S02_Base Offer Breakdown.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- 36C24126Q0173
About this file
This is a Base Offer Breakdown cost template for federal construction projects. The spreadsheet is designed for offerors to submit detailed pricing for construction work organized by the 16 standard construction divisions, including General Requirements, Concrete, Masonry, Metals, Wood and Plastic, Thermal & Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, Utilities, and Transportation. Offerors must separately itemize labor costs and material costs for each division, with the template automatically calculating total division costs and generating subtotals.
The template requires offerors to enter overhead percentage, profit percentage, and bond percentage, which are applied sequentially to the division subtotals to calculate the final Total Base Offer Cost. The spreadsheet includes sample labor detail lines showing labor categories with hourly rates and hours worked, as well as materials and equipment details with unit rates and quantities. The template is associated with solicitation 36C24126Q0173 for the "Z2NZ--631-19-002 Upgrade Steam Distribution System Phase II" project, which is being offered exclusively through the VISN 1 Construction MATOC by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1, and only eligible VISN 1 Construction MATOC vendors are permitted to submit offers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24126Q0173.docx | DOCX document | |
| S02_WD MA20260003 01 02 2026.pdf | ||
| S02_631-19-002 Upgrade Steam Phase 2 FINAL DRAWINGS.pdf | ||
| S02_631-19-002 Steam Ph2 Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
Base Offer Cost Breakdown
Project Number:
Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Labor Detail
| Sample Example | ||||
| Division | Labor Category | Labor Rate | Hours | Total |
| 1 | Plumber | $35.00 | 123 | $4,305.00 |
| 1 | Laborer | 14.75 | 70 | $1,032.50 |
| $5,337.50 |
Materials and Equipment Details
| Sample Example | ||||
| Division | Item | Rate | Units | Total |
| 1 | Pipe - 150' | $1.50 | 150 | $225.00 |
| 1 | 90 Degree Coupling | $1.10 | 5 | $5.50 |
| 1 | Pump Rental - Hour | $200.00 | 6 | $1,200.00 |
| $1,430.50 |
File details come from the government source that posted it. Updated .