- Project 757-23-101 Air Cooled Chillers
- Solicitation number
- 36C25025R0096_1
About this file
This document is a solicitation for a federal contract opportunity for air cooled chillers at the Chalmer Wylie Columbus VA Ambulatory Care Center. The project involves replacing two existing roof-installed air cooled chillers with three new air cooled chillers and increasing airflow in the sterile processing equipment room. The project is valued between $2,000,000 and $5,000,000, with NAICS code 236220 and a small business size standard of $45 million. The solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with offerors required to be verified and registered in SAM at the time of offer and award.
Key dates include a site visit on July 16, 2025, at 10AM EST at the Chalmers P. Wylie Engineering Building, and a cut-off date of July 22, 2025, at 2:30 PM EST for submitting Requests for Information (RFIs). Electronic proposal submissions are due by August 11, 2025, at 2:30 PM EST to Stanley Burdine at Stanley.Burdine@va.gov. The contract performance period is 251 calendar days from receipt of notice to proceed. Offerors must submit a completed Contractor Certification for VAAR 852.219-75, and failure to do so will result in the proposal being deemed non-responsive and not considered.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________
(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 74
36C25025R0096
X
06-13-2025
757-25-4-691-0113
757-23-101
701 AL
Department of Veterans Affairs
Network Contracting Office (NCO) 10
Regional Procurement Office Central
2780 Airport Drive, Suite 340
Columbus OH 43219-2292
Department of Veterans Affairs
Network Contracting Office (NCO) 10
Regional Procurement Office Central
2780 Airport Drive, Suite 340
Columbus OH 43219-2292
Stan Burdine (614) 388-7827
Air Cooled Chillers, Project No. 757-23-101
The scope of the project is to replace two roof installed air cooled chillers with three air cooled chillers; as well as to increase airflow in the sterile processing equipment room located within Chalmer Wylie Columbus VA Ambulatory Care
Center.
Contractor shall provide all labor, equipment, supplies, and supervision necessary for the Air Cooled Chillers at the
Chalmer Wylie Columbus VA Ambulatory Care Center (VAACC), 420 James Road, Columbus, OH 43219.
The project magnitude for the project is between $2,000,000and $5,000,000.
The NAICS code for this project is 236220. The business size standard is $45 million.
The Contractor Certification for VAAR 852.219-75 is required to be completed and submitted with the proposal. Failure to provide the completed certification shall deem the proposal non-responsive and the proposal will not be considered.
All work shall be coordinated with the Veteran Affairs (VA) Contracting Officer and the Contracting Officer's
Representative (COR).
All Bidder's/Offeror's are required to be submitted electronically by date and time to Stanley Burdine; Email:
Stanley.Burdine@va.gov.
Site Visit and place of performance is at Chalmer Wylie Columbus VA Ambulatory Care Center (VAACC), 420 James Road, VA
Engineering Building, Columbus, OH 43219.
An organized site visit will be conducted in accordance with FAR 52.236-27 – see solicitation section titled “SITE
VISIT INFORMATION" on page 12.
Cut-off date and time to submit Requests for Information (RFI) is 07-22-2025 at 2:30 PM EST. RFIs shall be emailed to
Stanley Burdine at stanley.burdine@va.gov.
This project is a 100% set-aside for a Service-Disabled Veteran Owned Small Business (SDVOSB). All offerors must be verified and registered in SAM at the time of the offer due date and time of award to be eligible for award. For eligibility under the NAICS, see VAAR 852.219.73 paragraph for performance requirements.
Public Law 105-339, Section 1534 provides "no agency may obligate or expend funds appropriated for the agency for a fiscal year to enter a contract described in Section 4212(a) of Title 38 with a contractor from which a report was required under Section 4212(d) of that title with respect to the preceding fiscal year, if such contractor did not submit such report."
0 251
X X FAR 52.211-10
X
1 2:30PM EST
08-11-2025
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your
Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
See "SF 1442 Block 17 continuation" on page 6.
701 AL
Department of Veterans Affairs
Network Contracting Office (NCO) 10
Regional Procurement Central
2780 Airport Drive, Suite 340
Columbus OH 43219-2292
36C250 Department of Veterans Affairs
Financial Services Center
Invoices to be Submitted Electronically www.ob10.com/us/en/veterans-affairs// e-Invoice Setup Info Phone 877-489-6135
Brian Kish
Contracting Officer
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or
Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
A.3 FAR 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023) ........ Error!
Bookmark not defined.
A.4 FAR 52.216-1 TYPE OF CONTRACT (APR 1984)
A.5 FAR 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY
SITE OF THE WORK (MAY 2014)
A.6 FAR 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014)
A.7 FAR 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
A.8 FAR 52.228-1 BID GUARANTEE (SEP 1996)
A.9 FAR 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID
GUARANTEE) (FEB 2021)
A.10 FAR 52.233-2 SERVICE OF PROTEST (SEP 2006)
A.11 FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB
1995)
A.12 FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
A.13 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
A.14 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE
RESOLUTION (OCT 2018)
A.15 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
A.16 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY
ACCESSIBILITY NOTICE (FEB 2023)
REPRESENTATIONS AND CERTIFICATIONS
3.1 FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)
(DEVIATION FEB 2025)
3.2 FAR 52.204-24 REPRESENTATION REGARDING CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT
(NOV 2021)
3.3 FAR 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT
ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023)
3.4 FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT
2018)
3.5 FAR 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR
AGREEMENTS—CERTIFICATION (NOV 2021)
3.6 FAR 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND
REPRESENTATION (JUN 2020)
GENERAL CONDITIONS
4.1 FAR 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS
AND CERTIFICATIONS (DEC 2014)
4.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984) ALTERNATE I (APR 1984)
4.3 FAR 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM
REREPRESENTATION (JAN 2025)
4.4 FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
4.5 FAR 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (DEC 2010)
4.6 FAR 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)
4.7 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.8 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
4.9 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.10 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)
4.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
4.12 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)
(DEVIATION)
4.13 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022)
4.14 VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899
(DEVIATION)(APR 2025)
4.15 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)
4.16 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
4.17 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)
4.18 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
4.19 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
4.20 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.21 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
ALTERNATE I (APR 2019)
4.22 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
4.23 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) .. 65
4.24 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
4.25 VAAR 852.246-71 REJECTED GOODS (OCT 2018)
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE
AND BONDS
**NOTE: A SINGLE AWARD MAY BE MADE ON LINE ITEM 1 (BASE ITEM),
DEPENDENT ON THE AVAILABILITY OF FUNDS.
LINE ITEM 1 (BASE BID): Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction and certain other items for the Air-Cooled Chillers. All work shall be completed within 251 calendar days after receipt of Notice to Proceed.
The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within
120 calendar days after the date offers are due (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.).
Contractor’s Name: _______________________________
CAGE Code: _______________________________
DUNS: _______________________________
The following bids are submitted in lieu of completing block 17 on the attached SF 1442:
Line Item 1 (Base Proposal): ___________________________________________
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO
BIDDERS/OFFERORS
A.3 FAR 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)
(a) All actual and potential offerors are encouraged to provide feedback on the pre-award and debriefing processes, as applicable. Feedback may be provided to agencies up to 45 days after award. The feedback is anonymous, unless the participant self-identifies in the survey. Actual and potential offerors can participate in the survey by selecting the following link: https:// www.acquisition.gov/360.
(b) The Contracting Officer will not review the information provided until after contract award and will not consider it in the award decision. The survey is voluntary and does not convey any protections, rights, or grounds for protest. It creates a way for actual and potential offerors to provide the Government with constructive feedback about the pre-award and debriefing processes, as applicable, used for a specific acquisition.
(End of Clause)
FAR DEVIATION FEB 2025 INSTRUCTIONS
“System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action
Compliance. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.”
IMPORTANT OFFEROR INFORMATION
PROPOSAL MATERIALS: Bidding materials consisting of drawings, specifications, contract forms and any issued Amendments will be posted at www.sam.gov . Enter 36C25025R0096 into the search box to access the bid materials. This is the only official location where these documents can be obtained and where updates are posted. No ‘hard copy’ bidding materials are available.
PROPOSAL SUBMISSION: The following documents are to be included in the bid submission: (1) An original, fully completed and signed SF 1442 Offer page (‘wet ink signature’), (2) Acknowledgment of any amendments issued either via completing block 19 of the SF1442 or completing blocks 15a, b, and c of the Amendment and attaching to the SF 1442
Offer page; (3) An original fully completed bid schedule; (4) An original completed and signed
SF 24 Bid Bond; (5) Completed Representations and Certifications section (FAR 52.204-8, http://www.sam.gov/
52.209-5 (Deviation), and 52.209-7); (6) Fully completed Contractor EMR Certification page;
(7) Fully completed Calculation of self-performed work and (8) Fully completed VAAR
852.219-75 VA Notice of Limitations on Subcontracting-Certificate of Compliance for Services and Construction Deviation.
Offerors are responsible for insuring and verifying their offer and all required proposal documents are received at the office designated in block 8 of the SF 1442 and by the date and time specified in block 13A of the SF 1442 (subject to amendment).
Evaluation Criteria
The government will evaluate the offer’s technical proposals, past performance, and price. All evaluation factors other than cost or price, when combined, are significantly more important than cost or price. The government intends to make an award without discussions but reserves the right to conduct them if it is in the best interest of the government. The evaluation criteria are listed in descending order of importance below:
1. Construction Management,
2. Technical Management Approach,
3. Past Performance, and
4. Price.
Offerors will submit a separate volume for the section. Each volume will be in PDF format, no more than 30 pages in length, with a font size no less than 12, one (1) inch margins and be named using the following naming convention: “Contractor Name – Factor I Construction
Management ”; “Contractor Name – Factor II Technical Management Approach”; “Contractor
Name – Factor III Past Performance”, “Contractor Name – Factor IV Price”. Any pages submitted in excess of 30 pages will not be read or evaluated by the government.
Presentations must be sent, via email, to the point of contact/email address listed in block eight
(8) of 1442. Only presentations received by/before the date/time specified in block 13 of the SF
1442 will be accepted. The following sections will address each volume to be submitted in order.
FACTOR 1 – Construction Management (40% weighting)
The offeror shall provide a narrative that describes the offeror’s overall organization, organizational chart, as well as number of personnel and the duties of proposed technical staff to determine if the offeror has the ability to manage multi-discipline projects without significant difficulty. The proposal narrative must adequately address functions, responsibilities and authorities for performing such duties as overall project management, site superintendence, quality, infection control, safety, administration, and in-house trade capabilities.
Sub-Factor 1 – Experience: Contractor shall provide demonstrated experience in civil, HVAC, electrical, low voltage, mechanical, and fire protection. Provide a list of three (3) completed projects within the past (5) five years with a contract value of at least $3M.
Standard for Acceptability: Provide complete project title, location, contract price, trades involved, start and completion dates. Provide a written narrative of work and a reference for verification.
Sub-Factor 2 – Key Personnel and Contractor: Provide project manager and on-site superintendent including names with title, years with prime contractor, and total work experience as it relates to hospital renovations.
Standard for Acceptability: Project manager and the job site superintendent must have a minimum of 2 years of construction project management in similar scope to this project.
Sub-Factor 3 – Infection Control Measures: Prime contractor shall show demonstrated successful infection control measures for Highest Risk Group 4 for Type A, B, C, and D mitigation precautions in projects similar to size and scope of this project. Provide company infection control policy.
Standard for Acceptability: Two successful completed projects where Highest Group 4 mitigation precautions were applied. Provide complete project information with contact reference information.
FACTOR 2 – Technical Management Approach (30% weighting)
The offeror shall review the project and provide a narrative that outlines the proposed technical approach for this project. The narrative shall include assumptions and their rationale for choosing the preferred approach. The narrative shall include a discussion of how the proposed duration/completion time was derived. Offeror must include identification of proposed personnel for quality control, safety during construction and in-house trade capabilities.
Project Schedule: Technical Management Approach: Provide a technical narrative that outlines the proposed technical approach for this project, including assumptions and rationale for choosing the preferred approach. Include a discussion of how the duration of project time was achieved; provide a Gantt chart of contract times broken into schedule of values by trade discipline.
Standard for Acceptability: Gantt chart achieving successful project completion in 251 days, with all requirements met for contract. Technical narrative always demonstrates sound logic with minimal disruption to medical center operations.
FACTOR 3 - Past Performance (20% weighting)
The offeror shall submit three (3) completed projects within the past (5) years for Past
Performance on contracts with a contract value of at least $3M on the VA Past Performance questionnaire.
Standard for Acceptability: This factor is met when three (3) past performance questionnaires that the offeror has worked on are submitted and are deemed satisfactory. The Government will evaluate the relative merits of each offeror’s past performance questionnaire responses for each project. The Government may, at its discretion, have contact references cited to verify the information contained therein.
FACTOR 4 – Price (10% weighting)
The proposed price will be analyzed for reasonableness. It may also be analyzed to determine whether it is realistic for the work to be performed, reflects a clear understanding of the requirements; and is consistent with the offeror’s technical proposal.
A detailed price breakdown is required, to include labor, disciplines, sub-disciplines, materials, profit, and overhead. If a detailed price breakdown is not included in the initial proposal response, the contractor may be excluded from further consideration of the contract award. The contractor must provide a cost proposal for the base offer. Pricing will be evaluated in accordance with FAR
15.4 to determine reasonableness and evaluate potential performance risks. In this context, reasonableness will be determined by comparing offered prices with the government estimate.
This factor will be evaluated as either reasonable or unreasonable.
Standard for Acceptability: Acceptable evaluation rating will be achieved when the offeror submits a price proposal consistent with the requirements and when analyzed is determined to be consistent with the contract documents.
Recency
Past information submitted by the Offerors will meet the recency requirement by not having concluded more than three (3) years prior to the issuance date of this solicitation. The
Government will not consider past performance information on an effort that concluded more than three (3) years prior to the issuance date of this solicitation.
Quality
Past performance information submitted by the Offerors will be evaluated for quality, timely performance, management effectiveness, contract administration, compliance with safety standards, and overall performance as reported on the PPQs and in PPIRS, in order to assess the Offerors’ ability to successfully complete the requirements of this solicitation. A separate quality assessment rating is not required; rather, the Integrated Past Performance Confidence
Assessment Rating is based on the\Offeror’s overall record of recency and quality of performance.
Offerors will receive an Integrated Past Performance Confidence Assessment Rating, based on the Offerors’ past and present performance as it relates to the probability of being successful under the anticipated JOC contract.
In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance in accordance with FAR 15.305(a)(2)(iv). Therefore, the Offeror will be determined to have unknown past performance and assigned a performance confidence rating of “Neutral.”
The rating of “Neutral” confidence is treated neither favorable nor unfavorably.
PRICE PROPOSAL:
Although the price factor is considered less important than the non-cost factors, it still must be determined as fair and reasonable for an award to be made. After an evaluation of Technical and Past Performance has been completed, the price will be evaluated, and an integrated assessment of proposals will determine the offers which represent the best value to the Government.
DOCUMENTATION:
Identify the types of documents that will be prepared during the course of the source selection, to include at a minimum an SSEB Report covering the initial evaluation, updated as necessary following responses to discussion questions, and a final SSEB Report after receipt of Final Proposal Revisions. Ultimately, making a recommendation to the Source Selection Authority, and in accordance with FAR 15.308, the Source Selection Decision Document (SSDD), which reflects the SSA’s independent determination. A Power Point presentation is acceptable to brief the SSA on the status of the procurement, but should not, as a general rule, constitute the official Reports required for the source selection.
DOCUMENTATION OF INITIAL EVALUATION RESULTS:
Following the initial round of evaluations, the Source Selection Evaluation Board (SSEB)
Chairperson will consolidate the inputs from each of the evaluation teams for presentation to the
SSA (normally this is the CO). The Contracting Officer and the SSEB Chairperson must ensure that proposals are evaluated solely on the criteria contained in the solicitation. All evaluation records and narratives must be reviewed by the Contracting Officer and the SSEB Chairperson for completeness and compliance with the solicitation.
Based upon review of the initial evaluation results the SSA (normally this is the CO) will decide to either (1) approve award without discussions, or (2) enter into the discussion process.
PROJECT INFORMATION
PROJECT TITLE AND NUMBER: Air Cooled Chillers PROJECT LOCATION: Columbus VAACC, 420 James Rd., Columbus, OH 44106 MAGNITUDE OF CONSTRUCTION: Between $2,000,000.00 and $5,000,000.00 TYPE CONSTRUCTION: Commercial and Institutional Building Construction
NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM CODE: (NAICS): 236220
SMALL BUSINESS SIZE STANDARD: $45 Million PERIOD OF PERFORMANCE: 251 calendar days from receipt of Notice to Proceed.
WAGE DETERMINATION: Department of Labor General Decision Number OH20240074 is included as an attachment to solicitation and is applicable to any resultant contract. If necessary, subsequent revisions will be posted to the solicitation via amendment prior to bid opening. Revision may also be applicable prior to any contract award. Wage decisions are available at http://www.wdol.gov/Index.aspx.
REQUESTS FOR INFORMATION (RFI): To obtain clarifications and/or additional information concerning the contract requirements, specifications and/or drawings, submit a written RFI utilizing the RFI Form attached to this Solicitation, send via email to
Stanley.burdine@va.gov. The subject line of the email must read ‘RFI ## – 36C25025R0096 http://www.wdol.gov/Index.aspx mailto:Stanley.burdine@va.gov
Project 757-23-101 Air Cooled Chillers. RFIs must be specific identifying section, paragraph and page no. of the specifications or cite the drawing number and must be in question format. All
RFIs submitted shall include the solicitation number and title, contractor name, city, state, telephone, email address, date submitted, and the RFI question(s). RFI responses will be posted to www.sam.gov as necessary in amendment format. Deadline for submission of RFIs for this solicitation is close of business July 23, 2025. No questions will be answered after this date unless determined to be in the best interest of the Government as deemed by the
Contracting Officer. Telephone requests for information will not be accepted or returned.
TYPE OF SET-ASIDE
THIS SOLICITATION IS A 100% SET-ASIDE FOR SERVICE-DISABLED VETERAN OWNED
SMALL BUSINESSES (SDVOSB)
SEE THE SOLICITATION FOR ELIGIBILITY REQUIREMENTS.
DATABASE REGISTRATION INFORMATION
SYSTEM FOR AWARD MANAGEMENT REGISTRATION: The System for Award
Management (SAM) is the Official U.S. Government system that consolidated the capabilities of the Central Contractor Registration (CCR including FedReg), Online Representations and
Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Federal
Acquisition Registrations require that federal contractors register in SAM at www.sam.gov and enter all mandatory information into the system. Warning: Award cannot be made to unregistered contractors. If not registered, offerors are advised to do so immediately. If registration is not active within 14 calendar days after the date proposals are opened the bid may be considered non-responsive and thereafter rejected.
THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals or businesses providing services under the contract have not engaged in fraud or abuse regarding
Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person or business providing services under this contract. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.
VETS-4212 REPORTING REQUIREMENT: Contractors are required to submit the required
Form VETS-4212, Federal Contractor Veterans' Employment Report in all cases where the contractor or subcontractor has received an award of $150,000 or more in any fiscal year.
Contracting Officers are prohibited from awarding a contract to a contractor that has not submitted a required VETS-4212 Report with respect to the preceding fiscal year if the contractor was subject to the reporting requirement of 38 U.S.C. 4212(d). Submit this report as soon as possible, if not already submitted, to avoid delays in the contract award process. For more information on this requirement and/or for completing the web-based reporting form, check the following website https://www.dol.gov/agencies/vets/programs/vets4212. See FAR provision
52.222-38 (JUN 2020), Compliance with Veterans' Employment Reporting Requirements (FEB http://www.sam.gov/
2016) under the Representations, Certifications and Other Statements of Offerors, and FAR clause 52.222-37, Employment Reports on Veterans (JUN 2020) under the General Conditions.
BONDING INFORMATION
BID GUARANTEE: A bid guarantee is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000.00. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of proposals, shall require rejection of the proposal in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-
4. Bid Bonds must be provided using Standard Form 24 (see FAR 28.106-1) and the form must be provided in original (no white outs, faxed or copied signatures, seals) with ‘wet ink’ signatures and contain the proper solicitation number, proposal opening date, and be from a corporate surety listed in Department of Treasury Circular 570. Individual sureties have to be acceptable to the Contracting Officer (see FAR 28.203) and be accompanied by Standard Form
28 Affidavit of Individual Surety. Other forms of bid security are acceptable as denoted in FAR
Part 28.203-2.
PERFORMANCE AND PAYMENT BONDS: In accordance with Contract Clause 52.228-15, and FAR 28.102, Contractors are reminded that any amount awarded over $30,000.00 will require a Payment Bond (SF 25A), and awards exceeding $150,000.00 shall require both
Payment and Performance Bonds (SF 25). Payment and Performance bonds are due no later than 10 days after notification of award. Bonds must be provided with original ‘wet ink’ signatures - no white outs or other corrections are allowable. Copies and facsimiles of bonds shall not be accepted.
SECURITY
BACKGROUND INVESTIGATIONS: All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation is commensurate with the level of access needed to perform the statement of work. This requirement is also applicable to all subcontractor personnel requiring the same level of access.
Levels and associated types of Background Investigations:
• If the project requires that workers have only limited physical access to the VA facility for a period of one year or less, a local flash badge with fingerprint check is issued.
• If the project requires that workers require un-supervised, logical and/or physical access for 180 consecutive or aggregate days in a 365-day period, over a 3-year period, a background investigation may be required (Special Agency Check (SAC)) which must be completed prior to being allowed access.
• If the project requires that workers have access to a VA Network (such as the Building
Management System) or un-supervised, full-time, logical, and/or restricted physical access for more than 6 months or more than 180 aggregate days in a one year period, a background investigation is required (Special Agency Check and National Agency Check with Written Inquiries (NACI)) and access is not allowed until a favorable SAC completion.
All costs for SAC and NACI checks are borne by the contractor. The VA may at its discretion make deductions against the contract in order to recoup the investigation costs. Current cost for a SAC is $25.00 per employee and the current cost for an NACI check is $182.00 per employee
(subject to change at any time).
MEDICAL CENTER ACCESS: Anyone participating in the site visit, or for any other reason that involves visiting the medical center related to this solicitation, must have a valid ID on their person and their vehicle must be properly registered and insured. Visitors are prohibited from possessing weapons while on a federal installation (See 18 USC 930 – Possession of Firearms and Dangerous Weapons in Federal Facilities). Handheld cellphone use or texting while driving is also prohibited. All VA Medical Centers and associated properties are Federal Property.
E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall enroll in
E-Verify within 30 days of the contract award date. They shall also begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54).
OTHER IMPORTANT OFFEROR INFORMATION
ADDITIONAL PRIME CONTRACTOR INFORMATION- SAFETY OR ENVIRONMENTAL
VIOLATIONS AND EXPERIENCE MODIFICATION RATING INFORMATION:
All Bidders/Offerors shall submit information pertaining to their past Safety and Environmental record. (using the attached EMR information and certification form) pertaining to their past
Safety and Environmental record. The information must contain a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a
Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
All Bidders/Offerors shall submit information regarding their current Experience Modification
Rate (EMR). This information shall be obtained from the Bidders/Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Offeror’s EMR is above 1.0, Bidder/Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.
Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc.
(NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from
NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and
Puerto Rico shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.
If the NCCI cannot issue an EMR because the Bidder/Offeror lacks insurance history, Bidder/Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that it has assigned
Bidder/Offeror a Unity Rating of 1.0.
The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make a
Determination of Responsibility.
This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.
CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS: The Contractor shall perform work under this contract consistent with the relevant policy and objectives identified in the agency, organizational, or facility Green Environmental Management System (GEMS) applicable for the contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the agency, organizational, or facility GEMS, and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the facility GEMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the environmental management system and how these requirements affect their work performed under this contract.
All on-site contractor personnel shall complete yearly EPA sponsored environmental training specified for the type of work conducted on-site. Upon inclusion in the contract, the Contracting Officer's Representative will verify that all contractor personnel have acquired EMS Awareness Training at their appropriate site or location.
REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, SENIOR RESIDENT ENGINEER,
OR PROJECT MANAGER: Any reference contained within contract specifications and/or drawings to the “VA Engineer”, “Resident Engineer”, “Senior Resident Engineer”, “Project
Manager”, or their abbreviations are to be replaced with “Contracting Officer’s Representative
(COR)”.
PAYMENT FOR MATERIALS STORED OFF-SITE: Payment in advance of installation for materials stored off-site is not authorized under this contract.
SCHEDULE OF MATERIAL SUBMITTALS: The submittals contemplated by FAR 52.236-5, Material and Workmanship, are listed on the Schedule of Material Submittals in the
Specifications. The schedule provided is for reference only, all submittals required by the contract documents are required.
PROGRESS SCHEDULE: The schedule required by FAR 52.236-15 shall be provided after receipt of the Notice to Proceed.
REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE
ASSESSMENT SYSTEM (CPARS)
(a) As prescribed in Federal Acquisition Regulation (FAR) Part 42.15, the Department of
Veterans Affairs (VA) evaluates contractor past performance on all contracts that exceed
$750,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided with an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS has connectivity with the Past Performance Information Retrieval System (PPIRS) database, which is available to all Federal agencies. PPIRS is the system used to collect and retrieve performance assessment reports used in source selection determinations and completed CPARS report cards transferred to PPIRS. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.
(b) Each contractor whose contract award is estimated to exceed $750,000 is required to register with CPARS database at the following web address:
www.cpars.csd.disa.mil. Help in registering can be obtained by contacting Customer
Support Desk at DSN: 684-1690 or COMM: 207-438-1690. Registration should occur no later than thirty days after the contract award and must be kept current should there be any change to the contractor's registered representative.
(c) For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor's performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor's designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.
(d) Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government's evaluation being placed on file in the database with a statement that the contractor failed to respond.”
*NOTE
The influenza season is generally considered to span the four-month period from December 1 through March 31; however, it can vary from one season or geographic location to another. Individual VHA facilities may expand (but not reduce) this time period based on local influenza activity and other epidemiological circumstances.
Health Care Personnel (HCP). HCP are individuals who, during the influenza season, work in VHA locations or who come into contact with VA patients or other HCP as part of their duties. VHA locations include, but are not limited to, VA hospitals and associated clinics, community living centers (CLCs), community-based outpatient clinics (CBOCs), domiciliary units, Vet centers and VA-leased medical facilities. HCP include all VA licensed and unlicensed, clinical and administrative, remote and onsite, paid and without compensation, full- and part-time employees, intermittent employees, fee basis employees, VA contractors, researchers, volunteers and health professions trainees
(HPTs) who are expected to perform any or all of their work at these facilities. HPTs may be paid or unpaid and include residents, interns, fellows and students. HCP also includes VHA personnel providing home-based care to Veterans and drivers and other personnel whose duties put them in contact with patients outside VA medical facilities.
* Seasonal Influenza Vaccination Program (VHA Directive 1192.01)
A.4 FAR 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates the award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
A.5 FAR 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—
SECONDARY SITE OF THE WORK (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
A.6 FAR 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material,"
"domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials"
(Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the
Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the
Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR
52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
A.7 FAR 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material,"
"designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition
Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the
Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of
FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the
Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or…