S02 Attachment 1 - Quality Assurance Surveillance Plan.docx

DOCX document 33 KB Posted

Attached to
R431--1 Year Headhunting Clinical Staffing Gastroenterologist and Cardiologist
Solicitation number
36C26126Q1090
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for a VA Northern California Health Care System headhunting staffing contract to recruit Gastroenterologists (2.0 FTE) and Cardiologist (1.0 FTE) positions. The QASP outlines the government's performance monitoring methodology, establishing that the contractor is responsible for locating qualified candidates meeting defined scope of practice requirements, with payment contingent upon successful hire. The plan employs a results-oriented approach focusing on outcome achievement rather than process compliance, utilizing direct observation and periodic reviews as surveillance techniques to verify contractor performance against established acceptable quality levels (AQLs) set at 100 percent for critical clinical positions.

The QASP identifies five core performance standards monitored continuously as needed: contractor experience in successfully recruiting gastroenterologists and cardiologists, candidate qualifications meeting defined scope of practice, maintenance of required licenses and accreditations, compliance with OSHA and applicable federal and state regulations, and timely communication regarding certification and service limitations. The plan establishes a Contracting Officer (CO), Contracting Officer's Representative (COR), and Quality Assurance Representative (QAR) structure for oversight and requires monthly written performance reports documenting compliance with stated objectives. The contractor must develop its own quality control program addressing quality, timeliness, responsiveness, and customer satisfaction. Failure to meet performance standards may result in corrective action plans or contract termination, with performance data and trend analysis reviewed monthly through completed monitoring forms that become part of permanent QA documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. INTRODUCTION

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Headhunting for Clinical Services (Gastroenterologists and Cardiologist). This plan sets forth the procedures and guidelines the VA Northern California Health Care System (VANCHCS) will use in ensuring the required performance standards or services levels are achieved by the contractor.

0. Purpose

0. The purpose of the QASP is to describe the systematic methods used to monitor performance and identify required documentation and resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and ensure the government pays only for the level of services received.

0. This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

0. Performance Management Approach

1. The PWS structures the acquisition around what service or quality level is required, as opposed to how the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by VANCHCS to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

1. Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, if the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract if the critical outcomes expected are being achieved and/or the desired performance levels are being met.

0. Performance Management Strategy

2. The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will also set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

2. The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determinations regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

1. ROLES AND RESPONSIBILITIES

1. The Contracting Officer (CO) The CO is responsible for monitoring contract compliance, contract administration, and cost control, and resolving any differences between observations documented by the VANCHCS: "contracting officer's representative (COR), "administrative contracting officer (ACO)," "quality assurance representative (QAR),” or "program/project manager (PM/PjM)" and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.

1. The COR The COR is designated in writing by the CO to act as their authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or authorize any contractual changes on the government’s behalf. Any changes the contractor deems may affect contract price, terms, or conditions must be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

1. IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the PWS and Attachment 1, Performance Requirements Summary. Services shall be provided for the following clinical services positions: gastroenterologists (2.0 FTE) and cardiologist (1.0 FTE). The contractor will be responsible for finding candidates that meet the requirements as detailed in the scope of practices. The contractor will be paid after a successful hire.

1. METHODOLOGIES TO MONITOR PERFORMANCE

0. Surveillance Techniques To minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The methods of surveillance are direct observation and periodic reviews.

1.

1.

1.

1.

3.

3. Customer Feedback The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems, but the customer always has the option to communicate complaints to the CO or COR or delegated official, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the CO or COR or delegated official. The CO or COR or delegated official will accept those customer complaints and investigate.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

3. Acceptable Quality Levels The acceptable quality levels (AQLs) included in Attachment 1 for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities, such as those involving gastroenterologists and cardiologists, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at VANCHCS.

1. QUALITY ASSURANCE DOCUMENTATION

4. The Performance Management Feedback Loop The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and assessed using the performance monitoring techniques shown in Attachment 1.

1.

1.

1.

1.

1.

4.

4. Monitoring Forms The government’s QA surveillance, accomplished by the COR or delegated official will be reported using the monitoring form in Attachment 2. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure the required results are being achieved.

1. The COR or delegated official will retain a copy of all completed QA surveillance forms.

1. ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

5. Determining Performance

0. The government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

5. Reporting

1. At the end of each month, the COR or delegated official will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

5. Reviews and Resolution

2. The COR or delegated official may require the contractor’s project manager or designated alternate to meet with the CO and other government IPT personnel as deemed necessary to discuss the performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:

· Monthly performance assessment data and trend analysis

· Issues and concerns of both parties

· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

· Recommendations for improved efficiency and/or effectiveness

· ssues arising from the performance monitoring processes 1.

1.

1.

1.

1.

1.

5.

5.

5.

2.

2. The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

2. The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the procuring CO.

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

Measures
PWS Reference
Performance Requirement
Standard
Acceptable Quality Level
Surveillance Method
Frequency
Met AQL/ DID NOT MEET AQL – CPAR RATING/ ADD COMMENTS
Contractor Experience
2.1.
The Contractor performing the work shall have extensive experience in successfully finding candidates for Gastroenterologists and Cardiologists.
All 100% of the time.
100% (No deviations accepted).
Direct Observation
Continuously as needed by the VA.
Qualifications of Candidates for Gastroenterologists and Cardiologist
2.2
All candidates referred by the Contractor shall meet the qualifications as defined in the scope of practices.
All 100% of the time.
100% (No deviations accepted).
Direct Observation
Continuously as needed by the VA.
Licensing and Accreditation
2.2
Contractor shall have and maintain all licenses, permits, accreditation and certificates required by law to operate as a staffing agency.
All 100% of the time.
100% (No deviations accepted).
Periodic Reviews
Continuously as needed by the VA.
Safety
2.4
The Contractor shall comply with all applicable OSHA, federal, and state laws and regulations as required for performing the type of services required.
All 100% of the time.
100% (No deviations accepted).
Periodic Reviews
Continuously as needed by the VA.
Certification/ Communication
2.3
Contractor is responsible for keeping the COR appraised of anything that would adversely affect or otherwise limit their certification and ability to provide the required services. Failure to keep VA fully informed on these matters may result in the immediate termination of the contract.
All 100% of the time.
100% (No deviations accepted).
Periodic Reviews
Continuously as needed by the VA.
Timely Billing
7.1
Invoices shall be submitted promptly to the authorizing facility by the 15h calendar day following the end of the month in which services were rendered.
Invoices shall be timely and accurate for all items billed.
95% Compliance
Periodic Reviews
Continuously as needed by the VA.

ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (check):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (check):

MonthlyQuarterlyAs needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (check):Meets Standards
Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: ___________________________________ DATE: _________________

File details come from the government source that posted it. Updated .