S02 ATTACHMENT B PRICE MATRIX.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Bid/Build Renovate Spinal Cord Unit Federal contract opportunity
Solicitation number
36C24823R0107
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This document contains an attachment with a price matrix and details of a federal contract opportunity to renovate the spinal cord unit at the Miami VA Medical Center. The price matrix lists line item costs by construction division with blank fields to include labor, material, and total costs. The related federal contract opportunity is a solicitation to award a fixed-price construction contract to renovate walls, floors, and ceilings across approximately 29,785 square feet of the spinal cord building. The scope of work includes renovating hallways, patient rooms, and staff areas but excludes telecom rooms and areas with ceramic tile or epoxy flooring. Contractors must provide all materials, tools, labor, personal protective equipment, and supervision to complete the project. The awarding agency is the Department of Veterans Affairs Network Contracting Office 8.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Base Offer Cost Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$-$-$-
Division 2Existing Conditions---
Division 3Concrete---
Division 4Masonry---
Division 5Metals---
Division 6Wood and Plastic---
Division 7Thermal & Moisture Protect---
Division 8Doors and Windows---
Division 9Finishes---
Division 10Specialties---
Division 11Equipment---
Division 12Furnishings---
Division 13Special Construction---
Division 14Conveying Equipment---
Division 21Fire Suppression---
Division 22Plumbing---
Division 23HVAC---
Division 26Electrical---
Division 27Communications---
Division 28Electronic Safety & Security---
Division 31Earthwork---
Division 32Exterior Improvements---
Division 33Utilities---
Division 34Transportation Subtotal---
Division Subtotals :$-$-$-
Overhead %0.00%-
Profit %0.00%-
Bond %0.00%-
Overhead/Profit Subtotals :$-

Total Price $- $- $-

File details come from the government source that posted it. Updated .