S02_AE_01-VHA_Required_Div_01_Spec_Sections.pdf
PDF 80 KB Posted
- Attached to
- C1DZ--631-23-002 Upgrade Lab and Radiology A/E
- Solicitation number
- 36C24124R0001
About this file
This document contains a master specifications table of contents for the Department of Veterans Affairs VHA. It lists 14 division 01 sections covering general requirements for architectural and engineering CPM schedules, project schedules, shop drawings, safety requirements, quality control, testing laboratory services, special inspections, temporary construction noise and vibration control, temporary environmental controls, temporary interior signage, construction waste management, and sustainable and general commissioning requirements.
The related federal contract opportunity is a solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 to provide upgrade lab and radiology A/E services. Solicitation number 36C24124R0001 has an opportunity type of Special Notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24124R0001 0007.docx | DOCX document | |
| 36C24124R0001 0006.docx | DOCX document | |
| 36C24124R0001 0005.docx | DOCX document | |
| 36C24124R0001 0004.docx | DOCX document | |
| 36C24124R0001 0003.docx | DOCX document | |
| 36C24124R0001 0002.docx | DOCX document | |
| 36C24124R0001 0001.pdf | ||
| S02_Conceptual Design Schematic.pdf | ||
| S02_AE_05-PG_18-15_AE_Submission-Reqts_Vol_C.pdf | ||
| S02_AE_07-VHA_Directive_1061_legionella.pdf | ||
| S02_PPQ_631-23-002 Upgrade Lab and Radiology.docx | DOCX document | |
| S02_SOW AE - Upgrade Lab and Radiology - Rev 2.pdf | ||
| 36C24124R0001.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07-01-23
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 01 32 16.01 Architectural and Engineering CPM Schedules 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01 33 23 Shop Drawings, Product Data, and Samples 01 35 26 Safety Requirements 01 42 19 Reference Standards 01 45 00 Quality Control 01 45 29 Testing Laboratory Services 01 45 35 Special Inspections 01 57 15 Temporary Construction Noise and Vibration Control 01 57 19 Temporary Environmental Controls 01 58 16 Temporary Interior Signage 01 74 19 Construction Waste Management 01 81 13 Sustainable Construction Requirements 01 91 00 General Commissioning Requirements
File details come from the government source that posted it. Updated .