S02 - Attach 6 Experience Information Sheet.docx
DOCX document 22 KB Posted
- Attached to
- Replace Electrical Panel Board in OR Federal contract opportunity
- Solicitation number
- 36C248
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 - Attach 10 Set of Drawings 3 of 4.pdf | ||
| S02 - Attach 9 Set of Drawings 2 of 4.pdf | ||
| S02 - Attach 8 Set of Drawings 1 of 4.pdf | ||
| S02 - Attach 7 Price Matrix.xlsx | XLSX spreadsheet | |
| Attachment 4 - EMR.docx | DOCX document | |
| S02 - Attach 13 Narrative Set 2 of 3.pdf | ||
| Attachment 1 - Site Plan.pdf | ||
| S02 - SOLICITATION 36C24823R0003_10_11_22.pdf | ||
| S02 - Attach 14 Narrative Set 3 of 3.pdf | ||
| S02 - Attach 5 Past Performance Form.pdf | ||
| S02 - Attach 3 Limitations of Subcontracting .pdf | ||
| S02 - Attach 2 _ Wage Dtermination FL20220125 _9_29_22.pdf | ||
| S02 - Attach 15 Floor Plan.pdf | ||
| S02 - Attach 12 Narrative Set 1 of 3.pdf | ||
| S02 - Attach 11 Set of Drawings 4 of 4.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXPERIENCE INFORMATION SHEET
36C24822R0003 Attachment 6
EXPERIENCE INFORMATION SHEET
PROJECT NO. [ ] Page 1 Must have a total of THREE (3) projects, more than 3 will not be evaluated; less than 3 may result in a lower rating.
a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)
b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)
c. Project Title/Name and Location
d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)
e. Percent (%) of project work performed by your company
f. if you work as subcontractor, who was the prime?
(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)
g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).
EXPERIENCE INFORMATION SHEET
PROJECT NO. [ ] Page 2
h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project: Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary
EXPERIENCE INFORMATION SHEET
PROJECT NO. [ ] Page 3
i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution
j. Describe unforeseen conditions and how each were resolved
k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date:
original completion date, if not completed, projected completion date (mm/dd/yyyy)
l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?
Actual Completion Date:
If not completed, Why?
m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.
n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.
Original Contract Price: Final Contract Price:
Explain Differences:
File details come from the government source that posted it. Updated .