQUIPMENT IN ABSENCE OF UPS EQUIPMENT. IN ADDITION, ELIMINATE

RE-FEEDING OF EXISTING PHILIPS MRI TO NEW PANEL BUT MAINTAIN 150A

BREAKER FOR FUTURE CONNECTION TO EXISTING MRI.

800A

800A

800A

K

K

K

REMOTE STATUS ALARM PANEL

(COORDINATE INSTALLATION

LOCATION WITH VA COR. ASSUME

LOCATION IN EQUIPMENT ROOM

FOR BIDDING)

CABLING AS REQUIRED

PER MANUFACTURER

[FOR BIDDING: 1"C - (14) #14AWG]

DC CABLING

(2) SETS OF 2.5"C - (2) 300KCM AND (1) #1EG (EACH) PER CABINET.

(6) TOTAL SETS. CONFIRM SIZING WITH VENDOR.

90A

SPARE

200A

SPARE

225A

SPARE

150A

SPARE

400A

SPARE

PROVIDE A LISTED, TYPE 2 SURGE PROTECTION DEVICE (SPD) ON ALL EMERGENCY SYSTEM

SWITCHBOARDS AND PANELBOARDS (CRITICAL, LIFE SAFETY, AND ESSENTIAL EQUIPMENT).

SURGE PROTECTION GENERAL NOTE:

ST

1 1 1

1 1

19026 FFH CF R18_ccampbell
E-302 - RADIOLOGY ONE-LINE DIAGRAM

File details come from the government source that posted it. Updated .