S02 - Attachment 2 - VHA Required Div 01 Spec Sections.docx

DOCX document 19 KB Posted

Attached to
C1BG--A&E Design 436-21-700, EHRM Infrastructure Upgrades – Ft. Harrison, MT (VA-21-00039468)
Solicitation number
36C77621R0108
Issued by

About this file

This document is a presolicitation notice for Architect-Engineering design services for an EHRM Infrastructure Upgrades project located at the VA Medical Center in Fort Harrison, Montana. The VA seeks a full design team to develop construction documents for network infrastructure installation, IT system renovations and upgrades with a project budget between $10-20 million. Responses are due by May 21, 2021. The contract will be a 100% SDVOSB set-aside awarded on a best-value basis considering specialized experience designing similar healthcare IT and network projects, professional qualifications, capacity, past performance, local knowledge and experience providing construction period services. The selected firm must complete design within 242 days of award and 50% of work must be performed by SDVOSB personnel. Interested parties should submit an SF 330 with information on experience, staff qualifications, and current workload by the specified deadline.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements

File details come from the government source that posted it. Updated .