TICS
| TENANT IMPROVEMENTS COST SUMMARY (TICS) FOR LEASE | ABOA SF = | 19,852 | |||
| Galesburg CBOC | TIA PER ABOA SF= | $ - 0 | |||
| Galesburg, IL | TOTAL TIA | $ - 0 | |||
| Tenant Improvement - UNIFORMAT SYSTEM ELEMENTS - | TI* | 0 | |||
| A11 | Foundations | $0.00 | $0.00 | ||
| A12 | Basement Construction | $0.00 | $ - 0 | ||
| A21 | Superstructure | $0.00 | $ - 0 | ||
| B11 | Exterior Walls | $0.00 | $ - 0 | ||
| B12 | Shatter-Resistant Film | $0.00 | $ - 0 | ||
| B13 | Roofing | $0.00 | $ - 0 | ||
| C11 | Partitions, ,Doors and Specialties | $0.00 | $ - 0 | ||
| C12 | Access/Platforms | $0.00 | $ - 0 | ||
| C13 | Interior Finishes | $0.00 | $ - 0 | ||
| D11 | Conveyance Systems | $0.00 | $ - 0 | ||
| D21 | Plumbing | $0.00 | $ - 0 | ||
| D22 | HVAC | $0.00 | $ - 0 | ||
| D31 | Fire Protection/Alarm | $0.00 | $ - 0 | ||
| D41 | Electrical Service, Distribution & Emergency Power | $0.00 | $ - 0 | ||
| D42 | Lighting and Branch Wiring | $0.00 | $ - 0 | ||
| D43 | Communications, Security & Other Elec. Systems | $0.00 | $ - 0 | ||
| E11 | Equipment and Furnishings | $0.00 | $ - 0 | ||
| F11 | Special Construction | $0.00 | $ - 0 | ||
| F12 | Building Demolition and Abatement | $ - 0 | $ - 0 | ||
| G11 | Sitework - Building Relates | $ - 0 | $ - 0 | ||
| G12 | Other Sitework - Project Related | $ - 0 | $ - 0 | ||
| Subtotal | $0.00 | $ - 0 | |||
| Project Fees** | Lessor's Overhead and Profit | ___% | $ - 0 | ||
| General Contractor Fee | ___% | $ - 0 | |||
| Taxes (if not included on contractors' bids) | ___% | $ - 0 | |||
| Architect/Engineering Fee | ___% | $ - 0 | |||
| TI TOTAL | $0.00 | ||||
| Cost per ABOA SF | $ - 0 | ||||
| *Include all subcontractors' soft costs | |||||
| **Change formulas if flat rate fee is applicable | |||||
| TENANT IMPROVEMENTS COST FOR LEASE | ABOA SF= | 19,852 | |||
| TI PER ABOA SF= | $0.00 | ||||
| Total TI Cost | $0.00 | ||||
| Tenant Improvement - UNIFORMAT SYSTEM ELEMENTS - | TI* | Summary | |||
| A11 | Foundations | Standard Foundations | Wall Foundations | $0.00 | $0.00 |
| Column Foundations & Pile Caps | $0.00 | $0.00 | |||
| Perimeter Drainage & Insulation | $0.00 | $0.00 | |||
| Special Foundations | Pile Foundations | $0.00 | $0.00 | ||
| Grade Beams | $0.00 | $0.00 | |||
| Caissons | $0.00 | $0.00 | |||
| Underpinning | $0.00 | $0.00 | |||
| Dewatering | $0.00 | $0.00 | |||
| Raft Foundations | $0.00 | $0.00 | |||
| Pressure Injected Footings | $0.00 | $0.00 | |||
| Other Special Foundations | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| A12 | Basement Construction | Basement Excavation | Excavation for Basements | $0.00 | $0.00 |
| Structure Backfill & Compact | $0.00 | $0.00 | |||
| Shoring | $0.00 | $0.00 | |||
| Basement Walls | Basement Wall Construction | $0.00 | $0.00 | ||
| Moisture Protection | $0.00 | $0.00 | |||
| Basement Wall Insulation | $0.00 | $0.00 | |||
| Interior Skin | $0.00 | $0.00 | |||
| Slab on Grade | Standard Slab on Grade | $0.00 | $0.00 | ||
| Structural Slab on Grade | $0.00 | $0.00 | |||
| Inclined Slab on Grade | $0.00 | $0.00 | |||
| Trenches Pits & Bases | $0.00 | $0.00 | |||
| Under Slab Drainage & Insulation | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| A21 | Superstructure | Floor and Column Construction | Suspended Basement Floor Construction | $0.00 | $0.00 |
| Upper Floors Construction | $0.00 | $0.00 | |||
| Balcony Floor Construction | $0.00 | $0.00 | |||
| Ramps | $0.00 | $0.00 | |||
| Floor Raceway Systems | $0.00 | $0.00 | |||
| Other Floor Construction | $0.00 | $0.00 | |||
| Roof Construction | Flat Roof Construction | $0.00 | $0.00 | ||
| Pitched Roof Construction | $0.00 | $0.00 | |||
| Canopies | $0.00 | $0.00 | |||
| Other Roof Construction | $0.00 | $0.00 | |||
| Stair Construction | Regular Stairs | $0.00 | $0.00 | ||
| Curved Stairs | $0.00 | $0.00 | |||
| Spiral Stairs | $0.00 | $0.00 | |||
| Exterior Fire Escapes | $0.00 | $0.00 | |||
| Stair Handrails and Balustrade | $0.00 | $0.00 | |||
| Special Superstructure Construction | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| B11 | Exterior Walls | Exterior Wall Construction | Exterior Wall Construction | $0.00 | $0.00 |
| Parapets | $0.00 | $0.00 | |||
| Exterior Louvers & Screens | $0.00 | $0.00 | |||
| Sun Control Devices (Exterior) | $0.00 | $0.00 | |||
| Balcony Walls & Handrails | $0.00 | $0.00 | |||
| Exterior Soffits | $0.00 | $0.00 | |||
| Special Wall Elements | Signage | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||
| B12 | Exterior Glazing and Doors | Windows | Windows | $0.00 | $0.00 |
| Curtain Walls | $0.00 | $0.00 | |||
| Storefronts | $0.00 | $0.00 | |||
| Curtain Walls | $0.00 | $0.00 | |||
| Storefronts | $0.00 | $0.00 | |||
| Doors | Glazed Doors & Entrances | $0.00 | $0.00 | ||
| Solid Exterior Doors | $0.00 | $0.00 | |||
| Revolving Doors | $0.00 | $0.00 | |||
| Overhead Doors | $0.00 | $0.00 | |||
| Other Doors & Frames | $0.00 | $0.00 | |||
| Shatter-Resistant Film | $0.00 | ||||
| $0.00 | $0.00 | ||||
| B13 | Roofing | Roof Coverings & Insulation | Roof Finishes | $0.00 | $0.00 |
| Traffic Coatings & Paving Membranes | $0.00 | $0.00 | |||
| Roof Insulation & Fill | $0.00 | $0.00 | |||
| Flashings & Trim | $0.00 | $0.00 | |||
| Roof Eaves and Soffits | $0.00 | $0.00 | |||
| Gutters and Downspouts | $0.00 | $0.00 | |||
| Skylights and Roof Openings | Glazed Roof Openings | $0.00 | $0.00 | ||
| Roof Hatches | $0.00 | $0.00 | |||
| Gravity Roof Ventilators | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| C11 | Partitions, ,Doors and Specialties | Partitions | Fixed Partitions | $0.00 | $0.00 |
| Demountable Partitions | $0.00 | $0.00 | |||
| Retractable Partitions | $0.00 | $0.00 | |||
| Site Built Toilet Partitions | $0.00 | $0.00 | |||
| Site Built Compartments & Cubicles | $0.00 | $0.00 | |||
| Interior Balustrades & Screens | $0.00 | $0.00 | |||
| Specimen Pass Through Window | $0.00 | $0.00 | |||
| Marker Boards | $0.00 | $0.00 | |||
| Retractable Partitions | $0.00 | $0.00 | |||
| Site Built Toilet Partitions | $0.00 | $0.00 | |||
| Site Built Compartments & Cubicles | $0.00 | $0.00 | |||
| Interior Balustrades & Screens | $0.00 | $0.00 | |||
| Interior Windows & Storefronts | $0.00 | $0.00 | |||
| Interior Doors | Interior Doors | $0.00 | $0.00 | ||
| Interior Door Frames | $0.00 | $0.00 | |||
| Interior Door Hardware | $0.00 | $0.00 | |||
| Interior Wall Opening Elements | $0.00 | $0.00 | |||
| Interior Door Sidelights & Transoms | $0.00 | $0.00 | |||
| Interior Hatches & Access Doors | $0.00 | $0.00 | |||
| Door Painting & Decoration | $0.00 | $0.00 | |||
| Specialties/Fittings | Cabinets and Countertops | $0.00 | $0.00 | ||
| Audioology Sound Suite Installation | $0.00 | $0.00 | |||
| Storage Shelving and Lockers | $0.00 | $0.00 | |||
| Ornamental Metals and Handrails | $0.00 | $0.00 | |||
| Identifying Devices | $0.00 | $0.00 | |||
| Millwork | $0.00 | $0.00 | |||
| Soundproofing | $0.00 | $0.00 | |||
| Flagpole | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| C12 | Access/Platforms | Floor Cavity | Audio Booth | $0.00 | $0.00 |
| Platform Floors | Radiology (Floor or Ceiling) | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||
| C13 | Interior Finishes | Wall Finishes | Lead Lining | $0.00 | $0.00 |
| Wall Finishes to Interior Walls | $0.00 | $0.00 | |||
| Ceramic Restroom Walls (4') | $0.00 | $0.00 | |||
| Floor Finishes | Ceramic Restroom Floors | $0.00 | $0.00 | ||
| Traffic Membranes | $0.00 | $0.00 | |||
| Hardeners and Sealers | $0.00 | $0.00 | |||
| Welded Seam Sheet Flooring | $0.00 | $0.00 | |||
| Carpeting | $0.00 | $0.00 | |||
| Bases, Curbs & Trim | $0.00 | $0.00 | |||
| Ceiling Finishes | Ceiling Finishes Applied to Structure | $0.00 | $0.00 | ||
| Suspended Ceilings | $0.00 | $0.00 | |||
| Other Ceilings | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| D11 | Conveyance Systems | Elevators & Lifts | Passenger Elevators | $0.00 | $0.00 |
| Freight Elevators | $0.00 | $0.00 | |||
| Patient Lift | $0.00 | $0.00 | |||
| Escalators, Moving Walks & Other | Escalators & Moving Walks | $0.00 | $0.00 | ||
| Other Conveying Systems | $0.00 | $0.00 | |||
| $0.00 | |||||
| D21 | Plumbing | Plumbing Fixtures | Water Closets | $0.00 | $0.00 |
| Urinals | $0.00 | $0.00 | |||
| Lavatories | $0.00 | $0.00 | |||
| Sinks | $0.00 | $0.00 | |||
| Bathtubs | $0.00 | $0.00 | |||
| Wash Fountains | $0.00 | $0.00 | |||
| Showers | $0.00 | $0.00 | |||
| Drinking Fountains and Coolers | $0.00 | $0.00 | |||
| Eyewash Stations | $0.00 | $0.00 | |||
| Domestic Water Distribution | Cold Water System | $0.00 | $0.00 | ||
| Hot Water System | $0.00 | $0.00 | |||
| Domestic Water Supply Equipment | $0.00 | $0.00 | |||
| Sanitary Waste | Waste Piping | $0.00 | $0.00 | ||
| Vent Piping | $0.00 | $0.00 | |||
| Floor Drains | $0.00 | $0.00 | |||
| Sanitary Waste Equipment | $0.00 | $0.00 | |||
| Rain Water Drainage | Pipe & Fittings | $0.00 | $0.00 | ||
| Roof Drains | $0.00 | $0.00 | |||
| Rainwater Drainage Equipment | $0.00 | $0.00 | |||
| Insulation | $0.00 | $0.00 | |||
| Other Plumbing Systems | Gas Distribution | $0.00 | $0.00 | ||
| Other Piping System | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| D22 | HVAC | Distribution Systems | Air Distribution Systems | $0.00 | $0.00 |
| Exhaust Ventilation Systems | $0.00 | $0.00 | |||
| Steam Distribution System | $0.00 | $0.00 | |||
| Hot Water Distribution | $0.00 | $0.00 | |||
| Chilled Water Distribution | $0.00 | $0.00 | |||
| Change-over Distribution System | $0.00 | $0.00 | |||
| Glycol Heating Distribution System | $0.00 | $0.00 | |||
| Terminal & Package Units | Terminal Self Contained Units | $0.00 | $0.00 | ||
| Package Units | $0.00 | $0.00 | |||
| Systems Testing & Balancing | Piping System Testing & Balancing | $0.00 | $0.00 | ||
| Air System Testing & Balancing | $0.00 | $0.00 | |||
| HVAC Commissioning | $0.00 | $0.00 | |||
| Other Systems Testing & Balancing | $0.00 | $0.00 | |||
| Special HVAC Systems & Equipment | Special Cooling Systems & Devices | $0.00 | $0.00 | ||
| Special Humidity Control | $0.00 | $0.00 | |||
| Dust & Fume Collectors | $0.00 | $0.00 | |||
| Air Curtains | $0.00 | $0.00 | |||
| Air Purifiers | $0.00 | $0.00 | |||
| Paint Spray Booth Ventilation | $0.00 | $0.00 | |||
| General Construction Items (HVAC) | $0.00 | $0.00 | |||
| Controls & Interface w/Bldg. Automation | Heating Generating System | $0.00 | $0.00 | ||
| Cooling Generating System | $0.00 | $0.00 | |||
| Heating/Cooling Air Handling Units | $0.00 | $0.00 | |||
| Exhaust & Ventilating Systems | $0.00 | $0.00 | |||
| Terminal Devices | $0.00 | $0.00 | |||
| Energy Monitoring & Control | $0.00 | $0.00 | |||
| Building Automation Systems | $0.00 | $0.00 | |||
| Other Controls and Instrumentation | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| D31 | Fire Protection/Alarm | Fire Protection Sprinkler Systems | Sprinkler Water Supply | $0.00 | $0.00 |
| Sprinkler Pumping Equipment | $0.00 | $0.00 | |||
| Dry Sprinkler System | $0.00 | $0.00 | |||
| Standpipe and Hose Systems | Water Supply | $0.00 | $0.00 | ||
| Pumping Equipment | $0.00 | $0.00 | |||
| Standpipe Equipment | $0.00 | $0.00 | |||
| Fire Hose Equipment | $0.00 | $0.00 | |||
| Fire Protection Specialties | Fire Extinguishers | $0.00 | $0.00 | ||
| Fire Extinguisher Cabinets | $0.00 | $0.00 | |||
| Other Fire Protection Systems | Carbon Dioxide System | $0.00 | $0.00 | ||
| Foam Generating Equipment | $0.00 | $0.00 | |||
| Clean Extinguishing Agent System | $0.00 | $0.00 | |||
| Dry Chemical Systems | $0.00 | $0.00 | |||
| Hood & Duct Fire Protection | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| D4 | Electrical | Electrical Service, Distribution & Emerg. Power | High Tension Service & Dist. | $0.00 | $0.00 |
| Low Tension Service & Dist. | $0.00 | $0.00 | |||
| Emergency Power Systems | $0.00 | $0.00 | |||
| Renewable Electric Generation | $0.00 | $0.00 | |||
| Lighting and Branch Wiring | General Purpose Lighting | $0.00 | $0.00 | ||
| Special Lighting | $0.00 | $0.00 | |||
| Branch Wiring (Lighting & Power) | $0.00 | $0.00 | |||
| Emergency Light & Power Systems | $0.00 | $0.00 | |||
| Communications and Special Systems | Voice and Data Distribution | $0.00 | $0.00 | ||
| Telecomm Closet and Cable Management | $0.00 | $0.00 | |||
| Public Address & Music Systems | $0.00 | $0.00 | |||
| Intercommunication & Paging System | $0.00 | $0.00 | |||
| Guest Wi-Fi | $0.00 | $0.00 | |||
| Monitor Wall Prep | $0.00 | $0.00 | |||
| Fire Alarm System | $0.00 | $0.00 | |||
| Security System | $0.00 | $0.00 | |||
| Electronic Access Control | $0.00 | $0.00 | |||
| Nurse Call | $0.00 | $0.00 | |||
| Video Surveillance | $0.00 | $0.00 | |||
| Panic Duress | $0.00 | $0.00 | |||
| Other | $0.00 | $0.00 | |||
| Other Electrical Systems | Grounding Systems | $0.00 | $0.00 | ||
| Floor Raceway Systems | $0.00 | $0.00 | |||
| Other Special Systems & Devices | $0.00 | $0.00 | |||
| General Construction Items (Elect.) | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| E11 | Equipment and Furnishings | Misc: Curtain Track | $0.00 | $0.00 | |
| Procedure lights | $0.00 | $0.00 | |||
| Toilet Accessories | $0.00 | $0.00 | |||
| Soap and Sanitizer Dispensers | $0.00 | $0.00 | |||
| Window accessories | $0.00 | $0.00 | |||
| Directional mirrors | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| F12 | Demolition & Abatement | Building Elements Demolition | Building Interior Demolition | $0.00 | $0.00 |
| Building Exterior Demolition | $0.00 | $0.00 | |||
| Hazardous Components Abatement | Removal of Hazardous Components | $0.00 | $0.00 | ||
| Encapsulation of Hazardous Components | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| Misc | Carpentry Hours- 160 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||
| G12 | Other Sitework - Project Related | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | |||
| Project Fees** | General Contractor Overhead and Profit (%) | $0.00 | $0.00 | ||
| General Contractor Contingency | $0.00 | $0.00 | |||
| Taxes (if not included on contractors' bids) | $0.00 | $0.00 | |||
| Architect/Engineering Fee | $0.00 | $0.00 | |||
| Lessor's Fee | $0.00 | $0.00 | |||
| TI TOTAL | $0.00 | ||||
| Total Contractor Fees | $0.00 | ||||
| Cost per ABOA SF | $0.00 | ||||
| *Include all subcontractors' soft costs | |||||
| **Change formulas if flat rate fee is applicable |
&C&"Arial,Bold" &RAttachment 3 &LPage &P
RSL 2007-03
Impact
| HIGH IMPACT PERCENTAGE COST ANALYSIS | ||
| Cost Impact Description | Calculation | |
| Approximate | Resulting | |
| % Impact | Cost Impact | |
| Structure | $ - 0 | |
| Structural Upgrades | 33.0% | $ - 0 |
| foundation work | $ - 0 | |
| New Constr Additions (e.g.In-fill) | $ - 0 | |
| Exterior | $ - 0 | |
| Façade Upgrade & Reconditioning | $ - 0 | |
| Window repair | $ - 0 | |
| Window replacement | $ - 0 | |
| Roof | $ - 0 | |
| Repair | $ - 0 | |
| Replacement | $ - 0 | |
| Interior | $ - 0 | |
| Vacant space recapture | $ - 0 | |
| Lobby upgrades | $ - 0 | |
| Tenant Fitout | $ - 0 | |
| Common Areas/lobbies | $ - 0 | |
| Elevator | $ - 0 | |
| Shaft Upgrades | $ - 0 | |
| Machinery | $ - 0 | |
| Cabs | $ - 0 | |
| Plumbing | $ - 0 | |
| Central Equipment | 10.0% | $ - 0 |
| Piping | $ - 0 | |
| Fixtures | $ - 0 | |
| HVAC | $ - 0 | |
| Upgrades (Chillers, Boilers, Air Handlers) | 10.0% | $ - 0 |
| Replacements | $ - 0 | |
| Ductwork | $ - 0 | |
| Piping systems | $ - 0 | |
| Electrical | $ - 0 | |
| Transformers | $ - 0 | |
| Switchgear | $ - 0 | |
| Panels | $ - 0 | |
| Bus duct & Wiring | $ - 0 | |
| Fire Protection | $ - 0 | |
| sprinklers | 5.0% | $ - 0 |
| alarm/detection | $ - 0 | |
| Standpipe | $ - 0 | |
| Sitework | $ - 0 | |
| Roadways | $ - 0 | |
| Parking repairs/upgrades | $ - 0 | |
| Plaza repairs/upgrades | $ - 0 | |
| Historic Restoration | 5.0% | $ - 0 |
| Security/Blast/Glass Frag. | $ - 0 | |
| ADA | 10.0% | $ - 0 |
| Seismic | $ - 0 | |
| Energy | $ - 0 | |
| Hazmat | 7.0% | $ - 0 |
| Asbestos | 20.0% | $ - 0 |
| Lead | $ - 0 | |
| PCB's | $ - 0 | |
| Other Special Requirements | $ - 0 | |
| Balance Not Accounted for >>> | 0.0% | $ - 0 |
| ECCA | 100.0% | $ - 0 |
Class
| PROJECT CLASSIFICATION | |||
| The following cost assignments proportion estimated total project costs to reflect | |||
| project focus and character. Entries are based upon the primary purpose behind | |||
| work item development. | |||
| CATEGORY | COST | ||
| 1. General Repair | $0.00 | ||
| 2. FireSafety | |||
| 3. Asbestos | |||
| 4. Seismic Safety | |||
| 5. Historic Preservation | |||
| 6. Accessibility | |||
| 7. Courts Space | |||
| 8. Energy Conservation | |||
| Estimated Total Project Cost: | $0.00 | ||
| Date Prepared: | |||
| Dec-99 | 0 |
Code
| New Construction | 2 |
| Repair and Alterations |