S02 - CALCULATION OF SELF PERFORMED WORK.pdf

PDF 107 KB Posted

Attached to
Z1DA--621-23-107 - Renovate Domiciliary Recreation Room - Bldg. -160
Solicitation number
36C24923B0012
Issued by

About this file

This solicitation document requests bids for a roof replacement project at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. Key details include a project scope to replace the roof of Building 77, a period of performance of 180 calendar days from notice to proceed, a 100% set-aside for service-disabled veteran-owned small businesses, a bid submission deadline of February 1, 2022, and a requirement for bidders to meet safety and environmental compliance standards. The solicitation outlines compliance and reporting requirements related to E-Verify, CPARS, records management, and privacy training. Bidders must also be registered in the System for Award Management database.

View the file

Other files

File Type Posted
36C24923B0012 0002.docx DOCX document
AE601 Rev 1 June 23.2023.pdf PDF
36C24923B0012 0001.docx DOCX document
AE401 Rev 1 June 23.2023.pdf PDF
RFI Form - Renovate Domiciliary.pdf PDF
Header - List of Attachments.txt TXT text file
36C24923B0012_1.docx DOCX document
Contractor EMR Certification Form.pdf PDF
Specifications 621-23-107 15 May 23.pdf PDF
DUNS _ TAX ID.pdf PDF
621-23-107 Dwgs 5.15.2023.pdf PDF
WD TN20230191 5-12-23.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK Project 621-23-107, Renovate Domiciliary Recreation Room Bldg 160

Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes with 237 and 238 prefix) of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division SDVOB Vendor (Y or N) Personnel Cost Material/Equipment Costs

Division 01 $ $ Division 02 $ $ Division 03 $ $ (Add additional lines as necessary for each Division applicable to this project)

Sub Total (Personnel Costs, Material/Equipment Costs)

Profit $ Home Office Overhead $ Bond $ Grand Total $

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $

3. Remainder is ‘Total amount of work to be self-performed under the Contract’: $

4. Self-performed work = Line 3/Line 1 x 100 = %

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)