S02 AttG 585-21-111 - BID DWGS 585-21-111 Upgrade Nurse Call 2023.02.14.pdf
PDF 10 MB Posted
- Attached to
- Z1DA--585-21-111 Upgrade Nurse Call System at the Oscar G. Johnson VA Medical Center in Iron Mountain , MI
- Solicitation number
- 36C25223B0013
About this file
This document provides details for a federal contract solicitation to upgrade the nurse call system at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The solicitation number is 36C25223B0013 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. Interested vendors are to provide bid drawings by February 14, 2023 for upgrading the existing nurse call system to a new IP-based system. The awarded contract is expected to provide all necessary equipment, installation, configuration, training and support services to replace the current analog nurse call equipment with a modern digital solution.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET & LEGENDS
G001
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
UPGRADE NURSE CALL SYSTEM
325 H STREET,
IRON MOUNTAIN, MI 49801
BID DOCUMENTS
SHEET INDEX
DIRECTOR
ASSOCIATE DIRECTOR
ASSOCIATE DIRECTOR FOR N&PCS
CHIEF OF POLICE
CHIEF OF ENGINEERING
INFECTION CONTROL NURSE
PATIENT SAFETY
A.F.G.E.
INDUSTRIAL HYGIENIST
CHIEF OF STAFF
SAFETY
PROJECT SECTION SUPERVISOR
APPROVALS
DWG. 1
NURSE CALL SYSTEM DEVICES
EMERGENCY STATION - CORD TYPE (SINGLE GANG RING)EN
CORRIDOR DOME LIGHT (CEILING, WALL) (SINGLE GANG RING)N N
CODE BLUE STATION (SINGLE GANG RING)CBN
DUTY STATION W/CODE BLUE (3 GANG)DEBN
PATIENT STATION WITH PILLOW SWITCH (SINGLE GANG)SPN
BM BED CONNECT/MODULEN
PATIENT STATION WITH CALL CORD/BUTTON (2 GANG)SPAN
EQN AUXILIARY 1/4" JACK(S) (SINGLE GANG)
DC DOMELESS CONTROLLER N
PATIENT STATION WITH PILLOW SWITCH, CODE BLUE (2 OR 3 GANG)SPBN
MASTER STATION (WALL OR DESK MOUNT CONSOLE)MN
NURSE CALL CONTROL PANEL / EQUIPMENT (NCCP)NCCP
DUTY STATION (3 GANG)DN
EMERGENCY CALL STATION (SINGLE GANG)CN
TV WIRING W/PILLOW SWITCH CONTROL/INTERFACENT
ROOM CONTROL BOX
CALL STATION W/CORD & PUSH BUTTON (SINGLE GANG)PBC
JUNCTION BOX WITH BLANK COVER
PANELBOARD (EXISTING, NEW)
CORRIDOR ZONE DOME LIGHT (CEILING)N
Z
EMERGENCY STATION - CORD TYPE WATERPROOF (SINGLE GANG RING)EWPN
DUPLEX RECEPT. ( NORMAL, EMERG.) - STANDARD HEIGHT
DATA/VOICE RACKRK
DATA, VOICE OR COMB. VOICE/DATA OUTLET(S) - ABOVE COUNTER
DATA, VOICE OR COMB. VOICE/DATA OUTLET(S) - STANDARD HEIGHT
#X
#X
POWER SUPPLY - WALL,CEILING, ABOVE CEILINGPSPS PS
FEBRUARY 14, 2023
Sheet Number Sheet Title
GENERAL
G001 COVER SHEET & LEGENDS
ELECTRICAL
ED101 BASEMENT DEMOLITION PLAN - NEW CLC
ED102 BASEMENT DEMOLITION PLAN - WEST
ED103 BASEMENT DEMOLITION PLAN - EAST
ED104 FIRST FLOOR DEMOLITION PLAN - NEW CLC
ED105 FIRST FLOOR DEMOLITION PLAN - WEST
ED106 FIRST FLOOR DEMOLITION PLAN - EAST
ED107 SECOND FLOOR DEMOLITION PLAN - WEST
ED108 SECOND FLOOR DEMOLTION PLAN - EAST
ED109 THIRD FLOOR DEMOLITION PLAN
ED110 FOURTH FLOOR DEMOLITION PLAN
ED111 FIFTH FLOOR DEMOLITION PLAN
ED112 SIXTH FLOOR DEMOLITION PLAN
E101 BASEMENT NEW WORK PLAN - NEW CLC
E102 BASEMENT NEW WORK PLAN - WEST
E103 BASEMENT NEW WORK PLAN - EAST
E104 FIRST FLOOR NEW WORK PLAN - NEW CLC
E105 FIRST FLOOR NEW WORK PLAN - WEST
E106 FIRST FLOOR NEW WORK PLAN - EAST
E107 SECOND FLOOR NEW WORK PLAN - WEST
E108 SECOND FLOOR NEW WORK PLAN - EAST
E109 THIRD FLOOR NEW WORK PLAN
E110 FOURTH FLOOR NEW WORK PLAN
E111 FIFTH FLOOR NEW WORK PLAN
E112 SIXTH FLOOR NEW WORK PLAN
VERIFY ALL DIMENSIONS RELATING NEW CONSTRUCTION TO EXISTING CONSTRUCTION.1.
2. GENERAL TRADE SHALL PATCH HOLES IN SLABS, PARTITIONS, AND CEILINGS CAUSED BY ANY TRADE AS FOLLOWS:
A). AT REMOVED CONDUIT
B). AT NEW CONDUIT IN EXISTING PARTITIONS
WHERE EXPOSED TO VIEW, PATCHED SURFACES SHALL MATCH ADJACENT FINISHES. WORK SHALL MAINTAIN EXISTING
SEPARATION RATINGS.
3.
CONSTRUCTION IN SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT IS CURRENTLY IN PROGRESS. ACTUAL
EXISTING CONDITIONS MAY VARY FROM CONDITIONS INDICATED ON THESE DRAWINGS.
4.
SEE SPECIFICATION SECTION 01 35 26 FOR INFECTION CONTROL. SEE SPECIFICATION SECTION 01 00 00 FOR PHASING AND WORK
TIME LIMITATIONS
5.
4'0" 2' 8' 12'
2'0" 1' 4' 6'
1'0" 6" 2' 3'
8"0" 4" 16" 24"
6"0" 3" 12" 18"
4"0" 2" 8" 12"
2"0" 1" 4" 6"
1/8" = 1'-0"
1/4" = 1'-0"
1/2" = 1'-0"
3/4" = 1'-0"
1" = 1'-0"
1 1/2" = 1'-0"
3" = 1'-0"
SCALE VERIFICATION
SYMBOLSGENERAL NOTES
MAINTAIN EXISTING POWER AND LIGHTING CIRCUIT(S) IN SERVICE. CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY DISRUPTION
TO THESE CIRCUIT(S). PROVIDE CONDUIT AND WIRING AS REQUIRED.
6.
CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REINSTALLATION OF CEILING TILES. GC TO REPLACE ANY DAMAGED TILES.7.
ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE FIRE SEALED PER SPECIFICATIONS BY THE CONTRACTOR.8.
ALL PENETRATIONS THROUGH NON-RATED WALLS SHALL BE SEALED PER SPECIFICATIONS BY THE CONTRACTOR.9.
ALL PENETRATIONS THROUGH THE FLOOR SHALL BE FIRE SEALED PER SPECIFICATIONS.10.
PROVIDE NEW NURSE CALL DEVICE(S) PER SPECIFICATIONS.11.
MULTICORELINK:22FED0400ED101-ED101
MULTICORELINK:22FED0400ED101-ED101
MULTICORELINK:22FED0400ED102-ED102
MULTICORELINK:22FED0400ED102-ED102
MULTICORELINK:22FED0400ED103-ED103
MULTICORELINK:22FED0400ED103-ED103
MULTICORELINK:22FED0400ED104-ED104
MULTICORELINK:22FED0400ED104-ED104
MULTICORELINK:22FED0400ED105-ED105
MULTICORELINK:22FED0400ED105-ED105
MULTICORELINK:22FED0400ED106-ED106
MULTICORELINK:22FED0400ED106-ED106
MULTICORELINK:22FED0400ED107-ED107
MULTICORELINK:22FED0400ED107-ED107
MULTICORELINK:22FED0400ED108-ED108
MULTICORELINK:22FED0400ED108-ED108
MULTICORELINK:22FED0400ED109-ED109
MULTICORELINK:22FED0400ED109-ED109
MULTICORELINK:22FED0400ED110-ED110
MULTICORELINK:22FED0400ED110-ED110
MULTICORELINK:22FED0400ED111-ED111
MULTICORELINK:22FED0400ED111-ED111
MULTICORELINK:22FED0400ED112-ED112
MULTICORELINK:22FED0400ED112-ED112
MULTICORELINK:22FED0400E101-E101
MULTICORELINK:22FED0400E101-E101
MULTICORELINK:22FED0400E102-E102
MULTICORELINK:22FED0400E102-E102
MULTICORELINK:22FED0400E103-E103
MULTICORELINK:22FED0400E103-E103
MULTICORELINK:22FED0400E104-E104
MULTICORELINK:22FED0400E104-E104
MULTICORELINK:22FED0400E105-E105
MULTICORELINK:22FED0400E105-E105
MULTICORELINK:22FED0400E106-E106
MULTICORELINK:22FED0400E106-E106
MULTICORELINK:22FED0400E107-E107
MULTICORELINK:22FED0400E107-E107
MULTICORELINK:22FED0400E108-E108
MULTICORELINK:22FED0400E108-E108
MULTICORELINK:22FED0400E109-E109
MULTICORELINK:22FED0400E109-E109
MULTICORELINK:22FED0400E110-E110
MULTICORELINK:22FED0400E110-E110
MULTICORELINK:22FED0400E111-E111
MULTICORELINK:22FED0400E111-E111
MULTICORELINK:22FED0400E112-E112
MULTICORELINK:22FED0400E112-E112
LNM1
EQCLC2
EASY CARE TO BE REMOVED
EXISTING MIDMARK RTLS
EQUIPMENT TO REMAIN.
EX
A
EXISTING PANEL(S)
TO REMAIN
EX
SUPPLY
CHAIN
SIMS
B082A
SUPPLY
CHAIN
INVENTORY
B082
AREAWAY
B096
IT
ROOM
B091
ELECTRICAL,
EMERGENCY
B092
ELECTRICAL,
INCOMING
B092
MECHANICAL
ROOM
B094
PIPE
TUNNEL
B095
BASEMENT DEMOLITION PLAN -
NEW CLC
ED101
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 2
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
ED101
F3 BASEMENT DEMOLITION PLAN - NEW CLC
1/8" = 1'-0" 4'0" 2' 8' 12'
MLL NMP
(THIS SHEET ONLY)
PLAN KEYED NOTES
A DISCONNECT AND REMOVE THE EXISTING NURSE CALL CABLING AND
SWITCHES, POWER SUPPLY AND DUPLEX RECEPTACLE. SALVAGE THE
EXISTING MIDMARK RTLS EQUIPMENT AND CABLING IN PLACE.
SALVAGE THE EXISTING CABINET IN PLACE.
N
TA
TA
TA
TA
LAUNDRY
CHUTE ABOVE
TA
FD
EL
EC
TR
IC
TR
AN
SF
OR
ME
RS
ON
4"
RA
ISE
D
CO
NC
SL
AB
TA
STAIR 5
UP
COIL
CABINET
STAIR 7
ELECTRIC TRANSFORMERS ON 4" RAISED
CONC SLAB
PIPE
SHAFT
ROOF OF MECHANICAL
ROOM 1400
FEC
E1
BM
C
BM
C
BCP
NH-ME-1
LNB-1
LNB-2
RSA
LNB-2A
B4
ATS
MONITORING
N E
Xref ..\OGJMC_HOSPITAL_AX_00.dwg
N N
ELA
B5
B3
NESS
EQ-CLC
EX
EX
NEN E
N E
N E
N E
N E
N
A A
A A A
A
A
A
A
A
NE
NE
NE
SUPPLY
CHAIN
SIMS
B082A
SUPPLY
CHAIN
INVENTORY
B082
MECHANICAL
ROOM
B079
PHARMACY
CACHE
B081
VAULT
B081A
SUPPLY
CHAIN MNGT.
STORAGE/OFFICE
B083
ELECTRICAL
EQUIPMENT
B027A
ELECTRONICS
SHOP
B027
ENGINEERING
AND
EMERGENCY
MANAGEMENT
B023
LOCKSMITH
B023A
MENS
LOCKER
ROOM
B021
AQUISITION
SPECIALIST
B019
MENS
TOILET
B021A
CHIEF,
SUPPLY
CHAIN MNGT.
B086A
MACHINE
SHOP
B060
CARPENTER
SHOP
B062
CARPENTER
SHOP
OFFICE
B062A
CONFERENCE
ROOM
B077
CONST.
CONTROL
REP.
B078
I.H. AND
GEMS
B067
GENERAL
ENGINEER
B074
SUPERVISORY
ENGINEER
B072
CHIEF
ENGINEER
B070
GENERAL
ENGINEER
B076
HALLWAY
B075
TOILET
B075A
PROGRAM
ASSISTANT
B066
GENERAL
ENGINEER
B068
CORRIDOR
B099C-1
GENERAL
ENGINEER
B069
CORRIDOR
B099B-1
CORRIDOR
B099A-1
CORRIDOR
B099D-1
ELECTRICAL
ROOM
B028
M & R
SUPERVISOR
AND WORK
LEADER
B022
SAFETY
MANAGER
B022
CORRIDOR
B018
MAINTENANCE
SHOP/OFFICE
B014
SOILED
STORAGE
B006
STORAGE
B004 STORAGE
B002
VESTIBULE
B018A
MAINTENANCE
STORAGE
B018B
MECHANICAL
ROOM
B018C
WOMENS
BREAK ROOM
B196
CORRIDOR
B199B-1
WOMENS
RESTROOM
B170
DINING
ROOM
B172
MENS
RESTROOM
B168
RETAIL
STORE
B174
CHIEF,
CANTEEN
B174A
CANTEEN
STORAGE
B175A
CANTEEN
KITCHEN
B175
MAIN
KITCHEN
B186
CART
WASHER
B186B
SANITATION
B186A
CANTEEN
SERVING
B192
WOMENS
TOILET
B196B
WOMENS
LOCKER
B196A
STAFF
LOCKERS
B194
CORRIDOR
B199A-1
CORRIDOR
B199C-1
ASSISTANT
CHIEF SUPPLY
CHAIN MNGT.
B084
SUPPLY
CHAIN
B086B
SUPPLY
CHAIN ADMIN.
OFFR
B086
PHONE
AND
DATA
B085
SHARED
SHOPS
B087
SHOP
OFFICE
B088
BIOMED
AND
ELECTRONICS
B089
BIOMED
AND
ELECTRONICS
B009A
SUPERVISOR
BIO-MED/
ELECTRONICS
B009
SOILED
LINEN
HOLDING
AREA
B003
HSKG
STORAGE
B122
NESS
OFFICE
B123
HOUSEKEEPING
SUPERVISORS
B129C
NESS
EQUIP.
AND
SUPPLIES
B129
MECHANICAL
ROOM
B129A
CART
WASHER
B129B
CHIEF,
NESS
B121
CANTEEN
STORAGE
AND
RECIEVING
B119
UNIFORMS
B191
DATA
CLOSET
B117
CBOC
STORAGE
B187
MAIN
ROOM
B107A
MSA
SUPERVISORS
B107B
VESTIBULE
B107
MECH.
ROOM
B107D
TELE-DIETICIAN
B120
B091
WOMENS
SHOWER
B196C
VESTIBULE
B199D-1
BASEMENT DEMOLITION PLAN -
WEST
ED102
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 3
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
ED102
F3 BASEMENT DEMOLITION PLAN - WEST
1/8" = 1'-0"
N
4'0" 2' 8' 12'
(THIS SHEET ONLY)
PLAN KEYED NOTES
A DISCONNECT AND REMOVE THE EXISTING NURSE CALL DEVICE(S) AND
ASSOCIATED CABLING. SALVAGE THE BACK BOX AND CONDUIT (OR
SURFACE RACEWAY AS APPLICABLE) FOR REUSE (AS FEASIBLE).
REMOVE THE CALL CORDS/BUTTONS TO BE REPLACED WITH NEW.
PROVIDE BLANK PLATE(S) FOR UNUSED BACK BOXES.
AutoCAD SHX Text
UP
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
FE
TO PANEL CR
EQK
PNL B1
PNL B2
PNL KP
B5
B3
BLEQ2
EX
EX
EX
EX
EX
EP
TEQ
IRM
B1E
CB
N
N
N E
NE
NE
N E
N
N E
N E
N E N E
N E A
A
A
A
A A
A A
A
A
A
A
FD FDFD
HYDRAULIC POWER
UNIT
FD
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
DN
UP
UP
PASSENGER
ELEVATOR
ACCESS
EL
EC
TR
ICA
L
EQ
UIP
ME
NT
MECH
SHAFT
D-4 D-5
ROOF OF MECHANICAL
ROOM 1400
LAUNDRY
CHUTE ABOVE
FEC
FEC
FEC
DN
E1
CANTEEN
KITCHEN
B175
MAIN
KITCHEN
B186
FOOD
BANK
COOLER 2
186Q
RETHERM
COOLER 1
186R
COOLER 3
B186P
COOLER 4
B186N
FREEZER 2
B186M
FREEZER 1
B186L
MORGUE
COOLER
B273
LOADING
DOCK
B271
VESTIBULE
B276
RECYCLING
AND SHREDDER
ROOM
B278
SHIPPING
AND
RECEIVING
B274
ELECTRICAL
EQUIP.
ROOM
B278A
ELEVATOR
EQUIPMENT
B224B
ROUGH
PREP.
B186H
STAFF
WORK
ROOM
B186D
FOOD
SERVICE
MANAGER
OFFICE
B186E
ELECTRIC
ROOM
B186I
CART
WASHER
B186B
UTILITY
B186C
SANITATION
B186A
CANTEEN
VENDING AND
BEVERAGE
STORAGE
B185
CORRIDOR
B299B-1
CORRIDOR
B199A-1
OFFICE
LOGISTICS
B298B
O2
STORAGE
B268
ELECTRICAL
ROOM
B269
UNIFORMS
B191
CBOC
STORAGE
B187
MAIN
ROOM
B107A
MSA
SUPERVISORS
B107B
VESTIBULE
B107
WAN
ROOM
B105
MECH.
ROOM
B107D
TELEPHONE
EQUIPMENT
B103
CODERS
WORKSTATIONS
B101
MEDICAL
RECORDS
B201
MECH.
ROOM
B202
RELEASE
OF
INFO.
B203
WOMENS
TOILET
B204
MENS
TOILET
B205
PRI. SUPPLY/
SURGURY
CASE CART
B291
CHIEF,
SPS
B291A
STOCK
BREAKOUT
B287
PIPE
CHASE
B284
EMERGENCY
ELECTRICAL
ROOM
B267
CORRIDOR
B299A-1
CORRIDOR
B299D-1
NON-EXP.
EQUIPMENT
B298A
WAREHOUSE
STORAGE
B298
DECONTAMINATION
B295
MECH.
ACCESS
B295A
LOCKERS
AND
SHOWER
B297
PREPARATION
PACKAGING
B291B
MECH.
ROOM
231B
STERILIZER
291C
MECH.
ROOM
B231A
MECH.
ROOM
B231C
BULK
MEDICAL
STORAGE
B231D
STORAGE
LOGISTICS
B231
LAUNDRY
CHUTE
B230
CORRIDOR
B299C-1
MECH.
ACCESS
B227
UNISEX
BREAK
ROOM
B228
MENS
TOILET AND
SHOWER
B228C
VEST.
228A
MENS
LOCKER
ROOM
B228B
MECHANICAL
ROOM
B224A
ELEVATOR
LOBBY
B224
MECH.
ROOM
B224CDATA
B296
DIETETICS
OFFICE
B186F
AMBIENT
DISPOSAL AND
NOURISHMENT
STORAGE
B186G
BASEMENT DEMOLITION PLAN -
EAST
ED103
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 4
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
(THIS SHEET ONLY)
PLAN KEYED NOTES
A DISCONNECT AND REMOVE THE EXISTING NURSE CALL DEVICE(S) AND
ASSOCIATED CABLING. SALVAGE THE BACK BOX AND CONDUIT (OR
SURFACE RACEWAY AS APPLICABLE) FOR REUSE (AS FEASIBLE).
REMOVE THE CALL CORDS/BUTTONS TO BE REPLACED WITH NEW.
PROVIDE BLANK PLATE(S) FOR UNUSED BACK BOXES.
ED103
F3 BASEMENT DEMOLITION PLAN - EAST
1/8" = 1'-0"
N
4'0" 2' 8' 12'
AutoCAD SHX Text
BLAST CHILLER
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
RAMP
E
N
CB
N
E
N
E 84"
NSPB
N
SPB
NE
N
E 84"
N E 84"
NE
N
DEB
N
SPB
N
SPB
NE
N
E 84"
N
N
N
N
N
N
N E
N M
N
SPB
N
E 84"
NE
N
SPB
N
E 84"
NE
N
SPB
N
E 84"
NE
N
SPB
NE
84"
NE
N
SPB
NE
84"
NE
NE
N
E 84"
N
DEB
N
SPB
NE
N
E 84"
N
E
BA
A
BA
BA
BA
BA
A
A
A A
A
A
A
A
N A
N
A
BA
BA
BA
BA
N
SPB
BA
BA
A
A
N A
N
A
A
A
A
N A
N
N
A
A
N
A
CLEAN
STORAGE
TOILET
1038A
FIRST FLOOR DEMOLITION PLAN -
NEW CLC
ED104
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 5
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
ED104
F3 FIRST FLOOR DEMOLTION PLAN - NEW CLC
1/8" = 1'-0" 4'0" 2' 8' 12'
(THIS SHEET ONLY)
PLAN KEYED NOTES
A DISCONNECT AND REMOVE THE EXISTING NURSE CALL DEVICE(S) AND
ASSOCIATED CABLING. SALVAGE THE BACK BOX(ES) AND CONDUIT(S)
FOR REUSE (AS FEASIBLE). REMOVE THE PILLOW SWITCHES TO BE
REPLACED WITH NEW.
SALVAGE THE EXISTING T.V. CONTROL/INTERFACE WIRING FOR
REUSE AS FEASIBLE. DISCONNECT AND REMOVE THE EXISTING
PILLOW SWITCH; SALVAGE THE WIRING AND LOW VOLTAGE LIGHTING
CONTROLLER FOR REUSE.
B
RESIDENT
BEDROOM
RESIDENT
BEDROOM
RESIDENT
BEDROOM
RESIDENT
BEDROOM
RESIDENT
BEDROOM
RESIDENT
BEDROOM
RESIDENT
BEDROOM
TOILET
ROOM
930A
TOILET
ROOM
932A
TOILET
ROOM
934A
TOILET
ROOM
938A
TOILET
ROOM
936A
TOILET
ROOM
940A
TOILET
ROOM
942A
BARIATRIC
HOSPICE
ROOM
BARIATRIC
TOILET
ROOM
926A
HOSPICE
ROOM
HOSPICE
ROOM
HOSPICE
ROOM
TOILET
ROOM
924A
TOILET
ROOM
922A
TOILET
ROOM
920A
SHARED
OFFICE
MEDITATION/
CONSULT
ELECTRICAL
ROOM
CORRIDOR
C1-10
CORRIDOR
C1-11
CORRIDOR
C1-16
CORRIDOR
C1-13
CORRIDOR
C1-12
NURSE
WORK
AREA
STORAGE
ALCOVE
CLEAN
LINEN
SUPPLY
TOILET
CLERK
BARBER
HSKP
MEDS
931A
TOILET
SOILED
CONFERENCE
DEN
LOBBY
FOYER
C1-14
LIVING
ROOM
DINING
CORRIDOR
C1-15
KITCHEN
MA
TC
HL
INE
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
SERVICE
ELEVATOR PASSENGER
ELEVATOR
UP
DN
UP
DN
CHASE
CHASE
TU
BE
ST
AT
ION
FI
RE
PL
AC
E
CHASE
MECH.
SHAFT
MECH.
SHAFT
UP
N
SP
N
EQ
N E
N D
N
EQ
N
SP
N E
NE
NE
N
SP
N
EQ
N E N E
NE
N E
N
SP
N
EQ
N
SP
N
EQ
NE NE
N D
MESSAGE (CALL)
BOARD(S)
N D
N D
N E
N E
NE
N E
N E
N
SP
N
EQ
N E
N E
N
SP
N
EQ
N E
N E
N
SP
N
EQ
N E
N E
N
SP
N
EQ
N E
N E
N D
N
SP
N
EQ
NE
NE
N
SP
N
EQ
N E
N E
N E
N E
N E
MESSAGE (CALL)
BOARD
N D
N
EQ
N
SP
N E
N E
N EQ
N SP
N E
NE
N EQ
N SP
N E
NE
MESSAGE (CALL)
BOARD
NEQ
NSP
N E
NE
NEQ
NSP
N E
N E
N D
N EQ
N SP
N SP
N EQ
N E
N E
N EQN SPN SPN EQ
NE
N E
ND
MESSAGE (CALL)
BOARD
N EQ N SP
NE
NE
N
EQ
N
SP
N E
N E
N
SP
N
EQ
N E
N E
N
EQ
N
SP
NE
NE
NE
NEQ
NSP
N E
NE N EQ
N SP
N E
N E
ND
N EQ
N SP
NE
N E
NEQ
NSP
N E
NE
N EQNSP
N E N E
N SPN EQ
N E
N E
N EQNSP
NE
N E
N D
NEQ
NSP
N E
NE
B
B
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
B
B B
A AA
A A
A
A
A
A
A
A
A
A
AA
A
A
A
A
A
A A
A
B
A
A
A A
A
A
DD
D
D
D
D
D
D
C
D
A
AA
A
A
DD
A
A A
A
A
A
A
A
A
DDD
AA
A
A
D
AA
D
A
A
A
A
A
A
DD
D
A
A
D
A E
D
A
A
A
A
E C
C
D D
A
D D
A
A
A
A
D
MESSAGE (CALL)
BOARD
B
D
D
D
D
D
A
C
C
C
C
C
C
C
CC
C
C
C C
C
C
C
C C C CC
C
C
C C
C
C
DD
F
EX RTLS
TO REMAIN
D
N M
A
D
N E A
FIRST FLOOR DEMOLITION PLAN -
WEST
ED105
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 6
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
ED105
F1 FIRST FLOOR DEMOLITION PLAN - WEST
1/8" = 1'-0" 4'0" 2' 8' 12'
MLL NMP
(THIS SHEET ONLY)
PLAN KEYED NOTES
A DISCONNECT AND REMOVE THE EXISTING NURSE CALL DEVICE(S) AND
ASSOCIATED CABLING. SALVAGE THE BACK BOX(ES) AND CONDUIT(S)
FOR REUSE (AS FEASIBLE). REMOVE THE PILLOW SWITCH(ES) TO BE
REPLACED WITH NEW. PROVIDE BLANK FACE PLATE FOR UNUSED
BACK BOX(ES).
DISCONNECT AND REMOVE MESSAGE BOARD AND ASSOCIATED
CONDUIT AND WIRING.
SALVAGE THE EXISTING T.V. CONTROL/INTERFACE WIRING FOR REUSE
AS FEASIBLE. DISCONNECT AND REMOVE THE EXISTING PILLOW
SWITCH; SALVAGE THE WIRING AND LOW VOLTAGE LIGHTING
CONTROLLER FOR REUSE.
DISCONNECT/REMOVE ROOM CONTROL BOX AND ALL ASSOCIATED
WIRING. SALVAGE CONDUIT FOR REUSE AS FEASIBLE.
DISCONNECT AND REMOVE EXISTING DEVICE AND ASSOCIATED
WIRING. PROVIDE BLANK COVER PLATE.
RTLS SWITCH AND COLLECTOR(S) TO REMAIN IN SERVICE.
B
C
D
CLOTHING
STORAGE
CLEAN
STORAGE
89 PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1038A
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1042A
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PROGRAM
ASSISTANT
1137 PRIVATE
RESIDENT
ROOM
KITCHENETTE
LOCKERS
1105A
CORRIDOR
C1-11
STAIR 7
NURSE
STATION
ALCOVE
TOILET
1036A
TOILET
1040A
TOILET
1044A
MECH.
SHAFT
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1028A
TOILET
1024A
TOILET
1020A
STORAGE
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1029A TOILET
1025A
TOILET
1009A
TOILET
1005A
TOILET
1052A
STAFF
TOILET
UTILITY
CLEAN
LINEN
DAY
ROOM
NURSE
STATION
NURSE
STATION
CLEAN
LINEN
ELECT.
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1008A
TOILET
1010A
TOILET
1006A
TOILET
1002A
EQUIPMENT
STORAGE
STAFF
TOILET
1148B
LOCKER
ROOM
1148A STAFF
LOUNGE
RECR.
THER.
STORAGE
PHYSICIAN
OFFICE
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1051A
TOILET
1055A
MECH.
CHASE
BATHING/
SPA
RECREATION
THERAPY
OFFICE
1147A
ACTIVITY/
GROUP ROOM
CORRIDOR
EQUIP. STOR.
STAIR 1
LINEN
CHUTE
MAIN
NURSE
STATION
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1128A
TOILET
1132A
TOILET
1136A
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1127A
TOILET
1131A
TOILET
1135A
NURSE
STATION
NURSE
MANAGER
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1166A
TOILET
1170A
STAIR 5
IV
STOR.
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1175A
TOILET
1171A
ADL.
BATH
1165B
ADL. OT AREA/
BEDROOM
OCCUPATIONAL
THERAPY
OFFICE
1165A
MEDS
ROOM
DATA
CLOSET
CLEAN
LINEN
UTILITY
CLOSET
STOR.
1116A
RESIDENT DINING AND
RECREATION AREA
UTILITY
CLOSET
PHYSICAL THERAPY
SATELLITE CLINIC
UNISEX
TOILET
NURSE
PRACTITIONER
1111A SOCIAL
WORKER
1109A
OXYGEN
STOR.
EQUIPMENT
STORAGE
RESIDENT
KITCHEN
1116B
CHAPLAIN
OFFICE
CLOSET
1182A
CLOSET
1182B
POLICE
PIV ROOM
ENROLLMENT
ELIGIBILITY
AMERICAN
LEGION/ DAV
CHIEF,
POLICE
E
F
HL
INE
BASEMENT ROOF
UP
DN
LO
CK
ER
S
DNUP
UP
DN
DUMB
WAITER
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
LDRY
CHUTMECH.
CHASE
UP
CARPET
CARPET
TILE
TILE
FE FE
MECH
SHAFT
PASSENGER
ELEVATOR
D-4 D-5
STAIR 4
STAIR 2
STAIR 8
STAIR 3
N E
SURF.
N E
SURF.
N E
SURF.
N
SPA
ND
N SPA
NSPA
ND
N
SPA
NSPA
N N
NE
NSPA
NSPA
N SPA
N SPA
NSPA
N
N SPA
N
N SPA
NN
N
N
NE
N
N
N E
N SPA
N
N N N N NN N
N SPA
N
N
N N
NN
N
N
NE
N N N N
N
N
N
N
N
N
N
N
N E
N
N
N
NE
ND
N
N N
NE
NN
N
N
N
ND
NM
NENE
NE
N
N
NE
N D
N
N
N D
N D
N D
ND
NE
NCB
N E
SURF.
N E
SURF.
N E
SURF.
A
A
A
A
A
A
A
A
A
A
NSPA NSPA NSPA NSPA
ND
A A
NSPA
A A A A
A
A A
A
A
A A
A
A
A
N E
N
CB
A
A
A
A A
A
A
A
A
A A
A
A
A
A A
A
AA
A
NC N CB
NC
NCB
A
NC N CB
A
A
A
A
NC N CB
A A
NC N CB
A
AA
A
A
A
N E
N E
NE
N E
N
N
A
A
A
A
N E
A
EASY CARE
B
A
N
A A
A
N
SPA
A
N
ND
C
N
N
A
C
A
A
N
NE
NE
N M
A
CHAPEL
CHAPEL
1284A
WAITING
ROOM
TRAVEL
OFFICE
1286A
WAITING
ROOM
AGENT
CASHIER
1288A
OFFICE
EVIDENCE
1201A
HOLDING
1201B
MAIN
OFFICE
LOBBY
WEAPONS
1201C
KITCHENETTE
LOCKERS
1105A
MENS
TOILET
VESTIBULE
1100A
WOMENS
TOILET
STAIR 2
PHARMACY
SUPPLY
CLINICAL
PHARMACIST
CORRIDOR
1299A
PHARMACY
CONSULTING
CONSULTING
1218B
CONSULTING
1218C
DATA AND
PHONE
1218A URGENT
CARE OFFICE
OUTPATIENT
DISPENSING
MEDS
CAROUSAL
COAT
ROOM
TOILET
1224A
PHARMACY
OFFICE
SECURE
MED PREP
VAULT
1228A
PHARMACY
MED PREP
NON-HAZ./
CLEAN RM.
1233B
HAZARD
HOOD RM.
1233A
IV ROOM
LOUNGE
PHARMACY
CHIEF
MED PREP
& OFFICES
STAIR 3
VESTIBULE
ELECTRICAL
WAITING
AREA
CLERK
AREA
WOUND
CARE
TREATMENT
NURSE
WORKROOM
EXAM
ROOM
1275 ALCOVE
PROCEDURE
ROOM
STAIR 4
PATIENT
TOILET
SOCIAL
WORKER
OPC NURSE
MANAGER
SOCIAL
WORKER
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
NURSE
WORKROOM
EXAM
ROOM
EXAM
ROOM
STAFF
TOILET
1340A
BREAK ROOM/
LOCKERS
ELEVATOR
LOBBY
EXAM
ROOM
DIETICIAN
DIETICIAN
MEDICATION
FIRE ALARM/
SECURITY RM.
ELECTRICAL
MENS
TOILET
WOMENS
TOILET
HSKP.
EXAM
ROOM
STAFF
TOILET
PATIENT
TOILET
DIABETES
DIABETES
NURSE
WORKROOM
PATIENT
TOILET
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
PT. ED./
CONS.
CLEAN
SUPPLY
STERILE
SUPPLY
PYXIS
ALCOVE
DECON
ROOM
MEDICATION
SOILED
UTILITY
PATIENT
TOILET
TREATMENT
ROOM
TREATMENT
ROOM
TREATMENT
ROOM
EQUIPMENT
CHA.
ROOM
1304C
CHA.
ROOM
1304B
MRI
VESTIBULE
1304 MRI
VESTIBULE
1304A
ED
WAITING
AREA
TRIAGE
ELEVATOR
EQUIPMENT
1368 PATIENT
TOILET
1312B
TREATMENT/
ISOLATION
SECURE
TREATMENT
WHEELCHAIR
STORAGE
ANTE
ROOM
1312A
WAITING
AREA
NURSE
STATION
DICTATION
EXAM
ROOM
OFFICE
NURSE
WORKROOM
EXAM
ROOM
SCALE
ALCOVE
CLERKS
STAIR 8
VOLUNTEER
AREA
HSKPG
HSKPG
CLOSET
AOD
OFFICE
VESTIBULE
1300A
VESTIBULE
1300B
AMBULANCE
GARAGE
C O
R R
ID
O
R
PATIENT
TOILET
1267B
BLOOD
DRAW
LAB
EKG
1267A
SOILED
FIRST FLOOR DEMOLITION PLAN -
EAST
ED106
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 7
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
MLL NMP
ED106
F1 FIRST FLOOR DEMOLITION PLAN - EAST
1/8" = 1'-0" 4'0" 2' 8' 12'
MLL NMP
(THIS SHEET ONLY)
PLAN KEYED NOTES
A DISCONNECT AND REMOVE THE EXISTING NURSE CALL DEVICE(S) AND
ASSOCIATED CABLING. SALVAGE THE BACK BOX AND CONDUIT (OR
SURFACE RACEWAY AS APPLICABLE) FOR REUSE (AS FEASIBLE).
REMOVE THE CALL CORDS/BUTTONS TO BE REPLACED WITH NEW.
PROVIDE BLANK PLATE(S) FOR UNUSED BACK BOXES.
DISCONNECT/REMOVE THE EXISTING EASY CARE HEAD END
EQUIPMENT AND ALL ASSOCIATED WIRING. SALVAGE CONDUIT AND
RECEPTACLE FOR REUSE AS FEASIBLE.
DISCONNECT AND REMOVE DEVICE AND ALL ASSOCIATED CONDUIT
AND WIRING.
B
C
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
FD FD FD
DWV
ELEC
CABINET
FD
DN
UP
STAIR 1
STAIR 5
STAIR 2
DN
UP
UP
DN
SERVICE
ELEVATOR PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
1st. FLOOR ROOF
MECH.
SHAFT
SUB-STERILIZER
MECH SPACE
MECH. RM. 1400
ROOF
NN
N ENE
N CB
N
CB
NNN
N
CB
N CB
ND
ND
N D
N
N D
N
CB
NN
N
N
N
N
N
N
N
N CB
N C
N CB
N C
N CB
N C
N CB
N C
NCB
NC
NCB
NC
NCB
NC
N D
N D
N D
N N
N E
N E
N D
N
N E
N D
N
N C
N
CB
N
N C
N
CB
N
N C
N
CB
N D
ND
N
N C
N
CB
N
ND
A
N C
N
CB
AAA
NCB
A
A
A A
A
A
A
A
AA
N
CB
A
AA
A A
A
A
A
A
A
A
A
A
A
A
A
A
A A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
N
A
N
N
A
N C
N
CB
A N C
N
CB
A
CPB
CPB
CPB
C PB
C PB
C PB
C PB
C
PB
C
PB
C PB
CPB
C PB C PB
C
PB
N N
A
A
EASY CARE
B
C
N
N CB
A
C PB
N E
A
ND
A
NE
A
CHANGING
ROOM
TOILET
STORAGE
2263B
SECOND FLOOR DEMOLITION PLAN
- WEST
ED107
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 8
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
4'0" 2' 8' 12'
MLL NMP
ED107
F2 SECOND FLOOR DEMOLITION PLAN - WEST
1/8" = 1'-0"
(THIS SHEET ONLY)
PLAN KEYED NOTES
A DISCONNECT AND REMOVE THE EXISTING NURSE CALL DEVICE(S) AND
ASSOCIATED CABLING. SALVAGE THE BACK BOX AND CONDUIT (OR
SURFACE RACEWAY AS APPLICABLE) FOR REUSE (AS FEASIBLE).
PROVIDE BLANK PLATE(S) FOR UNUSED BACK BOX(ES).
DISCONNECT/REMOVE EASY CARE EQUIPMENT AND ASSOCIATED
WIRING. SALVAGE CONDUIT AND RECEPTACLE(S) FOR REUSE AS
FEASIBLE.
DISCONNECT/REMOVE ALL EASY CARE AND ASCOM EQUIPMENT AND
ASSOCIATED WIRING. MAINTAIN THE EXISTING RTLS SWITCH AND
COLLECTOR(S) IN SERVICE. THE NEW NURSE CALL PLATFORM SHALL
INTERFACE IN THIS ROOM WITH THE VA NETWORK.
B
CYSTOSCOPY
HSKG
CLOSET
DATA
AND
PHONE
CORRIDOR
C2-1
SOILED
UTILITY
STERILE
SUPPLY
CLEAN
SUPPLY
PT.
TOILET
PT.
TOILET
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
2145A
CORRIDOR
OFFICE
OFFICE
OFFICE
STAFF
LOUNGE
BIOMED
DATA
DATA AND
PHONE
TREATMENT
TREATMENT
SOILED
UTILITY
TREATMENT
TREATMENT
TREATMENT
TREATMENT
PT.
TOILET
2176A
TREATMENT
CLEAN
SUPPLY
NURSE
STATION
PACS
VIEW
TOILET
STERILE
SUPPLY
2171A
WAITING
ROOM
H A
LL
W
A Y
CHECK-IN
CLERKS
WOMEN
MEN
WHEELCHAIR
ALCOVE
HSKG
CLOSET
CORRIDOR
2299B
WOMEN
2112A
LAUNDRY
CHUTE
TOILET
2143A
PACU
BED #8
2129K
PACU
BED #8
2129L
OR
SUPERVISOR
WOMEN
LCKR/
SHOWER
RM.
MEN
LCKR/
SHOWER
RM.
EQUIP.
STORAGE
SOILED
UTILITY
ANESTHESIA
WORK ROOM
BLANKET
WARMER
2110D
SEMI-RESTRICTED
CORRIDOR
MECHANICAL
MEN
2111A
CORRIDOR
2299H
PRE/POST
BED #1
2129A
PRE/POST
BED #2
2129B
PRE/POST
BED #3
2129C
PRE/POST
BED #4
2129D
EQUIPMENT
STORAGE
NURSING
STATION
PRE/POST
BED #7
2129G
PRE/POST
BED #6
2129F
PRE/POST
BED #5
2129E
PR
E/
PO
ST
C O
R R
ID
O
R
TREATMENT
OPERATING
ROOM
OPERATING
ROOM
HSKG
CLOSET
STERILE
SUPPLY
CLEAN
SUPPLY
CART
ALCOVE
2110C
CART
ALCOVE
2110A
ENDOSCOPY
ENDOSCOPY
SCRUB
ALCOVE
2110B
DUMBWAITER/
CART
ALCOVE
PNUEMATIC
TUBE COMP.
PACS WORK
STATION
CLERK
CHECK-IN
MEDICAL
SERVER
ROOM
2215A
SCRUB
2105A
SUB-
STERILE
2101A
GOWNING
ALCOVE
FEMALE
TOILET
C
D
STAIR 3
UP
DN
STAIR 4
UP
DN
ROOF
ROOF
MECH
CHASE
PASSENGER
ELEVATOR
STAIR 8
DN
UP
OPEN TO FIRST
FLOOR
MECH.
SHAFT
CHASE
CHASE
PASSENGER
ELEVATOR
MECH.
SHAFT
ROOF
FOLDING
WALL
CB
N
N
N E
N E
N
N E
N
N C
N
CB
N
N E
N
N C
N
CB
N
N E
NE
N
CB
N
N E
N
CB
N E
N
CB
N E
N CB
N
NE
N D
N
N
N C
N
CB
N CB
N C
N E
ND
N E
N
N E
N E
N D
N D N
N E
NE
N N
N
N
N
N
N N
N
N
N E
ND
N N N
N E
NN
N
N E
N
N
NE
NE
N
N N
N E
N D
NN
N
N
N
ND
NDN D
N E
N E
N E
N E
N
N
A
A
A
A
A
A
A
A
A
B
A
A
A
A
A
A
A
A
A
A A
A
A
A
A
N
A
A
BA
A
A
A
A
N
NA
A
A
A A
AA
A A A
A
A A
N
A
A A
A
A
A
A
A A A A
NN
AAA
A
A
A
A A
A
AAA
A
A
C PB CPB C PB
CPB
CPB
C PB C PB CPB
C PB C PB
CPB
CPBC PBC
PB
CPB
CPB
C PB
CPB CPB
CPB
CPB
A
CPB
A
C PB
A
CPB
A
C PB
A
N
A
C PB
CPB
C PB
EASY CARE C
SECOND FLOOR DEMOLTION PLAN
- EAST
ED108
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 9
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
4'0" 2' 8' 12'
MLL NMP
ED108
F2 SECOND FLOOR DEMOLITION PLAN - EAST
1/8" = 1'-0"
(THIS SHEET ONLY)
PLAN KEYED NOTES
A DISCONNECT AND REMOVE THE EXISTING NURSE CALL DEVICE(S) AND
ASSOCIATED CABLING. SALVAGE THE BACK BOX AND CONDUIT (OR
SURFACE RACEWAY AS APPLICABLE) FOR REUSE (AS FEASIBLE).
PROVIDE BLANK PLATE(S) FOR UNUSED BACK BOX(ES).
DISCONNECT AND REMOVE DEVICE AND WIRING. PROVIDE BLANK
FACEPLATE.
DISCONNECT/REMOVE EASY CARE EQUIPMENT AND ASSOCIATED
WIRING. SALVAGE CONDUIT AND RECEPTACLE(S) FOR REUSE AS
FEASIBLE.
B
HSKG
CLOSET
DATA
AND
PHONE
CORRIDOR
C2-1
CHANGING
ROOM
PT.
TOILET
STORAGE
2263B
HSKG
PACS
VIEWING
CLEAN
SUPPLY
STERILE
CLEAN
ULTRASOUND
PATIENT
TOILET
ULTRASOUND
IMAGING
CHIEF
STAFF
LOUNGE
AND
LOUNGE
CHANGING
ROOM
2245A
CONTROL
ROOM
2242A
EQUIPMENT
ALCOVE
2230B
PT.
TOILET
2242B
PACS
VIEWING
STRESS
TEST
TECH
WORK
ROOM
UTILITY
CORRIDOR
2230P
PT.
TOILET
WAITING
AREA
EQUIPMENT
ALCOVE
2230A BONE
DENSITY
TECH
WORK
ROOM
WOMEN
TOILET
MEN
TOILET
GE CT
SCANNER
CONTROL
ROOM
2263A
CONTROL
ROOM
2261A
RADIOLOGY
CORRIDOR
C2-2
ELEVATOR
LOBBY
ACCUPUNCTURE
EXAM ROOM
SOCIAL
WORKER
STAFF
LOUNGE
STERILE
SUPPLY
CLEAN
SUPPLY
SOCIAL
WORKER
DATA
CLOSET
2306 ACCUPUNCTURE
EXAM ROOM
EYE
PRE-TREATMENT
EYE
PRE-TREATMENT
OFFICE
SUB-WAIT
AREA
PATIENT
TOILET
2335A
MENTAL
HEALTH
EXAMS
CHEMOTHERAPY
RADIOLOGY
FLUOROSCOPY
CT
SCAN
CONTROL
CT
SCAN
NUCLEAR
MEDICINE
HOT
LAB
2254A
MECHANICAL
2307A
MECHANICAL
HSKG
CLST
ELECTRICAL
ROOM
LANE
ROOM
LANE
ROOM
LANE
ROOM
EYE
INSTRUMENTS
TELE-HEALTH
EXAM ROOM
TELE-HEALTH
EXAM ROOM
TELE-HEALTH
EXAM ROOM
SOILED
LINEN
2359 SUB-WAIT
AREA
TELE-HEALTH
EXAM ROOM
TELE-HEALTH
EXAM ROOM
MENS
TOILET
STAFF
TOILET
WOMENS
HEALTH
EXAM
WOMENS
HEALTH
EXAM
TOILET
NEUROLOGY
EXAM
ROOM
CORRIDOR
NEUROLOGY
EXAM
ROOM
2364 NEUROLOGY
EXAM
ROOM
CLERKS
AREA
2374 STAFF
WORK AREA
2374A
WOMENS
TOILET
MEETING
ROOM
MEETING
ROOM
WAITING
AREA
FAMILY
RESTROOM
2338A
FAMILY
LOUNGE
WOMENS
HEALTH
EXAM
WOMENS
HEALTH
EXAM
WOMENS
HEALTH
EXAM
CORRIDOR
LAUNDRY
CHUTE
CORRIDOR
2252P
ONCOLOGY
EXAM/OFFICE
ONCOLOGY
EXAM/PROC.
CORRIDOR
C
2ND FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
DN
UP
FIRE
EQUIP
FIRE
EQUIP
LDRY
CHUT
RAMP
UP 7"
FLOOR
UP 7"
AUDIOLOGY
SOUND BOOTH
AUDIOLOGY
SOUND BOOTH
CARPET
VINYL TILE
FIRE
EQUIP
DUCT
DUMB
WAITER
DN
UP
STAIR 1
STAIR 3
STAIR 2
STAIR 4
DN
UP
UP DN
SERVICE
ELEVATOR PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
MECH.
SHAFT
MECH
SHAFT
MECH
SHAFT
MECH
SHAFT
AUDIOLOGY
SOUND BOOTH
AUDIOLOGY
SOUND BOOTH
UPDN
LDRY
CHUT
STAIR 5
2ND FLOOR ROOF
MECH
SHAFT
MECH
SHAFT
2ND FLOOR ROOF
N D
NEN EN E
N E
NE
N D
N E
N
N
N
N E
N E
N E
N
N E
NE
NE
N
N
N E
N E
N
N
N
N
N
N
N
N N
B
A A
AA
A
A
A
A A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
N
A A
C PB
C PB
C PB
C PB
C PB
C PB
C PB
C PB
N
B
NE
1 1
A
C
PB
N
A
A
NM
N E
A
HSKG
PSYCHOLOGIST
SOCIAL
WORKER
HSKG
UTILITY
3142A
PSYCHOLOGIST
SOCIAL
WORKER
SOCIAL
WORKER
PSYCHOLOGIST
SOCIAL
WORKER
B.H.
ADMIN.
MEDIA
STORAGE
TOILET
B.H.
SOCIAL
WORKER
SOCIAL
WORKER
B.H.
ADMIN.
B.H.
PHARMACIST
PSYCHOLOGIST
B.H.
B.H.
PSYCHIATRIST
PSYCHIATRIST
B.H. VOC
REHAB
B.H.
PEER
CORRIDOR
3199B-1
WOMENS
TOILET
MENS
TOILET
B.H.
CONFERENCE
ROOM
PSYCHOLOGIST
SOCIAL
WORKER
SOCIAL
WORKER
SOCIAL
WORKER
SOCIAL
WORKER
STORAGE
SOILED
LINEN
CORRIDOR
3199A-1
ADMIN.
OFFICER
BREAK
ROOM
B.H. ADMIN.
SUPPORT
PSYCHOLOGIST/
CHIEF, B.H.
PSYCHOLOGIST/
ASST. CHIEF B.H.
B.H.
TELE-HEALTH
B.H.
TELE-HEALTH
CORRIDOR
3199C-1
DATA &
PHONE
SUPPLY
CLOSET
SUPPLY
B.H.
TELE-HEALTH
PSYCHOLOGIST
AND INTERNS
B.H.
PEERS
AUDIOLOGY
CHECK-IN
3184C
AUDIOLOGY
WAITING AREA
AUDIOLOGY
WAITING
ROOM
3184B
TECHNICIAN
WORK
ROOM
3184A AUDIOLOGY
OFFICE
3280A
SPEECH
THERAPY
3280B
HEARING
TESTING
WHOLE HEALTH
GROUP ROOM
CORRIDOR
3299A-1
CORRIDOR
TELE-HEALTH
EXAM ROOM
NURSE
STATION
TELE-HEALTH
TELE-HEALTH
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
STERILE
SUPPLY
WAITING
AREA
CORRIDOR
3299C-1
TELE-HEALTH
STAFF OFFICE
MSA
OFFICE
BIO-MED
CLOSET
DATA &
PHONE
STAFF
LOUNGE AND
LOCKERS
CORRIDOR
TOILET
C O
R R
ID
O
R
B.H. GROUP
ROOM
B.H. GROUP
ROOM
B.H.
CHECK-OUT
CLERK
B.H., NURSING,
AUDIOLOGY
WAITING ROOM
RECEPTION
CLERKS
3105A
WOMEN
MEN
TOILET
3225A
CLERK/
WORK
WAITING
ROOM
PASSAGE
3237A
CHIEF,
DENTAL
OPERATORY
OPERATORY
OPERATORY
X-RAY
OPERATORY
OPERATORY
OPERATORY
CONTROL
3228A
PASSAGE
CLEAN
STORAGE
STERILE
SOILED
LAB
CORRIDOR
3299B-1
NURSE
EDUCATION
TRAINING
ROOM
NURSE
EDUCATION
TRAINING
ROOM
PASSAGEWAY
NURSE
EDUCATION
OFFICE
NURSE
TRAINING
ROOM
3245NURSE
ED. STOR.
TOILET
3246A
TOILET
3250A
SOILED
UTILITY
CLEAN
SUPPLY
HSKG
STORAGE
ELEVATOR
LOBBY
MECH.
3244-A
THIRD FLOOR DEMOLITION PLAN
ED109
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 10
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
ED109
F1 THIRD FLOOR DEMOLITION PLAN
1/8" = 1'-0" 4'0" 2' 8' 12'
MLL NMP
(THIS SHEET ONLY)
PLAN KEYED NOTES
A DISCONNECT AND REMOVE THE EXISTING NURSE CALL DEVICE(S) AND
ASSOCIATED CABLING. SALVAGE THE BACK BOX AND CONDUIT (OR
SURFACE RACEWAY AS APPLICABLE) FOR REUSE (AS FEASIBLE).
PROVIDE BLANK PLATE(S) FOR UNUSED BACK BOX(ES).
DISCONNECT AND REMOVE EXISTING DEVICE AND ASSOCIATED
WIRING.
B
N
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
KINGSTON
K-2005
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
MECH
SHAFT
DUMB
WAITER
DN
STAIR 5
DN
UP
STAIR 2
DN
STAIR 4
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
UPUP
DN
UP
STAIR 1 STAIR 3
UP
DN
LDRY
CHUT
MECH
SHAFT
MECH
SHAFT
3RD FLOOR ROOF
FIRE
EQUIP
FIRE
EQUIP
MECH
SHAFT
PASSENGER
ELEVATOR
K-4330KINGSTONC_TOILETSVITREOUS CHINA K-4330KINGSTONC_TOILETSVITREOUS CHINA
K-4330KINGSTONC_TOILETSVITREOUS CHINA
MECH
SHAFT
PIPE
SHAFT
NM
N E N E
N E N E
N
N
N
N
N
N
N Z
NE NE
N E
SURF.
N M
NENE
N E
N E
NM
N E
N E
ND
NM
N E
N E
N
SPB
N BM
N BM
N E
N E
NNN
N E
N D
N
N
NE
NE
N E N E N E
NE NE NE
NNN
N N N
N
N E
N N
N
N E N N
N
NE
N E
NE
N E
N
N N
NE
NE
N E
NE
N Z
N Z
N
EZ CARE
ASCOM
ASCOM
NE
N Z
N D
N
N
N PSC
A
A
A
A
A
A
A
A A
A
N
A
A
A
A
A
A
A
A
A
A
A A
A
A
A A
B
A
A
A
A
A
A
EZ CARE
B
A
A
A
A
AAA
A A A A
AA
A
A
N CB
N E
N E
N E
N E
N E
N E
C
NE
NE
N E
N E
N E
N E
N
N
BM
N
SPB
A A D
A
A
A
A
N
A
N
BM
N
SPBA A D
A
N
A
N
BM
N
SPB
A A D
N
BM
N
SPBA A D
N
A
A
A
N E N E
A
N E N E
A
N E
A
N E
N E
A
N
D
N
A
E
B E
N
BM
N
SPB
A A D
NBM
NSPB
A
D A
NBM
NSPB
A
D A
N
A
A
N BM
N SPB
A
DA
N
BM
N
SPB
A A D
N
BM
N
SPB
A A D
N
BM
N
SPBA A D
N
BM
N
SPBA A D
N
BM
N
SPB
A A D
NBM
NSPB
A
D A
N BM
N SPB
A
DA
N E
N E
A
NBM
NSPB
A
D A
N E
A
A
A
TREATMENT
RECEPTION
THERAPIST
HALLWAY
4143P
TREATMENT
TREATMENT
SPEECH
THERAPY
CHIRO
TREATMENT
ADL
TOILET
4142ACHIRO
TREATMENT
ADL
TREATMENT
STORAGE
ALCOVE
CLEAN
SUPPLY
PHYSICAL
THERAPY
GYMNASIUM
TECH.
WORK
ROOM
DATA &
PHONE
PT/RT
STORAGE
STAFF
LOCKER
ROOM
EQUIPMENT
STORAGE
STAFF
LOUNGE
RESP.
THERAPY
ROOM
CHIEF,
PROSTHETICS
SOILED
UTILITY
RESPIRATORY
THERAPIST
SUPPLY
ALCOVE
4134A
PROSTHETICS
STORAGE
CORRIDOR
4205C
CORRIDOR
4129P
RECEIVING AND
ASSEMBLY
CHECK-IN
CLERKS
AND WORK
STATIONS
PM&R
WAITING
AREA
PM&R
CHIEF
CHECK-IN
CLERKS
WOMENS
TOILET
MENS
TOILET
TOILET
NURSING
ROOM
4116A
STERILE
SUPPLY
HSKPG
CLOSET
ELEVATOR
LOBBY
CARDIO-P
WAITING
PFL
STRESS
TEST
PASSAGE
4280P
BLOOD
GAS
TOILET
EDUCATION/
CHART ROOM
NUTRITION
OFFICE
LOCKER
DRESSING
ROOM
4282A EQUIPMENT
ISOLATION
ROOM
PT.
TOILET
4205A
ANTI-ROOM
SEMI-PRIVATE
OBSERVATION
MED/SURG #2
TOILET
4211A
TOILET
4215A
PHYS
CHART
OFFICE
SOCIAL
WORKER
STERILE
SUPPLY
4225 STAFF
TOILET
TOILET
4216A
MED/SURG
#3
MED/SURG
BED
MED/SURG
BED
TOILET
4270A
TOILET
4268A
MEDS
COMMUNICATOR
NOURISH
CONSULT
ROOM
TOILET
4262A
HSKPG
CORRIDOR
4212C
C O
R R
ID
O
R
C
PHONE
& DATA
ELEVATOR
LOBBY
OFFICE
4246 MED/ SURG #11
NURSE
STATION
MED/ SURG #10
MED/ SURG #9
SOILED
TOILET
4250A
TOILET
4245A
TOILET
4251A
PASSAGE
4242P
NURSE
MANAGER
TUB
ROOM
BARIATRIC
M/S #4
TOILET
4233A
TOILET
4237A
BARIATRIC
M/S #5
MED/SURG #6
MED/SURG #7
MED/SURG #8
STORAGE
CLEAN
LINEN
TOILET
4236A
NURSE
STATION
TOILET
4234A
PASSAGE
4230P
NURSE
STATION
TOILET
4230A
OFFICE
4107A
OFFICE
MED/SURG
BED
TOILET
4267A
MED/SURG
BED
TOILET
4269A
MOD
ROOM
CONFERENCE
ROOM
STAIR #4
MED/SURG
BED
FOURTH FLOOR DEMOLITION PLAN
ED110
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 11
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
ED110
F1 FOURTH FLOOR DEMOLITION PLAN
1/8" = 1'-0" 4'0" 2' 8' 12'
MLL NMP
(THIS SHEET ONLY)
PLAN KEYED NOTES
A DISCONNECT AND REMOVE THE EXISTING NURSE CALL DEVICE(S) AND
ASSOCIATED CABLING. SALVAGE THE BACK BOX AND CONDUIT (OR
SURFACE RACEWAY AS APPLICABLE) FOR REUSE (AS FEASIBLE).
PROVIDE BLANK PLATE(S) FOR ANY UNUSED BACK BOX(ES).
DISCONNECT/REMOVE THE HEAD-END EQUIPMENT AND ALL
ASSOCIATED CABLING. SALVAGE THE 20A, 120V CIRCUIT, RECEPTACLE
AND CONDUIT FOR REUSE.
DISCONNECT AND REMOVE THE POWER SUPPLY AND ALL
ASSOCIATED CONDUIT AND CABLING.
SALVAGE ALL CONTROL WIRING ASSOCIATED WITH LIGHTING AND T.V.
CONTROL FOR REUSE.
MAINTAIN ANY EXISTING RTLS EQUIPMENT AND WIRING IN SERVICE.
B
C
D
E
FISCAL
WORK
STATIONS
FISCAL
MULTIPURPOSE
CHIEF,
FISCAL
ASST.
CHIEF
FISCAL
FISCAL
OFFICE
CLERK
FISCAL
GROUP
ROOM
FILE
STORAGE
STAFF
LOUNGE
FISCAL
WORK
STATIONS
CORRIDOR
5199E-1
CORRIDOR
5199C-1
CORRIDOR
5199B-1
STORAGE
WOMENS
RESTROOM
STORAGE
ROOM
MENS
RESTROOM
PRIVACY
OFFICER
COMPLIANCE
OFFICER
OPEN
WORKSTATIONS
PROGRAM
ASSISTANT
CHIEF
HR
ASSISTANT
CHIEF HR
OPEN
WORKSTATIONS
WORKROOM
WORKERS
COMP.
SPECIALIST
CREDENTIALING
EEO
HR
TEAM
ROOM
DATA
PHONE
OI&T
STORAGE
OI&T
CHIEF
5114B
LEAD IT
TECH
5114A
HSKG
CLST
OI&T
OFFICES
CORRIDOR
5199A-1
CONFERENCE
CENTER
P.A.S.
OFFICE
5111B
P.A.S.
OFFICE
5111A
P.A.S.
CLERK
CHIEF OF
MEDICINE
5111C
OFFICE
5111D
CORRIDOR
5180-1
COMPUTER
SPECIALISTS
COMPUTER
SPECIALISTS
SERVERS
MECH.
ROOM
5281B
STORAGE
5281A
STORAGE
POLICE
STORAGE
CONFERENCE
5218 STAFF
LOUNGE
DATA &
PHONE
CORRIDOR
5299B-1
M.S.A.
SUPERVISOR
HSS TO
DIRECTOR
ADMIN. SUPPORT
PRI. CARE/
NURSE
PAO &
VEO
ASST.
CHIEF OF
NURSING
GRP PRACTICE
MNGR, ASST,
CHIEF
GPM & PRI.
CARE ASSOC.
CHIEF
CBOC
COORDINATOR
ADMIN. SUPPORT FOR AD,
COS, AND PRI. CARE
CORRIDOR
5299D-1
NURSING AND
DIRECTOR'S
SECRETARYS
DIRECTORS
OFFICE
DIRECTOR OF
NURSING
CHIEF OF
STAFF
ASSOCIATE
DIRECTOR
CORRIDOR
5299E-1
STORAGE
STORAGE
CHIEF OF
MEDICINE
CONFERENCE
ROOM
PRINTER
AREA
PI/QA
STORAGE
PI/QA AND
NURSING
WORKSTATIONS
PERFORMANCE
IMPROVEMENT
ADMIN.
CHIEF,
PERFORMANCE
IMPROVEMENT
CORRIDOR
5299C-1
PI/QA
CORRIDOR
5299F-1
MEN
WOMEN
ELEVATOR
LOBBY
5299A-1
RECEPTION
RECEPTION
2ND FLOOR ROOF
2ND FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
DUCT
INTAKE
4TH FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
3RD FLOOR ROOF
2ND FLOOR ROOF
DN
UP
RAMP
UP
FLOOR RAISED 9"
STEP
UP
DN
STAIR 5
LDRY
CHUT
FIRE
EQUIP
STAIR 1 STAIR 3
STEP
UP
DN
UP
STAIR 2
DN
STAIR 4
DUCT
INTAKE
UP
DN
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
MECH.
SHAFT
LDRY
CHUT
PIPE
SHAFT
N
N E
N E
N E
N
N E
N E
N
N E
N E
NE
NE
N
A A
AA
A
A
A
RK
EX VOCERA
SERVER TO
REMAIN
FIFTH FLOOR DEMOLITION PLAN
ED111
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 12
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
4'0" 2' 8' 12'
MLL NMP
ED111
F1 FIFTH FLOOR DEMOLITION PLAN
1/8" = 1'-0"
(THIS SHEET ONLY)
PLAN KEYED NOTES
A DISCONNECT AND REMOVE THE EXISTING NURSE CALL DEVICE(S) AND
ASSOCIATED CABLING. SALVAGE THE BACK BOX AND CONDUIT (OR
SURFACE RACEWAY AS APPLICABLE) FOR REUSE (AS FEASIBLE).
N
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
FE
AutoCAD SHX Text
MECH. SHAFT
COUNSELING
ROOM
6105A
COMMUNITY
CARE/CHOICE
COMMUNITY
CARE/CHOICE
6120A
MECH.
HSKG
STORAGE
STAFF
BREAK
ROOM
6120B
DATA &
PHONE
COMM.
CARE/CHOICE
SPVSR
ESCORTS
TRAINING
SPECIALIST
COMPUTER
TRAINING
6206C
PIV
OFFICE
COMM.
CARE/CHOICE
SPVSR
STORAGE
6112A
VOC
REHAB
6206A
VOC
REHAB
6206B
WALK-IN
COOLER
6210A
MICROBIOLOGY
CLEAN
SUPPLY
VOC
REHAB
ACCESSIONING
HISTOLOGY
TELEPATHOLOGY
BLOOD
BANK
STAFF
WORK
STATIONS
PASSAGE
DATA
ROOM
6222B
LABORATORY
COMM.
CARE/CHOICE
COMMUNITY
CARE/CHOICE
DRIVER
LOUNGE
CHIEF,
VOLUNTARY
SERVICES
6107A ADMIN.
ASSIST.
VOL. SERV.
NURSING
WORK
STATIONS
WOMENS
RESTROOM
MENS
RESTROOM
COMMUNITY
CARE WORK
STATIONS
RECEPTION
TOILET
BLOOD
DRAW
HSKG
CHIEF,
LAB
STAFF
LOUNGE
STORAGE
MECH
6226A
HSKG
SOILED
UTILITY
COMMUNITY
CARE/CHOICE
CORRIDOR
3RD FLOOR ROOF
2ND FLOOR ROOF
FIRST FLOOR ROOF
4TH FLOOR ROOF
5TH FLOOR ROOF
BASEMENT ROOF
DN
LDRY
CHUT
FIRE
EXTG.
FIRE
EXTG.
FIRE
EXTG.
UP
DN
STAIR 2
STAIR 1
STAIR 3
DN
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
PIPE
SHAFT
MECH.
SHAFT
LDRY
CHUT MECH.
SHAFT
PIPE
CHASE
N E
N E
N
N E
N E
N
NE
NE
NE
A
AA
AA
NA
SIXTH FLOOR DEMOLITION PLAN
ED112
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 13
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
ED112
F1 SIXTH FLOOR DEMOLITION PLAN
1/8" = 1'-0" 4'0" 2' 8' 12'
MLL NMP
(THIS SHEET ONLY)
PLAN KEYED NOTES
A DISCONNECT AND REMOVE THE EXISTING NURSE CALL DEVICE(S) AND
ASSOCIATED CABLING. SALVAGE THE BACK BOX AND CONDUIT (OR
SURFACE RACEWAY AS APPLICABLE) FOR REUSE (AS FEASIBLE).
N
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
VITREOUS CHINA
2 SR
LNM1
EQCLC2
SIMPLEX FIRE ALARM
TRANSPONDER PANEL
EX
EX
EX CABINET
1 2
EX RACK(S) 2
EX
AREAWAY
B096 IT
ROOM
B091
ELECTRICAL,
EMERGENCY
B092
ELECTRICAL,
INCOMING
B092
MECHANICAL
ROOM
B094
PIPE
TUNNEL
B095
BASEMENT NEW WORK PLAN - NEW
CLC
E101
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 14
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
4'0" 2' 8' 12'
MLL NMP
E101
F3 BASEMENT NEW WORK PLAN - NEW CLC
1/8" = 1'-0"
(THIS SHEET ONLY)
PLAN KEYED NOTES
MAINTAIN EXISTING RTLS SYSTEM IN OPERATION. PROVIDE
INTERFACE BETWEEN NEW NURSE CALL SYSTEM AND THE RTLS
SYSTEM, COORDINATE WITH OWNER.
UTILIZE EXISTING CABINET FOR NEW NURSE CALL EQUIPMENT/SWITCH
AS FEASIBLE. PROVIDE A NEW DUPLEX RECEPTACLE WITHIN THE
CABINET FED FROM A SPARE 20A/1P CIRCUIT BREAKER WITHIN
CRITICAL POWER EMERGENCY PANEL CLC-CR-2. THERE IS SPACE IN
DATA RACK(S) TO ACCOMMODATE A NEW SERVER OR ELECTRONICS,
COORDINATE WITH OWNER AS REQUIRED.
TA
TA
TA
LAUNDRY
CHUTE ABOVE
TA
FD
EL
EC
TR
IC
TR
AN
SF
OR
ME
RS
ON
4"
RA
ISE
D
CO
NC
SL
AB
TA
STAIR 5
UP
COIL
CABINET
ELEVATOR
STAIR 7
ELECTRIC TRANSFORMERS ON 4" RAISED
CONC SLAB
PIPE
SHAFT
ROOF OF MECHANICAL
ROOM 1400
FEC
E1
BM
C
BM
C
BCP
NH-ME-1
LNB-1
LNB-2
RSA
LNB-2A
B4
ATS
MONITORING
S
ELA
B5
B3
NESS
EQ-CLC
EX
EX
N E
N N
NEN E
N EWP
N EWP
N E
N E
N
1 1
1 1
N
EWP
NEWP
NE
2N
2N
NE43
N
NE
SUPPLY
CHAIN
SIMS
B082A
SUPPLY
CHAIN
INVENTORY
B082
MECHANICAL
ROOM
B079
PHARMACY
CACHE
B081
VAULT
B081A
SUPPLY
CHAIN MNGT.
STORAGE/OFFICE
B083
ELECTRICAL
EQUIPMENT
B027A
ELECTRONICS
SHOP
B027
ENGINEERING
AND
EMERGENCY
MANAGEMENT
B023
LOCKSMITH
B023A
MENS
LOCKER
ROOM
B021
AQUISITION
SPECIALIST
B019
MENS
TOILET
B021A
CHIEF,
SUPPLY
CHAIN MNGT.
B086A
MACHINE
SHOP
B060
CARPENTER
SHOP
B062
CARPENTER
SHOP
OFFICE
B062A
CONFERENCE
ROOM
B077
CONST.
CONTROL
REP.
B078
I.H. AND
GEMS
B067
GENERAL
ENGINEER
B074
SUPERVISORY
ENGINEER
B072
CHIEF
ENGINEER
B070
GENERAL
ENGINEER
B076
HALLWAY
B075
TOILET
B075A
PROGRAM
ASSISTANT
B066
GENERAL
ENGINEER
B068
CORRIDOR
B099C-1
GENERAL
ENGINEER
B069
CORRIDOR
B099B-1
CORRIDOR
B099A-1
CORRIDOR
B099D-1
ELECTRICAL
ROOM
B028
M & R
SUPERVISOR
AND WORK
LEADER
B022
SAFETY
MANAGER
B022
CORRIDOR
B018
MAINTENANCE
SHOP/OFFICE
B014
SOILED
STORAGE
B006
STORAGE
B004 STORAGE
B002
VESTIBULE
B018A
MAINTENANCE
STORAGE
B018B
MECHANICAL
ROOM
B018C
WOMENS
BREAK ROOM
B196
CORRIDOR
B199B-1
WOMENS
RESTROOM
B170
DINING
ROOM
B172
MENS
RESTROOM
B168
RETAIL
STORE
B174
CHIEF,
CANTEEN
B174A
CANTEEN
STORAGE
B175A
CANTEEN
KITCHEN
B175
MAIN
KITCHEN
B186
CART
WASHER
B186B
SANITATION
B186A
VENDING AND
BEVERAGE
CANTEEN
SERVING
B192
WOMENS
TOILET
B196B
WOMENS
LOCKER
B196A
STAFF
LOCKERS
B194
CORRIDOR
B199A-1
CORRIDOR
B199C-1
ASSISTANT
CHIEF SUPPLY
CHAIN MNGT.
B084
SUPPLY
CHAIN
B086B
SUPPLY
CHAIN ADMIN.
OFFR
B086
PHONE
AND
DATA
B085
SHARED
SHOPS
B087
SHOP
OFFICE
B088
BIOMED
AND
ELECTRONICS
B089
BIOMED
AND
ELECTRONICS
B009A
SUPERVISOR
BIO-MED/
ELECTRONICS
B009
SOILED
LINEN
HOLDING
AREA
B003
HSKG
STORAGE
B122
NESS
OFFICE
B123
HOUSEKEEPING
SUPERVISORS
B129C
NESS
EQUIP.
AND
SUPPLIES
B129
MECHANICAL
ROOM
B129A
CART
WASHER
B129B
CHIEF,
NESS
B121
CANTEEN
STORAGE
AND
RECIEVING
B119
UNIFORMS
B191
DATA
CLOSET
B117
CBOC
STORAGE
B187
MAIN
ROOM
B107A
MSA
SUPERVISORS
B107B
VESTIBULE
B107
MECH.
ROOM
B107D
TELE-DIETICIAN
B120
WOMENS
SHOWER
B196C
VESTIBULE
B199D-1
BASEMENT NEW WORK PLAN -
WEST
E102
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG. 15
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Consultant:
585-21-111
FEBRUARY 14, 2023
Revisions: Date:
UPGRADE NURSE CALL SYSTEM
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.berners-schober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 22FED04.00
50% DESIGN SUBMITTAL 07/08/2022
OF 25
95% DESIGN SUBMITTAL 10/27/2022
REVISED 95% DESIGN SUBMITTAL 11/04/2022
100% DESIGN SUBMITTAL 11/30/2022
BID DOCUMENTS 02/14/2023
(THIS SHEET ONLY)
PLAN KEYED NOTES
PROVIDE NEW NURSE CALL DEVICE, UTILIZE EXISTING BACK BOX AND
CONDUIT STUB. PROVIDE ADDITIONAL CONDUIT TO MEET THE
SPECIFICATIONS REQUIREMENT OF ALL NURSE CALL WIRING IN
CONDUIT. PROVIDE DEVICE ADAPTER PLATE WHEN REQUIRED FOR
DEVICE MOUNTING.
PROVIDE A NEW DOME LIGHT.
PROVIDE NEW NURSE CALL DEVICE(S) AS SHOWN.
CUT IN NEW BACK BOX, FISH WALL WITH CONDUIT TO PROVIDE NEW
DEVICE.
E102
F3 BASEMENT NEW WORK PLAN - WEST
1/8" = 1'-0"
N
4'0" 2' 8' 12'
AutoCAD SHX Text
UP
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
EQK
PNL B1
PNL B2
PNL KP
B5
B3
BLEQ2
EX
EX
EX
EX
EX
EP
TEQ
IRM
B1E
CB
N
N
N E
NE
NE
N E
N
N E
N E
N EWP
N EWP
N E
NEWP
N
FD FDFD
COILING OH DOOR
TA
HYDRAULIC POWER
UNIT
FD
COILING OH
DOOR
COILING OH
DOOR
COILING OH
DOOR
LIFT
COILING OH FABRIC
DOOR
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
DN
UP
UP
PASSENGER
ELEVATOR
TA
TA
PIP
E
CH
AS
E
ACCESS
EL
EC
TR
ICA
L
EQ
UIP
ME
NT
EL
EC
TR
IC
TR
AN
SF
OR
ME
RS
ON
4"
RA
ISE
D
CO
NC
SL
AB
MECH
SHAFT
D-4 D-5
SH
AF
T
PIPE
SHAFT
EXTERIOR
ROOF OF MECHANICAL
ROOM 1400
LAUNDRY
CHUTE ABOVE
TA
FEC
FEC
FEC
DN
E1
CANTEEN
KITCHEN
B175
MAIN
KITCHEN
B186
FOOD
BANK
COOLER 2
186Q
RETHERM
COOLER 1
186R
COOLER 3
B186P
COOLER 4
B186N
FREEZER 2
B186M
FREEZER 1
B186L
MORGUE
COOLER
B273
LOADING
DOCK
B271
VESTIBULE
B276
RECYCLING
AND SHREDDER
ROOM
B278
SHIPPING
AND
RECEIVING
B274
ELECTRICAL
EQUIP.
ROOM
B278A
ELEVATOR
EQUIPMENT
B224B
ROUGH
PREP.
B186H
STAFF
WORK
ROOM
B186D
FOOD
SERVICE
MANAGER
OFFICE
B186E
ELECTRIC
ROOM
B186I
CART
WASHER
B186B
UTILITY
B186C
SANITATION
B186A
CANTEEN
VENDING AND
BEVERAGE
STORAGE
B185
CORRIDOR CORRIDOR
B299B-1
CORRIDOR
B199A-1
OFFICE
LOGISTICS
B298B
O2
STORAGE
B268
ELECTRICAL
ROOM
B269
UNIFORMS
B191
CBOC
STORAGE
B187
MAIN
ROOM
B107A
MSA
SUPERVISORS
B107B
VESTIBULE
B107
WAN
ROOM
B105
MECH.
ROOM
B107D
TELEPHONE
EQUIPMENT
B103
CODERS
WORKSTATIONS
B101
MEDICAL
RECORDS
B201
MECH.
ROOM
B202
RELEASE
OF
INFO.
B203
WOMENS
TOILET
B204
MENS
TOILET
B205
PRI. SUPPLY/
SURGURY
CASE CART
B291
CHIEF,
SPS
B291A
STOCK
BREAKOUT
B287
PIPE
CHASE
B284
EMERGENCY
ELECTRICAL
ROOM
B267
CORRIDOR
B299A-1
CORRIDOR
B299D-1
NON-EXP.
EQUIPMENT
B298A
WAREHOUSE
STORAGE
B298
DECONTAMINATION
B295
MECH.
ACCESS
B295A
LOCKERS
AND
SHOWER
B297
PREPARATION
PACKAGING
B291B
MECH.
ROOM
231B
STERILIZER
291C
MECH.
ROOM
B231A
MECH.
ROOM
B231C
BULK
MEDICAL
STORAGE
B231D
STORAGE
LOGISTICS
B231
LAUNDRY
CHUTE
B230
CORRIDOR
B299C-1
MECH.
ACCESS
B227
UNISEX
BREAK
ROOM
B228
MENS
TOILET AND
SHOWER
B228C
VEST.
228A
MENS
LOCKER
ROOM
B228B
MECHANICAL
ROOM
B224A
ELEVATOR
LOBBY
B224
MECH.
ROOM
B224CDATA
B296
DIETETICS
OFFICE
B186F
AMBIENT
DISPOSAL AND
NOURISHMENT
STORAGE
B186G
BASEMENT NEW WORK PLAN -
EAST
E103
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
DWG.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .