S02 Attachment 1 - QASP.pdf

PDF 241 KB Posted

Attached to
Inpatient Dialysis Services Federal contract opportunity
Solicitation number
36C26125Q0155
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

This is a Quality Assurance Surveillance Plan (QASP) for inpatient dialysis treatment services at VA Central California Health Care System (VACCHCS). The QASP outlines how the government will monitor contractor performance in providing hemodialysis, continuous renal replacement therapy (CRRT), apheresis, and peritoneal dialysis treatments to veteran inpatients.

The plan establishes three key performance requirements: 1) Providing qualified registered nurses with dialysis certifications and skills, with 100% surveillance through staff observation, 2) Maintaining water quality and dialysis machine operability per AAMI standards with direct observation and random inspections, and 3) Reporting all patient safety incidents immediately to staff. The contractor must provide services 24/7 in the ICU/Stepdown Unit, Medical/Surgical Ward, Same Day Procedures suite or Emergency Department. The contractor must also provide a patient-pathways liaison to coordinate education, discharge planning, and outpatient dialysis treatment. Performance will be evaluated quarterly through direct observation, periodic inspections, and documentation review, with ratings from Exceptional to Unsatisfactory that impact past performance evaluations.

View the file

Other files for this federal contract opportunity

Other files attached to Inpatient Dialysis Services, newest first.
File Type Posted
S06 36C26125Q0155 0001 Inpatient Dialysis Services.pdf PDF
S02 Attachment 3 - Small Business Participation Plan.docx DOCX document
S02 36C26125Q0155 Inpatient Dialysis Services.pdf PDF
S02 Attachment 2 - WD 2015-5609.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP)

Project Title: INPATIENT DIALYSIS TREATMENT SERVICES

Contract Number:

Contract Description: (Scope of Work) The contractor shall provide all personnel, transportation, and equipment (machines must have Redsense® dialysis alarm) to perform inpatient Hemodialysis treatment services to Veteran patients who are being cared for as inpatients at VA Central California

Health Care System (VACCHCS). The contractor shall provide the necessary nurses who have certifications, experience, knowledge, abilities, and skills in operating a dialysis machine to provide hemodialysis, CRRT (continuous renal replacement therapy), apheresis, and PD (peritoneal dialysis) treatments to Veteran patients.

All services will be performed at VACCHCS in the ICU/Stepdown Unit, Medical/Surgical Ward, in the

Same Day Procedures suite or ED (Emergency Department). The services will be performed at any time, 24 hours/7 days a week. The services will be coordinated by the staff dialysis nurse at VACCHCS.

The payment of services shall be per patient, per treatment/procedure. The contractor dialysis nurse will generally consult with the Charge Nurse, Staff Nephrologist or Chief of Medical Service at VACCHCS when unusual circumstances arise. VACCHCS will provide physician oversight services and retain ultimate authority over and responsibility for each patient’s care and treatment.

Also included in this contract, the contractor is to provide a patient-pathways onsite liaison. The individual will coordinate education, post discharge care, outpatient clinic appointment and any necessary outpatient dialysis treatment. The liaison shall conform to VA policies in coordinating the services needed for the patient upon discharge. This may require understanding the processes of the

VA social work, health care benefits, and other care services for veterans.

Contractor’s Name:

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

a. What will be monitored.

b. How monitoring will take place.

c. Who will conduct the monitoring.

d. How monitoring efforts and results will be documented.

e. This QASP does not detail how The Contractor accomplishes the work. Rather, the QASP is created with the premise that The Contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with The Contractor. Copies of the original QASP and revisions shall be provided to The Contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: NCO 21, Contracting Officer Organization or Agency: Department of Veterans Affairs, Network Contracting Office VISN 21

b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Alma L. Smith, Administrative Officer/COR, Nursing Service Organization or Agency: Department of Veterans Affairs, VA Central California Health Care System Fresno, CA

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s program manager for this contract.

Primary:

Alternate:

4. PERFORMANCE STANDARDS

The contractor is responsible for performance of ALL terms and conditions of the contract. The COR will provide contract progress reports to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.

The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.

5. INCENTIVES/DEDUCTS

a. Incentives: The Government shall use past performance as incentives. Incentives shall be based on ratings received on the performance standards.

b. Deducts: The Government shall apply deducts in accordance with Section 6 below:

6. METHODS OF QA SUREVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION. 100% surveillance: Reportable by VACCHCS staff during patient treatment services.

b. PERIODIC INSPECTION. Inspections performed during the treatment as appropriate by the RN Clinical Director/Program Management and staff Nephrologist/attending physician to ensure compliance.

c. VERIFICATION OF DOCUMENTATION PROVIDED BY THE CONTRACTOR: Quarterly Joint Dialysis Oversight Committee meetings; contractor’s employees documentation presented to VACCHCS.

MEASURE/

INDICATOR

SOW

Ref Paragraph Number

PERFORMANCE

REQUIREMENT

STANDARD ACCEPTABL

E QUALITY

LEVEL

SURVEILLANCE

METHOD

INCENTIVE DISINCENTIVE

1 Registered Nurse (RN) qualified to perform dialysis

1 Provide RN for dialysis services as specified in the requirements.

Contract RN responds to requested services;

set-up, treatment, termination of treatment, and clean-up

100% Observation by Staff RN and/or staff Physician

Favorable contractor performance evaluation.

Unfavorable contractor performance evaluation.

2 Water Quality & Dialysis Machine Operability

Test quality of water used in the dialysis process;

perform periodic preventative maintenance

Acceptable level of water quality per AAMI standards;

Regularly scheduled PMs shall be completed according to equipment specification

100% Direct observation, random inspection, analysis of contractor’s reports;

Infection Control Coordinator review

Favorable contractor performance evaluation.

Unfavorable contractor performance evaluation.

3 Patient Safety 2 Patient safety incidents, including time-out, must be reported using Patient Safety Report.

All incidents reported immediately to staff RN and/or attending physician

100% Direct Observation as appropriate.

Favorable contractor performance evaluation.

Unfavorable contractor performance evaluation.

4 Contractor quality Assurance reports

2 Contractor to provide quality control reports on a quarterly basis

Contractor monitors own employee’s treatment process;

practice, skills/competencies, training; credentials

100% Present and discuss report to VA staff

Favorable contractor performance evaluation.

Unfavorable contractor performance evaluation.

7. RATINGS. Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:

EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT.

However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

VERY GOOD: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.

SATISFACTORY: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.

MARGINAL: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Note: To justify a Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported be referencing the management tool that the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).

UNSATISFACTORY: Performance does not meet some contractual requirements and recovery is not likely in a time manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported be referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).

8. DOCUMENTING PERFORMANCE

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT SYSTEM(CPARS).

b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action. The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor must present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability.

The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Reporting.

The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly or as needed (or as outlined in the contract or COR delegation) to review Contractor performance.

10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

SIGNED:

Alma L. Smith, Administrative Officer DATE

SIGNED:

Contractor DATE

File details come from the government source that posted it. Updated .