Table 1

TENANT IMPROVEMENTS COST FOR LEASE Lessor Cost Proposal RSF=15,297
TI PER GROSS SF=
CBOC LEASE Marshalltown, IA
Tenant Improvement - UNIFORMAT SYSTEM ELEMENTS -TI*
A11FoundationsStandard FoundationsWall Foundations0.00
Column Foundations & Pile Caps0.00
Perimeter Drainage & Insulation0.00
Special FoundationsPile Foundations0.00
Grade Beams0.00
Caissons0.00
Underpinning0.00
Dewatering0.00
Raft Foundations0.00
Pressure Injected Footings0.00
Other Special Foundations0.00
0.00
A12Basement ConstructionBasement ExcavationExcavation for Basements0.00
Structure Backfill & Compact0.00
Shoring0.00
Basement WallsBasement Wall Construction0.00
Moisture Protection0.00
Basement Wall Insulation0.00
Interior Skin0.00
Slab on GradeStandard Slab on Grade0.00
Structural Slab on Grade0.00
Inclined Slab on Grade0.00
Trenches Pits & Bases0.00
Under Slab Drainage & Insulation0.00
0.00
A21SuperstructureFloor and Column ConstructionSuspended Basement Floor Construction0.00
Upper Floors Construction0.00
Balcony Floor Construction0.00
Ramps0.00
Floor Raceway Systems0.00
Other Floor Construction0.00
Roof ConstructionFlat Roof Construction
Pitched Roof Construction0.00
Canopies0.00
Other Roof Construction0.00
Stair ConstructionRegular Stairs0.00
Curved Stairs0.00
Spiral Stairs0.00
Exterior Fire Escapes0.00
Stair Handrails and Balustrade0.00
Special Superstructure Construction0.00
0.00
B11Exterior WallsExterior Wall ConstructionExterior Wall Construction0.00
Parapets0.00
Exterior Louvers & Screens0.00
Sun Control Devices (Exterior)0.00
Balcony Walls & Handrails0.00
Exterior Soffits0.00
Special Wall Elements0.00
0.00
B12Exterior Glazing and DoorsWindowsWindows, film application0.00
Curtain Walls0.00
Windows0.00
Curtain Walls0.00
Storefronts0.00
DoorsGlazed Doors & Entrances0.00
Exterior Doors0.00
Double Unequal0.00
Overhead Doors0.00
Other Doors & Frames0.00
Special Glazing0.00
0.00
B13RoofingRoof Coverings & InsulationRoof Finishes0.00
Traffic Coatings & Paving Membranes0.00
Roof Insulation & Fill0.00
Flashings & Trim0.00
Roof Eaves and Soffits0.00
Gutters and Downspouts0.00
Skylights and Roof OpeningsGlazed Roof Openings0.00
Roof Hatches0.00
Gravity Roof Ventilators0.00
0.00
Retractable Partitions0.00
Site Built Toilet Partitions0.00
Site Built Compartments & Cubicles0.00
Interior Balustrades & Screens0.00
Interior Windows & Storefronts0.00
Interior DoorsInterior Doors0.00
Interior Door Frames0.00
Interior Door Hardware0.00
Interior Wall Opening Elements0.00
Interior Door Sidelights & Transoms0.00
Interior Hatches & Access Doors0.00
Door Painting & Decoration0.00
Specialties/FittingsFabricated Toilet Partitions0.00
Fabricated Compartments & Cubicles0.00
Storage Shelving and Lockers0.00
Corner Guards and Handrails0.00
Interior Signage0.00
Millwork0.00
Soundproofing0.00
Closet Specialties0.00
C12Access/PlatformsAccess Floors0.00
Platform Floors0.00
0.00
C13Interior FinishesWall FinishesWall Finishes to Inside of Exterior Wall0.00
Wall Finishes to Interior Walls0.00
Column Finishes0.00
Floor FinishesFloor Toppings0.00
Traffic Membranes0.00
Hardeners and Sealers0.00
Flooring0.00
Carpeting0.00
Bases, Curbs & Trim0.00
Ceiling FinishesCeiling Finishes Applied to Structure0.00
Suspended Ceilings0.00
Other Ceilings0.00
0.00
D11Conveyance SystemsElevators & LiftsPassenger Elevators0.00
Freight Elevators0.00
Lifts0.00
Escalators, Moving Walks & OtherEscalators & Moving Walks0.00
Other Conveying Systems0.00
0.00
D21PlumbingPlumbing FixturesWater Closets0.00
Urinals0.00
Lavatories0.00
Mirrors0.00
Sink, SS, Single Compartment0.00
Mop Sink0.00
Showers0.00
Drinking Fountains and Coolers0.00
Toilet Specialties0.00
Domestic Water DistributionCold Water System0.00
Hot Water System0.00
Domestic Water Supply Equipment0.00
Sanitary WasteWaste Piping0.00
Vent Piping0.00
Floor Drains0.00
Sanitary Waste Equipment0.00
Rain Water DrainagePipe & Fittings0.00
Roof Drains0.00
Rainwater Drainage Equipment0.00
Insulation0.00
Other Plumbing SystemsGas Distribution0.00
Plumbing (Supply and Sanitary)0.00
0.00
D22HVACDistribution SystemsAir Distribution Systems (HVAC)0.00
Exhaust Ventilation Systems0.00
Steam Distribution System0.00
Hot Water Distribution0.00
Chilled Water Distribution0.00
Change-over Distribution System0.00
Glycol Heating Distribution System0.00
Terminal & Package UnitsTerminal Self Contained Units0.00
Package Units0.00
Systems Testing & BalancingPiping System Testing & Balancing0.00
Air System Testing & Balancing0.00
HVAC Commissioning0.00
Other Systems Testing & Balancing0.00
Special HVAC Systems & EquipmentSpecial Cooling Systems & Devices0.00
Special Humidity Control0.00
Dust & Fume Collectors0.00
Air Curtains0.00
Air Purifiers0.00
Paint Spray Booth Ventilation0.00
General Construction Items (HVAC)0.00
Controls & Interface w/Bldg. AutomationHeating Generating System0.00
Cooling Generating System0.00
Heating/Cooling Air Handling Units0.00
Exhaust & Ventilating Systems0.00
Terminal Devices0.00
Energy Monitoring & Control0.00
Building Automation Systems0.00
Other Controls and Instrumentation0.00
0.00
D31Fire Protection/AlarmFire Protection Sprinkler SystemsSprinkler Water Supply0.00
Sprinkler Pumping Equipment0.00
Dry Sprinkler System0.00
Standpipe and Hose SystemsWater Supply0.00
Pumping Equipment0.00
Standpipe Equipment0.00
Fire Hose Equipment0.00
Fire Protection SpecialtiesFire Extinguishers0.00
Fire Extinguisher Cabinets0.00
Other Fire Protection SystemsCarbon Dioxide System0.00
Foam Generating Equipment0.00
Clean Extinguishing Agent System0.00
Dry Chemical Systems0.00
Hood & Duct Fire Protection0.00
0.00
D4ElectricalElectrical Service, Distribution & Emerg. PowerHigh Tension Service & Dist.0.00
Low Tension Service & Dist.0.00
Emergency Power Systems0.00
Renewable Electric Generation0.00
Lighting and Branch WiringGeneral Purpose Lighting0.00
Special Lighting0.00
Branch Wiring (Lighting & Power)0.00
Emergency Light & Power Systems0.00
Communications and Special SystemsVoice and Data Distribution0.00
Telecomm Closet and Cable Management0.00
Public Address & Music Systems0.00
Intercommunication & Paging System0.00
Telephone System0.00
Television System0.00
Fire Alarm System0.00
Security System0.00
Electronic Access Control0.00
Nurse Call0.00
Video Surveillance0.00
Panic Duress0.00
Other Special Systems0.00
Other Electrical SystemsGrounding Systems0.00
Floor Raceway Systems0.00
Other Special Systems & Devices0.00
General Construction Items (Elect.)0.00
0.00
E11Equipment and FurnishingsMisc (Total)0.00
Procedure lights0.00
Toilet Accessories0.00
Floor protection0.00
0.00
F12Demolition & AbatementBuilding Elements DemolitionBuilding Interior Demolition (Slab cuts)0.00
Building Exterior Demolition0.00
Hazardous Components AbatementRemoval of Hazardous Components0.00
Encapsulation of Hazardous Components0.00
0.00
MiscCarpentry Hours- 1600.00
0.00
G12Other Sitework - Project Related0.00
0.00
Subtotal0.00
Project Fees**General Contractor Overhead and Profit (10%)0.00
General Contractor Contingency (5%)0.00
Taxes/Escalation (if not included on contractors' bids 2%)0.00
Architect/Engineering Fee (5%)0.00
Lessor's Fee (7%)0.00
TI TOTAL0.00
Cost per GROSS SF$0.00