This addendum revises specifications for two roof-top air handling units to be replaced at the Louis Stokes VA Medical Center in Cleveland, Ohio under solicitation number 36C250. Key requirements include custom-built double-wall insulated aluminum RTUs with integral components like plenum fans, mixing boxes with dampers, filter housings, and factory-installed coils. The units must meet performance standards for airflow, leakage, and vibration levels. Manufacturers must submit detailed drawings, data sheets, factory and field test procedures and results for approval. Installation includes on-site assembly, start-up, and commissioning services. The bid opening date of June 1, 2020 remains unchanged.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 01 05/20/2020

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 1

SECTION 23 74 13

PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

PART 1 - GENERAL

1.1 DESCRIPTION

A. Custom Roof top air handling units including integral components specified herein.

B. Definitions: Roof Top Air Handling Unit(Roof Top Units, RTU): A factory fabricated assembly consisting of fan, coils, filters, and other necessary equipment to perform one or more of the following functions of circulating, cleaning, heating, cooling, humidifying, dehumidifying, and mixing of air. Design capacities of units shall be as scheduled on the drawings.

1.2 RELATED WORK

B. Section 23 05 11, COMMON WORK RESULTS FOR HVAC: General mechanical requirements and items, which are common to more than one section of

Division 23.

C. Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and

EQUIPMENT: Sound and vibration requirements.

D. Section 23 07 11, HVAC and BOILER PLANT INSULATION: Piping and duct insulation.

E. Section 23 21 13, HYDRONIC PIPING and Section 23 22 13, STEAM and

CONDENSATE HEATING PIPING: Piping and valves.

F. Section 23 82 16, AIR COILS: Heating and cooling coils and pressure requirements.

G. Section 23 34 00, HVAC FANS: Return and exhaust fans.

H. Section 23 31 00, HVAC DUCTS and CASINGS: Requirements for flexible duct connectors, sound attenuators and sound absorbing duct lining.

I. Section 23 40 00, HVAC AIR CLEANING DEVICES: Air filters and filters' efficiency.

J. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC: HVAC controls.

K. Section 23 05 93, TESTING, ADJUSTING, and BALANCING FOR HVAC: Testing, adjusting and balancing of air and water flows.

L. Section 23 05 12, GENERAL MOTOR REQUIREMENTS FOR HVAC and STEAM

GENERATION EQUIPMENT: Types of motors.

M. Section 26 29 11, LOW-VOLTAGE MOTOR STARTERS: Types of motor starters.

N. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS:

O. Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and training.

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 2

1.3 QUALITY ASSURANCE

A. Refer to Article, Quality Assurance, in Section 23 05 11, COMMON WORK

RESULTS FOR HVAC.

B. Air Handling Units Certification

1. Air Handling Units with Plenum Fans:

a. Air Handling Units with a single Plenum Fan shall be certified in accordance with AHRI 430 and tested/rated in accordance with AHRI

260.

b. Air handling Units with Multiple Fans in an Array shall be tested and rated in accordance with AHRI 430 and AHRI 260.

C. Heating, Cooling, and Air Handling Capacity and Performance Standards:

AHRI 430, AHRI 410, ASHRAE 51, and AMCA 210.

D. Performance Criteria:

1. The fan BHP shall include all system effects for all fans and v-belt drive losses for housed centrifugal fans.

2. The fan motor shall be selected within the rated nameplate capacity, without relying upon NEMA Standard Service Factor.

3. Select the fan operating point as follows:

a. Forward Curve and Axial Flow Fans: Right hand side of peak pressure point.

b. Air Foil, Backward Inclined, or Tubular Fans Including Plenum

Fans: At or near the peak static efficiency but at an appropriate distance from the stall line.

4. Operating Limits: AMCA 99 and Manufacturer’s Recommendations.

E. Units shall be factory-fabricated, assembled, and tested by a manufacturer, in business of manufacturing similar air-handling units for at least five (5) years.

1.4 SUBMITTALS:

A. The contractor shall, in accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, and SAMPLES, furnish a complete submission for all roof top units covered in the project. The submission shall include all information listed below. Partial and incomplete submissions shall be rejected without reviews.

B. Manufacturer's Literature and Data:

1. Submittals for RTUs shall include fans, drives, motors, coils, humidifiers, sound attenuators, mixing box with outside/return air dampers, filter housings, and all other related accessories. The contractor shall provide custom drawings showing total air handling unit assembly including dimensions, operating weight, access sections, flexible connections, door swings, controls penetrations, SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 3 electrical disconnect, lights, duplex receptacles, switches, wiring, utility connection points, unit support system, vibration isolators, drain pan, pressure drops through each component (filter, coil etc) and rigging points.

2. Submittal drawings of section or component only, will not be acceptable. Contractor shall also submit performance data including performance test results, charts, curves or certified computer selection data; data sheets; fabrication and insulation details; if the unit cannot be shipped in one piece, the contractor shall indicate the number of pieces that each unit will have to be broken into to meet shipping and job site rigging requirements. This data shall be submitted in hard copies and in electronic version compatible to AutoCAD version used by the VA at the time of submission.

3. Submit sound power levels in each octave band for fan and at entrance and discharge of RTUs at scheduled conditions. Include sound attenuator capacities and itemized internal component attenuation.

Internal lining of supply air ductwork with sound absorbing material is not permitted. In absence of sound power ratings refer to Section

23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT.

4. Provide fan curves showing Liters/Second (cubic feet per minute), static pressure, efficiency, and horsepower for design point of operation and at maximum design Liters/Second (cubic feet per minute) and 110 percent of design static pressure.

5. Submit total fan static pressure, external static pressure, for RTU including total, inlet and discharge pressures, and itemized specified internal losses and unspecified internal losses. Refer to air handling unit schedule on drawings.

C. Maintenance and operating manuals in accordance with Section 01 00 00, GENERAL REQUIREMENTS. Include instructions for lubrication, filter replacement, motor and drive replacement, spare part lists, and wiring diagrams.

D. Submit written test procedures two weeks prior to factory testing.

Submit written results of factory tests for approval prior to shipping.

E. Completed System Readiness Checklists provided by the Commissioning

Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS.

F. Submit shipping information that clearly indicates how the units will be shipped in compliance with the descriptions below.

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 4

1. Units shall be shipped in one (1) piece where possible and in shrink wrapping to protect the unit from dirt, moisture and/or road salt.

2. If not shipped in one (1) piece, provide manufacturer approved shipping splits where required for installation or to meet shipping and/or job site rigging requirements in modular sections. Indicate clearly that the shipping splits shown in the submittals have been verified to accommodate the construction constraints for rigging as required to complete installation and removal of any section for replacement through available access without adversely affecting other sections.

3. If shipping splits are provided, each component shall be individually shrink wrapped to protect the unit and all necessary hardware (e.g.

bolts, gaskets etc.) will be included to assemble unit on site (see section 2.1.A4).

4. Lifting lugs will be provided to facilitate rigging on shipping splits and joining of segments. If the unit cannot be shipped in one piece, the contractor shall indicate the number of pieces that each unit will have to be broken into to meet shipping and job site rigging requirements.

1.5 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. Air-Conditioning, Heating, and Refrigeration Institute (AHRI):

260-01..................Sound Rating of Ducted Air Moving and

Conditioning Equipment

410-01..................Standard for Forced-Circulation Air-Heating and

Air-Cooling Coils

430-09..................Standard for Central Station Air Handling Units

AHRI-DCAACP.............Directory of Certified Applied Air Conditioning

Products

C. Air Moving and Conditioning Association (AMCA):

210-07..................Laboratory Methods of Testing Fans for Rating

D. Anti-Friction Bearing Manufacturer's Association, Inc. (AFBMA):

9-90 (R2008)............Load Ratings and Fatigue life for Ball Bearings

E. American Society of Heating, Refrigerating and Air Conditioning

Engineers (ASHRAE):

51-2007.................Laboratory Methods of Testing Fans for Rating

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 5

F. American Society for Testing and Materials (ASTM):

A653/653M-02............Steel Sheet, Zinc-Coated (Galvanized) or Zinc-

Iron Alloy-Coated (Galvannealed) by the Hot-Dip

Process

B117-07a................Salt Spray (Fog) Testing

C1071-05e1..............Standard Specification for Fibrous Glass Duct

Lining Insulation (Thermal and Sound Absorbing

Material)

D1654-08................Standard Method for Evaluation of Painted or

Coated Specimens Subjected to Corrosive

Environments

D1735-08................Water Resistance of Coatings Using Water Fog

Apparatus

D3359-08................Standard Test Methods for Measuring Adhesion by

Tape Test

E84-10..................Standard Test Method for Surface Burning

Characteristics of Building Materials

G. Anti-Friction Bearing Manufacturer's Association, Inc. (AFBMA):

9-90....................Load Ratings and Fatigue life for Ball Bearings

H. Military Specifications (Mil. Spec.):

DOD-P-21035A-2003.......Paint, High Zinc Dust Content, Galvanizing

Repair

I. National Fire Protection Association (NFPA):

NFPA 90A................Standard for Installation of Air Conditioning and Ventilating Systems, 2009

J. Energy Policy Act of 2005 (P.L.109-58)

PART 2 - PRODUCTS

2.1 ROOF TOP AIR HANDLING UNITS

A. General:

1. Roof top units (RTU) shall be fabricated from insulated, solid double-wall aluminum without any perforations in draw-through configuration. Casing is specified in paragraph 2.1.C.

2. The contractor and the RTU manufacturer shall be responsible for insuring that the unit will not exceed the allocated space shown on the drawings, including required clearances for service and future overhaul or removal of unit components. All structural, piping, wiring, and ductwork alterations of units, which are dimensionally different than those specified, shall be the responsibility of the contractor at no additional cost to the government.

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 6

3. RTUs shall be fully assembled by the manufacturer in the factory in accordance with the arrangement shown on the drawings. The unit shall be assembled into the largest sections possible subject to shipping and rigging restrictions. The correct fit of all components and casing sections shall be verified in the factory for all units prior to shipment. All units shall be fully assembled, tested and then split to accommodate shipment and job site rigging. On units not shipped fully assembled, the manufacturer shall tag each section and include air flow direction to facilitate assembly at the job site.

Lifting lugs or shipping skids shall be provided for each section to allow for field rigging and final placement of unit.

4. The RTU manufacturer shall provide the necessary gasketing, caulking, and all screws, nuts, and bolts required for assembly. The manufacturer shall provide a local representative at the job site to supervise the assembly and to assure the units are assembled to meet manufacturer's recommendations and requirements noted on the drawings. Provide documentation that this representative has provided this service on similar jobs to the Contracting Officer. If a local representative cannot be provided, the manufacturer shall provide a factory representative.

5. Gaskets: All door and casing and panel gaskets and gaskets between air handling unit components, if joined in the field, shall be high quality which seal air tight and retain their structural integrity and sealing capability after repeated assembly and disassembly of bolted panels and opening and closing of hinged components. Bolted sections may use a more permanent gasketing method provided they are not disassembled.

6. Structural Rigidity: Provide structural reinforcement when required by span or loading so that the deflection of the assembled structure shall not exceed 1/200 of the span based on a differential static pressure of 1991 Pa (8 inches water gage) or higher.

7. Corrosion Protection:

a. Coil Treatment: Epoxy Immersion Coating–Electrically Deposited:

The multi-stage corrosion-resistant coating application comprises of cleaning (heated alkaline immersion bath) and reverse-osmosis immersion rinse prior to the start of the coating process. The coating thickness shall be maintained between 0.6-mil and 1.2-mil.

Before the coils are subjected to high-temperature oven cure, they are treated to permeate immersion rinse and spray. Where the coils are subject to UV exposure, UV protection spray treatment

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 7 comprising of UV-resistant urethane mastic topcoat shall be applied. Provide complete coating process traceability for each coil and minimum five years of limited warranty. The coating process shall such that uniform coating thickness is maintained at the fin edges. The quality control shall be maintained by ensuring compliance to the applicable ASTM Standards for the following:

1) Salt Spray Resistance (Minimum 6,000 Hours)

2) Humidity Resistance (Minimum 1,000 Hours)

3) Water Immersion (Minimum 260 Hours)

4) Cross-Hatch Adhesion (Minimum 4B-5B Rating)

5) Impact Resistance (Up to 160 Inch/Pound)

b. Casing Surfaces (Exterior and Interior): All exposed exterior metal panels shall be low reflective textured finished aluminum and interior metal surfaces shall be smooth aluminum.

B. Base:

1. Provide a heavy duty aluminum structural base for supporting all major RTU components. Bases shall be constructed of wide-flange aluminum I-beams and channels with height of 8 inches. Welded or bolted cross members shall be provided as required for lateral stability. Contractor shall provide supplemental aluminum supports as required to obtain proper operation heights for cooling coil condensate drain trap and steam coil condensate return trap.

Perimeter structural supports shall be covered by 0.040 inch aluminum flashing.

2. The base floor shall be constructed of minimum 3/16 inch thick aluminum treadplates. Base floor shall be fully welded at all joints and to structural base.

3. Base floor shall be insulated with 4 inches thick polyisocyanurate foam insulation covered with seamless vapor barrier minimum total thermal resistance (R-value) of (20 hr-ft2 OF/BTU). Vapor barrier shall be protected by 0.040 inches thick aluminum attached to bottom of base.

4. RTUs shall be completely self supporting for installation on steel support pedestals.

5. The RTU bases not constructed of aluminum shall be cleaned, primed with a rust inhibiting primer, and finished with rust inhibiting exterior enamel.

C. Casing (including wall and roof):

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 8

1. General: RTU casing shall be entirely double wall insulated panels, integral of or attached to a structural frame. Casing shall be designed for a maximum of 12 inches total static pressure and with no through metal which might conduct heat. Construction shall be such that removal of any panel shall not affect the structural integrity of the unit. Casing finished shall meet salt-spray test as specified in paragraph 2.1.C.10. All casing and panel sections shall be tightly butted and gasketed. No gaps of double wall construction will be allowed where panels bolt to air handling unit structural member.

Structural members, not covered by the double wall panels, shall have equivalent insulated double wall construction.

2. Double wall aluminum panels, minimum 101.6 mm (4 inches) thick, constructed of minimum 1.0 mm (18 gauge) outer skin and 1.0 mm (18 gauge) solid inner skin. to limit wall, roof and floor deflection to not exceed an L/240 ratio when the unit casing is pressurized to

(±1990 Pa (±8 in. w.g.). Deflection shall be measured at the midpoint of the panel height. Total housing leakage shall not exceed 1% of rated cfm when the unit casing is pressurized to ±8 in. w.g. (±1990

Pa). The outer (skin) and inner panels shall be solid.

3. Blank-Off: Provide blank-offs as required to prevent air bypass between each AHU sections for example around coils, around humidifier and filters.

4. Insulation: Insulation shall be injected polyisocyanurate foam encased in double-wall casing between exterior and interior panels such that no insulation can erode to the air stream. Insulation shall be 101.6 mm (4 inch) thick, and 48 kg/m3 (3.0 lb/ft3) density with a total thermal resistance (R-value) of approximately 3.446 m.K/W (20 hr-ft2 OF/BTU). Units with less than 101.6 mm (4 inch) of insulation in any part of the walls, floor, roof or drain pan shall not be acceptable. The insulation shall comply with NFPA 90-A for the flame and smoke generation requirements. Also, refer to specification

Section 23 07 11, HVAC and BOILER PLANT INSULATION.

Table 2.1.C.4

Outer Panel 1.0 mm (18 Gage) Minimum

Inner Panel 1.0 mm (18 Gage) Minimum

Insulation

Thickness

Density

Foam

101.6 mm (4 inch) Minimum

48 kg/m3 (3.0 lb/ft3) Minimum

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 9

Total R Value 3.446 m2.K/W (20 ft2.OF.hr/Btu)

Minimum

5. The thickness of insulation, mode of application, and thermal breaks shall be such that there is no visible condensation on the exterior panels of the AHU.

6. Casing panels shall be secured to the support structure with stainless steel or zinc-chromate plated screws and gaskets installed around the panel perimeter. Panels shall be completely removable to allow removal of fan, coils, and other internal components for future maintenance, repair, or modifications. Welded exterior panels are not acceptable.

7. Access Doors: Provide in each access section and where shown on drawings. Show single-sided and double-sided access doors with door swings on the floor plans. Doors shall be a minimum of 50 mm (2 inches) thick with same double wall construction as the unit casing.

Doors shall be a minimum of 600 mm (24 inches) wide, unless shown of different size on drawings, and shall be the full casing height up to a maximum of 1850 mm (6 feet). Doors shall be gasketed, hinged, and latched to provide an airtight seal. The access doors for fan section, mixing box, humidifier, sound attenuator, filters and coil section shall include a minimum 150 mm x 150 mm (6 inch x 6 inch) double thickness, with air space between glass panes tightly sealed, reinforced glass or Plexiglas window in a gasketed frame.

a. Hinges: Manufacturers standard, designed for door size, weight and pressure classifications. Hinges shall hold door completely rigid with minimum 45 kg (100 pound) weight hung on latch side of door.

b. Latches: Non-corrosive alloy construction, with operating levers for positive cam action, operable from either inside or outside.

Doors that do not open against unit operating pressure shall allow the door to ajar and then require approximately 0.785 radian (45 degrees) further movement of the handle for complete opening.

Latch shall be capable of restraining explosive opening of door with a force not less than 1991 Pa (8 inches water gage).

c. Gaskets: Neoprene, continuous around door, positioned for direct compression with no sliding action between the door and gasket.

Secure with high quality mastic to eliminate possibility of gasket slipping or coming loose.

8. Provide sealed sleeves, metal or plastic escutcheons or grommets for penetrations through casing for power and temperature control wiring

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 10 and pneumatic tubing. Coordinate with electrical and temperature control subcontractors for number and location of penetrations.

Coordinate lights, switches, and duplex receptacles and disconnect switch location and mounting. All penetrations and equipment mounting may be provided in the factory or in the field. All field penetrations shall be performed neatly by drilling or saw cutting. No cutting by torches will be allowed. Neatly seal all openings airtight.

9. Roof of the unit shall be sloped to have a minimum pitch of 1/4 inch per foot. The roof shall overhang the side panels by a minimum of three inches to prevent precipitation drainage from streaming down the unit side panels. Install aluminum rain gutter and aluminum downspout to direct rainwater to building roof. Entire roofing system shall be 0.045 inch thick polymer membrane permanently bonded to unit roof. Standing seam roofing system are not acceptable.

10. Casing finished shall meet ASTM B117, 500-hour salt spray test, using

20 percent sodium chloride solution. Immediately after completion of the test, the coating shall show no sign of blistering, wrinkling, or cracking, no loss of adhesion, and the specimen shall show no sign of rust creepage beyond 1/8-inch on either side of scratch mark.

D. Unit floor shall be level without offset space or gap and designed to support a minimum of 488 kg/square meter (100 pounds per square foot) distributed load without permanent deformation or crushing of internal insulation. Provide adequate structural base members beneath floor in service access sections to support typical service foot traffic and to prevent damage to unit floor or internal insulation. Unit floors in casing sections, which may contain water or condensate, shall be watertight with drain pan.

E. Condensate Drain Pan: Drain pan shall be designed to extend entire length of cooling coils including headers and return bends. Depth of drain pan shall be at least 43 mm (1.7 inches) and shall handle all condensate without overflowing. Drain pan shall be double wall construction, Type 304 stainless steel and have a minimum of 50 mm (2 inch) insulation, and shall be sloped to drain. Drain pan shall be continuous metal or welded watertight. No mastic sealing of joints exposed to water will be permitted. Drain pan shall be placed on top of casing floor or integrated into casing floor assembly. Drain pan shall be pitched in all directions to drain line.

1. An intermediate condensate drip pan shall be provided on stacked cooling coils and shall be constructed of type 304 stainless steel

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 11 with copper downspouts factory piped to main condensate pan. Use of intermediate condensate drain channel on upper casing of lower coil is permissible provided it is readily cleanable. Design of intermediate condensate drain shall prevent upper coil condensate from flowing across face of lower coil.

2. Drain pan shall be piped to the exterior of the unit. Drain pan shall be readily cleanable.

3. Installation, including frame, shall be designed and sealed to prevent blow-by.

H. Plenum Fans – Single and/or Multiple Fans in an Array

1. General: Fans shall be Class II (minimum) construction with single inlet, aluminum wheel and stamped air-foil aluminum bladed. The fan wheel shall be mounted on the directly-driven motor shaft in AMCA

Arrangement 4. Fans shall be dynamically balanced and internally isolated to minimize the vibrations. Provide a steel inlet cone for each wheel to match with the fan inlet. Locate fan in the air stream to assure proper flow. The fan performance shall be rated in accordance with AMCA 210 or ASHRAE 51.

2. Allowable vibration tolerances for fan shall not exceed a self-excited vibration maximum velocity of 0.005 m/s (0.20 inch per second) RMS, filter in, when measured with a vibration meter on bearing caps of machine in vertical, horizontal and axial directions.

After field installation, compliance to this requirement shall be demonstrated with field test in accordance with Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT and Section

23 05 93, TESTING, ADJUSTING, and BALANCING FOR HVAC. The fan wheel shall meet or exceed guidelines in AMCA 801-92 for dynamic balancing requirements. The complete fan assembly balance shall be tested using an electronic balance analyzer with a tunable filter and stroboscope.

Vibration measurements shall be taken on each motor bearing housing in the vertical, horizontal, and axial planes (5 total measurements, 2 each motor bearing and 1 axial).

3. The plenum fans shall be driven by variable speed drives with at least one back-up drive as shown in the design documents. Use of a drive with bypass is not permitted.

4. Multiple fans shall be installed in a pre-engineered structural frame to facilitate fan stacking. All fans shall modulate in unison, above or below the synchronous speed within the limits specified by the manufacturer, by a common control sequence. Staging of the fans is

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 12 not permitted. Redundancy requirement shall be met by all operating fans in an array and without the provision of an idle standby fan.

5. Fan Accessories

a. Fan Isolation: Provide an actuator-controlled damper to isolate the fan not in operation due to failure.

b. Fan Airflow Measurement: Provide an airflow measuring device integral to the fan to measure air volume within +/- 5 percent accuracy. The probing device shall not be placed in the airflow path to stay clear of turbulence and avoid loss of performance.

6. Fan Motor, Drive and Mounting Assembly: Fan Motors shall be premium energy efficient type, as mandated by the Energy Policy Act of 2005, with efficiencies as shown in the Specifications Section 23 05 12

(General Motor Requirements For HVAC and Steam Equipment), on drawings and suitable for use in variable frequency drive applications. Refer to Section 23 05 11, COMMON WORK RESULTS FOR

HVAC AND STEAM GENERATION, for additional motor and drive specifications. Refer to Specification Section 26 29 11, LOW-VOLTAGE

MOTOR STARTERS

J. Mixing Boxes: Mixing box shall consist of casing and outdoor air and return air dampers in opposed blade arrangement with damper linkage for automatic operation. Coordinate damper operator with Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC. Dampers shall be of ultra-low leak design with metal compressible bronze jamb seals and extruded vinyl edge seals on all blades. Blades shall rotate on stainless steel sleeve bearings or bronze bushings. Leakage rate shall not exceed 1.6 cubic meters/min/square meter (5 cfm per square foot) at 250 Pa (1 inch water gage) and 2.8 cubic meters/min/square meter (9 cfm per square foot) at

995 Pa (4 inches water gage) Electronic damper operators shall be furnished and mounted in an accessible and easily serviceable location by the air handling unit manufacturer at the factory. Damper operators shall be of same manufacturer as controls furnished under Section 23 09

23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.

L. Filter Section: Refer to Section 23 40 00, HVAC AIR CLEANING DEVICES, for filter requirements.

1. Provide filters including one complete set for testing use and one complete set at owner turn-over at site, for a total of two complete sets. The RTU manufacturer shall install filter housings and racks in filter section compatible with filters furnished. The RTU manufacturer shall be responsible for furnishing temporary filters

(pre-filters and after-filters, as required for RTU testing.

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 13

2. Factory-fabricated filter section shall be of the same construction and finish as the RTU casing including filter racks and hinged double wall access doors. Filter housings shall be constructed in accordance with side service or holding frame housing requirements in Section 23

40 00, HVAC AIR CLEANING DEVICES.

N. Coils: Coils shall be mounted on hot dipped galvanized steel supports to assure proper anchoring of coil and future maintenance. Coils shall be face or side removable for future replacement thru the access doors or removable panels. Each coil shall be removable without disturbing adjacent coil. Cooling coils shall be designed and installed to insure no condensate carry over. Provide factory installed extended supply, return, drain, and vent piping connections. Refer to Drawings and

Section 23 82 16, AIR COILS, for additional coil requirements.

1. Water Coils.

2. Integral Face and Bypass Steam Coils: Provide integral vertical face and bypass dampers. Electric damper operators shall be furnished and mounted by the RTU manufacturer at the factory. Damper operators shall be of same manufacturer as controls furnished under Section 23

09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.

3. Steam Distributing Tube Coils

O. Humidifier: When included in design, coordinate the humidification requirements with section 23 84 13 Humidifiers. Provide humidification section with stainless steel drain pan of adequate length to allow complete absorption of water vapor. Provide stainless steel dispersion panel or distributors as indicated, with stainless steel supports and hardware.

P. Sound Attenuators: Refer to Drawings, Specification Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT, and Section

23 31 00, HVAC DUCTS AND CASINGS, for additional unit mounted sound attenuator requirements. RTU sound attenuators shall be factory installed as an integral part of RTU.

Q. Discharge Section: Provide aerodynamically designed framed discharge openings or spun bellmouth fittings to minimize pressure loss.

R. Electrical and Lighting: Wiring and equipment specifications shall conform to Division 26, ELECTRICAL.

1. Vapor-proof lights using cast aluminum base style with glass globe and cast aluminum guard shall be installed in access sections for fan, mixing box, humidifier and any section over 300mm (12 inch) wide. A switch shall control the lights in each compartment with pilot light mounted outside the respective compartment access door.

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 14

Wiring between switches and lights shall be factory installed. All wiring shall run in neatly installed electrical conduits and terminate in a junction box for field connection to the building system. Provide single point 115 volt - one phase connection at junction box.

2. Install compatible 100 watt bulb in each light fixture.

3. Provide a convenience duplex weatherproof receptacle next to the light switch.

4. Disconnect switch and power wiring: Provide factory or field mounted disconnect switch. Coordinate with Division 26, ELECTRICAL.

S. UVC Emitters Section:

1. Refer to spec section 23 83 00 – UVC Emitters for product requirements.

PART 3 – EXECUTION

3.1 INSTALLATION

A. Install roof top unit in conformance with ARI 435.

B. Assemble roof top unit components following manufacturer's instructions for handling, testing and operation. Repair damaged galvanized areas with paint in accordance with Military Spec. DOD-P-21035A. Repair painted units by touch up of all scratches with finish paint material.

Vacuum the interior of air-handling units clean prior to operation.

C. Contractor shall perform and document a field leakage test after unit assembly. The casing leakage test shall verify that unit casing leakage is less than 1% of design air flow at 1-1/4 times the design static pressure. The unit shall be sealed; pressure sections shall be put under positive pressure and suction sections shall be put under negative pressure. The leakage shall be measured in each section using a calibrated orifice plate. The total casing leakage (positive plus negative) shall be considered the sum of the positive and negative leakage. Casing leakage test shall be performed by manufacturer’s employees in the field after all components are assembled.

Repair casing air leaks that can be heard or felt during normal operation and to meet test requirements.

E. Perform field mechanical (vibration) balancing in accordance with

Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and

EQUIPMENT.

F. Seal and/or fill all openings between the casing and RTU components and utility connections to prevent air leakage or bypass.

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 15

3.2 STARTUP SERVICES

A. The air handling unit shall not be operated for any purpose, temporary or permanent, until ductwork is clean, filters are in place, bearings are lubricated and fan has been test run under observation.

B. After the air handling unit is installed and tested, provide startup and operating instructions to VA personnel.

C. An authorized factory representative should start up, test and certify the final installation and application specific calibration of control components. Items to be verified include fan performance over entire operating range, noise and vibration testing, verification of proper alignment, overall inspection of the installation, Owner/Operator training, etc.

3.3 COMMISSIONING

A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS for all inspection, start up, and contractor testing required above and required by the

System Readiness Checklist provided by the Commissioning Agent.

B. Components provided under this section of the specification will be tested as part of a larger system. Refer to Section 23 08 00 –

COMMISSIONING OF HVAC SYSTEMS and related sections for contractor responsibilities for system commissioning.

3.4 FACTORY TESTING

A. Unit manufacture shall perform the following test at the factory to ensure unit integrity and compliance with the specifications:

1. The unit fan shall be operated at the factory at the design RPM and a complete vibration spectrum shall be conducted. Readings shall be taken in the horizontal, vertical, and axial direction at each fan and motor bearing.

2. The heating and cooling coils, as well as any other piping included with the air handling units shall be pressure tested at the factory.

Coils shall be A.R.I. certified.

3. The entire electrical system shall be functionally checked at the factory and in the field including motors, lights, utility outlets, etc. for proper operation.

4. The casing leakage test shall verify that unit casing leakage is less than 1% of design air flow at 1-1/4 times the design static pressure. The unit shall be sealed; pressure sections shall be put under positive pressure and suction sections shall be put under negative pressure. The leakage shall be measured in each section

SPEC REVISION 04-11

VAMC WADE PARK CLEVELAND

Replacement of AHU-17 & AHU-18 Project No. 541-18-104

23 74 13 - 16 using a calibrated orifice plate. The total casing leakage

(positive plus negative) shall be considered the sum of the positive and negative leakage. Casing leakage test shall be performed by manufacturer’s employees both at the factory and in the field after all components are assembled.

a. Testing shall assure the Owner and Architect that any potential system performance concerns are addressed. Any unit modifications necessary as a result of testing not meeting specified performance levels shall be done by the unit manufacturer at no additional cost to the Owner.

b. The Owners representative/ Engineer shall have the option to witness all tests at the owner’s expense. The manufacturer shall notify the Owners representative/Engineer two weeks prior to the scheduled factory test. Engineer will inform the manufacturer if a representative will witness the tests.

c. A formal written report including test results shall be submitted to the Engineer.

- - - E N D - - -

3.3 COmmissioning
3.4 Factory Testing