S02. ROOF - AREA-A - ROOF PLAN.pdf
PDF 2 MB Posted
- Attached to
- Project 757-23-101 Air Cooled Chillers
- Solicitation number
- 36C25025R0096_1
About this file
The document is a detailed roof plan and infection control drawing for a Veterans Affairs (VA) project at the Chalmer Wylie Columbus VA Ambulatory Care Center. The roof plan drawing (AE104) provides specific technical instructions for demolition, roof removal, and reconstruction, including requirements for:
- Removing existing roofing assemblies and composite roof deck down to structural steel
- Coordinating demolition with new construction
- Installing new steel columns and roof insulation
- Maintaining precise specifications for roof membrane, insulation, and flashing details
The accompanying infection control plan outlines strict protocols for construction work, including Class II and Class III precaution levels with extensive requirements such as dust control, critical barrier construction, negative air pressure maintenance, daily cleaning procedures, and specific work hour restrictions. The plan emphasizes minimizing contamination risks in a high-sensitivity medical environment, with particular attention to protecting patient areas during construction activities.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/8" = 1' -0"
SCALE FEET
5 0 5 10 15 20
ABCDEFGHJ
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE OUTSIDE
THE HOURS OF OPERATION. EVERY EFFORT SHALL BE MADE TO KEEP NOISE
AND VIBRATION TO A MINIMUM. HOURS OF OPERATIONS ARE MONDAY
THROUGH FRIDAY FROM 5 AM TO 8 PM AND ON SATURDAY AND SUNDAY
FROM 7 AM TO 5:30 PM. SCHEDULING SHALL BE COORDINATED WITH THE VA.
DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE
REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED
ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING
PANELS, WITHIN AND BEYOND PROJECT LIMITS.
COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
WHERE EXISTING ROOF IS REMOVED, ROOF AND MEMBRANE SHALL BE
REMOVED TO PROVIDE A CLEAR OPENING FOR STRUCTURAL
MODIFICATIONS. ROOF SLAB SHALL BE FILLED/ LEVELED TO PROVIDE A
LEVEL FINISHTO MATCH EXISITING.
GENERAL NOTES
ROOF PLAN NOTES
1.
2.
REMOVE ROOFING ASSEMBLY AND COMPOSITE ROOF DECK DOWN TO
STRUCTURAL STEEL AS REQUIRED TO PERFORM STRUCTURAL WORK, SEE
STRUCTURAL DRAWINGS. COORDINATE WITH STRUCTURE FOR EXTENT OF
REMOVAL.
SEE STRUCTURAL FOR COMPOSITE DECK TO BE INFILLED ONCE NEW STEEL
COLUMNS ARE INSTALLED. SEE DETAIL 2/AE104 FOR NEW INSULATION AND
ROOFING ASSEMBLY REPAIR AND FLASHING.
REFER TO MEP DRAWINGS FOR ROOF MECHANICAL EQUIPMENT
INFORMATION.
EXISTING ROOF INSULATION
ASSEMBLY
SEE STRUCTURAL DRAWINGS FOR
CONNECTION TO ROOF STRUCTURE
PROVIDE INSULATION CANT
ALL SIDES
PROVIDE TERMINATION BAR
ALL SIDES SET IN FULL BED
OF SEALANT
STEEL COLUMN, SEE
STRUCTURAL
PROVIDE NEW MEMBRANE
0' - 8"
0'
- 1
0"
NEW PORTION OF ROOF
INSULATION TO MATCH EXISTING
INFILL ROOF TO MATCH EXISTING,
REFER TO STRUCTURAL DRAWINGS6"
NOT IN SCOPE
LEGEND
ABOVE CEILING MECHANICAL ITEMS ARE SHOWN FOR CLARITY ON AREAS
OF WORK.
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
Au to de sk
D oc s:
//2
.0
VA
C ol um bu s (O
H ) A
E R ep la ce A ir- C oo le d C hi lle rs /2
4.
.0
1_ A_ v2 4.
rv t
3/
/2
3:
:5
PM
AE104
ROOF - AREA-A - ROOF PLAN Replace Air Cooled Chillers Chalmers P. Wylie VA Ambulatory Care Center
420 N. James Rd, Columbus, OH
01A
03/26/2025 TD TS
CONSTRUCTION
DOCUMENTS
757-23-101
N
SCALE: 1/8" = 1'-0"AE104
1 ROOF - AREA-A - ROOF PLAN
SCALE: 1 1/2" = 1'-0"AE104
2 STEEL COLUMN DETAIL
Revisions: Date:
A
A
B
B
C
C
D
D
E
E
F
F
G
G
Endoscopy Office Space 2B024
Surgery Office 2B025
Nurse Office 2B145
GI/ Phys. Office 2B161
Men's 2B165
Resident Office 2B008
Anesth Work/Storage/Office
2B163
Women's 2B167 Cart Wash
2B292
Decontam 2B291
Prep 2B293
Transfusion 2B263
Gross Histology 2B278
Staining / Cutting 2B276
Break Room 2B009
Corridor 2B006
Sterile 2B294
ANTE
2B291A
HAC
2B291H
Shared Office 2B283A
HAC
2B268
Telecommunications 2B003
Stair No. 5 2S005
Corridor 2B001
Training 2B281 Office
2B283
Office 2B285
Staff T 2B287
HAC
2B289H
Staging 2B289
Corridor 2B280
Storage 2B288
Corridor 2B146
Corridor 2B160
Micro Lab 2B279
Scope Clean 2B143
Ante 2B141
Exam Room 4 2B042
Exam Room 5 2B044
Pace/ Exam 6 2B046
Office 2B048
Surgery 2B144
Frozen Section 2B157
Clean 2B142
Med Gas Storage 2B164
HAC
2B158
Scope Storage 2B138B
Toilet 2B141T
AER
2B141A
Corridor 2B045
Toilet 2B139T
PFT Lab & Vent Test 2B037
Patient Toilet 2B041 Patient Toilet
2B043
Scope Storage 2B137 Scope Storage
2B136B
EGD/ Colon Procedure 2B136
Soiled 2B153
Procedure Room 2B155
Sterile Storage 2B191
Clean Core 2B190
EGD/ Colon Procedure 2B138
Equip/Apparatus 2B162
Major O.R.
2B181
Sub-Sterile 2B182
O.R.
2B183
Alcove/ Corridor 2B184
C-Arm Alcove 2B180
Scrub 2B180A
Corridor 2B002
Corridor 2B007
Open Lab 2B275
Corridor 2B005Open lab
2B270
Corridor 2B159
Processing 2B272
MI
N.
C
LE
AR
6'
- 0
1.
2.
3.
NO CEILING IN THIS AREA.
REMOVE ACOUSTIC CEILING TILES AS NEEDED TO PERFORM ABOVE CEILING
WORK. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS
FOR MORE INFORMATION. PROVIDE NEW CEILING TILES WHERE TILES WERE
REMOVED. FINISH SHALL MATCH EXISTING EXACTLY.
PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. REFER TO DETAIL 2/AE111. REFER TO SPECIFICATION FOR
ADDITIONAL INFORMATION.
REFLECTED CEILING PLAN NOTES
1/8" = 1' -0"
SCALE FEET
5 0 5 10 15 20
NOT IN SCOPE
LEGEND
ABOVE CEILING MECHANICAL ITEMS ARE SHOWN FOR CLARITY ON AREAS
OF WORK.
CONTINUOUSLY ADHERED FIRE
RETARDANT POLY TO FLOOR WITH TAPE
BEAD OF CONT. SEALANT
6 MIL. FIRE RETARDANT POLY
INTERIOR SIDE
CONSTRUCTION
SIDE
CONTINUOUSLY ADHERED 6 MIL. FIRE
RETARDANT POLY TO DECK WITH TAPE
UNDERSIDE OF STRUCTURAL DECK
CEILING
TO DECK
OCCUPIED
SIDE
6-MIL FIRE RETARDANT POLY
INTERIOR SIDE
EXISTING CEILING
CONTINUOUSLY ADHERE 6-MIL. FIRE
RETARDANT POLY TO CEILING WITH TAPE
CONTINUOUSLY ADHERE FIRE
RETARDANT POLY TO FLOOR WITH TAPE
EXISTING DECK
CONSTRUCTION
SIDE
OCCUPIED
SIDE
TO CEILING
CONSTRUCTION ACTIVITY - FIRE RISK: B
PATIENT RISK GROUP: HIGH (LABORATORY), HIGHEST (SPS STERILE SIDE)
CLASS OF PRECAUTION MATRIX: II (LABORATORY) & III (SPS STERILE SIDE)
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
REFER TO MEP DRAWINGS FOR PHASING OF WORK .
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE
FLOOR PLATE OF THE PROJECT BOUNDARY.
ALL WORK WITHIN ENVELOPE IS ABOVE CEILING AND SHALL TAKE PLACE
OFF HOURS, BETWEEN 8 PM AND 5 AM, MONDAY THROUGH FRIDAY AND 5:30
PM TO 7 AM ON SATURDAY & SUNDAY. CEILING TILES AND GRID SHALL BE
CAREFULLY REMOVED AND SOTRED IN A SAFE MANNER UNTIL THEY CAN BE
REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE REPLACED
BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS, MONDAY THROUGH FRIDAY FROM 5 AM
TO 8 PM AND ON SATURDAY AND SUNDAY FROM 7 AM TO 5:30 PM.
WORK REQUIRING VIBRATION OR LOAD NOISES, SUCH AS STRUCTURAL
WORK ON ROOF, SHALL TAKE PLACE OFF HOURS BETWEEN 8 PM AND 5 AM,
MONDAY THROUGH FRIDAY AND 5:30 PM TO 7 AM ON SATURDAY & SUNDAY.
EVERY EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A
MINIMUM. SCHEDULING SHALL BE COORDINATED WITH THE VA.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 6 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSE
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PROJECT INFORMATION
NOTE: THIS PRELIMINARY INFECTION CONTROL RISK ASSESSMENT (ICRA) WAS
COMPLETED DURING DESIGN IN ANTICIPATION OF WORK REQUIRED TO BE
COMPLETED BY THE CONTRACTOR DURING CONSTRUCTION. ACTUAL ICRA SHALL BE
COMPLETED BY THE VA ONCE CONSTRUCTION CONTRACT IS AWARDED. CONTRACTOR
SHALL COMPLY WITH ALL REQUIREMENTS AS DIRECTED BY THE VA INFECTION
CONTROL REPRESENTATIVE.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
CLASS II:
(NOTE: CLASS II MUST ALSO INCLUDE ALL CLASS I REQUIREMENTS,
INCLUDED BELOW)
PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
(CLASS I REQUIREMENT)
IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC.,
UPON COMPLETION OF WORK. (CLASS I REQUIREMENT)
ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST
BE FREE OF CONTAMINANTS AND LOOSE MATERIAL. (CLASS I REQUIREMENT)
PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING
INTO OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST.
ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE
LEAVING WORK AREA.
REMOVE OR ISOLATE AIR DIFFUSERS, BOTH SUPPLY AND RETURN, TO
PROTECT HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE.
REBALANCE SYSTEM TO ADDRESS DIFFUSER ISOLATION.
WHEN THE WORK INVOLVES OR IMPACTS PORTABLE WATER SYSTEMS
INCLUDING STAGNATION DUE TO REDUCE USAGE, THE PIPING SHALL BE
FLUSHED TWICE A WEEK OR ISOLATED FROM THE MAIN SYSTEM.
SEAL DOORS TO PREVENT DUST MIGRATION.
CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY
CLEANING AND DISPOSAL OF TRASH, WHICH MUST BE COVERED, FROM
WORK AREA USING AN IDENTIFIED EXIT ROUTE.
ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA
MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS
PRIOR TO REMOVAL FROM AREA.
NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS, WITH A HARD LID,
MUST BE USED TO TRANSPORT TRASH AND DEBRIS FROM CONSTRUCTION
AREAS. THESE CONTAINERS MUST BE DAMPED-WIPED CLEANED AND FREE
OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
INSTALL STICKY, DUST COLLECTION, MAT AT ENTRANCE OF CONTAINED
WORK AREA BASED ON FACILITY POLICY. STICKY MATT MUST BE CHANGE
ROUTINELY AND WHEN VISIBLY SOILED.
MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP
MOPPING OR HEPA VACUUMING SURFACES AT LEAST DAILY.
CLASS III:
(NOTE: CLASS III MUST INCLUDE ALL CLASS I & II REQUIREMENTS LISTED
ABOVE AS WELL AS THE REQUIREMENTS LISTED BELOW)
ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS
CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241
REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING
TILES ARE REMOVED, TO THE DECK ABOVE.
ALL PLASTIC OR HARD BARRIER CONSTRUCTION ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC
BARRIERS MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING, OR
DECK ABOVE, AND SECURE FROM MOVEMENT OR DAMAGE.
SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOOR
AND CEILING, USING APPROVED MATERIAL. (UL BARRIER FIRESTOP IF
APPLICABLE)
MAINTAIN 0.01 INCHES/WATER GUAGE NEGATIVE PRESSURIZATION OF THE
ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTLY
OUTDOORS, OR COMPLY WITH ALTERNATIVE METHODS. THESE CONTROL
METHODS MUST BE MAINTAINED CONTINOUSLY 24/7 FOR THE DURATION OF
THE PROJECT. HEPA FILTERED EXHAUST IF DIRECTLY DISCHARGED TO THE
OUTDOORS MUST BE AT A DISTANCE OF 25 OR GREATER FROM ENTRANCES,
AIR INTAKES OR OPERABLE WINDOWS. EXHAUSTING DISCHARGED AIR INTO
SHARED OR RECIRCULATING HVAC SYSTEMS OR OTHER SHARED EXHAUST
SYSTEMS, SUCH AS BATHROOMS, IS PROHIBITED.
INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE OR EXTERIOR OF
WORK CONTAINEMENT TO CONTINUALLY MONITOR AND DOCUMENT
NEGATIVE PRESSURIZATION. THE "BALL IN THE WALL" OR SIMILAR
APPARATUS ARE NOT ACCEPTABLE.
LEVEL OF PRECAUTIONS
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
Au to de sk
D oc s:
//2
.0
VA
C ol um bu s (O
H ) A
E R ep la ce A ir- C oo le d C hi lle rs /2
4.
.0
1_ A_ v2 4.
rv t
3/
/2
3:
:0
PM
AE111
SECOND LEVEL - AREA-A - RCP &
ICRA PLAN
Replace Air Cooled Chillers Chalmers P. Wylie VA Ambulatory Care Center
420 N. James Rd, Columbus, OH
01A
03/26/2025 TD TS
CONSTRUCTION
DOCUMENTS
757-23-101
SCALE: 1/8" = 1'-0"AE111
1 SECOND LEVEL - AREA-A - REFLECTED CEILING PLAN & INFECTION CONTROL PLAN
N
SCALE: 1 1/2" = 1'-0"AE111
2 TEMPORARY INFECTION CONTROL PLASTIC BARRIER
Revisions: Date:
| AE104 - ROOF - AREA-A - ROOF PLAN |
| AE111 - SECOND LEVEL - AREA-A - RCP & ICRA PLAN |
File details come from the government source that posted it. Updated .