This modification to a federal solicitation incorporates two addenda to the requirements for renovating and reconfiguring clinical services at the Louis Stokes Cleveland VA Medical Center. Addendum 1 and Addendum 3, issued on unspecified dates, are now part of solicitation number Am00003 for the project. Proposals are due by May 7, 2021 at 12:00 PM Eastern Time. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is the contracting agency. Renovation and construction services are the products and services required to complete the project objectives.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02. Addendum 1 - VARRCS Addendum 01 2021 04-15.pdf | ||
| S06. 36C25021B0004 0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. Bid Addendum 03
Date May 3, 2021
Project Name VA Renovate and Reconfigure Clinical Services
Project Number 19-116
Project Location 10701 East Blvd. Cleveland, OH. 44106
Documents Bid Issue, 4/9/21
This Addendum hereby modifies, supplements, and amends the Contract Documents, as prepared by Perspectus Architecture. Wherein this Addendum varies or is in conflict with the Contract Documents, the requirements of this Addendum shall govern. In all other particulars, the requirements of the original Specifications and Contract Documents, including any previous Addenda, shall govern.
This addendum is comprised of the following items:
DRAWINGS
No. Item 1 Existing chase walls north of Room 1B080 to be demolished and replaced with 2 HR rated construction. Wall type G2 added to Partition Schedule with UL# U438.
2 Existing rated soffit in 1B476 to remain and its rated construction verified. In new construction room 1B478, a new soffit is to match the height and depth of the existing, adjacent soffit.
[End of Addendum]
36 37
P
Q
R
T
V
U
39 4236a
5' -6
/2
All work this area during off-hours
Z4
PHASE 5
Temporary partition
1a
Blood Draw 6 1B473
Blood Draw Waiting 1B460
Blood Draw 4 1B470
Blood Draw 5 1B472
Corridor 1B466
Passage 1B461
EMS
1B469
Blood Draw 1B431
Blood Draw Waiting 1B430
VSO Office 1B414
Hall 1B412
VSO Office 1B415
VSO Office 1B413
Escort Services 1B411
Patient Alcove 1B410
VSO Office 1B417
VSO Office 1B416
VSO Office 1B419
VSO Office 1B418
Corridor 1B400G
Vestibule 1B440
Cubicle Area 1B442
Corridor 1A400H
Interview Room 1B441
Corridor 1B402
Existing construction to remain
Construction to be demolished
Temporary partition
30 32 33 34 35 36 37
N
P
Q
R
T
V
W
Y
L3
U
M
Y2 Y2
36a
Z4
7 4
7 4
3 3
1a
Temporary partition
Temporary partition
Phase 3 must be completed & accessible to owner prior to Phase 4 work Phase 4
Temporary partition
All work this area during off-hours
All work this area during off-hours
All work this area during off-hours
PHASE 4
PH
AS
E4
PHASE 4
PHASE 4
PHASE 4
3c
All work this area during off-hours
3c
6'-0"
6'-0"
6'-0"
7' -0
32 33 34 35 36
Y
3 3Phase 3 Temporary partition
Phase 3 must be completed & accessible to owner prior to Phase 4 work
Phase 3 Temporary partition
PHASE 3
PHASE 3
Phase 3 Temporary partition
6'-6"
5'-6"
Pre Op Office
1B501A
Blood Draw 1B431
Blood Draw Waiting 1B072
Surgical Service Office 1B462
EMS
1B079
Hall 1B400E
EEG Office 1B461
Tele-Health 1B472
Surgical Service Office 1B473
EEG Office 1B080
SCI Nurse 1B475
EEG Lab 1B466 E.C.
1B081
PIV
1B467
IRM
1B468
Vacant 1B478
Director's Suite Office
1B469
Mailroom / Breakroom
1B468A
Vacant 1B479
Surgical Service Office 1B498
Vacant 1B477
Vacant 1B476
Vacant 1B474
My Healthy Vet
1B471 Hall
1B400C
CWT Open Office 1B236
CWT Office 1B480A
CWT Conf.
Rm
1B482A
Corridor 1B400F
Vocera 1B481
Corridor 1B400D
Elec. Room 1B499
IRM
1B496
Eng Closet 1B495
Stair 10 1S10
Tri-C Veterans
Edu.
Connection
Center 1B420
Corridor 1C402
Interview Room 1B441
Files/Copy 1B458
Chief Of Police 1B459
Dispatch & Fire
1B456
Vestibule 1B440
Sec'y 1B457
Data 1B159
Lockers 1B453B
Elect.
1C403A
Closet 1C403B
Breakroom 1B567
Toilet 1B567B
Corridor 1B567C
Workroom 1B563
Registration 1B560A
Waiting 1B560
Toilet 1B570B
Toilet 1B570A
Corridor 1B570
Workroom 1B563A
Mainstreet 1B400B
Dry Storage 1C415
Corridor 1C403
Cooler 1C414B
Corridor 1B403
CWT Open Office 1B236
CWT Office 1B480A
CWT Conf.
Rm
1B482A
Corridor 59 Chief Of
Police 1B459
Dispatch & Fire
1B456
Data 1B159
Breakroom 1B567
Workroom 1B563Waiting
1B560
Corridor 1C403
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
PROJECT
NORTH
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CLEVELAND, OHIO
DESIGN AND CONSTRUCTION DOCUMENTS AS INSTRUMENTS OF
SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY
OF PERSPECTUS ARCHITECTURE. THE USE OF THIS DESIGN AND
THESE CONSTRUCTION DOCUMENTS FOR PURPOSES OTHER
THAN THE SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT © 2021.
1300 East 9th St. Suite 910 Cleveland, Ohio 44114 P. 216.752.1800 F. 216.752.3833
C :\T em p\
Lo ca ls
8\
VA
M
P_ R
R C
S_ M ai n
Bu ild in g_
R
_t kr ej ci pe rs pe ct us ar ch
.c om
.rv t
5/ 3/
:3
0:
P M
A-102
PARTIAL FIRST FLOOR
DEMOLITION PLAN PHASES 3, 4, 5
RENOVATE AND RECONFIGURE
CLINICAL SERVICES
541‐20‐101
4/9/21 - -
Scale: 1/8" = 1'-0"A-102
PARTIAL FIRST FLOOR DEMOLITION PLAN - PHASE 51
CODED DEMOLITION NOTES
1 Remove interior partition from floor to underside of structure above.
Prepare all adjacent surfaces to receive new construction and scheduled finish. Existing walls shown to be removed shall be demolished complete. This includes the removal of reinforcement, soffits, doors, windows, frames and overhead bracing. Coord. with mech. and elec. for disconnection and removal of exist utilities and devices located within areas scheduled to be demolished.
1a Remove plaster/finishes from wall. Prepare all adjacent surfaces to receive new construction and scheduled finish. Coord with mech and elec for disconnection and removal of exist utilities and devices located within areas scheduled to be demolished.
1b Remove gypsum board from wall. This includes above ceilings, doors and windows. Prepare all adjacent surfaces to receive new construction and scheduled finish. Coord with mech and elec for disconnection and removal of exist utilities and devices located within areas scheduled to be demolished.
2 Remove portion of wall as required for new opening. Patch/repair adjacent surfaces to match existing. Prepare surfaces for scheduled finishes.
2a Remove portion of wall as required for new opening. Provide shoring and newheader and lintel to support existing masonry and wall above. Patch/repair adjacent surfaces to match existing. Prepare surfaces for scheduled finishes.
3 Remove existing door, frame, anchors, thresholds, and hardware as indicated within limits of construction. Patch and repair wall and floor to match existing. Owner shall have the right to salvage any and all doors and hardware. Contractor shall verify doors for salvage or relocation prior to commencing demolition.
3a Remove existing door panel and hinges. Infill jamb area where hinges were removed, sand smooth and finish frame to match existing or scheduled finish. Owner shall have the right to salvage any and all doors and hardware. Contractor shall verify doors for salvage or relocation prior to commencing demolition.
3c Remove existing door, frame, sidelight, anchors, thresholds, and hardware as indicated within limits of construction. Patch and repair wall and floor to match existing. Owner shall have the right to salvage any and all doors and hardware. Contractor shall verify doors for salvage or relocation prior to commencing demolition.
4 Remove existing ceiling system, supports, ties, and related equpiment within limits of construction (unless noted otherwise).
Coordinate with electrical work on removal and/ or relocation of lights, conduit, ties, supports, and related wiring. Coordinate with mechanical on removal of diffusers, grills and related ductwork and equipment. Contractor shall verify fixtures for salvage or relocation prior to commencing demolition.
5 Door hardware to be replaced and door slab and frame to be reused/reinstalled: Remove and Retain existing door hardware.
Patch and repair wall and floor to match existing. Owner shall have the right to salvage any and all doors and hardware. Contractor shall verify doors for salvage or relocation prior to commencing demolition.
6 Remove plumbing fixtures as indicated within limits of construction.
Cap all plumbing lines not required by new construction. Coordinate with plumbing plans for additional information. Remove all accessories associated with plumbing fixtures including partitions, grab bars, dispensers, racks, shelving, sink base, disposals, etc.
7 Remove exist. floor finish and base from entire room to top of structural slab or subfloor as req'd for new construction. Patch and level exist floor to receive new finish as scheduled. Level per new floor finish manuf recommendations. Patch exist walls as reqd to receive new finish as scheduled.
8 Remove exist. millwork as indicated within limits of construction.
Coordinate removal of plumbing fixtures, diffusers, and devices with mep. drawings. Cabinets and counter tops may be required to be salvaged. Coord. with Owner.
9 Remove and relocate existing pneumatic tube station 10 Refer to finish plan for extent of existing wall finishes to remain this area.
11 Remove concealed window and replace with wall infill to match existing adjacent and provide lintel as required.
12 Remove and salvage lockers for Owner.
13 See finish draings for additional information 14 Existing rated soffit to remain. Contractor to verify 2 HR construction.
GENERAL DEMOLITION NOTES
A Refer to specifications section 024119 - Selective Demolition for additional requirements and information.
B Project Scope line is indicated for general intent only. Additional demolition will be req'd. outside of this line. Architectural demolition drawings are for schematic purposes. Contractor shall coord. all demolition with the entire set of contract documents for full scope of demolition work req'd for the project.
C Exist. conditions shown on these drawings are not guaranteed to be complete. The contractor shall verify all exist. conditions, dimensions, and materials req'd for the contracted work. Report all discrepencies to architect prior to fabrication, erection, and/or installation.
D Coord. all new penetrations and/or openings with other associated trades.
E The Owner may select and tag items for demolition to be salvaged.
The contractor shall remove selected items from the scope of work and deliver to the Owner's requested location within the exist. facility.
F Contractor shall provide HEPA filtered negative air machine(s) to maintain negative pressure to scope of work area ensuring no dust will be transfered to occupied areas. Provide visual pressure monitoring device at dust proof barricade to confirm pressure.
G The Facility's exist. smoke and fire suppression system shall remain in operation during the entire construction phase.
H All demolition work being done outside of temporary partitions is to be appropriately sealed off to prevent the transmission of dust and debris and minimize disruption to visitors, residents, and staff.
Coord. location of barriers with Owner.
J Remove partitions indicated to the underside of the structure above.
K Some items may be indicated in the demolition drawings and demolition notes which are not necessarily demolition work but are included to describe the overall scope of the project and to aid in the demolition coord. The contractor is responsible for all work required to complete the intended work of the overall project.
L Flooring demolition includes the removal of exist. floor finishes, including vct., sheet vinyl, ceramic tile, quarry tile, carpet and other finishes, grouts, mastics, and setting beds complete to exist. conc.
floor slab or other substrate ready for new floor finishes. Floor preparation shall be by the installing contractor.
M Remove misc. items within limits of demolition. Coord with Owner any items to be salvaged.
N Demolition of ceilings includes, grid, tile, supports, soffits, and related items as well as any ceiling mtd. elec. and mech. fixtures contained therein.
O Plug abandoned floor openings with new conc. Plug shall match exist. slab depth and be structurally sound to carry floor load of 100 lbs./ sq. ft. unless noted otherwise.
P All fire rated assemblies (columns, shafts, walls, etc.) shall be maintained or be relocated/ patched. Match exist. fire rating unless noted otherwise.
Q Where new wall/door openings are indicated to be cut into an existing wall: Prepare wall for new opening; Patch adjacent walls to match existing; Provide lintels as required to support existing construction.
DEMOLITION PLAN LEGEND
Scale: 1/8" = 1'-0"A-102
PARTIAL FIRST FLOOR DEMOLITION PLAN - PHASE 43
Scale: 1/8" = 1'-0"A-102
PARTIAL FIRST FLOOR DEMOLITION PLAN - PHASE 34
0 4 8 16'
0 4 8 16'
0 4 8 16'
REVISIONS: DATE:
BID ISSUE 1/8/21
BID ADDENDUM 03 4/30/21
UP
UP
Y
PHASE 3
PHASE 3
8' -0
CWT Open Office 1B236
CWT Office 1B480A
CWT Conf.
Rm
1B482A Corridor 1B400F
Breakroom 1B567
Corridor 1B403
1B
7A
Existing construction to remain
New construction
Temporary partition
P
Q
R
T
V
U
39 42
R1
36a
LOCKERS
8'-10" 1'-3"
1B
1B464
PHASE 5
14/A-401
1B
Z4
Corridor 1B400G
Multipurpose Room 1B430
Processing 1B465
Tlt.
1B464
Alcove 1B463
Passage 1B461
9/A-401
16/A-401
/A
-4
7' -1
1/
2"
2'-3 1/2"
A6
A6
A6
A6
/A
-4
2'-6"
/A
-4
Si m
Blood Draw 6 1B473
Blood Draw Waiting 1B460
Blood Draw 4 1B470
Blood Draw 5 1B472
Elec 1B462
Corridor 1B466
EMS
1B469
VSO Office 1B414
Hall 1B412
VSO Office 1B415
VSO Office 1B413
Escort Services 1B411
Interview Room 1B441
VSO Office 1B417
VSO Office 1B416
VSO Office 1B419
VSO Office 1B418
Vestibule 1B440
Cubicle Area 1B442
1' -6
GB-18
GB-42
GB-36
GB-36
30 32 33 34 35 36 37
N
P
Q
R
T
V
W
Y
L3
U
M
Y2 Y2
36a
7/A-401
13/A-401
8/ A-
Z4
PHASE 4
PH
AS
E4
PHASE 4
PHASE 4
PHASE 4
1B
Control Station 1B486
Clean 1B494
Corridor 1B486A
TeleHealth 1B492
Soil 1B493
Exam 6 1B491
Exam 7 1B490
Exam 8 1B489
Exam 5 1B488
Exam 4 1B487
Control Station 1B485
Storage 1B475
Blood Draw 3 1B474
Corridor 1B476B
Sub Wait 1B483
Elec. Room 1B499
Storage 1B484
Corridor 1B402
Corridor 1B466
Blood Draw 6 1B473
Blood Draw 5 1B472
IRM
1B496
Eng Closet 1B495
Corridor 1C402
Tlt.
1B479
Tlt.
1B478
Pre Op Waiting 1B476
Reception/ Discharge
1B477
Exam 2 1B480
Exam 3 1B481
Blood Draw 2 1B471
Blood Draw 1 1B468
Check-In 1B467
Blood Draw Waiting 1B460
Passage 1B461
EMS
1B469
Blood Draw 4 1B470
Corridor 1B403
Corridor 1C403
Exam 1 1B482
17/A-401
20/A-40119/A-401
'-9
'-1 0"
'-0
7' -7
7'
-7
/2
'-1
/2
'-0
Scale 1B476C
9'-7 3/4" 12'-7 5/8" 9'-11" 10'-0 3/4"
6' -8
'-4
1B
1B
1B
1B
1B
1B
1B
1B
1B
1B402A
1B475
3'-6"
4'-0"
1C402
14'-11" 7'-1 1/2"
'-8
5'
-6
11'-6"
11'-9"
9'-10"
2'-3"
1' -8
1B484
1B473
1B472 1B471
1B470
1B474
1B469
1B482
1B479
1B478
1B481
1B468
1B480
1B
1B
2B
7' -1
1" 7'
-7
/2
1' -3
6'-6 1/2"
1B
1B
6B
5' -6
5'
-6
2'-0"
1B
A6
A6
A6
A6
A6
A6
A6
A6
A6
A6
A6
A6
A6
A6
A6 A6
/A
-4
23/A-401
3'-0" 5'-0"
/A
-4
Kiosks 1B476A
Kiosks 1B460A
Elec 1B462
Pre Op Office
1B501A
Blood Draw 1B431
Blood Draw Waiting 1B430
Stair 10 1S10
Tri-C Veterans
Edu.
Connection
Center 1B420
Interview Room 1B441
Files/Copy 1B458
Chief Of Police 1B459
Dispatch & Fire
1B456
Vestibule 1B440
Sec'y 1B457
Toilet 1B451
Data 1B159
Lockers 1B453B
Elect.
1C403A
Closet 1C403B
Breakroom 1B567
Toilet 1B567B
Toilet 1B567A
Corridor 1B567C
Workroom 1B563
Registration 1B560A
Waiting 1B560
Toilet 1B570B
Toilet 1B570A
Corridor 1B570
Group Therapy 1 1B570C
Group Therapy 2 1B570D
Nurse Screening
1B581
Workroom 1B563A
Mainstreet 1B400B
Dry Storage 1C415
Food Prep.
1C414
Service 2 1C413
Servery 1C411
Cooler 1C414B
SD-1 PTD-1
SD-1 PTD-1
All work this area during off-hours
1B
0B
9 9
1B
1' -3
1'
-6
1' -6
1'
-3
GB-18
GB-42
GB-36
G2
G2G2
G2 1
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
PROJECT
NORTH
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CLEVELAND, OHIO
DESIGN AND CONSTRUCTION DOCUMENTS AS INSTRUMENTS OF
SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY
OF PERSPECTUS ARCHITECTURE. THE USE OF THIS DESIGN AND
THESE CONSTRUCTION DOCUMENTS FOR PURPOSES OTHER
THAN THE SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT © 2021.
1300 East 9th St. Suite 910 Cleveland, Ohio 44114 P. 216.752.1800 F. 216.752.3833
C :\T em p\
Lo ca ls
8\
VA
M
P_ R
R C
S_ M ai n
Bu ild in g_
R
_t kr ej ci pe rs pe ct us ar ch
.c om
.rv t
5/ 3/
:3
0:
P M
A-112
PARTIAL FIRST FLOOR PLAN
PHASES 3, 4, 5
RENOVATE AND RECONFIGURE
CLINICAL SERVICES
541‐20‐101
4/9/21 - -
Scale: 1/8" = 1'-0"A-112
PARTIAL FIRST FLOOR PLAN - PHASE 31
CODED FLOOR PLAN NOTES
1 Align 2 Construct column cover tight to column 3 Relocated pneumatic tube station 4 Provide 1 layer 5/8" type x gypsum board from floor to structure above..
Maintain fire/smoke ratings.
5 Speciman pass thru 6 "Flectron" Shielded fabric on metal studs and under gyp. board to structure above.
7 Existing flooring openings to be filled and patched.
8 Reveal accent around all doors in this main corridor area. See finish plan.
9 Provide ceiling lift. Basis of design: Guldman GH3/GH3+. Lift vendor to coordinate and provide required supports. Lift vendor to verify existing structure provides sufficient support for lift. Lift vendor to provide anchorage details for review.
10 For non-load bearing walls: provide steel lintel L5x3 1/2x5/16; with a minimum of 8" bearing at each end; use one angle per each 4" thickness of masonry; long leg vertical.
11 Wall infill to match construction and rating of existing adjacent.
12 Recessed fire extinguisher cabinet.
13 Move existing blood draw processing equipment from existing Blood Draw
1B431 to Blood Draw 1B474 at end of Phase 4 temporarily until Phase 5 is complete
14 Finishes disturbed by adjacent demolition/new construction to be replaced and are to match existing
GENERAL FLOOR PLAN NOTES
A All partitions to be Type ‘A1’ unless noted otherwise. Refer to A6 series drawings for partition information.
B Contractor to verify all dimensions and conditions in the field prior to commencement of work. If drawings conflict with actual field conditions, contact Architect prior to proceeding with work.
C Refer to Life Safety Plans for rated wall locations.
D Refer to Q- series drawings for furniture and equipment location coordination. Dashed furniture and equipment items shown for reference only and is not part of the General Contract. These items will be provided and installed by Owner. Contractor may need to coordinate specific fixture and equipment requirements if noted.
F Provide concealed in-wall reinforcing/blocking for attachment of all millwork, casework, and/or accessories as required.
G All dimensions are to finish face of wall unless noted otherwise.
H Verify in field with designer final locations of all light switches, strobes, fire extinguisher cabinets, fire alarm pulls and other devices on walls.
FLOOR PLAN WALL LEGEND
Scale: 1/8" = 1'-0"A-112
PARTIAL FIRST FLOOR PLAN - PHASE 52
Scale: 1/8" = 1'-0"A-112
PARTIAL FIRST FLOOR PLAN - PHASE 43
0 4 8 16'
0 4 8 16'
0 4 8 16'
REVISIONS: DATE:
BID ISSUE 1/8/21
BID ADDENDUM 03 4/30/21
32 33 34 35 36
Y
ACT-2
8' - 0"ACT-2
8' - 0"
PHASE 3
PHASE 3
1B2361B480A
1B482A
1B400F
1B567
GYP.
8' - 0"
GYP.
8' - 0"
4'-0" 4'-0"
Recessed can light fixture
2x2 recessed light fixture
2x4 recessed light fixture
Exit sign
Supply Diffuser
Return Diffuser
Wall sconce
Recessed linear fixture
Recessed circular fixture
Gyp. bd. clg. or Soffit
ACT-1 (ACOUSTICAL CEILING TILE)
ARMSTRONG
ULTIMA HEALTH ZONE HIGH NRC
24"x24" x.75", WHITE
GRID SYSTEM: PRELUDE XL 15/16"
ACT-2 (ACOUSTICAL CEILING TILE)
ARMSTRONG
OPTIMA
24"x24" x.75", WHITE
GRID SYSTEM: PRELUDE XL 15/16
Exposed Structure (ES)
ACT-1
ACT-2
36 37
P
Q
R
T
V
U
39 42
R1
36a
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
Z4
PHASE 5
1B430
1B465
1B4641B463
1B414 1B412
1B415
1B413
1B411
1B441
1B417 1B416
1B419 1B418
1B400G
1B440 1B442
1B473
1B460
1B470
1B472
1B467 1B462
1B466
1B461
1B469
30 32 33 34 35 36 37
N
P
Q
R
T
V
W
Y
L3
U
M
Y2
R1
36a
Z4
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0" ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
ACT-2
8' - 0"
PHASE 4
PH
AS
E4
PHASE 4
PHASE 4
PHASE 4
GYP.
8' - 0"
ACT-2
8' - 0"
GYP.
8' - 0"
GYP.
8' - 0"
2'-0"
GYP.
7' - 6"
GYP.
7' - 6"
GYP.
7' - 6"
GYP.
8' - 0"
6"
1/ 4"
6"GYP.
8' - 0"
GYP.
8' - 0"
GYP.
8' - 0"
GYP.
8' - 0"
1B499
1B496
1B495
1C402
1B499
1B496
1B495
1C402
1C403
1B476C
1B431
1B430
1S10
1B420
1B441
1B458
1B459
1B456
1B440
1B457 1B451
1B159
1B453B
1C403A 1C403B
1B567
1B567B
1B567A
1B567C
1B563
1B560A
1B560 1B570B
1B570A
1B570
1B570C
1B570D 1B581
1B563A
1B400B
1C415
1C414
1C413
1C411
1C414B
1B468
1B477
1B478
1B479
1B482
1B480
1B481 1B471
1B474
1B485
1B488 1B487
1B493
1B492 1B491
1B490
1B483
1B473
1B460
1B470
1B472
1B467
1B476
1B475
1B486
1B494
1B489
1B484
1B486A
1B476B
1B476A
1B460A
1B462
1B466
1B403
1B461
1B469
1B402
4 4 4 4
6'-0"
A
6'-0"
1'-0"
GYP.
8' - 0"
GYP.
8' - 0"
GYP.
8' - 0"
GYP.
8' - 0"
1' -0
A
A
6' -0
A
A
A
A
6' -3
6'
-3
A
6 6
A
A GYP. 8
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
PROJECT
NORTH
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CLEVELAND, OHIO
DESIGN AND CONSTRUCTION DOCUMENTS AS INSTRUMENTS OF
SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY
OF PERSPECTUS ARCHITECTURE. THE USE OF THIS DESIGN AND
THESE CONSTRUCTION DOCUMENTS FOR PURPOSES OTHER
THAN THE SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT © 2021.
1300 East 9th St. Suite 910 Cleveland, Ohio 44114 P. 216.752.1800 F. 216.752.3833
C :\T em p\
Lo ca ls
8\
VA
M
P_ R
R C
S_ M ai n
Bu ild in g_
R
_t kr ej ci pe rs pe ct us ar ch
.c om
.rv t
5/ 3/
:3
0:
P M
A-122
PARTIAL FIRST FLOOR REFLECTED
CEILING PLAN PHASES 3, 4, 5
RENOVATE AND RECONFIGURE
CLINICAL SERVICES
541‐20‐101
4/9/21 - -
Scale: 1/8" = 1'-0"A-122
PARTIAL FIRST FLOOR RCP PHASE 31
REFLECTED CEILING PLAN GENERAL NOTES
1 All ceilings are 8’-0” AFF unless noted otherwise.
2 Center and/or edge align all ceiling tiles, as indicated graphically, unless noted otherwise.
3 Refer to electrical drawings for light fixture descriptions and all ceiling mounted electrical devices.
4 Refer to mechanical drawings for diffuser descriptions and all ceiling mounted mechanical devices.
5 Refer to technology drawings for identification and description of ceiling mounted technology equipment.
6 CT = cut tile 7 Ceiling height dimensions shown on rcp. and details are from finish floor to finish ceiling.
8 Unless noted otherwise, light fixtures shall be located as shown on the reflected ceiling plans.
9 Where light fixtures, devices and accessories are shown to be recessed in ceiling tiles, they shall be centered in the ceiling tiles unless noted otherwise.
10 Provide access panels as required by applicable codes and as required for mechanical, electrical, and plumbing equipment. Access panels located in finished areas shall be painted to match adjacent surfaces. Locations shall be reviewed with the Architect prior to proceeding with the installation.
11 All gypsum. board ceilings and soffits are to be painted.
12 No mechanical equipment in the ceiling cavity requiring normal maintenance shall be installed above a gypsum. board ceiling. Notify architect if any such items are indicated above gypsum.
board ceilings.
13 Exit signs and smoke detectors located in hard ceilings shall be centered in corridors and located a distance of 1’-0” from wall to the center of the fixture unless noted otherwise. Locate exit signs as required by the authority having jurisdiction.
14 Soffits and bulkheads shall be laterally braced to resist horizontal movement.
15 Gyp. Bd soffits to occur above all wall cabinets. 7'-2" to ceiling, U.N.O.
CODED REFLECTED CEILING PLAN NOTES
1 Provide temporary ceiling and lighting. Access required for Phase 2. Refer to MEP drawings 2 Specialty recessed light fixture. Refer to MEP drawings 3 NRC to be 0.80 or greater for this ceiling.
4 Contractor to provide track for Owner supplied privacy curtain 5 Gyp Bd soffit above wall cabinets, bottom at 7'-2" unless noted otherwise, see elevations 6 Ceiling MTD Patient Lift; provide and coordinate support to structure with vendor.
7 Final ceiling to be installed as part of Phase 2.
8 Gyp Bd soffit (7'-10"+/-) to match elevation and leading edge of existing, adjacent soffit.
A Align Gyp Bd. ceiling plane with wall condition as indicated
REFLECTED CEILING PLAN LEGEND
Scale: 1/8" = 1'-0"A-122
PARTIAL FIRST FLOOR RCP PHASE 52
Scale: 1/8" = 1'-0"A-122
PARTIAL FIRST FLOOR RCP PHASE 43
0 4 8 16'
0 4 8 16'
0 4 8 16'
REVISIONS: DATE:
BID ISSUE 1/8/21
BID ADDENDUM 03 4/30/21
1. All partitions are type A1 unless noted otherwise.
2. Refer to the Life Safety Plans for fire barriers, fire partitions, smoke barriers and smoke partitions.
3. Fire resistance rating indicated on the Life Safety Plan shall mean the entire length and height of the partition inidcated to be fire rated. All piping, ducts cabinets etc that penetrate partitions shall be installed in a manner that will preserve the fire resistant rating of the partition.
4. Partitions are dimensioned from the face of gypsum board exclusive of finish materials such as porcelain tile or wood paneling. Coordinate finish dimensions with finish schedule.
5. Provide blocking in partitions for wall mounted accessories.
6. Provide water resistant gypsum board at plumbing locations unless cementitious backer board is specified.
7. Metals studs shall be 20 gage minimum. Maximum height is 15'-0".
Partition heights that exceed 15'-0" shall increase in gage in accordance with the Steel Stud Manufacturers Assosciation Technical Guide, Latest Edition.
Gypsum board to underside of deck -both sides
Ceiling may occur
Deck
Accoustic insulation
Gypsum board to underside of deck -one side only
Gypsum board to 6" above ceiling - On other side
Mineral wool fire blocking
Deck
Ceiling
Gypsum board to 6" above ceiling -both sides Mineral wool fire blocking
Deck
Ceiling
Gypsum board to underside of ceiling -both Sides
Deck
Ceiling
A
B
C
D
1. Power Assist Door Operator
2. RF Shielded
3. New hardware. Existing door and frame to be reused/reinstalled. PTD to match adjacent, existing.
4. Sound seals
F SM
8"
1/ 2"
3 1/2"3 1/2"
TG
N
9" 6"
3' -2
TG
F1 F2
2"
M at ch E xi st in g
Ex is tin g
M at ch 8"
2"
2"2"
F3
2" Schedule
See 2" See Schedule
2x Panel Width Schedule
See
Match Existing
08 11 13 - Hollow Metal frame
4"
EQ
Wall for wall type See plans
EQ
08 11 13 - HM frame
07920 - Sealant (typical all sides)
2"
Wall for wall type See plans
09 29 00 - Acoustical INSUL may occur
08 11 13 - HM frame2"
07 92 00 - Sealant (typical all sides)
Wall for wall type See plans
08 80 00 - Glazing
09 29 00 - Acoustical INSUL may occur
07920 - Sealant (typical all sides)
08 11 13 - HM frame2"
Wall for wall type See plans
4"
2 7/8"
2"
6 1/4"
See floor plan for partition type (typical)
06 10 00 - Wood blocking as required
08 36 16 - Aluminum frame
08 36 16 - Aluminum track cover
08 36 16 - Door - see floor plan and door schedule
Interior Room
Corridor
08 36 16 - Aluminum frame
See floor plan for partition type (typical)
09 22 16 - Double stud at jamb
08 36 16 - Door - see floor plan and door schedule
Note: Refer to floor plan for hand of door.
7/
8"
08 36 16 - Aluminum track cover above
2"2"
/1
6"
3/ 8"
08 36 16 - Aluminum frame beyond
08 36 16 - Door - see floor plan and door schedule
08 36 16 - Sill guide
07 92 00 - Sealant (typical all sides)
Gyp bd. or panel may occur - COORD w/wall type for wall type See plans
08 41 13 - ALUM framed storefront
08 41 13 - ALUM door (Wood door may occur
- see door types)
ALIGN
O - Owner C - Contractor
08 11 13 - HM frame07 92 00 - Sealant (typical all sides)
09 29 00 - Gyp bd patch;
flush w/ exist to remain
5/ 8"2"
1/2"
ETR VIF
11" +/-
09 29 00 - 5/8" Gyp bd
09 22 16 - 7/8" Mtl furring
1 1/4" Exp jt
09 29 00 - Acoustical insul may occur
New steel lintel; vif
07 84 00 - Fire safing
1 15/16"5 7/8"
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CLEVELAND, OHIO
DESIGN AND CONSTRUCTION DOCUMENTS AS INSTRUMENTS OF
SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY
OF PERSPECTUS ARCHITECTURE. THE USE OF THIS DESIGN AND
THESE CONSTRUCTION DOCUMENTS FOR PURPOSES OTHER
THAN THE SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT © 2021.
1300 East 9th St. Suite 910 Cleveland, Ohio 44114 P. 216.752.1800 F. 216.752.3833
C :\T em p\
Lo ca ls
8\
VA
M
P_ R
R C
S_ M ai n
Bu ild in g_
R
_t kr ej ci pe rs pe ct us ar ch
.c om
.rv t
5/ 3/
:3
1:
P M
A-601
SCHEDULES & DETAILS RENOVATE AND RECONFIGURE
CLINICAL SERVICES
541‐20‐101
4/9/21 - -
PARTITION SCHEDULE
TAG
FRAMING SHEATHING DETAIL
TOP
RATING
STC SOUND TEST #
TOTAL
WIDTH REMARKSSIZE TYPE SIDE 1 SIDE 2 TYPE TIME UL #
A1 3 5/8" 5/8" 5/8" X A 49 4 7/8"
A2 3 5/8" 5/8" 5/8" X A 1 HR U465 49 4 7/8"
A6 3 5/8" 5/8" X C 4 1/4" F1 1 1/2" 5/8" X A 2 1/8"
G2 2 1/2" 5/8" 1" X A 2 HR U438 3 3/4"
U7 3 5/8" 5/8" (2) 5/8" X A 57 NOAL 17-0539 5 1/2" PABCO Gypsum PGD-01-10-196 with QuietRock ES MR
TOILET ACCESSORIES - PHASE 2
ROOM # ROOM NAME
MARK DESCRIPTION
PROVIDED
BY
INSTALLED
BY
1B503C EEG Clinic HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B505C Tlt FM-1 Wall Mirror C C
GB-18 Grab Bar - 18" Vertical C C GB-36 Gra Bar - 36" C C GB-42 Grab Bar - 42" C C PTD-1 Paper Towel Dispenser, C-Fold C C
SD-1 Soap Dispenser O O TTD-1 Toilet Tissue Dispenser C C
1B508 CWT Work Area HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
PARTITION SCHEDULE GENERAL NOTES
TOP OF WALL LEGEND
DOOR SCHEDULE GENERAL NOTESDOOR PANEL TYPESDOOR FRAME TYPES
DOOR SCHEDULE - PHASE 5
NUMBER
DOOR FRAME
FIRE
RATING GLAZING NOTES
OPENING SIZE NUMBER
OF
PANELS
UNEQUAL PANEL
PANEL
MATERIAL
PANEL
FINISH
FRAME
TYPE
FRAME
MATERIAL
FRAME
FINISH
HEAD
DETAIL
JAMB
DETAIL
SILL
DETAILWIDTH HEIGHT
WIDTH TYPE
PANEL1 PANEL 2 PANEL 1 PANEL 2
MB-1-FIRST FLOOR
1B430 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader
1B464 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B465 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader
Scale: 1 1/2" = 1'-0"A-601 H3 / J34
Scale: 1 1/2" = 1'-0"A-601 H2 / J25
Scale: 1 1/2" = 1'-0"A-601 H1 / J11
Scale: 1 1/2" = 1'-0"A-601 H4 / J47
Scale: 1 1/2" = 1'-0"A-601 H56
Scale: 1 1/2" = 1'-0"A-601 J58
Scale: 1 1/2" = 1'-0"A-601 S59
Scale: 1 1/2" = 1'-0"A-601 H6 / J610
DOOR SCHEDULE - PHASE 4
NUMBER
DOOR FRAME
FIRE
RATING GLAZING NOTES
OPENING SIZE NUMBER
OF
PANELS
UNEQUAL PANEL
PANEL
MATERIAL
PANEL
FINISH
FRAME
TYPE
FRAME
MATERIAL
FRAME
FINISH
HEAD
DETAIL
JAMB
DETAIL
SILL
DETAILWIDTH HEIGHT
WIDTH TYPE
PANEL1 PANEL 2 PANEL 1 PANEL 2
MB-1-FIRST FLOOR
1B402A 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B402B 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B460 3' - 6" 7' - 0" 1 3' - 6" 0" SM ALUM ALUM F2 ALUM ALUM H6 J6 TG CR and ADA Pushplate - INT Mullion, Power Assist Door Operator 1B460B 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - 1 - card reader, power assist door operator 1B462 6' - 0" 7' - 0" 2 3' - 0" 3' - 0" F F HM PTD F1 HM PTD H1 J1 - card reader
1B468 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B469 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader
1B470 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B471 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B472 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B473 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B474 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B475 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B476 3' - 6" 7' - 0" 1 3' - 6" 0" SM ALUM ALUM F2 ALUM ALUM H6 J6 TG CR and ADA Pushplate - INT Mullion, Power Assist Door Operator 1B476B 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F2 HM PTD H1 J1 - - card reader 1B477 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F3 ALUM ALUM H5 J5 S5 card reader
1B478 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B479 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B480 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B481 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B482 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B484 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B486 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F3 ALUM ALUM H5 J5 S5 card reader
1B487 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B488 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B489 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B490 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B491 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B492 4' - 0" 7' - 0" 1 4' - 0" 0" F WD STD F1 HM PTD H1 J1 - - 1 - card reader, power assist door operator 1B493 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B494 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B496 0" 0" ETR ETR ETR ETR PTD ETR ETR 3 - card reader, new hardware. Existing frame and door.
1C402 4' - 0" 7' - 0" 1 4' - 0" 0" F WD STD F1 HM PTD H1 J1 - - 1 - power assist door operator
DOOR SCHEDULE - PHASE 1
NUMBER
DOOR FRAME
FIRE
RATING GLAZING NOTES
OPENING SIZE NUMBER
OF
PANELS
UNEQUAL PANEL
PANEL
MATERIAL
PANEL
FINISH
FRAME
TYPE
FRAME
MATERIAL
FRAME
FINISH
HEAD
DETAIL
JAMB
DETAIL
SILL
DETAILWIDTH HEIGHT
WIDTH TYPE
PANEL1 PANEL 2 PANEL 1 PANEL 2
MB-1-FIRST FLOOR
1B500B 7' - 0" 7' - 0" 2 3' - 6" 3' - 6" N N WD PTD HM PTD H7 20 MIN card reader on push side with relocated intercom for remote entry
RAD-FIRST FLOOR
1C593 3' - 0" 7' - 0" 1 3' - 0" 0" N WD STD F1 HM PTD H1 J1 Rework hardware, floor stop
DOOR SCHEDULE - PHASE 2
NUMBER
DOOR FRAME
FIRE
RATING GLAZING NOTES
OPENING SIZE NUMBER
OF
PANELS
UNEQUAL PANEL
PANEL
MATERIAL
PANEL
FINISH
FRAME
TYPE
FRAME
MATERIAL
FRAME
FINISH
HEAD
DETAIL
JAMB
DETAIL
SILL
DETAILWIDTH HEIGHT
WIDTH TYPE
PANEL1 PANEL 2 PANEL 1 PANEL 2
MB-1-FIRST FLOOR
1B500A 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - - 2 card reader 1B501A 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B501B 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B501C 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B501D 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B502A 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B502B 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B503A 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B503B 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B503C 4' - 0" 7' - 0" 1 4' - 0" 0" F HM PTD F1 HM PTD H1 J1 - 1, 2, 4 - card reader, power assist door operator, RF shielded, sounds seals 1B505A 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B505B 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B505C 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B505D 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B506 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader
1B506A 3' - 6" 7' - 0" 1 3' - 6" 0" F WD STD F1 HM PTD H1 J1 - -
1B507 5' - 0" 7' - 0" 2 2' - 6" 2' - 6" F F HM PTD F1 HM PTD H1 J1 - card reader 1B508 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B590 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B591 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B592 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B593 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader 1B594 3' - 0" 7' - 0" 1 3' - 0" 0" F WD STD F1 HM PTD H1 J1 - - card reader
TOILET ACCESSORIES - PHASE 4
ROOM # ROOM NAME
MARK DESCRIPTION
PROVIDED
BY
INSTALLED
BY
1B492 TeleHealth HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B493 Soil HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
TOILET ACCESSORIES - PHASE 4
ROOM # ROOM NAME
MARK DESCRIPTION
PROVIDED
BY
INSTALLED
BY
1B478 Tlt.
FM-1 Wall Mirror C C
GB-18 Grab Bar - 18" Vertical C C GB-36 Gra Bar - 36" C C GB-42 Grab Bar - 42" C C PTD-1 Paper Towel Dispenser, C-Fold C C
SD-1 Soap Dispenser O O
1B479 Tlt.
FM-1 Wall Mirror C C
GB-18 Grab Bar - 18" Vertical C C GB-36 Gra Bar - 36" C C GB-42 Grab Bar - 42" C C PTD-1 Paper Towel Dispenser, C-Fold C C
SD-1 Soap Dispenser O O
1B480 Exam 2 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B481 Exam 3 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B482 Exam 1 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B487 Exam 4 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B488 Exam 5 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B489 Exam 8 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B490 Exam 7 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B491 Exam 6 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
TOILET ACCESSORIES - PHASE 4
ROOM # ROOM NAME
MARK DESCRIPTION
PROVIDED
BY
INSTALLED
BY
1B460 Blood Draw Waiting HS-1 Hand Sanitizer O O
1B468 Blood Draw 1 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B470 Blood Draw 4 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B471 Blood Draw 2 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B472 Blood Draw 5 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B473 Blood Draw 6 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
1B474 Blood Draw 3 HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
TOILET ACCESSORIES - PHASE 5
ROOM NAME
MARK DESCRIPTION
PROVIDED
BY
INSTALLED
BY
1B464 Tlt.
GB-18 Grab Bar - 18" Vertical C C GB-36 Gra Bar - 36" C C GB-42 Grab Bar - 42" C C
HS-1 Hand Sanitizer O O PTD-1 Paper Towel Dispenser, C-Fold C C SPT-1 Specimin Pass-through C C TTD-1 Toilet Tissue Dispenser C C
1B465 Processing HS-1 Hand Sanitizer O O
PTD-1 Paper Towel Dispenser, C-Fold C C SD-1 Soap Dispenser O O
DOOR SCHEDULE - PHASE 3
NUMBER
DOOR FRAME
FIRE
RATING GLAZING NOTES
OPENING SIZE NUMBER
OF
PANELS
UNEQUAL PANEL
PANEL
MATERIAL
PANEL
FINISH
FRAME
TYPE
FRAME
MATERIAL
FRAME
FINISH
HEAD
DETAIL
JAMB
DETAIL
SILL
DETAILWIDTH HEIGHT
WIDTH TYPE
PANEL1 PANEL 2 PANEL 1 PANEL 2
MB-1-FIRST FLOOR
1B567A 3' - 0" 7' - 0" 1 3' - 0" 0" F HM PTD F1 HM PTD H1 J1 - OH Stop, Closer Pull Side, Mag Lock - Fail Safe
TOILET ACCESSORY ABBREVIATION LEGEND
Scale: 1 1/2" = 1'-0"A-601
DOOR HEAD DETAIL H711
REVISIONS: DATE:
BID ISSUE 1/8/21
RFI01 Date 4
BID ADDENDUM 03 4/30/21
RFI05 4/29/21
| A-102 - PARTIAL FIRST FLOOR DEMOLITION PLAN PHASES 3, 4, 5 |
| A-112 - PARTIAL FIRST FLOOR PLAN PHASES 3, 4, 5 |
| A-122 - PARTIAL FIRST FLOOR REFLECTED CEILING PLAN PHASES 3, 4, 5 |
| A-601 - SCHEDULES & DETAILS |
File details come from the government source that posted it. Updated .