TICS

TENANT IMPROVEMENTS COST SUMMARY (TICS) FOR LEASEABOA SF =19,852
Galesburg CBOCTIA PER ABOA SF=$ - 0
Galesburg, ILTOTAL TIA$ - 0
Tenant Improvement - UNIFORMAT SYSTEM ELEMENTS -TI*0
A11Foundations$0.00$0.00
A12Basement Construction$0.00$ - 0
A21Superstructure$0.00$ - 0
B11Exterior Walls$0.00$ - 0
B12Shatter-Resistant Film$0.00$ - 0
B13Roofing$0.00$ - 0
C11Partitions, ,Doors and Specialties$0.00$ - 0
C12Access/Platforms$0.00$ - 0
C13Interior Finishes$0.00$ - 0
D11Conveyance Systems$0.00$ - 0
D21Plumbing$0.00$ - 0
D22HVAC$0.00$ - 0
D31Fire Protection/Alarm$0.00$ - 0
D41Electrical Service, Distribution & Emergency Power$0.00$ - 0
D42Lighting and Branch Wiring$0.00$ - 0
D43Communications, Security & Other Elec. Systems$0.00$ - 0
E11Equipment and Furnishings$0.00$ - 0
F11Special Construction$0.00$ - 0
F12Building Demolition and Abatement$ - 0$ - 0
G11Sitework - Building Relates$ - 0$ - 0
G12Other Sitework - Project Related$ - 0$ - 0
Subtotal$0.00$ - 0
Project Fees**Lessor's Overhead and Profit___%$ - 0
General Contractor Fee___%$ - 0
Taxes (if not included on contractors' bids)___%$ - 0
Architect/Engineering Fee___%$ - 0
TI TOTAL$0.00
Cost per ABOA SF$ - 0
*Include all subcontractors' soft costs
**Change formulas if flat rate fee is applicable
TENANT IMPROVEMENTS COST FOR LEASEABOA SF=19,852
TI PER ABOA SF=$0.00
Total TI Cost$0.00
Tenant Improvement - UNIFORMAT SYSTEM ELEMENTS -TI*Summary
A11FoundationsStandard FoundationsWall Foundations$0.00$0.00
Column Foundations & Pile Caps$0.00$0.00
Perimeter Drainage & Insulation$0.00$0.00
Special FoundationsPile Foundations$0.00$0.00
Grade Beams$0.00$0.00
Caissons$0.00$0.00
Underpinning$0.00$0.00
Dewatering$0.00$0.00
Raft Foundations$0.00$0.00
Pressure Injected Footings$0.00$0.00
Other Special Foundations$0.00$0.00
$0.00$0.00
A12Basement ConstructionBasement ExcavationExcavation for Basements$0.00$0.00
Structure Backfill & Compact$0.00$0.00
Shoring$0.00$0.00
Basement WallsBasement Wall Construction$0.00$0.00
Moisture Protection$0.00$0.00
Basement Wall Insulation$0.00$0.00
Interior Skin$0.00$0.00
Slab on GradeStandard Slab on Grade$0.00$0.00
Structural Slab on Grade$0.00$0.00
Inclined Slab on Grade$0.00$0.00
Trenches Pits & Bases$0.00$0.00
Under Slab Drainage & Insulation$0.00$0.00
$0.00$0.00
A21SuperstructureFloor and Column ConstructionSuspended Basement Floor Construction$0.00$0.00
Upper Floors Construction$0.00$0.00
Balcony Floor Construction$0.00$0.00
Ramps$0.00$0.00
Floor Raceway Systems$0.00$0.00
Other Floor Construction$0.00$0.00
Roof ConstructionFlat Roof Construction$0.00$0.00
Pitched Roof Construction$0.00$0.00
Canopies$0.00$0.00
Other Roof Construction$0.00$0.00
Stair ConstructionRegular Stairs$0.00$0.00
Curved Stairs$0.00$0.00
Spiral Stairs$0.00$0.00
Exterior Fire Escapes$0.00$0.00
Stair Handrails and Balustrade$0.00$0.00
Special Superstructure Construction$0.00$0.00
$0.00$0.00
B11Exterior WallsExterior Wall ConstructionExterior Wall Construction$0.00$0.00
Parapets$0.00$0.00
Exterior Louvers & Screens$0.00$0.00
Sun Control Devices (Exterior)$0.00$0.00
Balcony Walls & Handrails$0.00$0.00
Exterior Soffits$0.00$0.00
Special Wall ElementsSignage$0.00$0.00
$0.00$0.00
B12Exterior Glazing and DoorsWindowsWindows$0.00$0.00
Curtain Walls$0.00$0.00
Storefronts$0.00$0.00
Curtain Walls$0.00$0.00
Storefronts$0.00$0.00
DoorsGlazed Doors & Entrances$0.00$0.00
Solid Exterior Doors$0.00$0.00
Revolving Doors$0.00$0.00
Overhead Doors$0.00$0.00
Other Doors & Frames$0.00$0.00
Shatter-Resistant Film$0.00
$0.00$0.00
B13RoofingRoof Coverings & InsulationRoof Finishes$0.00$0.00
Traffic Coatings & Paving Membranes$0.00$0.00
Roof Insulation & Fill$0.00$0.00
Flashings & Trim$0.00$0.00
Roof Eaves and Soffits$0.00$0.00
Gutters and Downspouts$0.00$0.00
Skylights and Roof OpeningsGlazed Roof Openings$0.00$0.00
Roof Hatches$0.00$0.00
Gravity Roof Ventilators$0.00$0.00
$0.00$0.00
C11Partitions, ,Doors and SpecialtiesPartitionsFixed Partitions$0.00$0.00
Demountable Partitions$0.00$0.00
Retractable Partitions$0.00$0.00
Site Built Toilet Partitions$0.00$0.00
Site Built Compartments & Cubicles$0.00$0.00
Interior Balustrades & Screens$0.00$0.00
Specimen Pass Through Window$0.00$0.00
Marker Boards$0.00$0.00
Retractable Partitions$0.00$0.00
Site Built Toilet Partitions$0.00$0.00
Site Built Compartments & Cubicles$0.00$0.00
Interior Balustrades & Screens$0.00$0.00
Interior Windows & Storefronts$0.00$0.00
Interior DoorsInterior Doors$0.00$0.00
Interior Door Frames$0.00$0.00
Interior Door Hardware$0.00$0.00
Interior Wall Opening Elements$0.00$0.00
Interior Door Sidelights & Transoms$0.00$0.00
Interior Hatches & Access Doors$0.00$0.00
Door Painting & Decoration$0.00$0.00
Specialties/FittingsCabinets and Countertops$0.00$0.00
Audioology Sound Suite Installation$0.00$0.00
Storage Shelving and Lockers$0.00$0.00
Ornamental Metals and Handrails$0.00$0.00
Identifying Devices$0.00$0.00
Millwork$0.00$0.00
Soundproofing$0.00$0.00
Flagpole$0.00$0.00
$0.00$0.00
C12Access/PlatformsFloor CavityAudio Booth$0.00$0.00
Platform FloorsRadiology (Floor or Ceiling)$0.00$0.00
$0.00$0.00
C13Interior FinishesWall FinishesLead Lining$0.00$0.00
Wall Finishes to Interior Walls$0.00$0.00
Ceramic Restroom Walls (4')$0.00$0.00
Floor FinishesCeramic Restroom Floors$0.00$0.00
Traffic Membranes$0.00$0.00
Hardeners and Sealers$0.00$0.00
Welded Seam Sheet Flooring$0.00$0.00
Carpeting$0.00$0.00
Bases, Curbs & Trim$0.00$0.00
Ceiling FinishesCeiling Finishes Applied to Structure$0.00$0.00
Suspended Ceilings$0.00$0.00
Other Ceilings$0.00$0.00
$0.00$0.00
D11Conveyance SystemsElevators & LiftsPassenger Elevators$0.00$0.00
Freight Elevators$0.00$0.00
Patient Lift$0.00$0.00
Escalators, Moving Walks & OtherEscalators & Moving Walks$0.00$0.00
Other Conveying Systems$0.00$0.00
$0.00
D21PlumbingPlumbing FixturesWater Closets$0.00$0.00
Urinals$0.00$0.00
Lavatories$0.00$0.00
Sinks$0.00$0.00
Bathtubs$0.00$0.00
Wash Fountains$0.00$0.00
Showers$0.00$0.00
Drinking Fountains and Coolers$0.00$0.00
Eyewash Stations$0.00$0.00
Domestic Water DistributionCold Water System$0.00$0.00
Hot Water System$0.00$0.00
Domestic Water Supply Equipment$0.00$0.00
Sanitary WasteWaste Piping$0.00$0.00
Vent Piping$0.00$0.00
Floor Drains$0.00$0.00
Sanitary Waste Equipment$0.00$0.00
Rain Water DrainagePipe & Fittings$0.00$0.00
Roof Drains$0.00$0.00
Rainwater Drainage Equipment$0.00$0.00
Insulation$0.00$0.00
Other Plumbing SystemsGas Distribution$0.00$0.00
Other Piping System$0.00$0.00
$0.00$0.00
D22HVACDistribution SystemsAir Distribution Systems$0.00$0.00
Exhaust Ventilation Systems$0.00$0.00
Steam Distribution System$0.00$0.00
Hot Water Distribution$0.00$0.00
Chilled Water Distribution$0.00$0.00
Change-over Distribution System$0.00$0.00
Glycol Heating Distribution System$0.00$0.00
Terminal & Package UnitsTerminal Self Contained Units$0.00$0.00
Package Units$0.00$0.00
Systems Testing & BalancingPiping System Testing & Balancing$0.00$0.00
Air System Testing & Balancing$0.00$0.00
HVAC Commissioning$0.00$0.00
Other Systems Testing & Balancing$0.00$0.00
Special HVAC Systems & EquipmentSpecial Cooling Systems & Devices$0.00$0.00
Special Humidity Control$0.00$0.00
Dust & Fume Collectors$0.00$0.00
Air Curtains$0.00$0.00
Air Purifiers$0.00$0.00
Paint Spray Booth Ventilation$0.00$0.00
General Construction Items (HVAC)$0.00$0.00
Controls & Interface w/Bldg. AutomationHeating Generating System$0.00$0.00
Cooling Generating System$0.00$0.00
Heating/Cooling Air Handling Units$0.00$0.00
Exhaust & Ventilating Systems$0.00$0.00
Terminal Devices$0.00$0.00
Energy Monitoring & Control$0.00$0.00
Building Automation Systems$0.00$0.00
Other Controls and Instrumentation$0.00$0.00
$0.00$0.00
D31Fire Protection/AlarmFire Protection Sprinkler SystemsSprinkler Water Supply$0.00$0.00
Sprinkler Pumping Equipment$0.00$0.00
Dry Sprinkler System$0.00$0.00
Standpipe and Hose SystemsWater Supply$0.00$0.00
Pumping Equipment$0.00$0.00
Standpipe Equipment$0.00$0.00
Fire Hose Equipment$0.00$0.00
Fire Protection SpecialtiesFire Extinguishers$0.00$0.00
Fire Extinguisher Cabinets$0.00$0.00
Other Fire Protection SystemsCarbon Dioxide System$0.00$0.00
Foam Generating Equipment$0.00$0.00
Clean Extinguishing Agent System$0.00$0.00
Dry Chemical Systems$0.00$0.00
Hood & Duct Fire Protection$0.00$0.00
$0.00$0.00
D4ElectricalElectrical Service, Distribution & Emerg. PowerHigh Tension Service & Dist.$0.00$0.00
Low Tension Service & Dist.$0.00$0.00
Emergency Power Systems$0.00$0.00
Renewable Electric Generation$0.00$0.00
Lighting and Branch WiringGeneral Purpose Lighting$0.00$0.00
Special Lighting$0.00$0.00
Branch Wiring (Lighting & Power)$0.00$0.00
Emergency Light & Power Systems$0.00$0.00
Communications and Special SystemsVoice and Data Distribution$0.00$0.00
Telecomm Closet and Cable Management$0.00$0.00
Public Address & Music Systems$0.00$0.00
Intercommunication & Paging System$0.00$0.00
Guest Wi-Fi$0.00$0.00
Monitor Wall Prep$0.00$0.00
Fire Alarm System$0.00$0.00
Security System$0.00$0.00
Electronic Access Control$0.00$0.00
Nurse Call$0.00$0.00
Video Surveillance$0.00$0.00
Panic Duress$0.00$0.00
Other$0.00$0.00
Other Electrical SystemsGrounding Systems$0.00$0.00
Floor Raceway Systems$0.00$0.00
Other Special Systems & Devices$0.00$0.00
General Construction Items (Elect.)$0.00$0.00
$0.00$0.00
E11Equipment and FurnishingsMisc: Curtain Track$0.00$0.00
Procedure lights$0.00$0.00
Toilet Accessories$0.00$0.00
Soap and Sanitizer Dispensers$0.00$0.00
Window accessories$0.00$0.00
Directional mirrors$0.00$0.00
$0.00$0.00
F12Demolition & AbatementBuilding Elements DemolitionBuilding Interior Demolition$0.00$0.00
Building Exterior Demolition$0.00$0.00
Hazardous Components AbatementRemoval of Hazardous Components$0.00$0.00
Encapsulation of Hazardous Components$0.00$0.00
$0.00$0.00
MiscCarpentry Hours- 160$0.00$0.00
$0.00$0.00
G12Other Sitework - Project Related$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00
Project Fees**General Contractor Overhead and Profit (%)$0.00$0.00
General Contractor Contingency$0.00$0.00
Taxes (if not included on contractors' bids)$0.00$0.00
Architect/Engineering Fee$0.00$0.00
Lessor's Fee$0.00$0.00
TI TOTAL$0.00
Total Contractor Fees$0.00
Cost per ABOA SF$0.00
*Include all subcontractors' soft costs
**Change formulas if flat rate fee is applicable

&C&"Arial,Bold" &RAttachment 3 &LPage &P

RSL 2007-03

Impact

HIGH IMPACT PERCENTAGE COST ANALYSIS
Cost Impact DescriptionCalculation
ApproximateResulting
% ImpactCost Impact
Structure$ - 0
Structural Upgrades33.0%$ - 0
foundation work$ - 0
New Constr Additions (e.g.In-fill)$ - 0
Exterior$ - 0
Façade Upgrade & Reconditioning$ - 0
Window repair$ - 0
Window replacement$ - 0
Roof$ - 0
Repair$ - 0
Replacement$ - 0
Interior$ - 0
Vacant space recapture$ - 0
Lobby upgrades$ - 0
Tenant Fitout$ - 0
Common Areas/lobbies$ - 0
Elevator$ - 0
Shaft Upgrades$ - 0
Machinery$ - 0
Cabs$ - 0
Plumbing$ - 0
Central Equipment10.0%$ - 0
Piping$ - 0
Fixtures$ - 0
HVAC$ - 0
Upgrades (Chillers, Boilers, Air Handlers)10.0%$ - 0
Replacements$ - 0
Ductwork$ - 0
Piping systems$ - 0
Electrical$ - 0
Transformers$ - 0
Switchgear$ - 0
Panels$ - 0
Bus duct & Wiring$ - 0
Fire Protection$ - 0
sprinklers5.0%$ - 0
alarm/detection$ - 0
Standpipe$ - 0
Sitework$ - 0
Roadways$ - 0
Parking repairs/upgrades$ - 0
Plaza repairs/upgrades$ - 0
Historic Restoration5.0%$ - 0
Security/Blast/Glass Frag.$ - 0
ADA10.0%$ - 0
Seismic$ - 0
Energy$ - 0
Hazmat7.0%$ - 0
Asbestos20.0%$ - 0
Lead$ - 0
PCB's$ - 0
Other Special Requirements$ - 0
Balance Not Accounted for >>>0.0%$ - 0
ECCA100.0%$ - 0

Class

PROJECT CLASSIFICATION
The following cost assignments proportion estimated total project costs to reflect
project focus and character. Entries are based upon the primary purpose behind
work item development.
CATEGORYCOST
1. General Repair$0.00
2. FireSafety
3. Asbestos
4. Seismic Safety
5. Historic Preservation
6. Accessibility
7. Courts Space
8. Energy Conservation
Estimated Total Project Cost:$0.00
Date Prepared:
Dec-990

Code

New Construction2
Repair and Alterations