S02 - Attachment 01 - Drawings - 157 pages.pdf

PDF 45 MB Posted

Attached to
Z2DA--Construct Bariatric Bathrooms at Community Living Center and South Bed Tower
Solicitation number
36C24825R0128
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

672-23-104

LAD NO.

Office of Construction and Facilities Management

CD (100%CD) FINAL BID DOCUMENTS – 03/14/2025

ARCHITECT/ENGINEER OF RECORD

A/E:

JUPITER

561-743-0165

ORLANDO

407-845-6630

WWW.RGDENGINEERS.COM

CERT OF AUTH 5454

121 S. ORANGE AVENUE, UNIT 1230N, ORLANDO, FL 32801

RGD PROJECT

#23-1050

8600 Indian Hills Dr Omaha, NE 68114 Tel 402.391.8111 Fax 402.391.8564

/1

/2

:3

:3

P

M

10 Calle Casia San Juan Puerto Rico 00921

COVER SHEET

GI001

Construct VA Bariatric Bathrooms at Community Center and South Bed Tower

003-10296-000

03/14/2025 RAD WMB

A u to d e s k D o c s /V

A C o n s tr u c t B a ri a tr ic B a th ro o m s a t C

L C

S

B T

R

V

A S

J B

A R

-A rc h it e c tu re .r v t

100% CD - FINAL BID

DOCUMENTS

Department of Veterans Affairs

Construct VA Bariatric Bathrooms at Community Center and South Bed Tower

VA CARIBBEAN HEALTHCARE SYSTEM

10 CALLE CASIA - ADM. BLDG. SUITE 4M440

SAN JUAN, PR 00921-3201

CD (100%CD) FINAL BID DOCUMENTS

LOCATION MAP APPLICABLE CRITERIA PROJECT INFORMATION

VA PROJECT NO. 36C24823R0029 NRM

DESIGN SERVICES PROJECT: 672-23-104

PROJECT LOCATION:

VA CARIBBEAN HEALTHCARE SYSTEM

10 CALLE CASIA - ADM. BLDG. SUITE #4M440

SAN JUAN, PR 00921-3201

ISSUING OFFICE:

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 8 (NC0 8)

VA CARIBBEAN HEALTHCARE SYSTEM (ADMIN BLDG)

CDC GUIDANCE FOR ENVIRONMENTAL INFECTION CONTROL IN HEALTH-CARE

FACILITIES (PER HICPAC)

INTERNATIONAL BUILDING CODE - 2021 (IBC)

INTERNATIONAL FIRE CODE - 2021 (IFC)

INTERNATIONAL PLUMBING CODE - 2021 (IPC)

NFPA 13 – STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS - 2022

NFPA 70 – NATIONAL ELECTRICAL CODE (NEC) - 2023

NFPA 72 – NATIONAL FIRE ALARM AND SIGNALING CODE - 2022

NFPA 101 – LIFE SAFETY CODE - 2021

VHA BARIATRIC GUIDEBOOK - 2015

VA BARRIER FREE DESIGN STANDARD (ABAAS) - 2017

VA SAFETY PATIENT AND MOBILITY DESIGN CRITERIA - 2021

ALL APPLICABLE FEDERAL, EPA, OSHA, PROSHA, STATE, CITY AND LOCAL

CODES, REGULATIONS, ORDINANCES, PUBLICATIONS AND MANUALS.

NORTH

VA DESIGN MANUALS:

PG-18-1 MASTER SPECIFICATIONS

PG-18-3 DESIGN & CONSTRUCTION PROCEDURES

PG-18-4 STANDARD DETAILS AND CAD STANDARDS

PG-18-5 EQUIPMENT GUIDE LIST

PG-18-9 VA SPACE PLANNING CRITERIA

PG-18-10 DESIGN MANUALS (BY DISCIPLINE)

PG-18-12 DESIGN GUIDES

PG-18-13 TOPIC SPECIFIC STANDARDS AND CRITERIA

PG-18-14 ROOM FINISHES, DOOR AND HDWR SCHEDULE

CHANGE SUMMARY

PG-18-15 VOL C A/E SUBMISSIONS INSTRUCTIONS FOR

MINOR AND NRM CONSTRUCTION PROGRAM

PG-18-17 ENVIRONMENTAL GUIDANCE

H-18-8 VA SEISMIC DESIGN HANDBOOK

NO. DESCRIPTION DATE

SCALE:

B2

VIEW NAME

1/8" = 1'-0"

A4

EARTH

EARTH GRAVEL

CONCRETE

METALS

BRICK

CMU

TILE

STONE

WOOD

GYPSUM

GLASS

INSULATION

REGULAR

STEEL ALUMINUM

FACE COMMON

CMU

CERAMIC

MARBLE LIMESTONE

FINISH BLOCKING

PLASTER OR GWB

LARGE SCALE SMALL SCALE

BATT OR

LOOSE

RIGID

SURFACE

DETAIL TITLE

BUILDING SECTION

WALL SECTION

EXTERIOR / INTERIOR

ELEVATION

INTERIOR MULTI-VIEW

ELEVATION

MATERIALS REFERENCE

DETAIL SECTION

AE402

C4

AE201

A1

AE305

SIM

A1

AE305

SIM

A1

AE305

SIM

AE505

C3

A3

ELEVATION NUMBER

SHEET ON WHICH

ELEVATION IS DRAWN

ELEVATION NUMBER

SHEET ON WHICH

ELEVATION IS DRAWN

ACTUAL SQ. FT.

ROOM NUMBER

DOOR NUMBER

KEYNOTE

WALL TYPE

REVISION NUMBER

ELEVATION INDICATION

COLUMN GRID

IDENTIFICATION

NORTH ARROW

WINDOW NUMBER

A1

EQUIPMENT TAG

D

NTRUE

NORTH

MATCHLINE

FINISH , FINISH MATERIAL FINISH EXTENTS

SPRAY FOAM

B

5E

1t

S

W1

ROOM NAME

A505B

150 SF

GENERAL SYMBOLS

ROOM CODE

ROOM NAME

A505B

OFA01

ROOM NUMBER

A. PARTITIONS AND WALLS

1. FLOOR PLAN DIMENSIONS ARE LOCATED FROM THE FINISHED FACE OF

PARTITIONS AND COLUMN CENTERLINES, UNLESS NOTED OTHERWISE.

2. THICKNESS OF CONCRETE MASONRY UNITS (CMU) AND LIGHT WEIGHT

MASONRY UNITS (LMU) PARTITIONS ARE NOMINAL UNLESS NOTED

OTHERWISE.

3. EXTERNAL EXPOSED CORNERS OF BLOCK WALLS AND PARTITIONS SHALL BE

BULLNOSE.

4. ALL PARTITIONS SHALL EXTEND FROM FLOOR TO UNDER SIDE OF DECK

ABOVE EXCEPT WHERE NOTED OR SHOWN OTHERWISE.

5. EXTEND ALL SOUND RATED PARTITIONS TO THE UNDER SIDE OF DECK ABOVE

TO PREVENT SOUND TRANSMISSION. FURNISH 4-1/4 POUNDS DENSITY GLASS

FIBER INSULATION SHAPED TO FIT THE VOID ABOVE THE PARTITION WHERE

AIR-BORNE SOUND CAN PENETRATE SPACE.

6. CONTROL JOINTS SHALL BE PROVIDED ABOVE DOORS AT EACH SIDE IN STUD

AND GWB PARTITIONS.

7. EXPANSION JOINTS AT ALL FLOORS, CEILINGS AND WALLS THAT ARE

EXPOSED TO VIEW SHALL BE COVERED WITH EXPANSION JOINT COVERS

APPROPRIATE FOR FINISHED SURFACES.

8. ALL COLUMNS WITHIN FINISHED SPACES SHALL BE FINISHED WITH SAME

MATERIALS SCHEDULED AT WALLS UNLESS OTHERWISE SHOWN OR

DETAILED.

9. PROVIDE ALL WALL AND FLOOR OPENINGS FOR MECHANICAL, DATA COMM.,

AND ELECTRICAL ITEMS.

10. SEAL AROUND ALL PENETRATIONS IN CORRIDOR WALLS TO PREVENT THE

PASSAGE OF SMOKE.

B. DOORS AND FRAMES

1. PROVIDE LABELS ON DOORS AND FRAMES WHERE SCHEDULED.

2. INSTALL CONTINUOUS CAULKING AROUND METAL FRAMES UNLESS NOTED

OTHERWISE.

3. HOLLOW METAL FRAMES SHALL BE ANCHORED TO THE STRUCTURAL FLOOR

WITH A MINIMUM OF TWO (2) ANCHOR BOLTS.

4. HOLLOW METAL FRAMES SHALL BE FILLED WITH GROUT TO THE DEPTH OF

THE FRAME ANCHOR FULL HEIGHT IN ORDER TO DAMPEN HOLLOW SOUND.

GROUT PRIOR TO SETTING IN PLACE.

5. INSTALL CASING (J) BEADS AND CAULK WHERE GWB ABUTS METAL FRAMES

WITHOUT SLIPPING BEHIND.

C. MISCELLANEOUS

1. PROJECT DRAWINGS ARE BASED ON RECORD DRAWINGS, ALL CONDITIONS

SHOWN SHALL BE VERIFIED IN FIELD PRIOR TO FABRICATION OF NEW ITEMS.

INFORM ARCHITECT OF ANY DISCREPANCIES FOUND AND REQUEST

DIRECTION.

2. PROVIDE BLOCKING AS REQUIRED TO SUPPORT WALL MOUNTED ITEMS

(INCLUDING, BUT NOT LIMITED TO, MAP RAILS, MARKER BOARDS, SIGNAGE,

CASEWORK, MILLWORK, GRAB BARS, TOILET ACCESSORIES, AND

EQUIPMENT). BLOCKING SHALL BE CONTINUOUS AND LOCATED BOTH AT

BOTTOM AND TOP OF EQUIPMENT.

3. PROVIDE BLOCKING AT RAILINGS AND GUARDRAILS CAPABLE OF

SUPPORTING THE POINT AND UNIFORM LOADS REQUIRED. WHERE MORE

THAN ONE CODE, STANDARD, OR GUIDELINE IS APPLICABLE, THE MOST

STRINGENT CASE SHALL BE ADHERED TO.

GENERAL ARCHITECTURAL NOTES

1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS

LISTED BY THE “SHEET INDEX”.

2. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE

DRAWINGS OF ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE –

SEE “INDEX OF DRAWINGS”.

3. THE SET OF DRAWINGS CONSISTS OF ALL DRAWINGS LISTED BY THE “INDEX OF

DRAWINGS”. THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE

MAY BE AFFECTED BY THE WORK DESCRIBED ON DRAWINGS OF ANOTHER

DISCIPLINE. DO NOT DISTRIBUTE OR UTILIZE PARTIAL SETS OF DRAWINGS.

4. ALL ARCHITECTURAL DRAWINGS ESTABLISH AND COORDINATE THE FINISHED

APPEARANCE AND LOCATION OF ALL EXPOSED ELEMENTS OF THE WORK,

INCLUDING THAT WORK, WHICH IS ILLUSTRATED PRIMARILY ON DRAWING OF

OTHER DISCIPLINES, UNLESS OTHERWISE NOTED ON THE DRAWINGS.

5. REFER TO THE STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND OTHER

SPECIALTY ENGINEERING DRAWINGS FOR THE DETAILED DESIGN, OF WHICH

PORTIONS MAY ALSO BE SHOWN ON THE ARCHITECTURAL DRAWINGS.

6. ALL PARTS OF THE WORK – INCLUDING MATERIALS, METHODS, ASSEMBLIES,

ETC – SHALL COMPLY WITH ALL APPLICABLE VHA RULES, CODES, REGULATIONS,

ORDINANCES, AND LAWS OF ALL FEDERAL, STATE DISTRICT, TERRITORIAL AND

LOCAL GOVERNMENT AUTHORITIES HAVING JURISDICTION OVER THE DESIGN,

CONSTRUCTION, AND OCCUPANCY OF THE PROJECT, WHETHER LISTED BY THE

CONTRACT DOCUMENTS OR NOT.

7. NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR

PERMIT WORK CONTRARY TO AN APPLICABLE VHA OR LOCAL GOVERNMENT RULE,

CODE, REGULATION, ORDINANCE, OR LAW.

8. IF A CONFLICT EXISTS BETWEEN THE CONTRACT DOCUMENTS AND A

REGULATORY REQUIREMENT, THE CONTRACTOR SHALL COMPLY WITH THE ONE

ESTABLISHING THE MORE STRINGENT OR RESTRICTIVE REQUIREMENT:

a. THE DRAWINGS AND SPECIFICATIONS MAY SET FORTH MORE DETAILED, MORE SPECIFIC, AND/OR MORE RESTRICTIVE REQUIREMENTS THAN THOSE

SET FORTH BY THE APPLICABLE REGULATORY REQUIREMENTS, WHERE THE

DRAWINGS AND SPECIFICATIONS PROVIDE MORE DETAILED, MORE SPECIFIC,

AND/OR MORE RESTRICTIVE REQUIREMENTS, THE CONTRACTOR SHALL

COMPLY WITH THOSE REQUIREMENTS.

b. WHERE THE APPLICABLE REQUIREMENTS OF THE REFERENCED RULES, CODES, REGULATIONS, ORDINANCES, OR LAWS ARE MORE RESTRICTIVE

THAN THAT SET FORTH BY THE DRAWINGS AND SPECIFICATION, THE

CONTRACTOR SHALL COMPLY WITH ALL SUCH MORE RESTRICTIVE

REQUIREMENTS. ALTHOUGH SUCH REQUIREMENTS MAY NOT BE

ILLUSTRATED BY THE DRAWINGS AND SPECIFICATIONS.

9. THE CONTRACTOR SHALL NOT SCALE DRAWINGS, ALL OF WHICH ARE

DIAGRAMMATIC IN NATURE. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS

AND EXISTING CONDITIONS PRIOR TO THE START OF WORK.

10. BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE

RESPONSIBLE TO SET-UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA

BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE PRESSURE. ALL

TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION

PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE

CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE

OCCUPIED BY MEDICAL CENTER STAFF AND RESIDENCE.

11. CONTRACTOR SHALL COMPLY WITH ALL VHA, FEDERAL AND LOCAL APPLICABLE

SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. IT IS

THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE CONSTRUCTION

MEANS, METHODS, PROCEDURES AND SEQUENCES TO ENSURE THE SAFETY OF

THE EXISTING BUILDING AND OCCUPANTS.

12. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD

REDUCE THEIR LOAD CARRYING CAPACITY OR LOAD-DEFLECTION RATIO.

13. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE

REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND

EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER

THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING

CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE

RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE

FINISHES, REMOVE COMPLETELY, FROM PLANE TO PLANE. TREAT REMAINING

SUBSURFACE TO RECEIVE NEW FINISHES SPECIFIED.

14. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER

ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH

OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT

CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS

FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT

TO REMAIN, UNLESS OTHERWISE NOTED. FINISH TO MATCH PAINT FINISH OF

ADJACENT SURFACE WHERE OCCURS.

GENERAL CONDITION NOTES

SOUTH BED TOWER (SBT)

COMMUNITY LIVING

CENTER (CLC)

C . C

AS

IA

C. MAGA

AV. JOSE KIKO CUSTODIO

TRAIN TRACKS

NTRUE

NORTH

GATE 1: CLC ACCESS

GATE 2

GATE 3

NOTE:

NO ON-SITE CONTRACTOR PARKING IS AVAILABLE.

GATE 5: SBT ACCESS

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

672-23-104

LAD NO.

Office of Construction and Facilities Management

CD (100%CD) FINAL BID DOCUMENTS – 03/14/2025

ARCHITECT/ENGINEER OF RECORD

A/E:

JUPITER

561-743-0165

ORLANDO

407-845-6630

WWW.RGDENGINEERS.COM

CERT OF AUTH 5454

121 S. ORANGE AVENUE, UNIT 1230N, ORLANDO, FL 32801

RGD PROJECT

#23-1050

8600 Indian Hills Dr Omaha, NE 68114 Tel 402.391.8111 Fax 402.391.8564

/1

/2

:3

:3

P

M

10 Calle Casia San Juan Puerto Rico 00921

GENERAL NOTES, SYMBOLS,

SHEET INDEX AND

ABBREVIATIONS

GI002

Construct VA Bariatric Bathrooms at Community Center and South Bed Tower

003-10296-000

03/14/2025 RAD WMB

A u to d e s k D o c s /V

A C o n s tr u c t B a ri a tr ic B a th ro o m s a t C

L C

S

B T

R

V

A S

J B

A R

-A rc h it e c tu re .r v t

100% CD - FINAL BID

DOCUMENTS

A

A/C AIR CONDITIONING

AB ANCHOR BOLT / AIR BLENDER

AC ALTERNATING CURRENT / AIR COMPRESSOR

ACP ASBESTOS CEMENT PIPE

ACU AIR CONDITIONING UNIT

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADJ ADJACENT / ADJUSTABLE

ADR ACCESS DOOR

AFF ABOVE FINISH FLOOR

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AL ALUMINUM

ALT ALTERNATE

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATELY

ARCH ARCHITECT(URAL)

ATB AIR TERMINAL BOX

ATC ACOUSTICAL TILE CEILING

ATD AIR TRANSFER DUCT

AUX AUXILIARY

AVG AVERAGE

B

BD BOARD

BDD BACK DRAFT DAMPER

BE BOTTOM ELEVATION

BL BUILDING LINE

BLDG BUILDING

BLKG BLOCKING

BM BENCH MARK / BEAM

BRG BEARING

BTU BRITISH THERMAL UNIT

C

C/C CENTER TO CENTER

CAB CABINET

CC COOLING UNIT

CEM CEMENT

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD

CI CURB INLET / CAST IRON

CIP CAST IRON PIPE

CJ CONTROL JOINT OR CONTRACTION JOINT

CL CENTER LINE

CLC COMMUNITY HEALTH CENTER

CLG CEILING

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CLEANOUT / CARBON MONOXIDE

COL COLUMN

COMB COMBINATION / COMBINE

COMP COMPRESSIBLE

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS / CONTINUATION

CONTR CONTRACTOR

COR CONTRACTING OFFICER REPRESENTATIVE

CORR CORRIDOR

CPT CARPET

CR CRASH RAIL

CS CONCRETE SEALER

CSF CUBIC FEET PER SECOND

CT CERAMIC TILE / COOLING TOWER

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

ABBREVIATIONS

CTR CENTER

CTW CERAMIC TILE WALL

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CW COLD WATER

D

D DRAIN / DIFFUSER

DA DENTAL AIR

DBL DOUBLE

DEPR DEPRESSED

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIFF DIFFUSER

DIP DUCTILE IRON PIPE

DISP DISPENSER

DIST DISTRIBUTION

DK DECK

DL DEAD LOAD

DN DOWN

DR DOOR

DS DOWNSPOUT

DWG DRAWING

DWP DOMESTIC WATER PUMP

E

EA EACH / EXHAUST AIR

EF EACH FACE / EXHAUST FAN

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMBED EMBEDMENT

EMD ESTIMATED MAXIMUM DEMAND

EMT ELECTRICAL METAL TUBING

ENG ENTRANCE GRATING

EP EPOXY PAINT

EQ EQUAL

EQUIP EQUIPMENT

ET EXPANSION TANK / EPOXY TERRAZZO

ETB EPOXY TERRAZZO INTEGRAL COVE BASE

EVAC MEDICAL GAS EVACUATION

EW EACH WAY

EWC ELECTRICAL WATER COOLER

EWH ELECTRICAL WATER HEATER

EXH EXHAUST

EXP EXPOSED

EXPN EXPANSION

EXST EXISTING

EXT EXTERIOR

F

FA FIRE ALARM

FCU FAN COIL UNIT

FD FLOOR DRAIN / FIRE DAMPER

FD / SD COMBINATION FIRE AND SMOKE DAMPER

FDC FIRE DEPARTMENT CONNECTION

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF&E FURNITURE, FIXTURE, AND EQUIPMENT

FHC FIRE HOSE CABINET

FIN FINISH

FIX FIXTURE

FL FLOOR

FM FORCE MAIN / FACTORY MUTUAL

FP FIREPROOFING / FIRE PUMP

FR FIRE RATED

FRP FIBERGLASS REINFORCED PLASTIC

FS FLOW SWITCH

FT FEET

FTG FOOTING

FV FIELD VERIFY

G

G GAS / GRILLE

GA GAGE

GALV GALVANIZED

GB GRAB BAR

GEN GENERATOR

GFRC GLASS FIBER REINFORCED CONCRETE

GI GALVANIZED IRON

GL GLASS

GLB GLASS BLOCK

GLP GLASS PANEL

GLT GLASS TILE

GPM GALLONS PER MINUTE

GR GRADE

GT GROUT

GWB GYPSUM WALLBOARD

GYP GYPSUM

H

HC HEATING COIL

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HNDRL HANDRAIL

HORIZ HORIZONTAL

HPT HIGH POINT

HR HOUR

HT HEIGHT

HTG HEATING

HTR HEATER

HVAC HEATING, VENTILATING AND AIR CONDITIONING

HW HOT WATER

HWC HOT WATER CIRCULATING

I

IA INSTRUMENT AIR

IC INTERCOM

ID INSIDE DIAMETER

IE INVERT ELEVATION

IF INSIDE FACE

IN INCH

INSUL INSULATION

INT INTERIOR

J

JAN JANITOR

JB JUNCTION BOX

JSN JOINT SCHEDULE NUMBER

JST JOIST

JT JOINT

K

KC MIL THOUSAND CIRCULAR MILS

KCJ KEYED CONSTRUCTION JOINT

KIT KITCHEN

KV KILOVOLT

KW KILOWATTS

L

LAM LAMINATE

LAV LAVATORY

LBS POUNDS

LF LINEAR FEET

LIN LINEAR

LINO LINOLEUM

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMU LIGHTWEIGHT MASONRY UNITS

LONG LONGITUDINAL

LT LIGHT

LT WT LIGHT WEIGHT

LTG LIGHTING

LV LABORATORY VACUUM

LVL LEVEL

LVT LUXURY VINYL TILE

M

M METER

M2 SQUARE METER

M3 CUBIC METER

MA MEDICAL AIR

MAINT MAINTENANCE

MAR MARBLE

MAS MASONRY

MAT MATERIAL

MAX MAXIMUM

MB METAL BASE

MDO MEDIUM DENSITY OVERLAY

ME MATCH EXISTING

MECH MECHANICAL

MET METAL

MFR MANUFACTURER

MG MOTOR GENERATOR / MEDICAL GAS

MH MANHOLE

MIN MINIMUM

MLO MAIN LUGS ONLY

MM MILLIMETER

MO MASONRY OPENING

MP METAL PANEL

MT METAL TRANSITION

MTD MOUNTED

MTG MOUNTING

MULL MULLION

MV MEDICAL VACUUM

N

N NITROGEN

N2O NITROUS OXIDE

NEC NATIONAL ELECTRICAL CODE

NFPA NATIONAL FIRE PROTECTION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

O/S OFFSET

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

OPNG OPENING

OPP OPPOSITE

OX OXYGEN

OZ OUNCE

P

P PAINT / PUMP / PENDANT

PART PARTITION

PAT PATIENT

PAVT PAVEMENT

PCF POUNDS PER CUBIC FOOT

PED PEDESTAL

PERP PERPENDICULAR

PHVAC PLUMBING, HEATING, VENTILATING AND AIR

CONDITIONING

PI POINT OF INTERSECTION

PIV POST INDICATOR VALVE

PKG PARKING

PL PLASTIC LAMINATE / PROPERTY LINE / PLATE

PLAS PLASTER

PLBG PLUMBING

PLF POUNDS PER LINEAR FOOT

PLYWD PLYWOOD

PNL PANEL

POL CONC POLISHED CONCRETE

PR PAIR

PRF POURED RESINOUS FLOORING

PROJ PROJECTION

PRV PRESSURE REGULATING VALVE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PORCELAIN TILE

PTVC POINT OF VERTICAL CURVATURE

PTW PORCELAIN TILE WALL

PVC POLYVINYL CHLORIDE

Q

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QZP QUARTZ POLYMER

R

R RADIUS / REGISTER

RA RETURN AIR

RAF RAISED ACCESS FLOORING

RB RESILIENT BASE

RCP REINFORCED CONCRETE PIPE

RD ROOF DRAIN

REF REFERENCE

REFL REFLECTED

REG REGISTER

REINF REINFORCED

REQD REQUIRED

REV REVERSE / REVISION

RF RETURN FAN

RGS RIGID GALVANIZED STEEL

RH ROOF HOOD / RELATIVE HUMIDITY / REHEAT

RHC REHEAT COIL

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RS RESILIENT SHEET

RT RESILIENT TILE

S

S STAIR / STAIN / SURFACE / SANITARY

SA SUPPLY AIR / SOUND ATTENUATOR

SAN SANITARY

SBT SOUTH BED TOWER

SCH SCHEDULE

SD SMOKE DAMPER / SUB DRAIN / STORM SEWER

SECT SECTION

SF SUPPLY FAN

SHT SHEET

SIM SIMILAR

SOG SLAB-ON-GRADE

SPEC SPECIFICATIONS

SQ SQUARE

SS SERVICE SINK / SANITARY SEWER

SSM SOLID SURFACE MATERIAL

SSO STORM SEWER OVERFLOW

SSTL STAINLESS STEEL

STA STATION

STD STANDARD

STIFF STIFFENER

STIR STIRRUP

STL STEEL

STOR STORAGE

STR STRUCTURAL

SUSP SUSPENDED

SW SWITCH

SYM SYMMETRICAL

T

T TREAD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TC TOP OF CURB

TE TOP ELEVATION

TEL TELEPHONE

TEMP TEMPERATURE

TERR TERRAZZO

TLT TOILET

TOPO TOPOGRAPHY

TOS TOP OF STEEL

TOW TOP OF WALL

TRANS TRANSVERSE

TS TRANSITION STRIP

TYP TYPICAL

U

UG UNDERGROUND

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UR URINAL

UV UNIT VENTILATOR

V

V VOLT

VACHS VA CARIBEAN HEALTH SYSTEM

VAV VARIABLE AIR VOLUME

VCP VITRIFIED CLAY PIPE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VFD VARIABLE FREQUENCY DRIVE

VWC VINYL WALL COVERING

W

W WATT / WATER

W/ WITH

W/O WITHOUT

WAGD WASTE ANESTHESIA GAS DISPOSAL

WC WATER CLOSET / WALL COVERING

WD WOOD

WDB WOOD BASE

WDF WOOD FLOOR

WDP WOOD PANEL

WDW WINDOW

WDWF WINDOW FILM

WGD WALL GUARD

WH WATER HEATER / WALL HYDRANT

WP WEATHERPROOF

WPFG WATERPROOFING

WT WEIGHT / WINDOW TREATMENT

WWF WELDED WIRE FABRIC

X

XFMR TRANSFORMER

Y

YD YARD

YH YARD HYDRANT

SHEET INDEX

GENERAL

GI001 COVER SHEET

GI002 GENERAL NOTES, SYMBOLS, SHEET INDEX AND ABBREVIATIONS

GI003 FIXTURE AND ACCESSORIES LOCATIONS

STRUCTURAL

S100 GENERAL NOTES

S200 CLC ROOMS 4 THROUGH 6 FRAMING AND SUPPORTS

S201 SBT BLDG. LEVELS 3 THRU 6 FRAMING

S300 FIXTURE ACCESSORIES AND VERTICAL SUPPORT DETAILS

S400 MASONRY FRAMING DETAILS

ARCHITECTURAL

AD101C DEMOLITION PLANS - CLC LEVEL 1 AND 2

AD102C ENLARGED DEMOLITION PLANS - CLC LEVEL 1 AND 2

AE101C FLOOR PLANS - CLC LEVEL 1 AND 2

AE410C ENLARGED FLOOR PLANS - CLC LEVEL 1

AE411C ENLARGED FLOOR PLANS - CLC LEVEL 2

AD103S DEMOLITION PLANS - SBT LEVEL 3 AND 4

AD105S DEMOLITION PLANS - SBT LEVEL 5 AND 6

AE103S FLOOR PLANS - SBT LEVEL 3 AND 4

AE105S FLOOR PLANS - SBT LEVEL 5 AND 6

AE410S ENLARGED FLOOR PLANS - SBT

AE420 INTERIOR ELEVATIONS - CLC

AE421 INTERIOR ELEVATIONS - SBT

AE450 CASEWORK AND INTERIOR DETAILS

AE600 PARTITION TYPES AND DETAILS

AE602 DOOR SCHEDULE, DOOR FRAME TYPES, DOOR DETAILS

INTERIORS

IN100C ENLARGED FINISH FLOOR PLANS CLC

IN100S ENLARGED FINISH FLOOR PLANS SBT

IN501 INTERIOR FINISH DETAILS

IN600 ROOM FINISH SCHEDULE

IN601 SCHEDULE OF FINISHES

FIRE PROTECTION

F-101 FIRE PROTECTION FLOOR PLAN - CLC LEVEL 1

F-102 FIRE PROTECTION FLOOR PLAN - CLC LEVEL 2

F-103 FIRE PROTECTION FLOOR PLAN - SBT LEVEL 3

F-104 FIRE PROTECTION FLOOR PLAN - SBT LEVEL 4

F-105 FIRE PROTECTION FLOOR PLAN - SBT LEVEL 5

F-106 FIRE PROTECTION FLOOR PLAN - SBT LEVEL 6

FD-201 ENLARGED FIRE PROTECTION DEMO FLOOR PLANS - CLC

FD-202 ENLARGED FIRE PROTECTION DEMO FLOOR PLANS - SBT

F-201 ENLARGED FIRE PROTECTION FLOOR PLANS - CLC

F-202 ENLARGED FIRE PROTECTION FLOOR PLANS - SBT

PLUMBING

P-001 PLUMBING COVER SHEET

PD-101 GRAVITY PIPING DEMO FLOOR PLAN - CLC LEVEL 1

PD-102 PRESSURE PIPING DEMO FLOOR PLAN - CLC LEVEL 1

PD-103 GRAVITY PIPING DEMO FLOOR PLAN - CLC LEVEL 2

PD-104 PRESSURE PIPING DEMO FLOOR PLAN - CLC LEVEL 2

PD-105 GRAVITY PIPING DEMO FLOOR PLAN - SBT LEVEL 3

PD-106 PRESSURE PIPING DEMO FLOOR PLAN - SBT LEVEL 3

PD-107 GRAVITY PIPING DEMO FLOOR PLAN - SBT LEVEL 4

PD-108 PRESSURE PIPING DEMO FLOOR PLAN - SBT LEVEL 4

PD-109 GRAVITY PIPING DEMO FLOOR PLAN - SBT LEVEL 5

SCALE: NTS

SITE PLAN - SAN JUAN VA MEDICAL CENTER

SHEET INDEX

PD-110 PRESSURE PIPING DEMO FLOOR PLAN - SBT LEVEL 5

PD-111 GRAVITY PIPING DEMO FLOOR PLAN - SBT LEVEL 6

PD-112 PRESSURE PIPING DEMO FLOOR PLAN - SBT LEVEL 6

PD-201 MEDICAL GAS PIPING DEMO FLOOR PLAN - CLC LEVEL 1

PD-202 MEDICAL GAS PIPING DEMO FLOOR PLAN - CLC LEVEL 2

PD-203 MEDICAL GAS PIPING DEMO FLOOR PLAN - SBT LEVEL 3

PD-204 MEDICAL GAS PIPING DEMO FLOOR PLAN - SBT LEVEL 4

PD-205 MEDICAL GAS PIPING DEMO FLOOR PLAN - SBT LEVEL 5

PD-206 MEDICAL GAS PIPING DEMO FLOOR PLAN - SBT LEVEL 6

PD-401 ENLARGED GRAVITY PIPING DEMO FLOOR PLANS - CLC

PD-402 ENLARGED PRESSURE PIPPING DEMO FLOOR PLANS - CLC

PD-403 ENLARGED GRAVITY PIPING DEMO FLOOR PLANS - SBT

PD-404 ENLARGED PRESSURE PIPING DEMO FLOOR PLANS - SBT

PD-405 ENLARGED MEDICAL GAS PIPING DEMO FLOOR PLANS - CLC

PD-406 ENLARGED MEDICAL GAS PIPING DEMO FLOOR PLANS - SBT

P-101 GRAVITY PIPING FLOOR PLAN - CLC LEVEL 1

P-102 PRESSURE PIPING FLOOR PLAN - CLC LEVEL 1

P-103 GRAVITY PIPING FLOOR PLAN - CLC LEVEL 2

P-104 PRESSURE PIPING FLOOR PLAN - CLC LEVEL 2

P-105 GRAVITY PIPING FLOOR PLAN - SBT LEVEL 3

P-106 PRESSURE PIPING FLOOR PLAN - SBT LEVEL 3

P-107 GRAVITY PIPING FLOOR PLAN - SBT LEVEL 4

P-108 PRESSURE PIPING FLOOR PLAN - SBT LEVEL 4

P-109 GRAVITY PIPING FLOOR PLAN - SBT LEVEL 5

P-110 PRESSURE PIPING FLOOR PLAN - SBT LEVEL 5

P-111 GRAVITY PIPING FLOOR PLAN - SBT LEVEL 6

P-112 PRESSURE PIPING FLOOR PLAN - SBT LEVEL 6

P-200 MEDICAL GAS PIPING FLOOR PLAN - BLDG 1 BASEMENT

(EXISTING)

P-201 MEDICAL GAS PIPING FLOOR PLAN - CLC LEVEL 1

P-202 MEDICAL GAS PIPING FLOOR PLAN - CLC LEVEL 2

P-203 MEDICAL GAS PIPING FLOOR PLAN - SBT LEVEL 3

P-204 MEDICAL GAS PIPING FLOOR PLAN - SBT LEVEL 4

P-205 MEDICAL GAS PIPING FLOOR PLAN - SBT LEVEL 5

P-206 MEDICAL GAS PIPING FLOOR PLAN - SBT LEVEL 6

P-401 ENLARGED GRAVITY PIPING FLOOR PLANS - CLC

P-402 ENLARGED PRESSURE PIPPING FLOOR PLANS - CLC

P-403 ENLARGED GRAVITY PIPING FLOOR PLANS - SBT

P-404 ENLARGED PRESSURE PIPING FLOOR PLANS - SBT

P-405 ENLARGED MEDICAL GAS PIPING FLOOR PLANS - CLC

P-406 ENLARGED MEDICAL GAS PIPING FLOOR PLANS - SBT

P-501 ENLARGED GRAVITY AND PRESSURE PIPING ISOMETRICS - CLC

P-502 ENLARGED GRAVITY, PRESSURE AND MEDICAL GAS PIPING

ISOMETRICS - SBT

P-503 OVERALL MEDICAL GAS PIPING ISOMETRICS - CLC

P-601 PLUMBING DETAILS AND SCHEDULES

MECHANICAL

M-001 MECHANICAL COVER SHEET

M-002 MECHANICAL SYMBOLS & ABBREVIATIONS

MD-101 MECHANICAL DEMOLITION FLOOR PLAN - CLC LEVEL 1

MD-102 MECHANICAL DEMOLITION FLOOR PLAN - CLC LEVEL 2

MD-103 MECHANICAL DEMOLITION FLOOR PLAN - SBT LEVEL 3

MD-104 MECHANICAL DEMOLITION FLOOR PLAN - SBT LEVEL 4

MD-105 MECHANICAL DEMOLITION FLOOR PLAN - SBT LEVEL 5

MD-106 MECHANICAL DEMOLITION FLOOR PLAN - SBT LEVEL 6

MD-401 MECHANICAL DEMOLITION ENLARGED FLOOR PLAN - CLC LEVEL 1

MD-402 MECHANICAL DEMOLITION ENLARGED FLOOR PLAN - CLC LEVEL 2

MD-403 MECHANICAL DEMOLITION ENLARGED FLOOR PLAN - SBT LEVEL 3

SHEET INDEX

MD-404 MECHANICAL DEMOLITION ENLARGED FLOOR PLAN - SBT LEVEL 4

MD-405 MECHANICAL DEMOLITION ENLARGED FLOOR PLAN - SBT LEVEL 5

MD-406 MECHANICAL DEMOLITION ENLARGED FLOOR PLAN - SBT LEVEL 6

MH-101 MECHANICAL FLOOR PLAN - CLC LEVEL 1

MH-102 MECHANICAL FLOOR PLAN - CLC LEVEL 2

MH-103 MECHANICAL FLOOR PLAN - SBT LEVEL 3

MH-104 MECHANICAL FLOOR PLAN - SBT LEVEL 4

MH-105 MECHANICAL FLOOR PLAN - SBT LEVEL 5

MH-106 MECHANICAL FLOOR PLAN - SBT LEVEL 6

MH-401 MECHANICAL ENLARGED FLOOR PLAN - CLC LEVEL 1

MH-402 MECHANICAL ENLARGED FLOOR PLAN - CLC LEVEL 2

MH-403 MECHANICAL ENLARGED FLOOR PLAN - SBT LEVEL 3

MH-404 MECHANICAL ENLARGED FLOOR PLAN - SBT LEVEL 4

MH-405 MECHANICAL ENLARGED FLOOR PLAN - SBT LEVEL 5

MH-406 MECHANICAL ENLARGED FLOOR PLAN - SBT LEVEL 6

MH-501 MECHANICAL DETAILS

MH-502 MECHANICAL DETAILS

MH-503 MECHANICAL DETAILS

MH-601 MECHANICAL SCHEDULES

MI-101 MECHANICAL CONTROLS DIAGRAM

ELECTRICAL

EJ001 ELECTRICAL NOTES AND SYMBOL LEGENDS

ED101 ELECTRICAL DEMOLITION OVERALL PLAN - CLC

ED101A ELECTRICAL ENLARGED DEMOLITION PLAN - CLC ROOMS

ED101B ELECTRICAL ENLARGED DEMOLITION PLAN - CLC ROOMS

ED102 ELECTRICAL DEMOLITION OVERALL PLAN - SBT

ED102A ELECTRICAL ENLARGED DEMOLITION PLAN - SBT ROOMS

ED102B ELECTRICAL ENLARGED DEMOLITION PLAN - SBT ROOMS

EP101 ELECTRICAL OVERALL PLAN - CLC

EP101A ELECTRICAL ENLARGED POWER PLAN - CLC ROOMS

EP101B ELECTRICAL ENLARGED POWER PLAN - CLC ROOMS

EP102 ELECTRICAL OVERALL PLAN - SBT

EP102A ELECTRICAL ENLARGED POWER PLAN - SBT ROOMS

EP102B ELECTRICAL ENLARGED POWER PLAN - SBT ROOMS

EP201 ELECTRICAL ENLARGED ROOMS

EL101A ELECTRICAL ENLARGED LIGHTING PLAN - CLC ROOMS

EL101B ELECTRICAL ENLARGED LIGHTING PLAN - CLC ROOMS

EL102A ELECTRICAL ENLARGED LIGHTING PLAN - SBT ROOMS

EL102B ELECTRICAL ENLARGED LIGHTING PLAN - SBT ROOMS

EK101 ELECTRICAL PANEL SCHEDULES - CLC

EK102 ELECTRICAL PANEL SCHEDULES - CLC

EK103 ELECTRICAL PANEL SCHEDULES - SBT

EK104 ELECTRICAL PANEL SCHEDULES - SBT

EK105 ELECTRICAL PANEL SCHEDULES - SBT

EK106 ELECTRICAL PANEL SCHEDULES - SBT

EK107 ELECTRICAL PANEL SCHEDULES - SBT

EK108 ELECTRICAL PANEL SCHEDULES - SBT

EK201 ELECTRICAL DETAILS

EK202 ELECTRICAL LIGHTING SCHEDULE & DETAILS

ET001 LOW VOLTAGE ELECTRICAL NOTES AND SYMBOL LEGENDS

ET101A LOW VOLTAGE ENLARGED PLAN - CLC ROOMS

ET101B LOW VOLTAGE ENLARGED PLAN - CLC ROOMS

ET102A LOW VOLTAGE ENLARGED PLAN - SBT ROOMS

ET102B LOW VOLTAGE ENLARGED PLAN - SBT ROOMS

ET201 LOW VOLTAGE DETAILS

MIN CLEAR

1'-3"

M A

X T

O R

IM

2' -1

0"

R E

F

LE

C T

IN

G

S U

R F

A C

E O

F M

IR

R

O R

3' -4

M

A X

T O

B O

MIRROR

MIN

8" DEEP

T O

R

IM

2' -1

0" M

A X

2'-1" MAX

1'-5" MIN

9" M

IN

9" M

IN

SIDE VIEW FRONT VIEW

1'-5" MIN

LAVATORY

PLUMBING LINES

WITHIN HATCHED

AREA REQUIRED

TO BE INSULATED

LINES OF REQUIRED

CLEARANCE

FINISH FLOOR

4'-0" MIN CLR

2' -3

M

IN

7"

CLEAR SPACE

ALLOWABLE FOR

ACCESSIBILITY

MIRROR

C

LR

K N

E E

S P

A C

E

2' -3

M

IN

7"

LINES OF REQUIRED

CLEARANCE

CLEARANCE

6" MAX TOE

T O

O P

E R

A T

IN

G

M E

C H

A N

IS

M

3' -4

M

A X4'

-6

4' -0

ROBE HOOK

(RH)

SOAP DISPENSER

SURFACE MTD

(SD)

4' -0

TOWEL BAR

(TB)

2' -9

SWING UP

GRAB BAR

T O

O P

E R

A T

IN

G

M E

C H

A N

IS

M

3' -4

M

A X

T O

O P

E R

A T

IN

G

M E

C H

A N

IS

M

3' -4

M

A X

T O

O P

E R

A T

IN

G

M E

C H

A N

IS

M

3' -4

M

A X

PAPER TOWEL

DISPENSER WALL MTD

(PTD)

4' -0

M

A X

3' -4

M

IN

VARIES FROM 3'-4"

HEIGHT FOR MAX 6"

DEPTH, TO 4'-0" HEIGHT

FOR MAX 1/2" DEPTH

3' -4

A

B O

V E

F

IN

IS

H

F

LO

O R

T O

B O

T T

O M

O F

R E

F L

S U

R F

A C

E

MIRROR

(MR)

4' -0

M

IN

2'-6" MIN

1' -5

M

IN

1' -7

M

A X

SINK

CLEAR FLOOR

SPACE

CLEARANCE AT SINK

GENERAL SHEET NOTES

A. ACCESSIBILITY DETAILS SHOWN SHALL BE USED WHERE ACCESSIBLE WORK IS

IDENTIFIED IN THESE DOCUMENTS. CONTRACTOR SHALL THOROUGHLY REVIEW THESE

DOCUMENTS. SHOULD ANY CONFLICTS IN THESE DOCUMENTS ARISE, THE CONTRACTOR

SHALL NOTIFY OWNER'S REPRESENTATIVE IN WRITING PRIOR TO PURCHASE,

INSTALLATION, AND CONSTRUCTION OF ANY ELEMENT OF THE WORK.

B. WHERE MORE THAN ONE CODE AND / OR STANDARD IS INDICATED AS BEING APPLICABLE,

THE MOST STRINGENT CASE SHALL BE ADHERED TO.

C. PROVIDE 6'-0" CIRCULAR TURNING SPACE IN BARATRIC PATIENT ROOMS AND TOILETS.

PROVIDE 5'-6" CIRCULAR TURNING SPACE NON-BARATRIC ROOMS.

PLAN

VERTICAL

GRAB BAR

GRAB BAR

ELEV A1

1' -6

3'

-0

6" 3'-0" 2"

E

LE

V B

3' -6

3' -4

6' -0

2'-0" 6"

2' -9

SLIDE BAR

GRAB BARS

SOAP DISPENSER

CONTROLS

SHOWER HEAD

GRAB BAR

GRAB BAR

VERTICAL GRAB BAR

ELEV A

ELEV A1

3'-0" 6"

2' -9

GRAB BAR

SHOWER

CORNER

(CORNER OPP

SIDE WHEN

OCCURS)SHOWER

CORNER

(CORNER

OPPOSITE SIDE

WHEN OCCURS)

MIN 59"

LONG HOSE

PROVIDE CLEAR AREA FOR SHOWER

4'-0"

6' -0

3'-0"

WATER CLOSET WATER CLOSET

CLEAR MIN

3'-0"

CLEAR MIN

3'-0"

CLEAR SPACE

3'-10"

6' -0

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

672-23-104

LAD NO.

Office of Construction and Facilities Management

CD (100%CD) FINAL BID DOCUMENTS – 03/14/2025

ARCHITECT/ENGINEER OF RECORD

A/E:

JUPITER

561-743-0165

ORLANDO

407-845-6630

WWW.RGDENGINEERS.COM

CERT OF AUTH 5454

121 S. ORANGE AVENUE, UNIT 1230N, ORLANDO, FL 32801

RGD PROJECT

#23-1050

8600 Indian Hills Dr Omaha, NE 68114 Tel 402.391.8111 Fax 402.391.8564

/1

/2

:3

:3

P

M

10 Calle Casia San Juan Puerto Rico 00921

FIXTURE AND ACCESSORIES

LOCATIONS

GI003

Construct VA Bariatric Bathrooms at Community Center and South Bed Tower

003-10296-000

03/14/2025 RAD WMB

A u to d e s k D o c s /V

A C o n s tr u c t B a ri a tr ic B a th ro o m s a t C

L C

S

B T

R

V

A S

J B

A R

-A rc h it e c tu re .r v t

100% CD - FINAL BID

DOCUMENTS

SCALE: 1/2" = 1'-0"

ACCESSIBLE LAVATORY CLEARANCE

SCALE: 1/2" = 1'-0"

TOILET FIXTURE AND ACCESSORIES

SCALE: 1/4" = 1'-0"

CLEAR FLOOR SPACES

2'

SCALE : 1/4" = 1'-0"

0 4' 8'

1'

SCALE : 1/2" = 1'-0"

0 2' 4'

SCALE: 1/2" = 1'-0"

VA PATIENT ACCESSIBLE SHOWER ROLL-IN

PATIENT TOILET LOCATION

BARIATRIC PATIENT TOILET LOCATION

S I D E W A L K

S I D E W A L K

PATIENT RM

IA-118

IA-117

IB-128IB-127

IB-126

IB-134IB-135IB-136IB-137IB-138IB-139IB-140

IB-142

IC-143

IC-150

IC-151

IC-152

IC-153

IC-155

IC-154

IC-1A

IA-119

IA-120

IA-121

IA-122

IA-123

IA-124

IB-125

IA-111

IA-110

IA-108

IC-157

IC-156

IC-156a

IA-100

IA-106

IA-104

IC-158

CI-1A

IC-159

IA-107 IA-109

IA-105

IC-144

IB-141

FUT. ELEV.

S-3

S-2

S-1

PATIENT RM

UP

STAIR #3

PATIENT RM

PATIENT RM

TLT

PATIENT RM

TLT

EXAM

W. SUPPLY

N. CALL

RES. LOUNGE

SOCIAL WK.

OFFICE

PATIENT

TLT

STG.

TLT

LOBBY

EQ. STG.

LAUNDRY

CORRIDOR

TLT QUIET

NURSES CLO.

KITCHEN

NURS.

HAC

TLT

CL. LINEN

CONG. BATH

STAIR #1

PATIENT RM

PATIENT RM

PATIENT RM

TLT

PATIENT RM

PATIENT RMPATIENT RM

TLT

STAIR

#2

PATIENT RM

TLT

PATIENT RMPATIENT RMPATIENT RM

STAFF

TLT

TLT

TLT

MACH. ROOM

ELEVATOR

ADMINISTRATIVE

OFFICES

LIVING CENTER

COMMUNITY

STG.

OFFICE

SUPERVISOR

NURSE

MEDIC

& CLERK

STATION

NURSE

BATH

ROOM

SOIL UTILITY

TLTTLT

TLT

TLT

PATIENT RM

PATIENT RM

TLT

PATIENT RM

IA-103

STAIR #3

#2

S-3

2A-107

2A-105

2C-156a

2C-156 2A-100

C2-1B

2B-1342B-1352B-136

2A-118

2A-119

2A-120

2A-117

2A-116

2A-121

2A-122

2B-127 2B-128

2B-1372B-1382B-139

2A-123

2B-125

2A-124

2A-111

2A-108

2A-110

2B-126

2B-142

2C-144

2B-141

C2-1A

2C-159

2C-158

2C-154

C2-1A

2C-157

2C-155

2A-109

2B-140

2C-143

2A-106

2C-149

2C-153

2C-152

2C-151

2C-150

PATIENT RM

PATIENT RM

TLT

PATIENT RM

PATIENT RM

TLT

PATIENT RM

PATIENT

TLT

THERAPY

EQ. STG.

QUIET

PATIENT RM

SOCIAL WK.

OFFICE

N. CALL

LAUND.

CORR.

W. SUPPLY

MEDIC

& CLERK

NURSE STATION

BATH

STAFF TLT

ROOM

SOIL UTILITY

BATH

NURSE

OFFICE

EXAM

MACHINE

TLT

NURSES CLO.

CL. LINEN

CONG. BATH

PATIENT RM

TLT

PATIENT RM PATIENT RM

PATIENT RM

STAIR #1

PATIENT RM

TLT

PATIENT RM

PATIENT RM

PATIENT RM

TLT

PATIENT RM

PATIENT RM

PATIENT RM

PATIENT RM

TLT

PATIENT RM

TLT

STAIR

TERRACE

LAUNDRY

FUT. ELEV.

RES. LOUNGE

PATIENT

TLT

PRIMARY CARE

HOME BASE SOCIAL

WORK

RECREATION

OFFICE

ICE

CORRIDOR

PATIENT RM

TLT

TLT

TLT

TLT

UP

AD102C

B3

AD102C

B5

AD102C

B1

100'-0"

AREA A

AREA B

AREA B

AREA C

S T U V WS1 U2 X Y Z

R

AD102C

D3

AD102C

D1

AD102C

D5

114'-0"

AREA A

AREA B

AREA B

AREA C

S T U V WS1 U2 X Y Z

R

PAT RM

1A-116

PAT RM

1A-115

PAT RM

1A-114

PAT RM

1A-113

PAT ROOM

1B-129

PAT RM

1B-130

PAT RM

1B-131

PAT RM

1B-132

PAT RM

1C-145

PAT RM

1C-146

PAT RM

1C-147

PAT RM

1C-148

PAT RM

1C-149

CORRIDOR

C2-2WA-1

CORRIDOR

C2-3WB-2

CORRIDOR

C2-4WC-3

PAT RM

1B-133

PAT RM

1A-112

PAT ROOM

2A-116

PAT ROOM

2A-115

PAT ROOM

2A-114

PAT ROOM

2A-113

PAT ROOM

2B-129

PAT ROOM

2B-130

PAT ROOM

2B-131

PAT ROOM

2B-132

PAT ROOM

2C-145

PAT RM

2C-146

PAT RM

2C-147

PAT RM

2C-148

PAT RM

2C-149

CORRIDOR

C2-3WB-2

CORRIDOR

C1-2WA-6

CORRIDOR

C1-4WB-8

PAT RM

2B-133

NTRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

672-23-104

LAD NO.

KEY PLAN NTS

Office of Construction and Facilities Management

BED

CLC

SICU

LAUNDRY

PARKING

GENERATORS

IWC

TWR

OPA

BLDG-1

ADMIN

CD (100%CD) FINAL BID DOCUMENTS – 03/14/2025

ARCHITECT/ENGINEER OF RECORD

A/E:

JUPITER

561-743-0165

ORLANDO

407-845-6630

WWW.RGDENGINEERS.COM

CERT OF AUTH 5454

121 S. ORANGE AVENUE, UNIT 1230N, ORLANDO, FL 32801

RGD PROJECT

#23-1050

8600 Indian Hills Dr Omaha, NE 68114 Tel 402.391.8111 Fax 402.391.8564

/1

/2

:2

:1

P

M

10 Calle Casia San Juan Puerto Rico 00921

DEMOLITION PLANS - CLC LEVEL

1 AND 2

AD101C

Construct VA Bariatric Bathrooms at Community Center and South Bed Tower

003-10296-000

03/14/2025 RAD WMB

A u to d e s k D o c s /V

A C o n s tr u c t B a ri a tr ic B a th ro o m s a t C

L C

S

B T

R

V

A S

J B

A R

-A rc h it e c tu re .r v t

100% CD - FINAL BID

DOCUMENTS

SCALE: 1/16" = 1'-0"

F1

DEMOLITION PLAN - CLC LEVEL 1

SCALE: 1/16" = 1'-0"

F5

DEMOLITION PLAN - CLC LEVEL 2

8'

SCALE : 1/16" = 1'-0"

0 16' 32'

X Y

SEE DEMOLITION

PLAN B1 THIS

SHEET FOR

TYPICAL NOTES

SEE DEMOLITION

PLAN B1 THIS

SHEET FOR

TYPICAL NOTES

REMOVE PARTIAL

HEIGHT WALL AND SILL

AS REQUIRED FOR

NEW WORK

BED REMOVAL AND

REPLACEMENT IS NIC,

TYPICAL REMOVE ROOM SIGNAGE

AND SHADOW BOX WHERE

OCCURS AT REMOVED

CORRIDORE DOORS.

SALVAGE FOR REUSE

REMOVE CRASH RAILS AND

BUMPERS AS REQUIRED FOR

WORK. TYPICAL AT CORRIDORS

AT AREAS OF WORK

CORRIDOR

C2-2WA-1

SEE DEMOLITION

PLAN B1 THIS

SHEET FOR

TYPICAL NOTES

X Y

CORRIDOR

C2-3WB-2

SEE DEMOLITION

PLAN B1 THIS

SHEET FOR

TYPICAL NOTES

CORRIDOR

2C-4WC-3

SEE DEMOLITION

PLAN B1 THIS

SHEET FOR

TYPICAL NOTES

PAT RM

1A-116

PAT RM

1A-115

PAT RM

1A-114

PAT RM

1A-113

CORRIDOR

C2-2WA-1

PAT RM

1A-112

PAT TLT

1A-115A

PAT TLT

1A-113A

PAT ROOM

1B-129

PAT RM

1B-130

PAT RM

1B-131

PAT RM

1B-132

CORRIDOR

C2-3WB-2

PAT RM

1B-133

PAT TLT

1B-130B

PAT TLT

1B-132A

PAT RM

1C-145

PAT RM

1C-146

PAT RM

1C-147

PAT RM

1C-148

PAT RM

1C-149

CORRIDOR

C2-4WC-3

PAT TLT

1C-145A

PAT TLT

1C-147A

PAT ROOM

2A-116

PAT ROOM

2A-115

PAT ROOM

2A-114

PAT ROOM

2A-113

PAT ROOM

2A-112

PAT RM

2A-115A

PAT RM

2A-113A

PAT ROOM

2B-129

PAT ROOM

2B-130

PAT ROOM

2B-131

PAT ROOM

2B-132

PAT RM

2B-133

PAT TLT

2B-130A

PAT TLT

2B-132A

PAT ROOM

2C-145

PAT RM

2C-146

PAT RM

2C-147

PAT RM

2C-148

PAT RM

2C-149

PAT TLT

2C-145A

PAT TLT

2C-147A

1. DASHED AREAS INDICATE MATERIAL OR EQUIPMENT TO BE REMOVED.

2. CONSTRUCTION SCHEDULING AND SEQUENCING SHALL BE COORDINATED WITH

COR PRIOR TO BEGINNING ANY WORK. COORDINATE DEMOLITION WORK TO

ACCOMMODATE VHA'S NORMAL OPERATIONS.

3. THE GENERAL CONTRACTOR SHALL ACCEPT THE PROJECT AS IT EXISTS.

4. REPORT CONFLICTS AND/OR DISCREPANCIES DISCOVERED IN DOCUMENTS TO

THE COR FOR CLARIFICATION PRIOR TO STARTING WORK.

5. THE EXISTING CONDITIONS, WHETHER OR NOT SPECIFICALLY NOTED ON THE

DRAWINGS, SHALL BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO THE

COMMENCEMENT OF WORK.

6. DEMOLITION DRAWINGS INDICATE GENERAL SCOPE OF WORK ONLY. NOT ALL

DEMOLITION WORK NECESSARY IS SPECIFICALLY INDICATED. THE EXTENT AND

METHOD OF DEMOLITION SHALL BE AS REQUIRED TO ACCOMMODATE NEW WORK.

7. PATCH AND REPAIR EXISTING CONSTRUCTION WHICH IS DAMAGED OR DISTURBED

DURING DEMOLITION TO MATCH EXISTING OR RESTORE TO ITS ORIGINAL

CONDITION INCLUDING PAINTING.

8. CONTRACTOR SHALL COORDINATE DEMOLITION AND CUT AND PATCHING WORK

WITH NEW CONSTRUCTION TO MINIMIZE CUT AND PATCHING. SEE NEW

CONSTRUCTION DRAWINGS FOR COORDINATION AND THE SPECIFICATIONS FOR

CUT AND PATCHING REQUIREMENTS.

9. ALL PENETRATIONS ARE TO BE APPROVED BY THE COR PRIOR TO THE

COMMENCEMENT OF ANY CUTTING AND CORING.

10. FOR ADDITIONAL DEMOLITION INFORMATION SEE STRUCTURAL, MECHANICAL,

ELECTRICAL AND PLUMBING DRAWINGS FOR REQUIRED STRUCTURAL,

MECHANICAL, ELECTRICAL, DATA COMM, AND PLUMBING DEMOLITION.

11. WHERE AREAS OR ITEMS THAT ARE INDICATED TO BE REMOVED, ABUT OR ADJOIN

EXISTING CONSTRUCTION INDICATED TO REMAIN, SAWCUT OR OTHERWISE

REMOVE TO PROVIDE A CLEAN EDGE. IF EVIDENCE OF DEMOLITION WILL NOT BE

CONCEALED BY NEW WORK, PATCH AND/OR REPAIR TRANSITION TO MATCH

ADJACENT SURFACE AND FINISH.

12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING

STRUCTURES SURROUNDING THE CONTRACT AREA. DAMAGE TO EXISTING

STRUCTURES OR EQUIPMENT SHALL BE REPAIRED OR REPLACED AT NO

ADDITIONAL COST TO VHA.

13. ERECT TEMPORARY PARTITIONS/BARRIERS AS REQUIRED TO PREVENT

CONTAMINATION OF ADJACENT AREAS THAT ARE OR WILL BE USED BY VHA.

CONTAMINATION INCLUDES DUST, DEBRIS, AND EXCESSIVE NOISE CAUSED BY

DEMOLITION ACTIVITIES.

14. SHORE AND/OR BRACE EXISTING WORK AS REQUIRED TO SAFELY REMOVE

ITEM(S) OR EXISTING CONSTRUCTION WITHOUT DAMAGE TO EXISTING

CONSTRUCTION INDICATED TO REMAIN.

15. DO NOT MODIFY EXISTING STRUCTURE UNLESS SPECIFICALLY INDICATED ON THE

DRAWINGS OR APPROVED IN ADVANCE BY COR.

16. COORDINATE WITH COR REGARDING MODIFICATIONS TO EXISTING AV, PHONE,

SECURITY SYSTEMS, ETC. PRIOR TO DEMOLITION.

17. IF MATERIALS CONTAINING ASBESTOS ARE IDENTIFIED WITHIN THE

CONSTRUCTION AREA, THE MATERIAL SHALL NOT BE DISTURBED UNLESS THE

RENOVATION REQUIRES ITS REMOVAL. ANY DISTURBANCE TO MATERIAL

CONTAINING ASBESTOS SHALL BE IN ACCORDANCE WITH THE JEGS, EPA

REGULATIONS, AND VHA SPECIFICATIONS.

18. REMOVE EXISTING PATIENT LIFTS AND ABOVE CEILING SUPPORTS AS REQUIRED

AT AREAS OF WORK.

19. VAMC TO REMOVE ALL BEDS FROM AREAS OF WORK.

20. AT REMOVED CORRIDOR DOORS SALVAGE EXISTING ROOM SIGNAGE (AND

SHOWDOW BOXES WHERE OCCURS)

21. REMOVE PORTIONS OF CRASH RAIL AND BUMPER AT CORRIDORS AS REQUIRED

FOR NEW WORK.

GENERAL DEMOLITION NOTES

NTRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

672-23-104

LAD NO.

KEY PLAN NTS

Office of Construction and Facilities Management

BED

CLC

SICU

LAUNDRY

PARKING

GENERATORS

IWC

TWR

OPA

BLDG-1

ADMIN

CD (100%CD) FINAL BID DOCUMENTS – 03/14/2025

ARCHITECT/ENGINEER OF RECORD

A/E:

JUPITER

561-743-0165

ORLANDO

407-845-6630

WWW.RGDENGINEERS.COM

CERT OF AUTH 5454

121 S. ORANGE AVENUE, UNIT 1230N, ORLANDO, FL 32801

RGD PROJECT

#23-1050

8600 Indian Hills Dr Omaha, NE 68114 Tel 402.391.8111 Fax 402.391.8564

/1

/2

:2

:1

P

M

10 Calle Casia San Juan Puerto Rico 00921

ENLARGED DEMOLITION PLANS -

CLC LEVEL 1 AND 2

AD102C

Construct VA Bariatric Bathrooms at Community Center and South Bed Tower

003-10296-000

03/14/2025 RAD WMB

A u to d e s k D o c s /V

A C o n s tr u c t B a ri a tr ic B a th ro o m s a t C

L C

S

B T

R

V

A S

J B

A R

-A rc h it e c tu re .r v t

100% CD - FINAL BID

DOCUMENTS

SCALE: 1/8" = 1'-0"

B3

ENLARGED DEMOLITION PLAN - CLC LEVEL 1 AREA B

SCALE: 1/8" = 1'-0"

B5

ENLARGED DEMOLITION PLAN - CLC LEVEL 1 AREA C

SCALE: 1/8" = 1'-0"

B1

ENLARGED DEMOLITION PLAN - CLC LEVEL 1 AREA A

SCALE: 1/8" = 1'-0"

D1

ENLARGED DEMOLITION PLAN - CLC LEVEL 2 AREA A

SCALE: 1/8" = 1'-0"

D3

ENLARGED DEMOLITION PLAN - CLC LEVEL 2 AREA B

SCALE: 1/8" = 1'-0"

D5

ENLARGED DEMOLITION PLAN - CLC LEVEL 2 AREA C

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

S I D E W A L K

PATIENT RM

IA-118

IA-117

IB-128IB-127

IB-126

IB-134IB-135IB-136IB-137IB-138IB-139IB-140

IB-142

IC-143

IC-150

IC-151

IC-152

IC-153

IC-155

IC-154

IC-1A

IA-119

IA-120

IA-121

IA-122

IA-123

IA-124

IB-125

IA-111

IA-110

IA-108

IC-157

IC-156

IC-156a

IA-100

IA-106

IA-104

IC-158

CI-1A

IC-159

IA-107 IA-109

IA-105

IC-144

IB-141

FUT. ELEV.

S-3

S-2

S-1

PATIENT RM

UP

STAIR #3

PATIENT RM

PATIENT RM

TLT

PATIENT RM

TLT

EXAM

W. SUPPLY

N. CALL

RES. LOUNGE

SOCIAL WK.

OFFICE

PATIENT

TLT

STG.

TLT

LOBBY

EQ. STG.

LAUNDRY

CORRIDOR

TLT QUIET

NURSES CLO.

KITCHEN

NURS.

HAC

TLT

CL. LINEN

CONG. BATH

STAIR #1

PATIENT RM

PATIENT RM

PATIENT RM

TLT

PATIENT RM

PATIENT RMPATIENT RM

TLT

STAIR

#2

PATIENT RM

TLT

PATIENT RMPATIENT RMPATIENT RM

STAFF

TLT

TLT

TLT

MACH. ROOM

ELEVATOR

ADMINISTRATIVE

OFFICES

LIVING CENTER

COMMUNITY

STG.

OFFICE

SUPERVISOR

NURSE

MEDIC

& CLERK

STATION

NURSE

BATH

ROOM

SOIL UTILITY

TLTTLT

TLT

TLT

PATIENT RM

PATIENT RM

TLT

PATIENT RM

IA-103

STAIR #3

#2

S-3

2A-107

2A-105

2C-156a

2C-156 2A-100

C2-1B

2B-1342B-1352B-136

2A-118

2A-119

2A-120

2A-117

2A-116

2A-121

2A-122

2B-127 2B-128

2B-1372B-1382B-139

2A-123

2B-125

2A-124

2A-111

2A-108

2A-110

2B-126

2B-142

2C-144

2B-141

C2-1A

2C-159

2C-158

2C-154

C2-1A

2C-157

2C-155

2A-109

2B-140

2C-143

2A-106

2C-149

2C-153

2C-152

2C-151

2C-150

PATIENT RM

PATIENT RM

TLT

PATIENT RM

PATIENT RM

TLT

PATIENT RM

PATIENT

TLT

THERAPY

EQ. STG.

QUIET

PATIENT RM

SOCIAL WK.

OFFICE

N. CALL

LAUND.

CORR.

W. SUPPLY

MEDIC

& CLERK

NURSE STATION

BATH

STAFF TLT

ROOM

SOIL UTILITY

BATH

NURSE

OFFICE

EXAM

MACHINE

TLT

NURSES CLO.

CL. LINEN

CONG. BATH

PATIENT RM

TLT

PATIENT RM PATIENT RM

PATIENT RM

STAIR #1

PATIENT RM

TLT

PATIENT RM

PATIENT RM

PATIENT RM

TLT

PATIENT RM

PATIENT RM

PATIENT RM

PATIENT RM

TLT

PATIENT RM

TLT

STAIR

TERRACE

LAUNDRY

FUT. ELEV.

RES. LOUNGE

PATIENT

TLT

PRIMARY CARE

HOME BASE SOCIAL

WORK

RECREATION

OFFICE

ICE

CORRIDOR

PATIENT RM

TLT

TLT

TLT

TLT

UP

AE410C

C1

AE410C

F1

AE410C

F5

339 SF

BARIATRIC PAT

RM

1A-113

232 SF

PAT RM

1A-112

372 SF

BARIATRIC PAT

RM

1B-130

373 SF

BARIATRIC PAT

RM

1C-147

231 SF

PAT RM

1C-146

242 SF

PAT RM

1C-145

183 SF

PAT RM

1C-149

236 SF

PAT RM

1B-131

CORRIDOR

C1-3WB-7

CORRIDOR

C1-2WA-6

CORRIDOR

C1-4WB-8

100'-0"

AREA A

AREA B

AREA B

AREA C

S T U V WS1 U2 X Y Z

R

225 SF

PAT RM

1A-114

183 SF

PAT RM

1A-116

232 SF

PAT RM

1B-129

255 SF

PATIENT RM

1B-133

AE411C

C1

AE411C

F1

AE411C

F5

375 SF

BARIATRIC PAT

RM

2B-130

235 SF

PAT RM

2B-131

255 SF

PAT RM

2B-133

231 SF

PAT RM

2B-129

223 SF

PAT RM

2A-114

183 SF

PAT RM

2A-116

230 SF

PAT RM

2A-112

232 SF

PAT RM

2C-146

370 SF

BARIATRIC PAT

RM

2C-147

41 SF

PAT TLT

2C-145A

182 SF

PAT RM

2C-149

241 SF

PAT RM

2C-145

CORRIDOR

C2-2WA-1

CORRIDOR

C2-3WB-2

CORRIDOR

2C-4WC-3

114'-0"

AREA A

AREA B

AREA B

AREA C

S T U V WS1 U2 X Y Z

R

NON-RATED FIRE PARTITION. PARTITION IS A

BARRIER TO LIMIT THE TRANSFER OF SMOKE

OVERALL FLOOR PLAN LEGEND

NTRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

672-23-104

LAD NO.

KEY PLAN NTS

Office of Construction and Facilities Management

BED

CLC

SICU

LAUNDRY

PARKING

GENERATORS

IWC

TWR

OPA

BLDG-1

ADMIN

CD (100%CD) FINAL BID DOCUMENTS – 03/14/2025

ARCHITECT/ENGINEER OF RECORD

A/E:

JUPITER

561-743-0165

ORLANDO

407-845-6630

WWW.RGDENGINEERS.COM

CERT OF AUTH 5454

121 S. ORANGE AVENUE, UNIT 1230N, ORLANDO, FL 32801

RGD PROJECT

#23-1050

8600 Indian Hills Dr Omaha, NE 68114 Tel 402.391.8111 Fax 402.391.8564

/1

/2

:2

:2

P

M

10 Calle Casia San Juan Puerto Rico 00921

FLOOR PLANS - CLC LEVEL 1

AND 2

AE101C

Construct VA Bariatric Bathrooms at Community Center and South Bed Tower

003-10296-000

03/14/2025 RAD WMB

A u to d e s k D o c s /V

A C o n s tr u c t B a ri a tr ic B a th ro o m s a t C

L C

S

B T

R

V

A S

J B

A R

-A rc h it e c tu re .r v t

100% CD - FINAL BID

DOCUMENTS

SCALE: 1/16" = 1'-0"

F1

FLOOR PLAN - CLC LEVEL 1

SCALE: 1/16" = 1'-0"

F5

FLOOR PLAN - CLC LEVEL 2

8'

SCALE : 1/16" = 1'-0"

0 16' 32'

CLC CONSTRUCTION TYPE (IBC):

BUILDING TYPE 1B

PRIMARY STRUCTURAL FRAME: 2 HOURS

INTERIOR BEARING WALLS: 2 HOURS

NONBEARING INTERIOR WALLS: 0

FLOORS: 2 HOURS

ROOF: 1 HOUR

PAT TLT

1A-114A

BARIATRIC PAT TLT

1A-113A

BARIATRIC PAT RM

1A-113

PAT RM

1A-112

PAT RM

1A-114

EXTEND EXISTING

CEILING AS REQ'D

FOR NEW WORK

EXISTING CEILING

TO REMAIN

9'-0"

9'-0"

9'-0"

EXISTING CEILING

PATCH/ PAINT/

REPAIR CEILING/

WALLS/ FLOORING

AS NEEDED TO

MATCH EXISTING

OR ADJACENT

SURFACE, TYP

A1203

A1203

EXISTING WALL, TYP

A5180

U5170

SHOWER CURTAIN

TRACK, TYP

AE420A7

AE420

C3

AE420

A1

A3

A5

C7 C1

B1

B5

C5

PAT TLT

1A-114A

TLTS2

BARIATRIC PAT TLT

1A-113A

TSPB1

BARIATRIC PAT RM

1A-113

BRBA1

PAT RM

1A-112

PAT TLT

1A-116A

CORRIDOR

C1-2WA-6

1A-114A

1A-113

PAT RM

1A-114

6 5/8" 9'-5 3/8" +/- 1'-7 1/2" 6'-10"

7' -6

2"

'-2

AE410C

D4

PAT RM

1A-116

6'-1" 4' -1

4"

3'-1"

SODA

SA

MASONRY W/ PLASTER

WALL INFILL TO MATCH

EXISTING, TYP

CLOSE EXISTING

WINDOW BLINDS

PRIOR TO

INSTALLING WALL

S6OC

MASONRY AND PLASTER WALL

INFILL. PATCH AS REQUIRED TO

MATCH ADJACENT CONDITIONS,

TYP.

7'-6" 7'-6"

CLEARANCE FROM BED

SHOWN DASHED

AE420

D1

SEE ENLARGED CEILING

PLAN - CLC LEVEL 1 AREA

A FOR CEILING PLAN THIS

AREA

WARDROBE NIC

WARDROBE NIC

1A -1

A

A1203

A5115

P9050

A5115

P3100 A5115

P9056

A5115

C04Q0/CT020

A1203

P5040

C04Q0/CT020

P3005

U0043

U0047

A5080

A5075

A5205

A5145

A1066

A5080 A1066 A5075

A5080

A1066

A5075

A5075 A1066 A5080

FAN COIL UNIT, SEE

MECHANICAL

NEW SILL ON

EXISTING PARTIAL

HEIGHT WALL

NEW SILL ON

EXISTING PARTIAL

HEIGHT WALL

REINSTALL SALVAGED

ROOM SIGNAGE AND

SHADOW BOXES WHERE

OCCURS. COORDINATE

WITH COR

U0043

S6A

EXISTING WALL, TYP

B5

AE450

AE450

B9

F0265

M7040

M7009 F0350

A5180

NEW SILL ON

EXISTING PARTIAL

HEIGHT WALL @

PAT RM 1A-114 AND

2A-114 ONLY

NEW SILL ON

EXISTING PARTIAL

HEIGHT WALL

F0400

REWORK EXISTING/PROVIDE NEW

CRASH RAIL AND BUMPER AS

REQUIRED FOR WORK. MATCH

EXISTING PROFILES. TYPICAL AT

CORRIDORS AT AREAS OF WORK

U5170

A5077

F2000 F2000

M0505

B7

AE450

B6

AE450

M0750

FACE OF GWB

2'-1"

B7

AE450

EXISTING FCU

RUBBER BASE TO MATCH

EXISTINGAT NEW WORK

STL TUBE,

TYP. SEE STR

M0755 M0765

'-6

2'

-0

U0047

BARIATRIC PAT RM

1B-130

BRBA1

BARIATRIC PAT TLT

1B-130A

TSPB1

PAT TLT

1B-131A

TLTS2

PAT RM

1B-129

PAT TLT

1B-133A

PAT RM

1B-131

CORRIDOR

C1-3WB-7

1B -1

A

1B-130A

1B -1

X Y

AE420

A7

A1

A3

A5

AE420

B1

B5

AE420 C5

C1

C7

C3

SEE ENLARGED FLOOR PLAN - CLC

LEVEL 1 AREA A, (ROTATED 90°), FOR

TYPICAL NOTES AND EQUIPMENT

THESE ROOMS

7'-6"

SOC

AE450

F1

9' -7

/8

1'

-5

6' -1

0"

SEE ENLARGED CEILING PLAN - CLC

LEVEL 1 AREA B, FOR CEILING PLAN

THIS AREA

MASONRY AND PLASTER WALL

INFILL. PATCH AS REQUIRED TO

MATCH ADJACENT CONDITIONS,

TYP.

FACE OF

GWB

BARIATRIC PAT RM

1B-130

PAT TLT

1B-131A

BARIATRIC PAT TLT

1B-130A

PAT RM

1B-129

PAT RM

1B-131

X Y

CORRIDOR

C1-3WB-7

EXISTING

CEILING

9'-0"

9'-0"

9'-0"

A1203

A1203

U5170

A5180

PAT RM

1C-146

PAT TLT

1C-146A

TLTS2

BARIATRIC PAT TLT

1C-147A

TSPB1

BARIATRIC PAT RM

1C-147

BRBA1

PAT RM

1C-149

PAT TLT

1C-145A

PAT RM

1C-145

CORRIDOR

C1-4WB-8

1C-146A

1C-147

1C -1

A

6'-10" 1'-5" 9'-7 7/8" +/- 6 5/8"

7' -6

AE420

A1

A7

AE420

B5

B1 AE420

C5

C7C1

C3

A5

A3

6'-1"

S6A

SODA

S6OC

EXISTING WALL

SOC

7'-6" 7'-6"

REV

REV

REV

REV

REV

REV

REV

REV

REV

REV

SEE ENLARGED CEILING

PLAN - CLC LEVEL 1 AREA

C FOR CEILING PLAN THIS

AREA,

AE450

F1

SIM

SEE ENLARGED FLOOR

PLAN - CLC LEVEL 1 AREA

A, (REVERSE), FOR

TYPICAL NOTES AND

EQUIPMENT THESE

ROOMS

MASONRY AND PLASTER

WALL INFILL. PATCH AS

REQUIRED TO MATCH

ADJACENT CONDITIONS, TYP.

1'-1"

FACE OF GWB

PAT RM

1C-146

PAT TLT

1C-146A

BARIATRIC PAT TLT

1C-147A

BARIATRIC PAT RM

1C-147

PAT RM

1C-149

EXISTING

CEILING

EXISTING

CEILING

9'-0"

9'-0"

9'-0"

A5180

EXISTING WALL, TYP

A1203

A1203

U5170

EXISTING

CEILING

PAT TLTBARIATRIC PAT TLT

1' -4

1' -4

1' -6

1'

-3

1' -3

1'

-9

TYPICAL DIMENSIONS FROM

WALLS TO FIXTURES. SEE ALSO

SHEET GI003

1' -6

S

LO

P E

1/ 8"

/1 2"

FLOOR DRAIN, TYP.

1' -1

1/

2"

EQ EQ

1' -1

1/

2" E

Q E

Q E

Q

S

LO

/1 2"

S

LO

/1 2"

S

LO

/1 2"

S

LO

/1 2"

S

LO

/1 2"

2'-0"

EQ EQ

3' -0

1. SEE INTERIORS DRAWINGS FOR FINISH FLOOR PLANS

2. GRAB BARS, SINKS, TOILET, AND PATIENT LIFT LOCATED IN BARIATRIC PATIENT

ROOMS AND TOILETS ARE TO BE ABLE TO SUPPORT 1000 POUNDS MINIMUM.

GENERAL NOTES ARCHITECTURAL

CC = GENERAL CONTRACTOR FURNISHED AND GENERAL CONTRACTOR INSTALLED

(EQUIPMENT IS PURCHASED AND INSTALLED BY THE GENERAL CONTRACTOR)

VV = GOVERNMENT FURNISHED AND GOVERNMENT INSTALLED (EQUIPMENT IS

PROVIDED AND INSTALLED BY THE GOVERNMENT / EQUIPMENT VENDOR OR AGENT /

IOT CONTRACTOR)

GENERAL CONTRACTOR NOT RESPONSIBLE FOR PROCUREMENT AND INSTALLATION

OF ACQUISITION CODE VV EQUIPMENT. GENERAL CONTRACTOR AND GOVERNMENT /

EQUIPMENT VENDOR OR AGENT / IOT CONTRACTOR TO COORDINATE SCHEDULES FOR

INSTALLATION OF EQUIPMENT.

ACQUISITION CODE - CC

ACQUISITION CODE - VV

ACQUISITION CODE LEGEND

REFLECTED CEILING LEGEND

NOTE:

1. SEE ELECTRICAL FOR LIGHTING FIXTURE TYPES.

2. SEE MECHANICAL FOR AIR DEVICES.

3. COORDINATE SPRINKLER HEAD LOCATIONS WITH CEILING ITEMS SHOWN.

RECTANGULAR LUMINAIRE

ROUND LUMINAIRE

MECH SUPPLY AIR DIFFUSER

MECH RETURN AIR DIFFUSER

ACCOUSTICAL CEILING PANEL OR TILE SYSTEM

GYPSUM BOARD CEILING SYSTEM

NTRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

672-23-104

LAD NO.

KEY PLAN NTS

Office of Construction and Facilities Management

BED

CLC

SICU

LAUNDRY

PARKING

GENERATORS

IWC

TWR

OPA

BLDG-1

ADMIN

CD (100%CD) FINAL BID DOCUMENTS – 03/14/2025

ARCHITECT/ENGINEER OF RECORD

A/E:

JUPITER

561-743-0165

ORLANDO

407-845-6630

WWW.RGDENGINEERS.COM

CERT OF AUTH 5454

121 S. ORANGE AVENUE, UNIT 1230N, ORLANDO, FL 32801

RGD PROJECT

#23-1050

8600 Indian Hills Dr Omaha, NE 68114 Tel 402.391.8111 Fax 402.391.8564

/1

/2

:2

:2

P

M

10 Calle Casia San Juan Puerto Rico 00921

ENLARGED FLOOR PLANS - CLC

LEVEL 1

AE410C

Construct VA Bariatric Bathrooms at Community Center and South Bed Tower

003-10296-000

03/14/2025 RAD WMB

A u to d e s k D o c s /V

A C o n s tr u c t B a ri a tr ic B a th ro o m s a t C

L C

S

B T

R

V

A S

J B

A R

-A rc h it e c tu re .r v t

100% CD - FINAL BID

DOCUMENTS

SCALE: 1/4" = 1'-0"

F3

ENLARGED CEILING PLAN - CLC LEVEL 1 AREA A

SCALE: 1/4" = 1'-0"

F1

ENLARGED FLOOR PLAN - CLC LEVEL 1 AREA A

FURNITURE & EQUIPMENT SCHEDULE TYP CLC BRBA1

JSN JSN_Name ACQUISITION CODE

A1015 TELEPHONE, DESK, MULTIPLE LINE CC

A1066 MIRROR, FLOAT GLASS, WITH SS FRAME CC

A1203 LIFT SYSTEM, OVERHEAD, BARIATRIC CC

A5075 DISPENSER, SOAP, DISPOSABLE CC

A5077 SOAP DISPENSER, SURFACE MOUNTED CC

A5080 PAPER TOWEL DISPENSER, SURFACE-MOUNTED CC

A5180 TRACK, CUBICLE, SURFACE MOUNTED, WITH CURTAIN VV

CT020/C04Q0 SOLID SURFACE COUNTERTOP WITH CABINET CC

F0265 CHAIR, RECLINER VV

F0350 STOOL, STEP, RETRACTABLE CASTER VV

F0400 CABINET, BEDSIDE, DOOR, DRAWER VV

M0505 TELEVISION, COLOR, BEDSIDE VV

M0750 FLOWMETER, AIR, CONNECT W/ 50 PSI SUPPLY VV

M0755 FLOWMETER, OXYGEN, LOW FLOW VV

M0765 REGULATOR, VACUUM VV

M7009 BED, PATIENT, ELECTRIC, SPECIAL CARE, BARIATRIC VV

M7040 TABLE, OVERBED CC

FURNITURE & EQUIPMENT SCHEDULE TYP CLC TSPB1

JSN JSN_Name ACQUISITION CODE

A1066 MIRROR, FLOAT GLASS, WITH SS FRAME CC

A1203 LIFT SYSTEM, OVERHEAD, BARIATRIC CC

A5075 DISPENSER, SOAP, DISPOSABLE CC

A5080 PAPER TOWEL DISPENSER, SURFACE-MOUNTED CC

A5115 GRAB BAR, FLIP-UP HEAVY DUTY CC

A5145 HOOK, GARMENT, DOUBLE, SS, SURFACE MOUNTED CC

A5205 BAR, TOWEL, 1" DIAMETER, SS, SURFACE MOUNTED CC

F2000 WASTEBASKET, ROUND, FIRE RESISTANT VV

P3005 LAVATORY, VITREOUS CHINA, BARIATRIC CC

P5040 SHOWER, SINGLE, HAND-HELD CC

P9056 TOILET, FLOOR MOUNTED, BARIATRIC CC

U0043 GRAB BAR, 36" CC

U0047 GRAB BAR, 24", VERTICAL CC

U5170 PATIENT LIFT SHOWER CURTAIN VV

2'

SCALE : 1/4" = 1'-0"

0 4' 8'

SCALE: 1/4" = 1'-0"

C1

ENLARGED FLOOR PLAN - CLC LEVEL 1 AREA B

SCALE: 1/4" = 1'-0"

C5

ENLARGED CEILING PLAN - CLC LEVEL 1 AREA B

SCALE: 1/4" = 1'-0"

F5

ENLARGED FLOOR PLAN - CLC LEVEL 1 AREA C

SCALE: 1/4" = 1'-0"

F7

ENLARGED CEILING PLAN - CLC LEVEL 1 AREA C

SCALE: 1/4" = 1'-0"

D4

ENLARGED TOILET PLAN CLC - FIXTURE LOCATIONS

FURNITURE & EQUIPMENT SCHEDULE CLC TLTS2

JSN JSN_Name ACQUISITION CODE

A1066 MIRROR, FLOAT GLASS, WITH SS FRAME CC

A5075 DISPENSER, SOAP, DISPOSABLE CC

A5080 PAPER TOWEL DISPENSER, SURFACE-MOUNTED CC

A5115 GRAB BAR, FLIP-UP HEAVY DUTY CC

F2000 WASTEBASKET, ROUND, FIRE RESISTANT VV

P3100 LAVATORY, VITREOUS CHINA, SLAB TYPE CC

P9050 TOILET, WALL HUNG, SIPHON JET CC

PAT RM

2A-114

BARIATRIC PAT TLT

2A-113A

TSPB1

PAT TLT

2A-114A

TLTS2

PAT RM

2A-112

PAT RM

2A-116

PAT TLT

2A-116A

CORRIDOR

C2-2WA-1

2A-114A

2A -1

A

2A-113

AE420B1

B5

AE420 C1

C3

C7

C5

AE420A7

A1

A3

A5

BARIATRIC PAT RM

2A-113

BRBA1

SO

SEE ENLARGED FLOOR PLAN -

CLC LEVEL 1 AREA A, SHEET

AE410C, FOR TYPICAL NOTES

AND EQUIPMENT FOR CLC

LEVEL 2 AREA A

AE420

D1

AE450

B9

MASONRY AND PLASTER WALL

INFILL. PATCH AS REQUIRED TO

MATCH ADJACENT CONDITIONS,

TYP.

7' -6

2"

1'-5" 6'-10"

FACE OF GWB

B7

AE450

SEE ENLARGED CEILING PLAN - CLC

LEVEL 2 AREA A, FOR CEILING PLAN

THIS AREA

PAT RM

2A-114

BARIATRIC PAT TLT

2A-113A

PAT TLT

2A-114A

PAT RM

2A-112

BARIATRIC PAT RM

2A-113

9'-0"

9'-0"

9'-0"

A1203

A5180

A1203

U5170

EXTEND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .