S02. 36C25019B0060_3 Addendum 02 ELECTRICAL ONE-LINE LEGEND, SCHEDULES, AND PHASING NOTES R01A02.pdf

PDF 145 KB Posted

Attached to
Replacement of AHU-17 & AHU-18 LOUIS STOKES VAMC - CLEVELAND, OH 44106 541-18-104
Solicitation number
Amendment0007
Issued by

About this file

This document is an electrical one-line diagram, schedules, and phasing notes for the replacement of air handling units 17 and 18 at the Louis Stokes Cleveland VA Medical Center. The project involves installing new air handling units 19, 18, and 17 in three phases, with associated electrical equipment including new panels, transformers, feeders, and a manual transfer switch. Phase one will provide equipment for air handling unit 19, phase two for unit 18, and phase three for unit 17. The document outlines the specific electrical work required for each phase, including disconnecting and reconnecting equipment to various existing and new electrical panels in order to safely implement the new air handling units while maintaining power. Demolition and relocation of certain pumps and existing loads is also specified. Control integration with the building automation system is detailed for the new manual transfer switch and related metering equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

59459

M.P. LONG

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TEA

H

F OO

IO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

MEPT ENGINEER:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

STRUCTURAL ENGINEER:

REPLACEMENT OF

AHU-17 & AHU-18

VAMC - WADE PARK

BARBER & HOFFMAN, INC.

2217 EAST 9TH STREET, SUITE 350

CLEVELAND, OH 4115-1257

PHONE: (216)-875-0100

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

PHONE: (440)-546-9696

541-18-104

19002

Z M y D o c u m e n ts

\1

F F

H C

F R c c a m p b e ll.

rv t

/2

/2

:0

:5

P

M

E0.2

ELECTRICAL ONE-LINE LEGEND,

SCHEDULES, AND PHASING NOTES

CPCMPL08/09/2019

ELECTRICAL PHASING NOTES

AHU 19 INSTALLATION ( PHASE 1)

1.

2.

3.

4.

5.

6.

AHU 18 INSTALLATION (PHASE 2)

1.

2.

3.

AHU 17 INSTALLATION (PHASE 3)

1.

2.

3.

4.

DISABLE SURGERY CHILLER #1 AT 7TH FLOOR TO LIMIT POTENTIAL LOAD ON PANEL 'DPHL71EQ'

(4) EXISTING PUMPS CONNECTED TO EXISTING PANEL 'DPHL71EQ' ARE INTENDED TO BE RE-FED TO MOTOR CONTROL CENTER 'MCC-HL71EQ'. HOWEVER, MCC WILL NOT HAVE SUFFICIENT SPACE UNTIL DEMOLITION OF EXISTING LOADS FROM AC-17/18. (2) PUMPS CAN BE RELOCATED BY REMOVING EXISTING SPARE UNIT AND EXISTING PROVISION AND PROVIDING NEW BREAKERS AS INDICATED. REMAINING (2) PUMPS MAY BE MAINTAINED ON EXISTING PANEL UNTIL FREE SPACE IS CREATED IN MOTOR CONTROL CENTER THROUGH DEMOLITION OF EXISTING LOADS. ALTERNATIVELY, AVAILABLE SPACE IN 'DPHL72EQ' MAY BE UTILIZED SO LONG AS SPACE IS MAINTAINED TO INSTALL THE NEW BREAKER FOR 'DPHL73EQ'. PUMPS SHALL BE SHUT- DOWN AND MOVED ONE AT A TIME UNLESS OTHERWISE DIRECTED BY VA FACILITIES. COORDINATE

SHUTDOWNS OF PUMPS WITH FACILITIES.

PROVIDE NEW EQUIPMENT AND FEEDERS FOR CONNECTION OF AIR-HANDLING UNIT 19.

A.

B.

C.

D.

CONNECT ALL AHU 19 FANS (SUPPLY, RETURN, AND OUTSIDE AIR) TO NEW PANEL 'DPHL75EQ'.

CONNECT NEW 480:208/120V-3PH-4W TRANSFORMER WITH INTEGRAL PANELBOARD 'LL75EQ' TO NEW PANEL 'DPHL75EQ' AND CONNECT ALL 120V OR 208V LOADS ASSOCIATED WITH AHU 19 TO NEW CIRCUIT BREAKERS

WITHIN PANEL.

RECONNECT EXISTING CHILLERS #1 AND #2 TO EXISTING PANEL 'DPHL71EQ' AT NEW LOCATION AS INDICATED

ON PLANS

PROVIDE NEW EQUIPMENT AND FEEDERS FOR CONNECTION OF AIR-HANDLING UNIT 18.

A.

REMOVE EXISTING PANEL 'EPE72-CR' TO FACILITATE INSTALLATION OF NEW AHU 18.

A.

CONNECT ALL AHU 18 FANS (SUPPLY, RETURN, AND OUTSIDE AIR) TO NEW PANEL 'DPHL74EQ'.

CONNECT NEW 480:208/120V-3PH-4W TRANSFORMER WITH INTEGRAL PANELBOARD 'LL74EQ' TO NEW PANEL 'DPHL74EQ' AND CONNECT ALL 120V OR 208V LOADS ASSOCIATED WITH AHU 18 TO NEW CIRCUIT BREAKERS

WITHIN PANEL.

DEMOLISH (2) EXISTING 350A-3P CIRCUIT BREAKERS IN PANEL 'DPHL72EQ' THAT PREVIOUS FED SUPPLY FANS IN DEMOLISHED UNITS AC 17 AND AC 18. INSTALL NEW 600AF/600AT, 3P CIRCUIT BREAKER IN NEWLY

CREATED SPACE.

INSTALL NEW PANEL 'DPHL73EQ' AND CONNECT COMPLETE TO NEWLY INSTALLED 600A-3P CIRCUIT BREAKER

IN PANEL 'DPHL72EQ'.

CONNECT ALL AHU 17 FANS (SUPPLY, RETURN, AND OUTSIDE AIR) TO NEW PANEL 'DPHL73EQ'.

CONNECT NEW 480:208/120V-3PH-4W TRANSFORMER WITH INTEGRAL PANELBOARD 'LL73EQ' TO NEW PANEL 'DPHL73EQ' AND CONNECT ALL 120V OR 208V LOADS ASSOCIATED WITH AHU 18 TO NEW CIRCUIT BREAKERS

WITHIN PANEL.

PROVIDE (2) NEW 600AMP FRAMES IN EXISTING PANEL 'DPHL71EQ' (FOR AHU 19 AND AHU 18). PROVIDE (1)

WITH 600AMP TRIP UNIT AND (1) WITH 400A TRIP UNIT.

UPGRADE EXISTING TRIP UNIT IN EXISTING SPARE 800A CIRCUIT BREAKER IN SUBSTATION 'E2'. REFER TO

ONE-LINE FOR ADDITIONAL DETAILS.

NOTE: DURING ANY SHUTDOWN OF SUBSTATION 'E2' TO FACILITATE NEW WORK, 'ATS-45' AND 'ATS-46' SHALL BE TRANSFERRED TO GENERATOR POWER TO MAINTAIN OPERATION OF EQUIPMENT CONNECTED TO THESE

TRANSFER SWITCHES (SURGERY AIR-HANDLING UNITS AND OTHER SURGERY EQUIPMENT).

PROVIDE NEW MANUAL TRANSFER SWITCH 'MTS-47' AT LOCATION AS INDICATED ON PLANS AND ALL ASSOCIATED CONTROLS AND NEW FEEDERS FROM NEW 600AF/400AT IN PANEL 'DPHL71EQ' AND EXISTING 800AF IN SUBSTATION 'E2' DISTRIBUTION SECTION. CONNECT NEW MANUAL TRANSFER SWITCH COMPLETE.

PROVIDE NEW DISTRIBUTION PANELBOARD EQUIPMENT MOUNTED IN AHU 19 VESTIBULE AND CONNECT

COMPLETE TO NEW FEEDER FROM LOAD SIDE LUGS OF NEW 'MTS-47'.

NOTE: DUE TO THE INSTALLATION LOCATION OF NEW PANEL 'DPHL75EQ' IN THE VESTIBULE OF AHU-19, PANELBOARD CANNOT BE INSTALLED UNTIL AHU 19 IS RIGGED INTO PLACE.

PROVIDE NEW DISTRIBUTION PANELBOARD 'DPHL74EQ' LOCATED IN PENTHOUSE ADJACENT TO NEW AHU 18 AND CONNECT COMPLETE TO PREVIOUSLY INSTALLED 600AF/600AT CIRCUIT BREAKER IN PANEL 'DPHL71EQ'.

VA SHUTDOWNS

DISCONNECTING PANEL 'EPE72-CR' WILL SHUTDOWN (6) EXISTING EXHAUST FAN LOADS (PER PANELBOARD DIRECTORY). CONTRACTOR SHALL IDENTIFY AREAS OF THE FACILITY THAT WILL BE AFFECTED BY THIS

SHUTDOWN AND NOTIFY VA COR AT LEAST (14) DAYS PRIOR TO SCHEDULED SHUTDOWN.

TRANSFER SWITCH OPERATIONS NOTES

NOTE: CONTRACTOR SHALL PROVIDE CONTROLS SUBMITTAL ALONG WITH TRANSFER SWITCH AND METERING SUBMITTALS, INCLUDING WIRING DIAGRAM, INPUT/OUTPUT REGISTER LISTS, PCB DIAGRAMS, ETC. AS NECESSARY TO DETAIL THE PHYSICAL IMPLEMENTATION OF THE CONTROL SCHEME INDICATED BELOW.

SUBMITTALS WILL BE REJECTED UNLESS CONTROLS SUBMITTAL IS PROVIDED.

TYPICAL OPERATION

'MTS-49' PRIMARY SOURCE (SOURCE A) SHALL BE CONSIDERED NORMAL POWER FEEDER FROM SUBSTATION 'E2'

'MTS-49' SECONDARY SOURCE (SOURCE B) SHALL BE CONSIDERED EMERGENCY EQUIPMENT BRANCH POWER

FEEDER FROM DISTRIBUTION PANELBOARD 'DPHL71EQ'.

'AHU 19' SHALL OPERATE ON SOURCE A UNLESS MANUALLY TRANSFERRED TO SOURCE B.

TRANSFER TO SOURCE B

MONITOR THE TOTAL THREE-PHASE DEMAND AMPERAGE (15 MINUTE WINDOW) ON THE LOAD FEEDER FROM

'ATS-44'.

• PROVIDE AN OUTPUT SIGNAL TO 'MTS-49' TO INHIBIT MANUAL TRANSFER TO SOURCE B WHEN THE DEMAND

AMPERAGE EXCEEDS 450A.

• PROVIDE AN OUTUT SIGNAL TO 'MTS-49' TO AUTOMATICALLY SHED TRANSFER SWITCH TO SOURCE A WHEN

THE DEMAND AMPERAGE EXCEEDS 770A.

COORDINATE NECESSARY SIGNAL REQUIREMENTS AND PROGRAMMING BETWEEN METER AND TRANSFER

SWITCH MANUFACTURERS.

WHEN CRITERIA IS MET TO ALLOW FOR A MANUAL TRANSFER TO SOURCE B, 'MTS-49' SHALL DELAY (30) SECONDS IN CENTER-OFF POSITION TO ALLOW UNIT'S MOTORS TO SPIN DOWN BEFORE TRANSFERRING TO SOURCE B.

RE-TRANSFER TO SOURCE A

DURING MANUAL OR AUTOMATIC RE-TRANSFER TO SOURCE A, 'MTS-49' SHALL DELAY (30) SECONDS IN CENTER- OFF POSITION TO ALLOW UNIT'S MOTORS TO SPIN DOWN BEFORE TRANSFERRING TO SOURCE B.

OUTPUT CONNECTIONS

PROVIDE BACNET/IP CONNECTION FROM 'MTS-49' TO BUILDING AUTOMATION SYSTEM (BAS). PROGRAM SYSTEM TO DISPLAY TRANSFER SWITCH POSITION, BY-PASS STATUS, INHIBIT TRANSFER STATUS, AND LOAD SHED

STATUS.

PROVIDE BACNET/IP CONNECTION FROM ELECTRIC POWER METER ON LOAD SIDE OF 'ATS-44' TO BUILDING AUTOMATION SYSTEM (BAS). PROGRAM SYSTEM TO DISPLAY INSTANTANEOUS VOLTAGE PER PHASE, INSTANTANEOUS CURRENT PER PHASE, DEMAND CURRENT PER PHASE, PEAK DEMAND CURRENT PER PHASE, INSTANTANEOUS DEMAND KW AND KVA, AND PEAK DEMAND KW AND KVA.

Revisions: Date:

BID ISSUE 08/09/2019

AMENDMENT 2 05/29/2020

19002 FFH CF R17_ccampbell
E0.2 - ELECTRICAL ONE-LINE LEGEND, SCHEDULES, AND PHASING NOTES