S02. Drawings - 0-GI-1 - COVER SHEET.pdf

PDF 289 KB Posted

Attached to
Y1NB--Renovate Operating Rooms - VAMC Cleveland
Solicitation number
Amend0003
Issued by

About this file

This document package includes architectural drawings for the renovation of operating rooms at the Department of Veterans Affairs Medical Center in Cleveland, Ohio. The drawings cover site plans, floor plans, reflected ceiling plans, life safety plans, equipment plans, interior elevations, finish plans, and schedules for three phases of construction. Mechanical, electrical, plumbing, fire protection, medical gas, safety and security, and technology drawings are also included, with demolition and new work plans for each phase. Amendment 0003 to solicitation Y1NB adds the Cover Sheet drawing to the set for the project to renovate operating rooms at the VA Medical Center in Cleveland. The bid opening date remains September 9, 2020 at 12:00 PM EST and all other terms are unchanged. The agency issuing this amendment is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files

File Type Posted
S06. 36C25020B0022 Amend 0003.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

EAST BLVD.

E.

S

T.

EA

ST

B

LV

D

MAGNOLIA DR.

HA

ZE

L

DR

E. 108 ST.

MT. SINAI DR.

MARTIN LUTHER KING DR.

SITE PLAN

Scale = None

North

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK

10701 EAST BLVD. CLEVELAND, OH. 44106

PROJECT NO.

Perspectus Architecture LLC

Fredrick, Fredrick & Heller Engineers, Inc.

672 East Royalton Road Broadview Heights, Ohio 44147

Architect 13212 Shaker Square Suite 204 Cleveland, Ohio 44120

PROJECT AREA: 22,810 sf

DESIGN CODES:

2018 Life Safety Code, 2018 IBC

OCCUPANCY,USE GROUP:

Health Care, I-2 FIRE SUPPRESSION: Fully Sprinkled

TRAVEL DISTANCES: (LSC 18.2.5.7.3.3)

Suite Remote Point to Exit Access Door One Intervening Room: 100' Two Intervening Rooms: 50'

Suite Remote Point to Exit: 200'

TYPE OF CONSTRUCTION: (LSC A.8.2.1.2)

Type 1 - 332, 1B

EXTERIOR BEARING WALLS: (LSC A.8.2.1.2)

3 Hours

INTERIOR BEARING WALLS: (LSC A.8.2.1.2)

3 Hours

STRUCTURAL COLUMNS: (LSC A.8.2.1.2)

3 Hours - Supporting more than 1 floor 2 Hours - Supporting one floor only 2 Hours - Supporting roof only (UL X799)

FLOOR - CEILING ASSEMBLIES: (LSC A.8.2.1.2)

2 Hours

ROOF - CEILING ASSEMBLIES: (LSC A.8.2.1.2)

1 1/2 Hours (UL S715)

INTERIOR NONBEARING WALLS: (LSC A.8.2.1.2)

0 Hour

EXTERIOR NONBEARING WALLS: (LSC A.8.2.1.2)

0 Hour

EXIT ENCLOSURES (LSC 7.1.3.2.1)

Existing: 1 Hour New: 2 Hours

SHAFT ENCLOSURES (LSC 8.6.5)

4 Stories or more: 2 Hours Less than 4 stories: 1 Hour

SMOKE BARRIERS: (LSC 18.3.7.3)

1 Hour

EXIT ACCESS CORRIDORS: (LSC 18.3.6.2)

0 Hour, Smoke Partitions

SUITE WALLS: (LSC 18.2.5.7.1.2)

0 Hour, Smoke Partitions

HAZARDOUS AREA PROTECTION

Storage room larger than 100 s.f. : 1 Hour

CODE INFORMATION

DRAWING INDEX

ARCH JOB NO.:

2-F4

2-E2

2-E4 2-D4 2-C4 2-B4

2-AC-3

2-AC-2

2-B2

2-C2 2-D2

2-E3 2-D3 2-C3 2-B3

2-B5 2-C5

2-F3

KEY PLAN - SECOND FLOOR

Scale = None

PROJECT

SCOPE

Barber & Hoffman, Inc.

2217 East 9th Street, Suite 350, Ohio 44115

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833 William C. Ayars, License #7259

Expiration Date 12/31/2021

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTIS

S

AYARS

ST

AT

E OF OHIO

C :\U se rs

\jw al ko sa k\ D oc um en ts

\V

AM

P_ Su rg er y Ex pa ns io n_

PA

_1

C

D _R

9_ jw al ko sa k@ pe rs pe ct us ar ch

.c om

.rv t

6/

/2

:0 1:

A

M

541-19-101

Bid Issue 06-26-2020

Renovate Operating Rooms

0-GI-1

10701 East Blvd. Cleveland, OH 44106

06-26-2020 WJW WJW

541-19-101Renovate Operating RoomsBid IssueCOVER SHEET

181200-A1-0 SITE PLAN

0-A1-1 EXISTING FLOOR PLAN

0-A1-2 COMPLETED FLOOR PLAN

0-A1-3 COMPOSITE REFLECTED CEILING PLAN

0-A1-4 PROJECT PHASING - OVERALL

0-A1-5 PROJECT PHASING - PHASE 1

0-A1-6 PROJECT PHASING - PHASE 2

0-A1-7 PROJECT PHASING - PHASE 2 DETAIL PLANS

0-A1-8 PROJECT PHASING - PHASE 3

0-A1-9 PROJECT PHASING - PHASE 3A

0-A1-10 PROJECT PHASING - PHASE 3B

0-A1-11 PROJECT PHASING - PHASE 3C

0-A1-12 PROJECT PHASING - PHASE 3D

0-A2-1 SECOND FLOOR LIFE SAFETY PLAN - PHASE 1

0-A2-2 SECOND FLOOR LIFE SAFETY PLAN - PHASE 2, 2A, 2B

0-A2-3 SECOND FLOOR LIFE SAFETY PLAN - PHASE 3

0-A2-4 SECOND FLOOR LIFE SAFETY PLAN - PHASE 3A

0-A2-5 SECOND FLOOR LIFE SAFETY PLAN - PHASE 3B

0-A2-6 SECOND FLOOR LIFE SAFETY PLAN - PHASE 3C

0-A2-7 SECOND FLOOR LIFE SAFETY PLAN - PHASE 3D

0-A3-1 INFECTION CONTROL PLAN - PHASE 2

0-A3-2 INFECTION CONTROL PLAN - PHASE 3

0-A5-1 DOOR SCHEDULES AND NOTES

0-A6-1 MILLWORK DETAILS

1-A1-1 SECOND FLOOR DEMOLITION PLAN - PHASE 1

1-A1-2 SECOND FLOOR NEW WORK PLAN - PHASE 1

1-A3-1 SECOND FLOOR NEW WORK REFLECTED CLNG. PLAN - PHASE 1

1-A5-0 FINISH SCHEDULE AND DETAILS - ALL PHASES

1-A5-1 SECOND FLOOR FINISH FLOOR PLAN PHASE 1

1-A5-2 SECOND FLOOR FINISH WALL PLAN PHASE 1

2-A1-1 SECOND FLOOR DEMOLITION PLAN - PHASE 2

2-A1-2 SECOND FLOOR NEW WORK PLAN - PHASE 2

2-A1-3 ENLARGED FLOOR PLANS

2-A2-1 ROOF PLAN

2-A3-2 SECOND FLOOR NEW WORK REFLECTED CLNG PLAN - PHASE 2

2-A4-1 INTERIOR ELEVATIONS

2-A4-2 INTERIOR ELEVATIONS

2-A4-3 INTERIOR ELEVATIONS

2-A5-3 SECOND FLOOR FINISH FLOOR PLAN PHASE 2

2-A5-4 SECOND FLOOR FINISH WALL PLAN PHASE 2

2-A6-1 EQUIPMENT PLAN - PHASE 2

2-A6-2 EQUIPMENT PLANS AND SCHEDULES - PHASE 2

3-A1-1 SECOND FLOOR DEMOLITION PLAN - PHASE 3

3-A1-2 SECOND FLOOR NEW WORK PLAN - PHASE 3

3-A1-3 ENLARGED FLOOR PLANS

3-A3-2 SECOND FLOOR NEW WORK REFLECTED CLNG PLAN - PHASE 3

3-A4-1 INTERIOR ELEVATIONS

3-A4-2 INTERIOR ELEVATIONS

3-A4-3 INTERIOR ELEVATIONS

3-A5-5 SECOND FLOOR FINISH FLOOR PLAN PHASE 3

3-A5-6 SECOND FLOOR FINISH WALL PLAN PHASE 3

3-A6-1 EQUIPMENT PLAN - PHASE 3

3-A6-3 EQUIPMENT PLANS AND SCHEDULES - PHASE 3

3-A7-1 EXTERIOR DETAILS

3-A7-2 EXTERIOR DETAILS

1-S1-1 GENERAL NOTES, TESTING AND SPECIAL INSPECTIONS

1-S1-2 FRAMING PLANS AND SECTIONS

0-ES1-1 ELECTRONIC SAFETY AND SECURITY LEGEND & NOTES

0-ES1-2 ACCESS CONTROL SYSTEM RISER, DIAGRAM, AND NOTES

0-ES1-3 ACCESS CONTROLLED DOOR DETAILS AND NOTES

2-ES2-1 PARTIAL SECOND FLOOR F.A. & SECURITY DEMO PLAN - PHASE 2

2-ES2-2 PARTIAL SECOND FLOOR F.A. & SECURITY PLAN - PHASE 2

3-ES2-1 PARTIAL SECOND FLOOR F.A. AND SECURITY DEMO PLAN - PHASE 3

3-ES2-2 PARTIAL SECOND FLOOR F.A. & SECURITY PLAN - PHASE 3

ARCHITECTURAL DRAWINGS

STRUCTURAL DRAWINGS

FIRE PROTECTION DRAWINGS

MEDICAL GAS DRAWINGS

PLUMBING DRAWINGS

MECHANICAL DRAWINGS

ELECTRICAL DRAWINGS

SAFETY AND SECURITY DRAWINGS

TECHNOLOGY DRAWINGS

0-GI-1 COVER SHEET

GENERAL DRAWINGS

3-FP1-2 PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 3

3-FP2-1 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PHASE 3

3-FP2-2 PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - PHASE 3

3-FP2-3 PENTHOUSE FIRE PROTECTION PLAN - PHASE 3

0-FP1-1 FIRE PROTECTION LEGEND AND GENERAL NOTES

1-FP1-1 PARTIAL SECOND FLOOR FIRE PROTECTION PLANS - PHASE 1

2-FP1-1 PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 2

2-FP2-1 PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - PHASE 2

2-FP2-2 PENTHOUSE FIRE PROTECTION PLAN - PHASE 2

3-FP1-1 PARTIAL FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE 3

0-MG1-1 MEDICAL GAS LEGEND, SCHEDULES, DETAILS, AND NOTES

1-MG1-1 PARTIAL SECOND FLOOR MEDICAL GAS PLANS - PHASE 1

2-MG1-1 PARTIAL FIRST FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 2

2-MG1-2 PARTIAL SECOND FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 2

2-MG2-1 PARTIAL SECOND FLOOR MEDICAL GAS PLAN - PHASE 2

3-MG1-1 PARTIAL FIRST FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 3

3-MG1-2 PARTIAL SECOND FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 3

3-MG2-1 PARTIAL SECOND FLOOR MEDICAL GAS PLAN - PHASE 3

0-P1-1 PLUMBING LEGEND, SCHEDULE, DETAILS, AND NOTES

0-P1-2 PLUMBING ISOMETRICS

0-P1-3 PLUMBING ISOMETRICS

2-P1-1 PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN - PHASE 2

2-P1-2 PARTIAL SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 2

2-P2-1 PARTIAL FIRST FLOOR PLUMBING PLAN - PHASE 2

2-P2-2 PARTIAL SECOND FLOOR PLUMBING PLAN - PHASE 2

3-P1-1 PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN - PHASE 3

3-P1-2 PARTIAL SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 3

3-P2-1 PARTIAL FIRST FLOOR PLUMBING PLAN - PHASE 3

3-P2-2 PARTIAL SECOND FLOOR PLUMBING PLAN - PHASE 3

3-H5-1 PENTHOUSE INTERSTITIAL SPACE HVAC PLAN - PHASE 3

3-H7-1 OPERATING ROOM HVAC PLANS - PHASE 3

3-H8-1 MECHANICAL SECTIONS

0-H0-1 MECHANICAL LEGEND AND GENERAL NOTES

0-H0-2 MECHANICAL DETAILS

0-H0-3 MECHANICAL DETAILS

0-H0-4 MECHANICAL SCHEDULES

0-H0-5 MECHANICAL SCHEDULES

0-H0-6 TEMPERATURE CONTROLS

0-H0-7 TEMPERATURE CONTROLS

0-H0-8 TEMPERATURE CONTROLS

0-H0-9 AIRFLOW DIAGRAMS

0-H0-10 HEATING HOT WATER PIPING DIAGRAM

1-H1-1 PARTIAL SECOND FLOOR HVAC PLANS - PHASE 1

2-H1-1 PARTIAL FIRST FLOOR HVAC DEMOLITION PLAN - PHASE 2

2-H1-2 PARTIAL SECOND FLOOR HVAC DEMOLITION PLAN - PHASE 2

2-H1-3 PARTIAL SECOND FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 2

2-H2-1 ENLARGED MECHANICAL ROOM 107 DEMOLITION PLAN - PHASE 2

2-H3-2 PARTIAL SECOND FLOOR HVAC DUCTWORK PLAN - PHASE 2

2-H3-3 PARTIAL ROOF HVAC PLAN - PHASE 2

2-H4-1 PARTIAL SECOND FLOOR HVAC PIPING PLAN - PHASE 2

2-H5-1 PENTHOUSE INTERSTITIAL SPACE HVAC PLAN - PHASE 2

2-H5-2 PENTHOUSE HVAC DUCTWORK PLAN - PHASE 2

2-H6-1 PENTHOUSE HVAC PIPING PLAN - PHASE 2

2-H7-1 HVAC PHASING PLANS - SUB-PHASES 2A, 2B

2-H7-2 OPERATING ROOM HVAC PLANS - PHASE 2

2-H8-1 MECHANICAL SECTIONS

2-H8-2 MECHANICAL SECTIONS

3-H1-1 PARTIAL FIRST FLOOR HVAC DEMOLITION PLAN - PHASE 3

3-H1-2 PARTIAL SECOND FLOOR HVAC DUCTWORK DEMOLITION PLAN - PHASE 3

3-H1-3 PARTIAL SECOND FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 3

3-H1-4 PARTIAL ROOF HVAC DEMOLITION PLAN - PHASE 3

3-H2-1 ENLARGED MECHANICAL ROOM 107 DEMOLITION PLANS - PHASE 3

3-H3-1 PARTIAL FIRST FLOOR HVAC PLAN - PHASE 3

3-H3-2 PARTIAL SECOND FLOOR HVAC DUCTWORK PLAN - PHASE 3

3-H3-3 PARTIAL ROOF HVAC PLAN - PHASE 3

3-H4-1 ENLARGED MECHANICAL ROOM 107 PLAN - PHASE 3

0-E1-1 ELECTRICAL LEGEND AND GENERAL NOTES

0-E1-2 LIGHTING FIXTURE SCHEDULE AND DETAILS

0-E1-3 PARTIAL FIRST FLOOR ELECTRICAL KEY PLAN

0-E1-4 PARTIAL SECOND FLOOR ELECTRICAL KEY PLAN

0-E1-5 PARTIAL THIRD FLOOR ELECTRICAL KEY PLAN

0-E1-6 POWER DISTRIBUTION ONE-LINE DIAGRAM LEGEND AND NOTES

0-E1-7 NORMAL POWER DISTRIBUTION ONE-LINE DIAGRAM DEMOLITION

0-E1-8 EMERGENCY PWR DISTRIBUTION ONE-LINE DIAGRAM DEMO

0-E1-9 PWR DISTRIB ONE-LINE DIAGRAM ESS EQUIP SYSTEM DEMO

0-E1-10 NORMAL POWER DISTRIBUTION ONE-LINE DIAGRAM NEW

0-E1-11 EMERGENCY POWER DISTRIBUTION ONE-LINE DIAGRAM NEW

0-E1-12 PANELBOARD SCHEDULES

0-E1-13 ISOLATED POWER PANELBOARD SCHEDULES

0-E1-14 ELECTRICAL DETAILS

0-E1-15 ELECTRICAL DETAILS

0-E1-16 ELECTRICAL DETAILS

1-E2-1 PARTIAL SECOND FLOOR ELECTRICAL OVERALL PLAN - PHASE 1

1-E2-2 PARTIAL SECOND FLOOR ELECTRICAL PLANS - PHASE 1

2-E2-1 PARTIAL SECOND FLOOR LIGHTING DEMOLITION PLAN - PHASE 2

2-E2-2 PARTIAL SECOND FLOOR LIGHTING PLAN - PHASE 2

2-E3-1 PARTIAL SECOND FLOOR POWER DEMOLITION PLAN - PHASE 2

2-E3-2 PARTIAL SECOND FLOOR POWER PLAN - PHASE 2

2-E4-1 PARTIAL ROOF MECH CONNECTIONS DEMO PLAN - PH 2

2-E4-2 PARTIAL ROOF MECHANICAL CONNECTIONS PLAN - PHASE 2

2-E5-1 ELECTRICAL SUB-PHASING PLANS - SUB PHASES 2A, 2B

3-E2-1 PARTIAL SECOND FLOOR LIGHTING DEMOLITION PLAN - PHASE 3

3-E2-2 PARTIAL SECOND FLOOR LIGHTING PLAN - PHASE 3

3-E3-1 PARTIAL SECOND FLOOR POWER DEMOLITION PLAN - PHASE 3

3-E3-2 PARTIAL SECOND FLOOR POWER PLAN - PHASE 3

3-E4-1 PARTIAL FIRST FLOOR MECH CONNECTION DEMO PLAN - PH 3

3-E4-2 PARTIAL FIRST FLOOR MECH CONNECTIONS PLAN - PHASE 3

3-E4-3 PARTIAL ROOF MECH CONNECTIONS DEMO PLAN - PH 3

3-E4-4 PARTIAL ROOF MECHANICAL CONNECTIONS PLAN - PHASE 3

0-T1-1 TECHNOLOGY LEGEND AND GENERAL NOTES

0-T1-2 PARTIAL SECOND FLOOR TECHNOLOGY KEY PLAN

0-T1-3 PARTIAL SECOND FLR TECH CABLE TRAY & CONDUIT ROUTING PLAN

0-T1-4 TECHNOLOGY DETAILS

0-T1-5 TECHNOLOGY DETAILS

1-T2-1 PARTIAL SECOND FLOOR ELECTRICAL PLANS - PHASE 1

2-T2-1 PARTIAL SECOND FLOOR TECHNOLOGY DEMO PLAN - PH 2

2-T2-2 PARTIAL SECOND FLOOR TECHNOLOGY PLAN - PHASE 2

2-T2-3 PARTIAL SECOND FLOOR AUDIO/VISUAL PLAN - PHASE 2

3-T2-1 PARTIAL SECOND FLOOR TECHNOLOGY DEMO PLAN - PH 3

3-T2-2 PARTIAL SECOND FLOOR TECHNOLOGY PLAN - PHASE 3

3-T2-3 PARTIAL SECOND FLOOR AUDIO/VISUAL PLAN - PHASE 3

FIRE PROTECTION DRAWINGS (CONTINUED) MECHANICAL DRAWINGS (CONTINUED)

Revisions: Date:

Bid Issue 06/26/2020

Sheets
0-A1-0 - SITE PLAN
0-A1-1 - EXISTING FLOOR PLAN
0-A1-2 - COMPLETED FLOOR PLAN
0-A1-3 - COMPOSITE REFLECTED CEILING PLAN
0-A1-4 - PROJECT PHASING - OVERALL
0-A1-5 - PROJECT PHASING - PHASE 1
0-A1-6 - PROJECT PHASING - PHASE 2
0-A1-7 - PROJECT PHASING - PHASE 2 DETAIL PLANS
0-A1-8 - PROJECT PHASING - PHASE 3
0-A1-9 - PROJECT PHASING - PHASE 3A
0-A1-10 - PROJECT PHASING - PHASE 3B
0-A1-11 - PROJECT PHASING - PHASE 3C
0-A1-12 - PROJECT PHASING - PHASE 3D
0-A3-1 - INFECTION CONTROL PLAN - PHASE 2
0-A3-2 - INFECTION CONTROL PLAN - PHASE 3
0-A5-1 - DOOR SCHEDULES AND NOTES
0-A6-1 - MILLWORK DETAILS
0-GI-1 - COVER SHEET
1-A1-1 - SECOND FLOOR DEMOLITION PLAN - PHASE 1
1-A1-2 - SECOND FLOOR NEW WORK PLAN - PHASE 1
1-A3-1 - SECOND FLOOR NEW WORK REFLECTED CLNG. PLAN - PHASE 1
1-A5-0 - FINISH SCHEDULE AND DETAILS - ALL PHASES
1-A5-1 - SECOND FLOOR FINISH FLOOR PLAN PHASE 1
1-A5-2 - SECOND FLOOR FINISH WALL PLAN PHASE 1
2-A1-1 - SECOND FLOOR DEMOLITION PLAN - PHASE 2
2-A1-2 - SECOND FLOOR NEW WORK PLAN - PHASE 2
2-A1-3 - ENLARGED FLOOR PLANS
2-A2-1 - ROOF PLAN
2-A3-2 - SECOND FLOOR NEW WORK REFLECTED CLNG PLAN - PHASE 2
2-A4-1 - INTERIOR ELEVATIONS
2-A4-2 - INTERIOR ELEVATIONS
2-A4-3 - INTERIOR ELEVATIONS
2-A5-3 - SECOND FLOOR FINISH FLOOR PLAN PHASE 2
2-A5-4 - SECOND FLOOR FINISH WALL PLAN PHASE 2
2-A6-1 - EQUIPMENT PLAN - PHASE 2
2-A6-2 - EQUIPMENT PLANS AND SCHEDULES - PHASE 2
3-A1-1 - SECOND FLOOR DEMOLITION PLAN - PHASE 3
3-A1-2 - SECOND FLOOR NEW WORK PLAN - PHASE 3
3-A1-3 - ENLARGED FLOOR PLANS
3-A3-2 - SECOND FLOOR NEW WORK REFLECTED CLNG PLAN - PHASE 3
3-A4-1 - INTERIOR ELEVATIONS
3-A4-2 - INTERIOR ELEVATIONS
3-A4-3 - INTERIOR ELEVATIONS
3-A5-5 - SECOND FLOOR FINISH FLOOR PLAN PHASE 3
3-A5-6 - SECOND FLOOR FINISH WALL PLAN PHASE 3
3-A6-1 - EQUIPMENT PLAN - PHASE 3
3-A6-3 - EQUIPMENT PLANS AND SCHEDULES - PHASE 3
3-A7-1 - EXTERIOR DETAILS
3-A7-2 - EXTERIOR DETAILS

File details come from the government source that posted it. Updated .