S02 - Blast Tube ABS Dimensions.pdf

PDF 197 KB Posted

Attached to
B540--405-23-020 | Blast Tube - Installation Feasibility Study Federal contract opportunity
Solicitation number
36C24123R0184
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This special notice requests SF 330 qualification packages from architectural and engineering firms for a blast tube feasibility study at the VA Medical Center in White River Junction, Vermont. Firms must have experience evaluating the design and installation of research testing equipment, preferably in a hospital setting. The study will assess installing an advanced blast simulator and make recommendations for structural, acoustic, and other changes. Submissions are due by January 26, 2024. The selection criteria are specialized experience, professional qualifications of key staff, past performance on similar projects, capacity to complete the work, and commitment to using veteran-owned small businesses as subcontractors. The contract type will be firm fixed price.

View the file

Other files for this federal contract opportunity

Other files attached to B540--405-23-020 | Blast Tube - Installation Feasibility Study, newest first.
File Type Posted
S02 - SOW - Blast Tube Study.pdf PDF
S02 - Stumpton Compressed Gas and Gas Det Driver Comparison.pdf PDF
S02 - Building 44 Floor Plans.pdf PDF
36C24123R0184 - SF330 Request.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A A

B B

C C

D D

SHEET 1 OF 1

DRAWN

CHECKED

QA

MFG

APPROVED

DB

8/18/2022

DWG NO

24in ABS Dimensions

TITLE

SIZE

D

SCALE

REV

0.06

242.25 in

65.0 in

39.0 in

Driver Transition Section Test Section Dumptank/EWE

File details come from the government source that posted it. Updated .