S02 Attachment 3 QASP.docx
DOCX document 24 KB Posted
- Attached to
- Hemodialysis Federal contract opportunity
- Solicitation number
- 36C25520R0061_1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25520R0061_1 09.09.2020 Final.docx | DOCX document | |
| S02 Attachment 7 - VA Form 3288 _ Request For And Consent To Release Of Information From Individual_s Records print.pdf | ||
| S02 Attachment 8 - VHA Form 10-5345 - Request For And Authorization To Release Medical Records Or Health Information print.pdf | ||
| S02 Attachment 3 By-Laws Wichita VA Medical Center.pdf | ||
| S02 Attachment 9 - Organizational Conflicts of Interest.docx | DOCX document | |
| S02 Attachment 2 - Contractor Certification Immigration and Nationality Act of 1952.docx | DOCX document | |
| S02 Attachment 4 Sub-Contracting Plan Model.docx | DOCX document | |
| S02 Attachment 5 - Contract Deficiency Report.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Health Care Resources (HCR)
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Colleen Donahue-MacDonald Organization or Agency:
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Sharon Wilbur Organization or Agency: Robert J. Dole, Wichita VAMC
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary:
Alternate:
Quality Assurance Surveillance Plan (QASP)
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. Ten (10) randomly selected patient files will be reviewed per inspection period. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.
b. VALIDATED USER/CUSTOMER COMPLAINTS. Complaints are registered in the patient advocate system.
c. RANDOM SAMPLING. Ten (10) randomly selected patient files will be reviewed per quarter. All reviews and reports will be conducted in compliance with VA Privacy and Information security standards.
6. QASP PERFORMANCE REPORT DATE:__________________
| Measures |
| PWS |
Reference Performance Requirement
| Standard |
| Acceptable Quality Level |
| Surveillance |
Method Met AQL/DID NOT MEET AQL-
CPAR RATING/ADD COMMENTS
1 - Coverage
| 4.4. |
| Response to emergency within two (2) hours of notice or request |
| No more than 2 late arrivals per quarter |
| 95% |
| Periodic inspection and validated user/customer complaints |
| 2 - Qualifications of Key Personnel |
| 4.1. |
| Contractor’s physician (s) Board Certified /Board Eligible In accordance with PWS requirements. |
| All (100%) Contractor’s physicians (s) are Board Certified |
| 95% |
| Random Inspection of qualification documents |
| 3 - Scope of Practice/Privileging |
| 1.3.9 |
| Contractor’s Nurse (s) perform within their individual scopes of practice/privileging |
| All (100%) Contractor’s Nurse (s) perform within their scope of practice/privileges 100% of the time. |
| 95% |
| Random Inspection of records. |
| 4 - Invoices and Supporting Documentation |
| 6.2.1 |
| Invoices and supporting documentation must be submitted no later than the 20th workday of the month |
| Invoices and supporting documentation must be submitted no later than the 20th workday of the month |
| 97% |
| Periodic Inspection |
| 6 - Maintains licensing, registration, and certification |
| 2.1.1. |
| Updated Licensing, registration and certification shall be provided as they are renewed. Licensing and registration information kept current. |
| All (100%) licensing, registration(s) and certification(s) for Contractor’s physician (s) (s) shall be provided as they are renewed. Licensing and registration information kept current. |
| 97% |
| Periodic Sampling and Random Sampling |
| 7 - Mandatory Training |
| 2.1.4.; |
4.6.4.7.
| Contractor shall complete all required training per VAMC policy |
| All (100%) of required training is complete on time by Contractor’s physician (s). |
| 97% |
| Periodic Sampling |
| 8 - Privacy, Confidentiality and HIPAA |
| 6.6.; |
6.1.1.
| Contractor is aware of all laws, regulations, policies and procedures relating to Privacy, Confidentiality and HIPAA and complies with all standards Zero breaches of privacy or confidentiality |
| All (100%) Contractor’s physician (s) comply with all laws, regulations, policies and procedures relating to Privacy, Confidentiality and HIPAA |
| 97% completions |
Contractor shall provide evidence of annual training required by VAMC, reports violations per VA Directive 6500.6.
7. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CR on the following page.
8. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
COR NAME/TITLE DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
File details come from the government source that posted it. Updated .