S02. MECHANICAL SYMBOLS AND ABREVIATIONS.pdf
PDF 2 MB Posted
- Attached to
- Project 757-23-101 Air Cooled Chillers
- Solicitation number
- 36C25025R0096_1
About this file
The file is a Mechanical Symbols and Abbreviations document for a VA project to replace air-cooled chillers at the Chalmers P. Wylie VA Ambulatory Care Center in Columbus, Ohio. The detailed technical drawing provides comprehensive mechanical design symbols, abbreviations, and notes for HVAC, piping, temperature control, and mechanical system components. Key technical specifications include requirements for demolition and installation of mechanical systems, with specific attention to maintaining air quality, pressurization, and operational continuity during construction.
The drawings outline precise technical guidelines for contractors, including mandates for system balancing, air and water flow measurements, temporary system maintenance, and specific installation requirements like pipe connections, insulation, supports, and seismic bracing. The documentation includes schedules for equipment like air-cooled chillers, pumps, air separators, and exhaust fans, specifying technical parameters such as flow rates, electrical specifications, performance metrics, and manufacturer recommendations. The mechanical design emphasizes maintaining building systems' functionality throughout the renovation process, with meticulous attention to system integration, control sequences, and performance standards.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR REQUIREMENTS FOR THE
DEMOLITION OF, OR ADDITION TO, ANY PORTION
OF AIR, PLUMBING OR HYDRONIC SYSTEMS.
COVER SHEET NOTES:
THE FOLLOWING SHALL APPLY TO ALL MECHANICAL SYSTEMS AFFECTED BY CONSTRUCTION ACTIVITIES. SYSTEMS INCLUDED BUT ARE NOT LIMITED TO HVAC, EXHAUST, EQUIPMENT, DUCTWORK, DUCTWORK ACCESSORIES, HYDRONICS, COILS, FILTERS, PLUMBING, TEMPERATURE CONTROLS, LIFE
SAFETY CONTROLS AND PRESSURIZATION CONTROLS.
1. AIR QUALITY, QUANTITY AND PRESSURE RELATIONSHIPS SHALL COMPLY WITH THE LATEST, ANSI/ASHRAE/ASHE STANDARD 170
REQUIREMENTS.
2. COMPLY WITH THE FACILITY'S INFECTIOUS CONTROL RISK ASSESSMENT (ICRA) REQUIREMENTS.
3. MAINTAIN EXISTING AIR QUALITY REQUIREMENTS, AIR PRESSURIZATION AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS
DURING ANY RENOVATION OR CONSTRUCTION.
4. DETERMINE AND VERIFY THE AREAS SERVED BY THE AFFECTED SYSTEMS.
5. TAKE AIR AND OR/ WATER BALANCE READINGS OF THE SYSTEMS BEING AFFECTED.
6. IF THERE ARE SPACES BEING SERVED OUTSIDE OF THE DEMOLITION OR ADDITION AREA, THE FOLLOWING PROCEDURES MUST BE TAKEN:
a. TAKE AIR AND/OR WATER BALANCE READINGS AS NEEDED TO QUANTIFY THE AIR AND/OR WATER FLOWS DELIVERED TO THE
SYSTEMS OUTSIDE THE AFFECTED AREA.
b. DURING DEMOLITION, TAKE ALL NECESSARY MEASURES TO MAINTAIN THE CORRECT AIR AND/OR WATER FLOWS TO THE SYSTEMS
THAT ARE REMAINING.
c. AFTER THE COMPLETION OF DEMOLITION, VERIFY THAT AIR AND/OR WATER FLOWS ARE CORRECT.
d. AFTER COMPLETING ANY ADDITIONS TO THE SYSTEM, VERIFY THAT AIR AND/OR WATER FLOWS ARE CORRECT.
7. THE CONTRACTOR IS TO PROVIDE TEMPORARY AIR/AND OR WATER SYSTEMS AS NEEDED TO MAINTAIN PROPER TEMPERATURE AND
PRESSURE RELATIONSHIPS OF SPACES REQUIRED TO BE OCCUPIED DURING CONSTRUCTION.
8. ALL TEMPORARY AIR SUPPLY SYSTEMS MUST UTILIZE FINAL FILTERS THAT ARE A MINIMUM OF 90% EFFICIENT (MERV 14). FINAL FILTERS
MUST BE DOWNSTREAM OF ALL AIR SUPPLY COMPONENTS.
MECHANICAL GENERAL NOTES:
A. THESE NOTES APPLY TO ALL SHEETS CONTAINING HVAC, PIPING, PLUMBING, TEMPERATURE CONTROLS, AND FIRE PROTECTION WORK. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. WHERE A DISCREPANCY EXISTS BETWEEN THESE PLANS AND THE PROJECT SPECIFICATIONS, THE SPECIFICATION REQUIREMENTS SHALL TAKE PRECEDENCE OVER THE DRAWINGS.
B. VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL. BE ADVISED THAT LOCATIONS SHOWN ARE APPROXIMATE. AN ATTEMPT HAS BEEN MADE TO SHOW ALL PIPING, FIXTURES, DUCTWORK, AND OUTLETS. CONTRACTOR SHALL VISIT THE SITE TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS NEED TO BE REMOVED IN THE DEMOLITION AREA UNLESS NOTED ON THE DRAWINGS. IF DEVIATION BETWEEN EXISTING CONDITIONS AND NEW WORK IS FOUND, CONTRACTOR SHALL NOTIFY
ENGINEER.
C. IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN CONTINUOUS AND NON-INTERRUPTED OPERATION DURING THE CONSTRUCTION OF THE ADDITIONS AND REMODELING/ALTERATION OF THE EXISTING BUILDING. SERVICES TO THE EXISTING BUILDING SHALL BE KEPT ON CONTINUOUS OPERATION EXCEPT DURING SCHEDULED SHUTDOWNS FOR EXTENSION OR MODIFICATION. PLAN TO COMPLETE SHUTDOWNS DURING OFF HOURS TO MINIMIZE IMPACT TO THE OWNER. COORDINATE SHUTDOWNS WITH THE OWNER A MINIMUM OF 14 DAYS PRIOR TO WORK. PROVIDE TEMPORARY SERVICES WHERE NECESSARY TO ACCOMPLISH ANY SHUTDOWN. THIS INCLUDES BUT IS NOT LIMITED TO STAFFING AND EQUIPMENT FOR FIRE WATCHES, PROVISIONS FOR BOTTLED WATER, AND TEMPORARY HEATING OR COOLING EQUIPMENT.
TEMPORARY MEASURES SHALL NOT BE REMOVED UNTIL THE PERMANENT SYSTEMS ARE OPERATIONAL AND HAVE PASSED ALL REQUIRED
TESTING.
D. REFER TO THE SPECIFICATIONS AND ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS. DURING EACH PHASE THE CONTRACTOR SHALL COMPLETE ALL WORK LOCATED WITHIN THE BOUNDARY OF THAT PHASE. ANY WORK AND THAT MUST BE COMPLETED IN THE AREA AFTER THAT AREA HAS BEEN TURNED OVER TO THE OWNER SHALL BE IDENTIFIED AT THE BEGINNING OF THE PHASE FOR EVALUATION AND ACCEPTANCE OF
THE OWNER.
E. CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN DEMOLITION, REMOVAL, CAPPING, STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND
REFINISHING SHALL MATCH THE EXISTING CONSTRUCTION AS NEARLY AS POSSIBLE.
F. EXCEPT WHERE OTHERWISE SHOWN OR NOTED ON THE DRAWINGS AS "TO BE RETAINED, RELOCATED", ALL EXISTING EQUIPMENT AND MATERIAL IN AREAS TO BE REMODELED/ALTERED SHALL BE REMOVED WHERE THEY INTERFERE WITH PROPOSED NEW CONSTRUCTION AND/OR
WITH PROPOSED USAGE OF SPACE BY OWNER AS FOLLOWS:
a. REMOVE ANY PIPING PROTRUDING ABOVE FINISHED FLOOR OR THROUGH WALL AND CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE
MAIN WITH MATERIAL TO MATCH EXISTING.
b. REMOVE ALL FIXTURES, CARRIERS, SUPPLY AND WASTE AND VENT PIPING, STEAM, HEATING HOT WATER, HVAC SUPPLY, RETURN AND EXHAUST AS NOTED. CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE MAIN. SUPPLY AND RETURN MAINS ON PIPING SYSTEMS
CONVEYING WATER OR GASES SHALL BE VALVED AND CAPPED
c. IN REMODELED/ALTERED AREAS, ANY PIPING OR DUCTWORK PASSING THROUGH THE REMODELED AREAS TO SERVE (OR BEING SERVED FROM EXISTING ADJACENT, REMOTE, OR SURROUNDING AREAS THAT ARE TO REMAIN) SHALL BE RETAINED AND KEPT OPERATIONAL AND SHALL BE REROUTED IN ALL CASES WHERE THEY INTERFERE WITH ANY NEW WORK OR USAGE TO BE ACCOMPLISHED IN THE
REMODELED AREA.
d. REMOVE UNUSED OR ABANDONED HANGERS AND PATCH ABANDONED PENETRATIONS TO MATCH EXISTING.
e. PENETRATIONS THROUGH EXISTING WALLS AND FLOORS FORMERLY OCCUPIED BY REMOVED PIPING OR DUCTWORK SHALL BE PATCHED
TO MATCH EXISTING CONSTRUCTION.
f. RE-SUPPORT ANY PIPING AND DUCTWORK THAT WAS SUPPORTED FROM BUILDING ELEMENTS REMOVED AS PART OF THE WORK.
g. MAINTAIN CONTROL WIRING OR PNEUMATIC TUBING REQUIRED FOR THE CONTINUED PROPER OPERATION OF THE BUILDING
AUTOMATION SYSTEM.
G. ALL EXISTING EQUIPMENT BEING REMOVED WILL BE HANDED OVER TO OWNER FOR FIRST RIGHT OF SALVAGE. IF OWNER REFUSES SALVAGE
ITEMS, REMOVING CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL.
H. CONTRACTOR SHALL REFER TO THE DRAWINGS OF ALL TRADES TO FAMILIARIZE THEMSELVES WITH EXTENT OF WORK INCLUDING BUT NOT
LIMITED TO WHERE NEW PARTITIONING IS BEING INSTALLED, WHERE EXISTING PARTITIONING IS BEING REMOVED, WHERE CEILINGS ARE BEING
REMOVED AND/OR REPLACED, ETC.
I. THESE DRAWINGS ARE NECESSARILY DIAGRAMMATIC IN NATURE. NOT ALL FITTINGS, OFFSETS, VENTS OR DRAINS ARE SHOWN. THE CONTRACTOR SHALL INCLUDE ALL FITTINGS, OFFSETS, VENTS, DRAINS, AND DEVICES REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
J. PERFORM AIR AND FLUID BALANCE PRE-TEST ON ALL DISTRIBUTION EQUIPMENT AND ALL AIR OUTLETS IN THE AREA PRIOR TO COMMENCING
WORK. SUBMIT PRE-TEST INFORMATION TO OWNER/ENGINEER.
K. PROVIDE ACCESS DOORS IN DUCTWORK AND/OR ARCHITECTURAL ELEMENTS WHERE REQUIRED TO ACCESS ALL EQUIPMENT REQUIRING MAINTENANCE AND ADJUSTMENT. THIS EQUIPMENT INCLUDES BUT IS NOT LIMITED TO SENSORS, DAMPERS, ACTUATORS, CONTROL DEVICES, VALVES, ETC. ACCESS DOORS SHALL BE SIZED TO PROVIDE APPROPRIATE ACCESS BASED ON HEIGHT OF ACCESS REQUIRED AND ACTIVITY.
INSTALL SUCH THAT ACCESS DOOR IS FULLY OPERABLE WITHOUT THE REMOVAL OF ARCHITECTURAL ELEMENTS SUCH AS CEILING RUNNERS, SUPPORTS, ETC. INSTALL IN A LOCATION SUCH THAT STEPPING OR LEANING OVER PERMANENT EQUIPMENT OR FURNITURE IS NOT REQUIRED.
WHERE ACCESS DOORS ARE REQUIRED IN ARCHITECTURAL ELEMENTS THAT PROVIDE A FIRE AND/OR SMOKE RATING, ACCESS DOOR SHALL
MAINTAIN THE REQUIRED RATING.
L. SEAL ALL WALL PENETRATIONS (DUCTWORK, PIPING, CONTROLS, CONDUITS, ETC.) WITH NON-COMBUSTIBLE MATERIAL. SEAL PENETRATIONS INTO ROOMS THAT REQUIRE PRESSURE CONTROL OR SOUND ISOLATION. WITH NON-COMBUSTIBLE MATERIAL AND CAULK.
M. PIPING AND DUCTWORK SHALL NOT BE ROUTED OVER ELECTRICAL AND TELECOM ROOMS. WHERE ROUTING OVER SUCH ROOMS IS UNAVOIDABLE, CONTRACTOR SHALL COORDINATE WITH OWNER, DESIGN TEAM, AHJ, AND OTHER TRADES REGARDING LOCATION OF PANELS AND UTILITY ROUTING AND SHALL PROVIDE DRIP PANS UNDER ALL UTILITIES WITH MOISTURE SENSORS OR DRAIN PIPING AS REQUIRED BY THE
SPECIFICATIONS.
N. REMOVAL AND REINSTALLATION OF CEILINGS REQUIRED FOR THE COMPLETION OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.
CONTRACTOR SHALL REPAIR OR REPLACE ALL DAMAGED CEILING COMPONENTS TO MATCH EXISTING. WHERE AN IDENTICAL MATCH IS NO LONGER AVAILABLE, CONTRACTOR SHALL PROVIDE A SIMILAR REPLACEMENT UPON APPROVAL FROM THE OWNER.
O. FLEXIBLE DUCTWORK SHALL HAVE A MAXIMUM LENGTH OF 48" REGARDLESS OF LENGTH SHOWN ON DRAWINGS. FLEX DUCT INSTALLATION SHALL BE AT TERMINAL ENDS ONLY. CONNECTIONS AT VAV BOX INLETS SHALL BE SOLID HARD DUCT. THE DUCTWORK AT ANY FIRE AND/OR FIRE
SMOKE DAMPER SHALL BE HARD DUCT.
P. LOCATE PIPING AND DUCTWORK IN EXTERIOR BUILDING WALLS ON THE WARM SIDE OF THE BUILDING AND VAPOR BARRIER. COORDINATE INSTALLATION OF BUILDING INSULATION TO RUN CONTINUOUS BETWEEN PIPING AND BUILDING WALL.
Q. SUPPORT ALL DUCTWORK, PIPING AND EQUIPMENT FROM BUILDING STRUCTURE MEMBERS. ROUTE DUCT MAINS TIGHT TO STRUCTURE UNLESS NOTED OTHERWISE. HOLD PIPING TIGHT TO BOTTOM OF STRUCTURAL MEMBERS OR RUN THROUGH JOIST WEBS IF POSSIBLE. DO NOT USE WIRE OR PERFORATED METAL TO SUPPORT PIPING. DO NOT SUPPORT PIPING FROM OTHER PIPING, DUCTWORK, AND/OR ELECTRICAL CONDUITS. DO NOT SUPPORT FROM WOOD TONGUE AND GROOVE ROOF DECK. SUPPORT FROM BOTTOM CHORD OF BAR JOISTS ONLY AT PANEL POINTS. ALL COMPONENTS REQUIRING MAINTENANCE SHALL BE SUPPORTED IN SUCH A MANNER AS TO BE READILY ACCESSIBLE WITHOUT REMOVAL OF THE CEILING SYSTEM AND TO ALLOW FOR REMOVAL FROM THE SYSTEM WHEN SUCH REMOVAL IS REQUIRED FOR
MAINTENANCE.
R. PROVIDE CONSTRUCTION FILTERS ON AIR MOVING EQUIPMENT SERVING THE CONSTRUCTION AREA AS WELL AS ALL RETURN/EXHAUST DUCT PENETRATIONS COMING FROM THE CONSTRUCTION AREA. AT THE COMPLETION OF WORK, REMOVE ALL TEMPORARY AND CONSTRUCTION
FILTERS AND PROVIDE NEW FILTERS FOR ALL AIR MOVING EQUIPMENT.
S. PROTECT ALL DUCTWORK AND PIPING DURING CONSTRUCTION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. AT A MINIMUM, DUCTWORK AND PIPING ENDS SHALL BE COVERED AND SEALED TO PREVENT THE COLLECTION OF DUST AND DEBRIS. CLEAN ALL INTERIOR SURFACES PRIOR TO INSTALLATION AND PROTECT ONCE INSTALLED. MEDICAL GAS PIPING SHALL BE PROTECTED IN ACCORDANCE WITH NFPA
99 REQUIREMENTS.
T. AT THE COMPLETION OF WORK, CLEAN ALL STRAINERS PROVIDED AS A PART OF THE WORK AS WELL AS PRIMARY SYSTEM STRAINERS LOCATED AT PUMPS WHERE SYSTEMS WERE EXTENDED. ON EXISTING EQUIPMENT, COORDINATE WORK WITH OWNER.
U. PROVIDE INTERMEDIATE TESTING AND BALANCING AT THE COMPLETION OF EACH PHASE AND AS REQUIRED TO MAINTAIN PROPER OPERATION OF SYSTEMS SERVING AREAS OF THE FACILITY IN USE INCLUDING BUT NOT LIMITED TO OCCUPIED AREAS, STORAGE AREAS, AND OTHER AREAS
DEEMED CRITICAL BY THE OWNER OR AHJ.
V. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED. REFER TO DETAIL SHEETS FOR GENERAL CONSTRUCTION DETAILS.
W. REFER TO SCHEDULES FOR SIZES OF FINAL RUNOUTS TO EQUIPMENT, FIXTURES, DIFFUSERS, GRILLES, AND TERMINAL DEVICES. FINAL RUNOUT SIZES LISTED SHALL BE USED TO WITHIN 10 EQUIVALENT DIAMETERS OF FINAL CONNECTION POINT. FINAL PIPING CONNECTION TO EQUIPMENT SHALL MATCH EQUIPMENT CONNECTION SIZE, PROVIDE TRANSITIONS AS REQUIRED. REFER TO DETAILS, DIAGRAMS AND SCHEMATICS FOR ADDITIONAL FINAL CONNECTION REQUIREMENTS. REFER TO SCHEDULE SHEETS FOR PROVIDED SCHEDULES.
X. FOR DUCTWORK PENETRATING A ONE HOUR FIRE RATED WALL WHERE A FIRE DAMPER IS NOT SHOWN, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. THE SYSTEM SHALL BE FIRE TESTED PER ASTM E119 AND COMPLY WITH EXCEPTION 1 OF 2018 IBC PART 717.5.2. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER'S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO A ONE HOUR FIRE RATED WALL, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS.
REFER TO THE ARCHITECTURAL LIFE SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS. ALL DUCTWORK PENETRATIONS SHALL BE INSPECTED BY AN APPROVED THIRD PARTY INSPECTION AGENCY IN ACCORDANCE WITH ASTM E2174. THE INSPECTION AGENCY SHALL BE PROCURED BY THE CONTRACTOR. DOCUMENTATION OF APPROVED INSPECTION SHALL BE INCLUDED WITH PROJECT CLOSEOUT
DOCUMENTATION.
Y. FIRE ALARM CONTRACTOR SHALL PROVIDE A DUCT SMOKE DETECTOR FOR EACH SMOKE OR FIRE/SMOKE DAMPER AS REQUIRED BY CODE.
MECHANICAL CONTRACTOR SHALL COORDINATE THE LOCATION OF EACH DUCT SMOKE DETECTOR AND SHALL INSTALL THEM IN THE DUCT.
Z. FOR ALL PIPING, CONDUIT, AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER'S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.
AA. CUTTING GRADE MOUNTED FLOORS: CONTRACTOR TO FIELD VERIFY LOCATION AND DEPTH OF EXISTING UTILITIES PRIOR TO SAWCUTTING FLOORS. CONTRACTOR SHALL X-RAY FLOOR, SCOPE PIPING AND USE OTHER APPROPRIATE MEANS TO IDENTIFY EXISTING CONDITIONS, PIPING, OR OTHER UTILITIES PRIOR TO COMMENCING WORK.
ABBREVIATION
HVAC ABBREVIATIONS
DESCRIPTION
AIR BLENDERAB
AIR CONDITIONING UNIT (SPLIT SYSTEM INDOOR UNIT)AC
AIR HANDLING UNITAHU
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
BOILER FEED UNITBFU
BOILERBLR
CONSTANT AIR VOLUME BOXCAV
COOLING COILCC
CONDENSATE DRAINCD
CUBIC FEET PER MINUTECFM
CHILLERCH
CONDENSATE PUMPCP
CONDENSER WATER RETURNCR
CONDENSER WATER SUPPLYCS
COOLING TOWERCT
CONDENSING UNITCU
CABINET UNIT HEATERCUH
CHILLED WATER RETURNCWR
CHILLED WATER SUPPLYCWS
DIFFUSERD
DUAL DUCTDD
DIRECT EXPANSIONDX
EXHAUST AIREA
ENTERING AIR TEMPERATUREEAT
EXHAUST FANEF
EFFICIENCYEFF
ENERGY RECOVERY COILERC
ENERGY RECOVERY WHEELERW
EXPANSION TANKET
ENTERING WATER TEMPERATUREEWT
FILTER BANK (CONSISTING OF ONE OR MORE FILTERS)FB
FAN COIL UNITFCU
FLOW MEASURING STATIONFMS
FUEL OIL RETURNFOR
FUEL OIL SUPPLYFOS
FUEL OIL VENTFOV
FIRE DAMPERFRD
FIRE SMOKE DAMPERFSD
FINNED TUBE RADIATORFTR
GRILLEG
GLYCOL CHILLED WATER RETURNGCWR
GLYCOL CHILLED WATER SUPPLYGCWS
GRAVITY EXHAUSTGE
GLYCOL HEATING HOT WATER RETURNGHWR
GLYCOL HEATING HOT WATER SUPPLYGHWS
GRAVITY INTAKEGI
HEATING COILHC
ABBREVIATION DESCRIPTION
HORSEPOWERHP
HIGH PRESSURE STEAM CONDENSATEHPC
HIGH PRESSURE STEAM SUPPLY (86 PSIG AND ABOVE)HPS
HEAT RECOVERY CHILLERHRC
HUMIDIFIERHUM
HEATING HOT WATER RETURNHWR
HEATING HOT WATER SUPPLYHWS
LOW PRESSURE STEAM CONDENSATELPC
LOW PRESSURE STEAM SUPPLY (0-12 PSIG)LPS
LOUVERLV
LEAVING WATER TEMPERATURELWT
BTU (1000'S)MBH
MANUAL DAMPERMD
MOTOR OPERATED DAMPERMOD
MEDIUM PRESSURE STEAM CONDENSATEMPC
MEDIUM PRESSURE STEAM SUPPLY (13-85 PSIG)MPS
NORMALLY CLOSED, NOISE CRITERIANC
NORMALLY OPEN, NUMBERNO
OUTDOOR AIROA
PUMPP
PUMPED CONDENSATEPC
PRESSURE REDUCING VALVEPRV
PUMPED STEAM CONDENSATEPSC
REGISTERR
RETURN AIRRA
RELIEF AIRREA
REFRIGERANT DX LIQUIDREFL
REFRIGERANT DX SUCTION GASREFS
RETURN FANRF
RELATIVE HUMIDITYRH
ROOF TOP UNITRTU
SUPPLY AIRSA
SMOKE DAMPERSD
SUPPLY FANSF
STATIC PRESSURESP
STEAMSTM
TEMPERATURETEMP
TRANSFERTR
UNIT HEATERUH
VARIABLE AIR VOLUME BOXVAV
VENT THROUGH ROOFVTR
WET BULB TEMPERATUREWB
WATER COLUMNWC
WATER PRESSURE DROPWPD
WATER SOURCE HEAT PUMP RETURNWSHPR
WATER SOURCE HEAT PUMP SUPPLYWSHPS
RECTANGULAR DUCTWORK
W = DIMENSION IN VIEW (INCHES)
H = DIMENSION PERPENDICULAR TO VIEW (INCHES)
ROUND DUCTWORK
D = DUCT DIAMETER
TURNING VANES
FLEXIBLE PIPING
WxH
D"Ø
HVAC SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
W/H
FLAT OVAL DUCTWORK
W = DIMENSION IN VIEW (INCHES)
H = DIMENSION PERPENDICULAR TO VIEW (INCHES)
REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
DUCT CROSS SECTION - SUPPLY
DUCT CROSS SECTION - RETURN
DUCT CROSS SECTION - EXHAUST
CROSS SECTION INDICATES DUCT EXTENDING PERPENDICULAR TO THE PAGE. IN
PLAN VIEW THIS INDICATES A DUCT RISE OR DROP TO ANOTHER LEVEL. SOLID FILLED
REGION INDICATE EXTENSION UP. NO FILLED REGION INDICATES EXTENSION DOWN.
MANUAL BALANCE DAMPER
REFER TO SPECIFICATIONS FOR TYPE. LOCATE MANUAL BALANCE DAMPERS IN AN
ACCESSIBLE LOCATION AND AS CLOSE TO THE MAIN DUCT AS POSSIBLE.
CONTROL DAMPER
FIRE/SMOKE DAMPER
REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE
LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.
DIFFUSER
REFER TO SPECIFICATIONS FOR TYPE.
FLEXIBLE DUCT
REFER TO SPECIFICATIONS FOR TYPE. REFER TO DETAILS FOR INSTALLATION
REQUIREMENTS. MAXIMUM LENGTH SHALL BE 48 INCHES UNLESS NOTED OTHERWISE
ON THE PLANS OR IN THE SPECIFICATIONS.
REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND INSTALLATION REQUIREMENTS.
VARIABLE AIR VOLUME BOX - NO COIL
REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND INSTALLATION REQUIREMENTS.
VARIABLE AIR VOLUME BOX - HOT WATER COIL
REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND INSTALLATION REQUIREMENTS.
VARIABLE AIR VOLUME BOX - ELECTRIC COIL
VB-#
### CFM
VAV BOX TAG
# = REFERENCE NUMBER IN SCHEDULE
### = AIRFLOW IN CFM
REFER TO VARIABLE VOLUME BOX SCHEDULE FOR TYPES AND SIZING. AIRFLOW
LISTED IS NOMINAL DESIGN CFM AND GPM. FINAL VALUES ARE TO BE DETERMINED BY
TESTING AND BALANCING CONTRACTOR AND PROGRAMMED BY CONTROLS
CONTRACTOR.
VB-#
#.# GPM
VAV BOX TAG
# = REFERENCE NUMBER IN SCHEDULE
#.# = WATER FLOW RATE IN GPM
REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND INSTALLATION REQUIREMENTS.
VARIABLE AIR VOLUME BOX - DUAL DUCT
D#
DIFFUSER TAG
D = TYPE # = TYPE NUMBER
### = AIRFLOW IN CFM
REFER TO DIFFUSER SCHEDULE FOR TYPE DESCRIPTIONS AND SIZING. BALANCE TO
AIRFLOW LISTED. WHEN TYPE IS NOT GIVEN AND ONLY CFM IS DESIGNATED, PROVIDE
D1 FOR SUPPLY OR G1 FOR RETURN/EXHAUST.
FLOW ARROW ARROW INDICATES DIRECTION OF AIRFLOW FROM DIFFUSERS WITH ADJUSTABLE
THROWS.
DIFFUSER BLANK OFF SHADED AREA INDICATES QUADRANT OF DIFFUSER TO BE PROVIDED WITH BLANK OFF
PANEL.
RETURN GRILLE
EXHAUST GRILLE
WALL REGISTER / GRILLE
DUCT MOUNTED REGISTER / GRILLE
LINEAR SLOT
REFER TO VARIABLE VOLUME BOX SCHEDULE FOR TYPES AND SIZING. AIRFLOW
LISTED IS NOMINAL DESIGN CFM AND GPM. FINAL VALUES ARE TO BE DETERMINED
BY TESTING AND BALANCING CONTRACTOR AND PROGRAMMED BY CONTROLS
CONTRACTOR.
SMOKE DAMPER
REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE
LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.
FIRE DAMPER
REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE
LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.
CD
FD
SD
FS
DAMPER SHALL BE SAME SIZE AS DUCT UNLESS NOTED OTHERWISE. REFER TO
SEQUENCES, SCHEMATICS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
TRANSFER AIR ARROW
### = AIRFLOW IN CFM ARROW INDICATES DIRECTION OF TRANSFER AIR.
UNION
Y STRAINER WITH BLOWDOWN
ELBOW UP
ELBOW DOWN
TEE UP
PIPING
- SOLID LINE INDICATES SYSTEM SUPPLY
-- DASHED LINE INDICATES SYSTEM RETURN
NUMBER INDICATES NOMINAL DIAMETER IN INCHES,
LETTER(S) INDICATES SYSTEM.
REFER TO ABBREVIATIONS FOR SYSTEM TYPE.
GENERAL MECHANICAL SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
# SHEET NOTE
DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS
AND IS USED TO DESCRIBE WORK THAT IS TOO LENGTHY TO PLACE ON PLAN.
DIAMETER
DENOTES CONNECTION OF NEW WORK TO
EXISTING SYSTEM
PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.
ARROW INDICATES DOWNWARD PIPE SLOPE
#/# INDICATES SLOPE IN INCHES PER FOOT
WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR REQUIREMENTS
ARROW INDICATES DIRECTION OF FLOW IN PIPING
ISOLATION VALVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
CHECK VALVE OR BACKWATER VALVE
ARROW INDICATES DIRECTION OF NORMAL FLOW
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
PIPE IN SLEEVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
CIRCUIT SETTER, AUTOFLOW, ETC.
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
PRESSURE GAUGE
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIESTHERMOMETER - HORIZONTAL PIPE
TEE DOWN
TEE HORIZONTAL
PIPE REDUCER
INDICATES POINT WHERE PIPING CHANGES FROM ONE SIZE TO ANOTHER. SMALL
POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION.
REQUIRED SERVICE CLEARANCE FOR EQUIPMENT
DUCT CONTINUATION
AIR VENT
AUTOMATIC FLOW CONTROL VALVE
# INDICATES FLOW TO BE BALANCED IN GPM
BACKFLOW PREVENTER
CALIBRATED BALANCING VALVE
VALVE - THROTTLING SERVICE
VALVE - SHUTOFF SERVICE
P/T PORT
PIPE CAP
PIPE CONTINUATION
PRESSURE GAUGE STEAM REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
PRESSURE REDUCING VALVE
PUMP
RELIEF VALVE
S SENSOR
SUCTION DIFFUSER
THERMOMETER - VERTICAL PIPE REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
VACUUM BREAKER
Y STRAINER
STEAM TRAP
ABBREVIATION
GENERAL ABBREVIATIONS
DESCRIPTION
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
AD ACCESS DOOR/PANEL
AFF ABOVE FINISHED FLOOR
AMB AMBIENT
DIA DIAMETER
DN DOWN
E EXISTING
EC ELECTRICAL CONTRACTOR
EFF EFFICIENCY
GC GENERAL CONTRACTOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
L LENGTH
GPM GALLONS PER MINUTE
BOB BOTTOM OF BEAM
CC CONTROLS CONTRACTOR
ABBREVIATION DESCRIPTION
LF LINEAR FEET
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MFR MANUFACTURER
MIN MINIMUM
NIC NOT IN CONTRACT
NTS NOT TO SCALE
PC PLUMBING CONTRACTOR
PSIG POUNDS PER SQUARE INCH GAUGE
RPM REVOLUTIONS PER MINUTE
SHT SHEET
TOB TOP OF BEAM
TOS TOP OF STEEL
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
PRESSURE/TEMPERATURE TEST PORT
TEMPERATURE CONTROL SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
WALL MOUNTED CONTROL DEVICE
# INDICATES TYPE
REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION.
T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON MONOXIDE, ETC.)
OCCUPANCY SENSOR
REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. WHEN
SENSOR IS NOT SHOWN ON ELECTRICAL DRAWINGS IT SHALL BE PROVIDED
AND INSTALLED BY THE TEMPERATURE CONTROLS CONTRACTOR.
DUCT, PIPE, OR CEILING MOUNTED CONTROL
SENSOR
REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND
SCHEMATICS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON DIOXIDE, ETC.)
CONTROL VALVE (3-WAY)
CONTROL VALVE (2-WAY)
REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND
SCHEMATICS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
F/S FLOW MEASURING STATION REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND
SCHEMATICS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND
SCHEMATICS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
FLOW SWITCHF
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
03/26/2025
A u to d e s k D o c s /2
.0
V A
C o lu m b u s
O H
A
E R e p la c e
A ir -C o o le d C h ill e rs
/2
.0
V A
C o lu m b u s A
E R e p la c e
A C
C S
E S
.r v t
/2
/2
:3
:5
A
M
M000
MECHANICAL SYMBOLS AND
ABBREVIATIONS
Replace Air Cooled Chillers
Chalmers P. Wylie VA Ambulatory
Care Center
420 N. James Rd, Columbus, OH 43219
01A
03/26/2025 DAB BJB
23203.001
CONSTRUCTION
DOCUMENTS
757-23-101
Revisions: Date:
ABCDEFGHJK
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
03/26/2025
A u to d e s k D o c s /2
.0
V A
C o lu m b u s
O H
A
E R e p la c e
A ir -C o o le d C h ill e rs
/2
.0
V A
C o lu m b u s A
E R e p la c e
A C
C S
E S
.r v t
/2
/2
:3
:5
A
M
MD102
SECOND LEVEL - OVERALL -
MECHANICAL - DEMOLITION
Replace Air Cooled Chillers
Chalmers P. Wylie VA Ambulatory
Care Center
420 N. James Rd, Columbus, OH 43219
01A
03/26/2025 DAB BJB
23203.001
CONSTRUCTION
DOCUMENTS
757-23-101
N
5 5 10 15 20 25 30 35 40 45
1/16" = 1'-0"
FEETSCALE
1/16" = 1'-0"
SECOND LEVEL - OVERALL - MECHANICAL - DEMOLITION
(E) EXH
(E) EXH
(E) SA
(E) SA
(E )6
G
C W
S
(E)6" GCWR
(E )6
G
C W
R
(E )6
G
C W
R
(E )1
LP
C (E
)1
/2
LP
S
(E )2
/2
H
W R
(E )2
/2
H
W S
(E )4
C
W R
(E )4
C
W S
3 (E )6
G
C W
S
(E)6" GCWS
(E)2 1/2" HWS
(E)2 1/2" HWR
(E)1 1/2" LPS
(E)1" LPC
(E)4" CWS
(E)4" CWR
ABCDEFGHJ
Office
2B251
Office
2B257
D.S. Toilet
2B271
Men's Toilet
2B256T
Women's Toilet
2B258T
Exg Toilet
2B262
MECH
2B259
Storage
2B261
Office
2B048
Pace/ Exam 6
2B046
Exam Room 4
2B042
Exam Room 3
2B040
Exam Room 2
2B038
Exam Room 1
2B036
Exam/ Consult
2B034
Exam/ Consult
2B032
Transfusion
2B263
Telecommunications
2B003
Electrical Room
2B004
Nurse Office
2B145
Resident Office
2B008
GI/ Phys. Office
2B161
Gross Histology
2B278
HAC
2B268 Stair No. 5
2S005
Elec. Closet
2B002EC
Office
2B283
Office
2B285
Shared Office
2B283A
Staff T
2B287
HAC
2B289H
Staging
2B289
HAC
2B291H
Training
2B281
Cart Wash
2B292
Prep
2B293
Sub-Sterile
2B182
Med Gas Storage
2B164
Equip/Apparatus
2B162
Procedure Room
2B155
Scope Storage
2B137
Nurse Office
2B073
Toilet
2B141T
Toilet
2B139T
Ante
2B141
AER
2B141A
Scope Clean
2B143
Surgery Office
2B025
Endoscopy Office Space
2B024
EGD/ Colon Procedure
2B138
Frozen Section
2B157
Surgery
2B144
Scope Storage
2B138B
EGD/ Colon Procedure
2B136
Scope Storage
2B136B
Clean
2B142 HAC
2B158
PFT Lab & Vent Test
2B037
Reception
2B033
Pulmonary Office
2B035
Patient Toilet
2B043
Patient Toilet
2B041
Point of CareTraining
2B263
Corridor
2B146
Shared Office
2B252
Open Lab
2B275
Bulk Storage
2B277
Scrub
2B180A
Staining / Cutting
2B276
MULTIPURPOSE ROOM
2B372
Office
2B255
Major O.R.
2B181
Soiled
2B153
Exam Room 5
2B044
Micro Lab
2B279
Corridor
2B280
Elec. Closet
2BEC
Corridor
2B007
Sterile Storage
2B191
Clean Core
2B190
Corridor
2B001
ANTE
2B291A
Office
2B253
Men's Locker
2B256
Women's Locker
2B258
Anesth Work/Storage/Office
2B163
O.R.
2B183
Sterile
2B294
Corridor
2B260
C-Arm Alcove
2B180
Decontam
2B291
Corridor
2B002
Alcove/ Corridor
2B184
Corridor
2B254
Corridor
2B250
Corridor
2B160
Corridor
2B159
Corridor
2B005
Corridor
2B006
Women's
2B167
Men's
2B165
Corridor
2B045
Processing
2B272
Open lab
2B270
Break Room
2B009
Storage
2B288
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
03/26/2025
A u to d e s k D o c s /2
.0
V A
C o lu m b u s
O H
A
E R e p la c e
A ir -C o o le d C h ill e rs
/2
.0
V A
C o lu m b u s A
E R e p la c e
A C
C S
E S
.r v t
/2
/2
:3
:5
A
M
MD102A
SECOND LEVEL - AREA-A -
MECHANICAL - DEMOLITION
Replace Air Cooled Chillers
Chalmers P. Wylie VA Ambulatory
Care Center
420 N. James Rd, Columbus, OH 43219
01A
03/26/2025 DAB BJB
23203.001
CONSTRUCTION
DOCUMENTS
757-23-101
1/8" = 1'-0"
SECOND LEVEL - AREA-A - MECHANICAL - DEMOLITION
N
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
SHEET NOTES:
1. PERFORM PRE-DEMOLITION TEST AND BALANCE ON THE SUPPLY AND
EXHAUST GRILLES IN THIS ROOM TO DETERMINE IF THE SCHEDULED CFM
VALUES ARE BEING ACHIEVED
2. EXISTING PIPING UP TO RTU-13.
3. EXISTING PIPING UP TO CHILLERS.
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
GENERAL NOTES:
(E)6" GCWR
(E )6
G
C W
R (E
)6
G C
W R
(E)6" GCWS
(E )6
G
C W
S
(E)3" REFL UP
(E)3" REFL UP
(E)6" HWS UP
(E)6" HWR UP
EFGHJ
WOMENS TOILET
2B353
MENS TOILET
2B352
EXAM
2B305
PASSAGE
2B306
Public Toilet
2B112
Public Toilet
2B114 GI Exam
2B120
Electrical Room
2B103
LOW VOLTAGE
2B361
Stair No. 4
2S004
Contr. Tech
2B053
Nuclear Imaging
2B051
Nurse Office
2B111
Exam
2B113
Exam
2B115 Family Consultation
2B121
Pre-admission testing office
2B123
Exam
2B118
Exam
2B116
Vascular Office
2B074
Endo Phys. Office
2B133
Surgery
2B135
Scope Storage
2B137
Nurse Office
2B073
Echo
2B075
Anesthesia Office
2B201
EGD/ Colon Procedure
2B136
Scope Storage
2B136B
Scope Storage
2B132B
Bronchoscopy Procedure
2B132
Waiting
2B031
PFT Lab & Vent Test
2B037
Reception
2B033
Pulmonary Office
2B035
Vascular Lab
2B052
Injection
2B054
Hot Lab
2B056
Exam
2B058
Physician Office
2B071
Patient Toilet
2B043
Patient Toilet
2B041
PFT/ Rehab
2B037A
Storage
2B062
Storage
2B060
EXAM
2B307
Crash Cart/Clean Storage
2B059
Exam/ EKG
2B061
Soiled
2B063
HAC
2B065
Exam
2B117
Cardiac Stress
2B057
CONFERENCE ROOM
2B303
Exam 12
2B206
Exam 13
2B205 Exam 16
2B204
Nuclear Imaging
2B055
WORKSTATIONS
2B304
GI Exam
2B122
Corridor
2B050
RECEPTION
2B300
Exam 15
2B203
C.G. Nurses Station
2B200
Exam 14
2B202
Pre-op/Post-Op Corridor
2B230
Exam 11
2B207
Corridor
2B070
Corridor
2B119
Elevator Lobby
2B100
Corridor
2B124
Corridor
2B110
WAITING
2B301
ALCOVE
2B354
Corridor
2B302
Telecommunications
2B102
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
03/26/2025
A u to d e s k D o c s /2
.0
V A
C o lu m b u s
O H
A
E R e p la c e
A ir -C o o le d C h ill e rs
/2
.0
V A
C o lu m b u s A
E R e p la c e
A C
C S
E S
.r v t
/2
/2
:3
:5
A
M
MD102B
SECOND LEVEL - AREA-B -
MECHANICAL - DEMOLITION
Replace Air Cooled Chillers
Chalmers P. Wylie VA Ambulatory
Care Center
420 N. James Rd, Columbus, OH 43219
01A
03/26/2025 DAB BJB
23203.001
CONSTRUCTION
DOCUMENTS
757-23-101
1/8" = 1'-0"
SECOND LEVEL - AREA-B - MECHANICAL - DEMOLITION
N
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
SHEET NOTES:
1. EXISTING GLYCOL RETURN PIPING FROM SYSTEM UP TO MECHANICAL
PENTHOUSE SHALL REMAIN.
2. EXISTING GLYCOL RETURN PIPING FROM PUMPS IN MECHANICAL
PENTHOUSE SHALL REMAIN.
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
5. THERE IS NO MECHANICAL DEMOLITION REQUIRED, THIS SHEET. INFORMATION ON EXISTING PIPING IS
INCLUDED FOR CLARITY.
(E )6
G
C W
S (E
)6
G C
W R
(E)6" GCWS
(E)6" GCWR
ABCD
Scrub
2B170A
SCOPE DEPOSITION
2B365
TOILET
2B364A
STAFF TOILET
2B369
Anesthesia Office
2B229
Staff Toilet
2B241
Patient Toilet
2B242
WORKSTATIONS
2B317
HSKP
2B320
WORKSTATIONS
2B319
EXAM
2B323 TOILET
2B324
TRIAGE
2B331
EXAM
2B330
EXAM
2B329
EXAM
2B339
EXAM
2B336
EXAM
2B335
EXAM
2B338
EXAM
2B345
EXAM
2B342
EXAM
2B341
EXAM
2B344
EXAM
2B343
EXAM
2B351
PASSAGE
2B350
EXAM
2B349
EXAM
2B347
EXAM
2B348
STORAGE
2B315
WORKSTATIONS
2B313
EXAM
2B314
PASSAGE
2B311
TELECOMM
2B310
WORKSTATIONS
2B308
Parent Toilet
2B219
Meds
2B211
Patient Toilet
2B224
Patient Toilet
2B214
TRIAGE
2B332
STAIR
2BS5
PASSAGE
2B346
Clean Med
2B245
Exam 9
2B213
Exam 5
2B225
MULTIPURPOSE ROOM
2B372
WORKSTATIONS
2B373
WORKSTATIONS
2B374
UROLOGY PROCEDURE ROOM
2B364
Sub-Sterile
2B172
Storage
2B171A
Soiled
2B153
Anesthesia Office
2B221
O.R.
2B173
Recovery
2B240C
Cysto/ O.R.
2B171
Exam 6
2B218
Crash
2B222
WORKSTATIONS
2B312
ELECTRIC
2B309
Nourishment
2B212
Exam 7
2B217
Exam 8
2B216
WORKSTATIONS
2B322
CLEAN UTILITY
2B325
STAFF TOILET
2B318
STOR.
2B316A
SOILED UTILITY
2B326
STORAGE/COPIER
2B370
EXAM
2B337
EXAM
2B334
CORRIDOR
2B327
DIRECTOR OF SURGERY
2B375
PAIN PROCEDURE ROOM
2B367
UROLOGY PROCEDURE ROOM
2B366
TOILET
2B366A
PASSAGE
2B316
PASSAGE
2B340
PASSAGE
2B333
CORRIDOR
2B356
PACU
2B240
Corridor
2B170
Control Room
2B151
Clerical
2B152
Exam 1
2B228
Exam 2
2B227
Exam 3
2B226
C.G. Nurses Station
2B220
Exam 4
2B223
WORKSTATIONS
2B328
STAFF TOILET
2B368
Subwaiting
2B359
Subwaiting
2B360
CORRIDOR
2B363
CORRIDOR
2B371
CORRIDOR
2B357
Corridor
2B150
Recovery
2B240D
Recovery
2B240E
Recovery
2B240A
Recovery
2B240B
C.G. Nurses Station
2B210
Exam 10
2B215
Logistics Storage
2B174A
Alcove/Corridor
2B174
SUBWAITING
2B358
4 Isolation
2B244
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
03/26/2025
A u to d e s k D o c s /2
.0
V A
C o lu m b u s
O H
A
E R e p la c e
A ir -C o o le d C h ill e rs
/2
.0
V A
C o lu m b u s A
E R e p la c e
A C
C S
E S
.r v t
/2
/2
:3
:5
A
M
MD102C
SECOND LEVEL - AREA-C -
MECHANICAL - DEMOLITION
Replace Air Cooled Chillers
Chalmers P. Wylie VA Ambulatory
Care Center
420 N. James Rd, Columbus, OH 43219
01A
03/26/2025 DAB BJB
23203.001
CONSTRUCTION
DOCUMENTS
757-23-101
1/8" = 1'-0"
SECOND LEVEL - AREA-C - MECHANICAL - DEMOLITION
N
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
SHEET NOTES:
1. EXISTING PIPING TO RTU-10 SHALL REMAIN.
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
5. THERE IS NO MECHANICAL DEMOLITION REQUIRED, THIS SHEET. INFORMATION ON EXISTING PIPING IS
INCLUDED FOR CLARITY.
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
03/26/2025
A u to d e s k D o c s /2
.0
V A
C o lu m b u s
O H
A
E R e p la c e
A ir -C o o le d C h ill e rs
/2
.0
V A
C o lu m b u s A
E R e p la c e
A C
C S
E S
.r v t
/2
/2
:3
:5
A
M
MD103
ROOF - OVERALL - MECHANICAL -
DEMOLITION
Replace Air Cooled Chillers
Chalmers P. Wylie VA Ambulatory
Care Center
420 N. James Rd, Columbus, OH 43219
01A
03/26/2025 DAB BJB
23203.001
CONSTRUCTION
DOCUMENTS
757-23-101
N
5 5 10 15 20 25 30 35 40 45
1/16" = 1'-0"
FEETSCALE
1/16" = 1'-0"
ROOF - OVERALL - MECHANICAL - DEMOLITION
(E) ACH-1
(E) ACH-1
(E) RTU-13
(E) RTU-11
ABCDEFGHJ
(E) RTU-9
(E) EF
(E) CU
(E) EF
(E) EF
(E) EF (E) EF
(E) EF
(E) EF
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
03/26/2025
A u to d e s k D o c s /2
.0
V A
C o lu m b u s
O H
A
E R e p la c e
A ir -C o o le d C h ill e rs
/2
.0
V A
C o lu m b u s A
E R e p la c e
A C
C S
E S
.r v t
/2
/2
:3
:5
A
M
MD103A
ROOF - AREA A - MECHANICAL
DEMOLITION
Replace Air Cooled Chillers
Chalmers P. Wylie VA Ambulatory
Care Center
420 N. James Rd, Columbus, OH 43219
01A
03/26/2025 DAB BJB
23203.001
CONSTRUCTION
DOCUMENTS
757-23-101
1/8" = 1'-0"
ROOF - AREA-A - MECHANICAL DEMOLITION
SHEET NOTES:
1. REMOVE EXISTING AIR COOLED CHILLER. PERFORM WORK IN
SEQUENCES INDICATED ON SHEET M400 TO KEEP SYSTEM OPERATIONAL
DURING CONSTRUCTION.
2. REMOVE EXISTING 6" GCWR PIPING TO JUST ABOVE ROOF AND CAP.
PERFORM WORK IN SEQUENCES INDICATED ON SHEET M400 TO KEEP
SYSTEM OPERATIONAL DURING CONSTRUCTION.
3. REMOVE PORTION OF EXISTING 6" GCWS PIPING ON THE ROOF AND
PREPARE FOR CONNECTION TO NEW PIPING. PERFORM WORK IN
SEQUENCES INDICATED ON SHEET M400 TO KEEP SYSTEM
OPEARATIONAL DURING CONSTRUCTION.
4. RE-PIPE EXISTING CHILLED WATER COIL IN RTU-13. REFER TO NEW WORK
PLAN
N
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
(E) RTU-6 (E) RTU-7
(E)3/4" LPC
(E)6" HWR
(E)6" HWS
(E )3
H
P S
(E )3
/4
LP
C
(E )6
H
W R
(E )6
H
W S
(E)6" HWS DN
(E)6" HWR DN
(E)6" GCWR DN
(E)6" GCWR DN
(E)3" HPS DN
MD300
EFGHJ
(E) ACC-4
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
03/26/2025
A u to d e s k D o c s /2
.0
V A
C o lu m b u s
O H
A
E R e p la c e
A ir -C o o le d C h ill e rs
/2
.0
V A
C o lu m b u s A
E R e p la c e
A C
C S
E S
.r v t
/2
/2
:3
:5
A
M
MD103B
ROOF - AREA B - MECHANICAL
DEMOLITION
Replace Air Cooled Chillers
Chalmers P. Wylie VA Ambulatory
Care Center
420 N. James Rd, Columbus, OH 43219
01A
03/26/2025 DAB BJB
23203.001
CONSTRUCTION
DOCUMENTS
757-23-101
1/8" = 1'-0"
ROOF - AREA-B - MECHANICAL DEMOLITION
N
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
(E) RTU-10
(E) RTU-8
ABCD
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
03/26/2025
A u to d e s k D o c s /2
.0
V A
C o lu m b u s
O H
A
E R e p la c e
A ir -C o o le d C h ill e rs
/2
.0
V A
C o lu m b u s A
E R e p la c e
A C
C S
E S
.r v t
/2
/2
:3
:5
A
M
MD103C
ROOF - AREA C - MECHANICAL
DEMOLITION
Replace Air Cooled Chillers
Chalmers P. Wylie VA Ambulatory
Care Center
420 N. James Rd, Columbus, OH 43219
01A
03/26/2025 DAB BJB
23203.001
CONSTRUCTION
DOCUMENTS
757-23-101
1/8" = 1'-0"
ROOF - AREA-C - MECHANICAL DEMOLITION
SHEET NOTES:
1. EXISTING RTU-10 WITH EXISTING THREE WAY CONTROL VALVE SHALL
REMAIN.
N
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
5. THERE IS NO MECHANICAL DEMOLITION REQUIRED, THIS SHEET. INFORMATION ON EXISTING PIPING AND
EQUIPMENT IS INCLUDED FOR CLARITY.
(E)6" HWS
(E)6" HWR
(E)3/4" LPC
(E )3
H
P S
(E )3
/4
LP
C
(E )6
H
W R
(E )6
H
W S
(E)6" HWS DN
(E)6" HWR DN
(E )6
H
W R
(E )6
H
W S
(E)6" GCWR DN
(E)6" GCWR DN
G
H
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
03/26/2025
A u to d e s k D o c s /2
.0
V A
C o lu m b u s
O H
A
E R e p la c e
A ir -C o o le d C h ill e rs
/2
.0
V A
C o lu m b u s A
E R e p la c e
A C
C S
E S
.r v t
/2
/2
:3
:5
A
M
MD300
ENLARGED MECHANICAL ROOM -
DEMOLITION
Replace Air Cooled Chillers
Chalmers P. Wylie VA Ambulatory
Care Center
420 N. James Rd, Columbus, OH 43219
01A
03/26/2025 DAB BJB
23203.001
CONSTRUCTION
DOCUMENTS
757-23-101
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
1/4" = 1'-0"
ENLARGED MECHANICAL ROOM - DEMOLITION
SHEET NOTES:
1. REMOVE EXISTING 6" GCWR PIPING, AIR SEPARATOR, STRAINER AND
PUMPS. PERFORM WORK IN SEQUENCES INDICATED IN PHASING PLANS
AND ON SHEETS M400 AND M401 TO KEEP SYSTEM OPERATIONAL
THROUGHOUT CONSTRUCTION.
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
03/26/2025
A u to d e s k D o c s /2
.0
V A
C o lu m b u s
O H
A
E R e p la c e
A ir -C o o le d C h ill e rs
/2
.0
V A
C o lu m b u s A
E R e p la c e
A C
C S
E S
.r v t
/2
/2
:3
:5
A
M
MH202
SECOND LEVEL - OVERALL -
MECHANICAL
Replace Air Cooled Chillers
Chalmers P. Wylie VA Ambulatory
Care Center
420 N. James Rd, Columbus, OH 43219
01A
03/26/2025 DAB BJB
23203.001
CONSTRUCTION
DOCUMENTS
757-23-101
N
5 5 10 15 20 25 30 35 40 45
1/16" = 1'-0"
FEETSCALE
1/16" = 1'-0"
SECOND LEVEL - OVERALL - MECHANICAL
6" G
C W
S
6" G
C W
R
6" GCWS UP 6" GCWR UP
(E)2 1/2" HWS
(E)2 1/2" HWR
(E)1 1/2" LPS
(E)1" LPC
(E)4" CWS
(E)4" CWR
(E)6" GCWS
(E)6" GCWR
(E)6" GCWR
(E)6" GCWS
(E) EXH
(E) SA
(E) SA
(E) EXH
GE2
12" EXHAUST UP TO FAN ON ROOF
ABCDEFGHJ
6" GCWS UP
Office
2B251
Office
2B257
D.S. Toilet
2B271
Men's Toilet
2B256T
Women's Toilet
2B258T
Exg Toilet
2B262
MECH
2B259
Storage
2B261
Office
2B048
Pace/ Exam 6
2B046
Exam Room 4
2B042
Exam Room 3
2B040
Exam Room 2
2B038
Exam Room 1
2B036
Exam/ Consult
2B034
Exam/ Consult
2B032
Transfusion
2B263
Telecommunications
2B003
Electrical Room
2B004
Nurse Office
2B145
Resident Office
2B008
GI/ Phys. Office
2B161
Gross Histology
2B278
HAC
2B268 Stair No. 5
2S005
Elec. Closet
2B002EC
Office
2B283
Office
2B285
Shared Office
2B283A
Staff T
2B287
HAC
2B289H
Staging
2B289
HAC
2B291H
Training
2B281
Cart Wash
2B292
Prep
2B293
Sub-Sterile
2B182
Med Gas Storage
2B164
Equip/Apparatus
2B162
Procedure Room
2B155
Scope Storage
2B137
Nurse Office
2B073
Toilet
2B141T
Toilet
2B139T
Ante
2B141
AER
2B141A
Scope Clean
2B143
Surgery Office
2B025
Endoscopy Office Space
2B024
EGD/ Colon Procedure
2B138
Frozen Section
2B157
Surgery
2B144
Scope Storage
2B138B
EGD/ Colon Procedure
2B136
Scope Storage
2B136B
Clean
2B142 HAC
2B158
PFT Lab & Vent Test
2B037
Reception
2B033
Pulmonary Office
2B035
Patient Toilet
2B043
Patient Toilet
2B041
Point of CareTraining
2B263
Corridor
2B146
Shared Office
2B252
Open Lab
2B275
Bulk Storage
2B277
Scrub
2B180A
Staining / Cutting
2B276
MULTIPURPOSE ROOM
2B372
Office
2B255
Major O.R.
2B181
Soiled
2B153
Exam Room 5
2B044
Micro Lab
2B279
Corridor
2B280
Elec. Closet
2BEC
Corridor
2B007
Sterile Storage
2B191
Clean Core
2B190
Corridor
2B001
ANTE
2B291A
Office
2B253
Men's Locker
2B256
Women's Locker
2B258
Anesth Work/Storage/Office
2B163
O.R.
2B183
Sterile
2B294
Corridor
2B260
C-Arm Alcove
2B180
Decontam
2B291
Corridor
2B002
Alcove/ Corridor
2B184
Corridor
2B254
Corridor
2B250
Corridor
2B160
Corridor
2B159
Corridor
2B005
Corridor
2B006
Women's
2B167
Men's
2B165
Corridor
2B045
Processing
2B272
Open lab
2B270
Break Room
2B009
Storage
2B288
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10 www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
AREA - A
AREA - B
AREA - C
KEY PLAN :-
GUIDON DESIGN
1221 N Pennsylvania St, Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com GD Project : 24-1012-01
ARCHITECT, STRUCTURAL ENGINEER
03/26/2025
A u to d e s k D o c s /2
.0
V A
C o lu m b u s
O H
A
E R e p la c e
A ir -C o o le d C h ill e rs
/2
.0
V A
C o lu m b u s A
E R e p la c e
A C
C S
E S
.r v t
/2
/2
:3
:5
A
M
MH202A
SECOND LEVEL - AREA-A -
MECHANICAL
Replace Air Cooled Chillers
Chalmers P. Wylie VA Ambulatory
Care Center
420 N. James Rd, Columbus, OH 43219
01A
03/26/2025 DAB BJB
23203.001
CONSTRUCTION
DOCUMENTS
757-23-101
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
SHEET NOTES:
1. EXISTING PIPING UP TO RTU-13.
2. EXISTING PIPING UP TO CHILLERS
3. ADJUST AIR TERMINAL UNIT AIRFLOW MAXIMUM SETPOINT TO 1700 CFM. MAINTAIN THE SAME OFFSET
(EXHAUST - SUPPLY CFM) AS IS CURRENTLY BEING PROVIDED, AS MEASURED VIA PRE-TEST AND BALANCE.
GENERAL NOTES:
1/8" = 1'-0"
SECOND LEVEL - AREA-A - MECHANICAL
N
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
(E)6" GCWR (E)6" GCWR
(E)6" GCWS
(E)6" GCWR
(E)6" GCWR
(E)6" GCWS
EFGHJ
WOMENS TOILET
2B3…
This is the start of the file's text. The full file is on GovTribe.