S02 - ATTACHMENT D.1 QASP v2.pdf
PDF 468 KB Posted
- Attached to
- Q702--Onsite Sterile Processing Technician (SPS) Services MEDVAMC Federal contract opportunity
- Solicitation number
- 36C25622Q0130
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25622Q0130 0003_1.docx | DOCX document | |
| S06 - Amendment 36C25622Q0130 0003 - SPS Services v1.pdf | ||
| S06 - Amendment to RFQ 36C25622Q0130 0002 - SPS Services v1.pdf | ||
| 36C25622Q0130 0002_1.docx | DOCX document | |
| 36C25622Q0130 0001_1.docx | DOCX document | |
| S06 - Amendment to RFQ 36C25622Q0130 0001 - Q and A Session v1.pdf | ||
| S02 - ATTACHMENT D.4 - IMMIGRATION CERTIFICATION v2.pdf | ||
| S02 - ATTACHMENT D.3 - WAGE DETERMINATION v2.pdf | ||
| S02 - RFQ 36C25622Q0130 - Sterile Processing Tech Services v4.pdf | ||
| S02 - ATTACHMENT D.2 - PAST PERFORMANCE QUESTIONNAIRE v2.pdf | ||
| 36C25622Q0130_2.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored?
• How monitoring will take place.
• Who will conduct the monitoring?
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship.
The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned Contracting Officer (CO): Frank Mendoza, 713-791-1414 ext. 22769 Assigned Contract Specialist (CS): Steven A. Berkeley, 713-791-1414 ext. 21345 Organization or Agency: Michael E. DeBakey VA Medical Center (MEDVAMC)
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Thomas Hewett, 713-794-7141 Organization or Agency: The Michael E. DeBakey VA Medical Center (MEDVAMC)
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary:
Alternate:
Attachment D.1 - QASP - 36C25622Q0130
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. Periodic surveillance.
b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed via the use of F/OPPE reviews.
c. VALIDATED USER/CUSTOMER COMPLAINTS. Customer Satisfaction Surveys and Patient Advocate Reports will be used to evaluate any complaints reported by patients.
PERFORMANCE MEASURES
Measures PWS Reference
Performance Requirement
Standard Acceptable Quality Level
Surveillance Method
Met Accptable Quality Level/DID NOT MEET
Acceptable Quality Level CPAR
RATING/ADD COMMENTS
Key Personnel
2.2 Provide up to eight (8)
qualified technicians
Qualified personnel Available as needed to properly perform tasks outlined in the PWS
90% Random Inspection, Time and Attendence Sheets, Quality Assurance
Shift Coverage
6.1 Provide required coverage
for contract technician(s) absence.
Contractor shall maintain adequate coverage to perform required duties outline in the
PWS
90% Random Inspection, Time and Attendence Sheets, Quality Assurance
Technician Duties
4.1 through 4.8
Contractor Technician(s) shall perform all required duties outlined in section 4 of the PWS
All (95%) contract technician(s) are on time and available to perform duties.
95% Direct Observation
Maintain Certification
4.2.1 4.6 4.6.1 4.6.2 5.1
Updated certification shall be provided as they are renewed.
All contract technician(s) certification(s) must be current and shall be provided as they are renewed.
95% Periodic Inspection
The table below is a sample that can be tailored – note that the table must identify where in the PWS the standards are found for monitoring performance. Check the MSO Customer Resource Center for approved mandatory QASPs.
7. RATINGS
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.
VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.
SATISFACTORY:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.
MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY
: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT.
However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or
Environmental Deficiency Reports, or letters).
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR
PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
See Sample CR below.
Page 6 of 7 version 0003 Dated 10/7/ 2014
CONTRACT REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CDR PREPARED b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO
PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
13. GOVERNMENT ACTIONS (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
Page 7 of 7 version 0003 Dated 10/7/ 2014
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement. The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Reporting. The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.
10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
Thomas Hewett, COR DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
File details come from the government source that posted it. Updated .