S02- 561-19-160_Prosthetics Lab_ Final Bid Drawings NEW_Part2.pdf

PDF 1 MB Posted

Attached to
Y1DA--Upgrade prosthetics (VA-22-00010940)
Solicitation number
36C24222B0005
Issued by

About this file

This solicitation is for construction services to upgrade the prosthetics lab at the VA East Orange Medical Center in New Jersey. The scope of work includes demolishing existing interior walls, finishes, ceilings and mechanical, plumbing and electrical components; abating hazardous materials; and constructing new interior walls, doors, ceilings, finishes, and mechanical, plumbing and electrical systems. Specific tasks involve demolishing and replacing flooring in Stairwell A-S7, removing and installing doors, and creating new openings. The performance period is 180 calendar days from notice to proceed. The solicitation also includes an alternate to delete a pass window and fire rated coiling counter door between two rooms. The total project area is approximately 4,695 square feet on the A level of Building 1.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CENTER LINE

DETAIL INDICATOR

DETAIL INDICATOR FOR SMALL CONDITIONS

DIMENSION LINE

NEW DOOR HARDWARE AND OPENING / BORROWED LIGHT

IDENTIFIER

- SEE DOOR SCHEDULE, DETAILS, SPECIFICATIONS AND

ELEVATIONS SHEET

DRAWING BLOCK TITLE, TYPICAL

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR, INTERIOR

BUILDING SECTION INDICATOR

TYPICAL DETAIL INDICATOR

EXISTING ROOM NAME AND NUMBER

COLUMN GRID

ARCHITECTURAL KEYNOTE TAG

WALL OR PARTITION TYPE

FIRE EXTINGUISHER CABINET

CORNER GUARD

NORTH ARROW

CG

FEC

A

CORRIDOR

C2

DETAIL NUMBER

SHEET WHERE

DRAWN

XX-XX

XX-XX

X

DRAWING TITLE

SCALE: 1 1/2" = 1'-0"

1"

D2

XX-XX

XX-XX

CL

XX-XX

x'-x" SPOT ELEVATION

? REVISION

REVISION CLOUD

BREAK LINE

NEW ROOM NAME AND NUMBER

CORRIDOR

C2

X

EXISTING DOOR OPENING

X

N P N

H W

-X X

XX-XX

XX-XX

ELEVATION INDICATOR, INTERIOR CORRIDOR

EXTERIOR

REFLECTED CEILING KEYNOTE TAGX

& AND

@ AT

C CENTERLINE

# NUMBER

AB ANCHOR BOLT

ABV ABOVE

ACT ACOUSTIC CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH

DISABILITIES ACT

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALUM ALUMINUM

ALT ALTERNATE

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AT ACOUSTIC TILE

AUTO AUTOMATIC

AVG AVERAGE

BD BOARD

BLDG BUILDING

BLK BLOCK

BM BEAM

BMPR BUMPER

BOT BOTTOM

BRG BEARING

BEL BELOW

BR BUMPER RAIL

BRK BRICK

C CONCRETE

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CCT CUBICLE CURTAIN TRACK

CG CORNER GUARD

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CT CERAMIC TILE

CLG CEILING

CL CLOSET

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONT CONTINUOUS

CPT CARPET

CU CUBIC

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DISP DISPENSER

DN DOWN

DO DOOR OPENING

DOZ DOZEN

DP DAMPPROOFING

DR DOOR

DWG DRAWING

DWGS DRAWINGS

DWR DRAWER

E EAST

EA EXHAUST AIR, EACH

EL ELEVATION

ELEV ELEVATION

ELEC ELECTRICAL

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EP ELECTRICAL PANELBOARD

EPY EPOXY

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXP EXPANSION

EJ EXPANSION JOINT

EXIST EXISTING

EXT EXTERIOR

FA FIRE ALARM

FB FACE BRICK

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF FINISH FACE

FHC FIRE HOSE CABINET

FIN FINISH

FLR FLOOR

FLUOR FLUORESCENT

FO __ FACE OF __

FOC FACE OF CONCRETE

FOS FACE OF STUD

FOW FACE OF WALL

FPRF FIREPROOF(ING)

FR FIRE RATING, FRAME

FRMG FRAMING

FS FULL SIZE

FT FOOT OR FEET

FTG FOOTING

FUR FURRING

FUT FUTURE

GC GENERAL CONTRACTOR

GA GAUGE

GAL GALLON

GALV GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GL GLASS

GND GROUND

GR GRADE

GWB GYPSUM WALLBOARD

GYP BD GYPSUM WALLBOARD

HB HOSE BIBB

HC HOLLOW CORE

HD HEAD

HDPL HIGH DENSITY PLASTIC LAMINATE

HDWR HARDWARE

HDWD HARDWOOD

HT HEIGHT

HDRL HANDRAIL

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMF HOLLOW METAL FRAME

HR HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HP HIGH POINT

HR HOUR

HVAC HEATING, VENTILATION, AIR

CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER / DIMENSION

IN INCH

INCL INDLUDE(D)

INSUL INSULATION

INT INTERIOR

INV INVERT

JAN JANITOR

JST JOIST

JT JOINT

KP KICK PLATE

KO KNOCKOUT

L LENGTH

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LBS POUND

LED LIGHT EMITTING DIODE

LF LINEAR FEET

LH LEFT HAND

LIN LINEAR

LIQ LIQUID

LKR LOCKER

LG LONG

LL LEAD LINED

LLV LONG LEG VERTICAL

LP LOW POINT

LRG LARGE

LT LIGHT

LT WT LIGHTWEIGHT

LVR LOUVER

LVT LUXORY VINYL TILE

MAT WALK-OFF CARPET

MATL MATERIAL

MAS MASONRY

MAX MAXIMUM

MECH MECHANICAL

MTL METAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MP MOP PLATE

MTD MOUNTED

N NORTH

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER / DIMENSION

OFF OFFICE

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OH OVERHEAD

OZ OUNCE

P PAINT

PAV PAVING

PC PRECAST CONCRETE

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PLBG PLUMBING

PMF PREMOLDED FILLER

PR PAIR

PT POINT

PT PORCELAIN TILE

PTN PARTITION

QT QUARRY TILE

R RADIUS, RISER

RA RETURN AIR

RAD RADIUS

RB RESILIENT BASE, RUBBER

BASE

RD ROOF DRAIN

RL ROOF LEADER

REF REFERENCE

REFR REFRIGERATOR

REQ'D REQUIRED

REV REVISION

RFI REQUEST FOR

INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

RT RUBBER TILE

S SOUTH

S SOLID SURFACE

SA SUPPLY AIR

SAN SANITARY

SC SOLID CORE

SCHED SCHEDULE

SECT SECTION

SH SPRINKLER HEAD

SHT SHEET

SIM SIMILAR

SM SMOKE

SPEC SPECIFICATION

SPKR SPEAKER

SQ SQUARE

STA STATION

STD STANDARD

STO STORAGE

STL STEEL

SS STAINLESS STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TEL TELEPHONE

TEMP TEMPERED

T&G TONGUE AND GROOVE

THK THICK

TOC TOP OF CONCRETE

TOP TOP OF PAVEMENT

TOS TOP OF STEEL

TOW TOP OF WALL

TRAN TRANSITION

TV TELEVISION

TYP TYPICAL

UNFIN UNFINISHED

UON UNLESS OTHERWISE

NOTED

VB BAPOR BARRIER

VERT VERTICAL

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VTR VET THRU ROOF

W WEST

W/ WITH

WD WOOD

W/O WITHOUT

WP WATERPROOF

WP WALL PROTECTION

WRS WINDOW ROLLER SHADE

WT WEIGHT

WWF WELDED WIRE FRAME

NOTE:

ALL ABBREVIATIONS SHOWN MAY NOT BE USED ON

THIS PROJECT. CERTAIN COMMON ABBREVIATIONS

MAY NOT BE SHOWN.

WOOD

WOOD FINISH

ALUMINUM

STEEL

EARTH

GYPSUM - PLASTER

MASONRY - CONCRETE BLOCK

RIGID INSULATION

BATT INSULATION

PLYWOOD

CONCRETE

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE REMOVED

1. SPACES AROUND THE PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF ALTERATIONS WILL BE VACATED. ALL CONTRACTOR WORK WILL BE PERFORMED DURING NORMAL DAYTIME WORKING HOURS UNLESS INDICATED. ALL TEMPORARY SYSTEM SHUTDOWNS WILL OCCUR DURING 2ND SHIFT OR WEEKENDS AND COORDINATED AND APPROVED BY THE PROJECT COR.

2. BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE AIR PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND PATIENTS.

3. DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION.

4. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT.

5. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING CAPACITY OR LOAD-DEFLECTION

RATIO.

6. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO

RECEIVE NEW FINISHES DESIGNATED.

7. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK.

8. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED

TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN.

9. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENING SHALL BE PATCHED

TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN.

10. IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHED TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS OTHERWISE NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE.

11. WHERE CODED NOTE DESIGNATIONS ARE SHOWN AS "TYP" OR "TYPICAL" IT IS INTENDED THAT THE NOTE GENERALLY REFERS TO ALL SIMILAR

ITEMS OR SURFACES.

12. A HAZARDOUS MATERIALS SURVEY WAS NOT CONDUCTED BY THE ARCHITECT OF RECORD. A HAZARDOUS MATERIALS SURVEY WAS SUPPLIED BY THE VA. THE RESULTS OF THE SAMPLES TAKEN ARE INCLUDED WITHIN THE CONSTRUCTION DOCUMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE PROTECTIVE MEASURES FOR ITS WORKERS PRIOR TO THE BEGINNING OF ANY RENOVATION OR DEMOLITION WORK.

13. AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR AND ARCHITECT FOR REVIEW OF EXISTING CONDITIONS.

14. PATCH AND FIRE STOP EXISTING ABANDONED PENETRATIONS THROUGH THE CONCRETE FLOORS AND WALLS.

1. ALL DIMENSIONS OF NEW PARTITIONS/BARRIERS SHALL BE TAKEN TO FACE OF STUD. DIMENSIONS TO EXISTING WORK SHALL BE

TAKEN TO FACE OF FINISH SURFACE.

2. DO NOT SCALE DRAWINGS. DRAWINGS ARE CONCEPTUAL PLANS.

3. THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR COMPLETING

THE PROJECT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.

4. THE CONTRACTOR SHALL PROCURE, COMPLETE AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT.

5. THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS AND MUST VISIT THE SITE AND BE ACQUAINTED WITH

THE CONDITIONS AFFECTING THE WORK.

6. WORKMANSHIP. ALL WORK TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN USING ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR

SHALL CLEAN THE WORK AREA THOROUGHLY.

8. ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER UNLESS OTHERWISE

NOTED IN THE SPECIFICATIONS.

9. ALL PLUMBING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL PLUMBING CODE. INSTALL ALL WATER, WASTE AND VENT PIPING IN ACCORDANCE WITH ALL APPLICABLE CODES. REVIEW DRAWINGS AND PROVIDE ALL WORK FOR A COMPLETE AND OPERABLE SYSTEM, INCLUDING ALL INCIDENTALS, REQUIRED BY CODE AGENCIES AND LOCAL GOVERNING

BODIES.

10. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS, COORDINATE ALL DIMENSIONS IN

FIELD AND VERIFY ALL LOCATIONS OF UTILITIES IN THE FIELD.

11. ALL HEATING, VENTILATING AND AIR CONDITIONING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL

MECHANICAL CODE.

12. THE COMPLETE MECHANICAL AND HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL 2018 INTERNATIONAL MECHANICAL AND ENERGY CONSERVATION CODES, AND 2018 FACILITIES GUIDELINE INSTITUTE (AS APPLICABLE), STATE CODES, AND ANY REQUIREMENTS OF THE LOCAL AUTHORITIES HAVING

JURISDICTION.

13. THE COMPLETE ELECTRICAL SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL ELECTRICAL CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES.

SOAP & PAPER TOWEL

DISPENSER COUNTER

HAND

SANITIZER

WALL PHONE COAT HOOK ON

DOOR

NOTES:

THE DIMENSIONS SHOWN ARE FOR TYPICAL MOUNTING HEIGHTS.

SEE ELEVATIONS FOR MOUNTING HEIGHT FOR INFREQUENTLY USED ITEMS.

SEE ELEVATIONS FOR ATYPICAL MOUNTING HEIGHTS.

4"

EQ EQ

ELECTRONIC DOOR

CONTROL DEVICE

8"

DS

NC

LIGHT SWITCHES, NURSE

ASSIST, DUTY STATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELA

C

U se rs \a k a n u sk y \D o c u m e n ts

\5 -1

-1

P ro s th e ti cs

L a b V

A R

C

M

-0

-2 a k a n u s k yV

B N

S Y

.r v t

/1

/2

:3 :2

P

M

GI102

GENERAL INFORMATION, SYMBOLS & GENERAL NOTES

6/18/2021 JLH

VA NEW JERSEY HEALTH CARE SYSTEM - EAST ORANGE CAMPUS

561-19-160UPGRADE PROSTHETICS LABFINAL BID DOCUMENTS

ARCHITECTURAL SYMBOLS ARCHITECTURAL ABREVIATIONS MATERIAL LEGEND GENERAL NOTES - GENERAL CONDITIONS

GENERAL NOTES - CONSTRUCTION NOTES

STANDARD MOUNTING HEIGHTS

Revisions: Date: Page 2 of 43

515 SF

LABORATORY

289 SF

MECHANICAL ROOM

677 SF

OPEN OFFICE 115 SF

OFFICE

111 SF

OFFICE

158 SF

OFFICE

64 SF

TOILET

41 SF

STORAGE

E

57 SF

ELEC.

E90

E90

E90

E90

E90

E90

E90

E90 E90

E90 E90

E90

E90

E90

E90

E60

E60

E

E90

60 60

EXIT A

STAIR A

EXIT B

STAIR

.3"/OCC

CODE MIN:

PROVIDED:

(E)

(52)

32"

46"

16"

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

44"

72"

12"

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

(E)

32"

72"

12"

C R

S T

A

IR

A

6'

C

R E

X

IT

B

2'

LA

B

E X

IT

A

5'

EXIT B = 87'

PLAN NOTES:

1. SEE ELECTRICAL PLANS FOR EMERGENCY LIGHTS, SMOKE

DETECTORS, EXIT SIGNS, ETC...

1088 SF

STORAGE

175 SF

EXAM

90 SF

SHOE FITTING

259 SF

EXAM

127 SF

RECEPTION

157 SF

W/C REPAIR

WALL

MOUNTED

FE

NOT FOR WHEELCHAIR

ACCESS/ EXIT

A E

E

E

GENERAL NOTES

A. PARTITIONS SHALL BE TYPE A1 UNLESS NOTED OTHERWISE.

B. REFER TO SPECIFICATIONS AND PARTITION TYPE SCHEDULE FOR ADDITIONAL NOTES.

C. NEW PARTITIONS ARE DIMENSIONED TO FACE OF METAL STUD OR MASONRY UNLESS NOTED OTHERWISE.

D. EXISTING PARTITIONS ARE DIMENSIONED TO FINISH FACE UNLESS NOTED OTHERWISE.

E. REFER TO ELECTRICAL DRAWINGS FOR EXIT LIGHT LOCATIONS.

FIRE RATING LEGEND

SYMBOL

(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING

60 MIN.ONE HOUR

EXISTING

SMOKE BARRIER

EXISTING

NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE

STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE

REFERENCES.

FIRE EXTINGUISHER IN RECESSED CABINET UNLESS OTHERWISE NOTED

60 60 60

E60 E60 E60

E90 E90 E90

HAZARDOUS AREA

EXIT SIGNAGE W/ DIRECTIONAL ARROWS- REFER TO ELECTRICAL PLANS

FOR MORE INFORMATION

LIFE SAFETY ANALYSIS

PROJECT OVERVIEW:

RENOVATE _______

APPLICABLE CODES:

• NFPA 13-2019 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

• NFPA 14-2019 STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOUSE SYSTEMS

• NFPA 24-2019 STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES

• NFPA 72-2019 NATIONAL FIRE ALARM CODE

• NFPA 90A-2018 STANDARD FOR HEALTH CARE FACILITIES

• NFPA 99-2018 STANDARD FOR HEALTH CARE FACILITIES

• NFPA 101-2021 LIFE SAFETY CODE

• NFPA 220-2018 STANDARD ON TYPES OF BUILDING CONSTRUCTION

• NFPA 291-2019 RECOMMENDED PRACTICE FOR FIRE FLOW TESTING AND MARKING OF HYDRANTS

• NFPA 1963-2009 STANDARD FOR FIRE HOSE CONNECTIONS

• VA DESIGN GUIDE AND TECHNICAL GUIDE

• VA FIRE PROTECTION DESIGN MANUAL - DECEMBER 2015

• UNIFORM FEDERAL ACCESSIBILITY STANDARDS WITH VA BARRIER FREE DESIGN GUIDE (PG 18-13)

BUILDING USE CLASSIFICATION:

HEALTH CARE

EXISTING HEALTH CARE OCCUPANCY (NFPA 101 - CHAPTER 18)

BUILDING CONSTRUCTION:

BUILDING STRUCTURE: STEEL COLUMNS/BEAMS, ENCASED IN CONCRETE, CONCRETE SLABS

NUMBER OF STORIES _____

CONSTRUCTION TYPE: TYPE II (222) NFPA-101

SPRINKLER: FULLY SPRINKLERED IN ACCORDANCE WITH NFPA13- INSTALLATION OF SPRINKLER SYSTEMS

FIRE EXTINGUISHERS: PROVIDE IN ACCORDANCE WITH NFPA-10-PORTABLE FIRE EXTINGUISHERS WITH

TRAVEL DISTANCE OF 75 FT.

MAX. ALLOWABLE NUMBER OF STORIES (ABOVE GRADE):

EXISTING

MAX. ALLOWABLE AREAS:

LIFE SAFETY CODE: UNLIMITED

BUILDING COMPONENTS NFPA 220 2012

NFPA 101 2018

PROJECT SQUARE FOOTAGE

AREA A (PATIENT AREA) 2,422 SF

AREA B (ADMINISTRATION AREA) 2,273 SF

RATED CONSTRUCTION FIRE RATING (IN HOURS)

EXTERIOR WALLS -

LOAD BEARING 2

NON-LOAD BEARING 0

INTERIOR BEARING WALLS 2

RATED CONSTRUCTION FIRE RATING (IN HOURS)

EXIT, EXIT HALLWAY STAIRWAY ENCLOSURE 2 (4 OR MORE STORIES)

MECHANICAL SHAFTS, ELEVATOR HOIST WAYS 2 (4 OR MORE)

EXIT ACCESS CORRIDORS 0 (SMOKE TIGHT)

HORIZONTAL EXITS NA

MIN. # OF EXITS/FLOOR (<500 OCC. LOAD) 2

(> 500-1000) 3

SMOKE BARRIERS 1

COLUMNS 2

COLUMNS (ROOF ONLY) 1

BEAMS 1

BEAMS (ROOF ONLY) 1

FLOOR CONSTRUCTION (INCLUDING BEAMS) 2

ROOF CONSTRUCTION -

SOILED LINEN ROOMS 1 HR

STORAGE ROOMS MORE THAN 100 SF 1 HR

TRAVEL DISTANCE (FT)

• FROM ANY POINT TO EXIT (WITH AUTO FIRE SUPP. SYS.) 200 FEET

• MAX. DEAD END LENGTH REQUIRED (SPRINKLERED BLDG) 30 FEET (18.2.5.2)

• COMMON PATH OF TRAVEL 100 FEET (18.2.5.3)

REQUIRED EGRESS WIDTH:

DOORWAYS 34" MIN.

STAIR DOORS 36" WIDE

STAIRS 44"

CORRIDOR WIDTH 44"

OPENING PROTECTIVES IN RATED CONSTRUCTION

DOORS IN OTHER 1 HR RATED CONSTRUCTION 3/4 HR, "C" LABEL

DOORS IN 2 HR RATED CONST. (SELF CLOSING) 1 1/2 HR, "B" LABEL

DOORS IN SMOKE BARRIER PARTITIONS (SELF CLOSING) 3/4 HR

SMOKE COMPARTMENT

• MINIMUM OF TWO PER FLOOR 18.3.7.1 (2)

• MAXIMUM OF 40,000 SF PER SMOKE COMPARTMENT 18.3.7.1 (4)

• TRAVEL DISTANCE FROM ANY POINT TO REACH A DOOR: 200 FEET 18.3.7.1 (5)

TRAVEL DISTANCE LIMITS

OCCUPANCY DISTANCE

COMMON PATH OF TRAVEL (2018 NFPA 39.2.5.3) 100'

DEAD END (2018 NFPA 39.2.5.2) 20'

TRAVEL DISTANCE LIMIT (2018 NFPA 39.2.6.3) 300'

* TRAVEL DISTANCES ARE FOR SPRINKLERED BUILDINGS

B

B

B

EXIT CAPACITIES LEGEND

DOORS

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

32"

WIDTH PER OCCUPANT (NFPA T 7.3.3.1)

OCCUPANTS (AREA/OCC. LOAD FACTOR)

MIN WIDTH (0.2" X OCC.)

CODE MIN (18 IBC 1010.1.1)

CLEARANCE PROVIDED

CLEARANCE SHOWN W/ DOOR OPEN 90° BETWEEN STOP & OPEN DOOR FACE

CORRIDORS

WIDTH PER OCCUPANT (NFPA T 7.3.3.1)

OCCUPANTS (AREA/OCC. LOAD FACTOR)

MIN WIDTH (0.2" X OCC.)

CODE MIN (2018 NFPA 39.2.3.2)

CLEARANCE PROVIDED

CLEARANCE SHOWN BETWEEN FACE OF WALLS

STAIRS

WIDTH PER OCCUPANT (NFPA T 7.3.3.1)

OCCUPANTS (AREA/OCC. LOAD FACTOR)

MIN WIDTH (0.3" X OCC.)

CODE MIN (18 IBC 1010.1.1)

CLEARANCE PROVIDED

* 2018 NFPA TABLE 7.2.2.2.1.1(b) EXISTING STAIRS

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

44"

STAIR

.3"/OCC

CODE MIN:

PROVIDED:

36" *

(2018 NFPA 101, TABLE 7.3.1.2 OCCUPANT LOAD FACTOR)

OCCUPANT LOAD FACTORS

SPACE FUNCTION SF/OCC

ASSEMBLY 15 NET

BUSINESS 150 GROSS

EXERCISE 50 GROSS

STORAGE 500 GROSS

ADMIN SUPPORT

SUITE

1,885 SF

CLINIC SUITE

2,454 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELA

C

U se rs \a k a n u sk y \D o c u m e n ts

\5 -1

-1

P ro s th e ti cs

L a b V

A R

C

M

-0

-2 a k a n u s k yV

B N

S Y

.r v t

/1

/2

:3 :2

P

M

GI201

LIFE SAFETY PLAN

6/18/2021 JLH

VA NEW JERSEY HEALTH CARE SYSTEM - EAST ORANGE CAMPUS

561-19-160UPGRADE PROSTHETICS LABFINAL BID DOCUMENTS

1/16" = 1'-0"1

LEVEL A - LIFE SAFETY PLAN SQUARE FOOTAGE PLAN

Revisions: Date: Page 3 of 43

UP

GENERAL AREA OF

WORK

N

PROJECT

NORTH

A

B

C

P Q R S

RECEPTION

A-103K

CONTRACTOR ENTRANCE: EXISTING LOCK TO

RECEIVE NEW CORE DURING DEMOLITION &

CONSTRUCTION. SHOP & UTILITY

OPERATORS TO RECEIVE KEYS AS REQUIRED

ICRA

ANTEROOM

T1

T1

CONSTRUCTION

STICKY WALK-OFF MAT

1 11

S G

1 11

S G

H W

-0

H W

-0

OFFICE

TELEPHONE

SWITCH

A-101A

ORTHOTIC LAB

A-103D

ORTHOTIC LAB

A-103E

ORTHOTIC

STORAGE

A-103F

RECEPTION

A-103C

TOILET

A-103B

MAIN

WASTE

A-103G

MECH. RM.

A-103J

PROSTHETIC

FITTING ROOM

A-103 ELECTRIC

A-E-102

ELEC.

CLOSET

A-E-102D

STAIR

A-S7

TELEPHONE OPERATOR

SUITE

A-102C

TOILET

A-102D

CHIEF

PROSTHETICS

PROS.

A-102E

ASST.

CHIEF

A-102B

ORTHOTIC

FITTING ROOM

A-103A

CORRIDOR

A-114

PROS.

SVC

A-102E

PROS.

SVC

A-102F

PROS.

SVC

A-102G

PSAS SERVICE

A-102

MECH.

A-102H

TELEPHONE

EQUIPMENT

A-101C

VESTIBULE

A-101BMEN'S TOILET

A-103B

CLOSET

TELEPHONE OPERATOR

SUITE

A-102D

PROSTHETIC &

ORTHOTIC LAB

A-103C

PROSTHETIC &

ORTHOTIC LAB

A-103C

CONSTRUCTION

STICKY WALK-OFF

MAT

EXISTING DOOR TO RECEIVE NEW

STOREROOM LOCKSET WITH

KEYPAD LOCK DURING

CONSTRUCTION. DOOR TO

RECEIVE SIGNAGE STATING 'NO

ACCESS' DURING DEMOLITION &

CONSTRUCTION. SHOP & UTILITY

OPERATORS TO RECEIVE KEYPAD

CODE AS REQUIRED

CONSTRUCTION

STICKY WALK-OFF

MAT

T2

T3

T3

SIM

SIM

SECTION

PLAN

/8

3 5/8" METAL STUDS @ 16" O.C., TYP

5/8" GYPSUM BOARD, BOTH SIDES, SEE

ROOM FINISH SCHEDULE FOR FINISHES

CONTINUOUS METAL STUD TOP TRACK. PROVIDE

DEFLECTION TRACK AT ROOF

CONTINUOUS METAL STUD BOTTOM TRACK

LINE OF EXISTING FLOOR

CONTINUOUS 3 1/2" SOUND ATTENUATION

BATTS, TYP

CONTINUOUS METAL HORIZONTAL BRIDGING

CHANNEL @ MID HEIGHT, TYP

FIRE-RATED SEALANT, BOTH SIDES

3 5/8" METAL STUDS @ 16" O.C., 25-GAGE, TYPICAL

5/8" TYPE "X" GYPSUM BOARD, BOTH SIDES

WITH STAGGERED UNFINISHED TAPED

JOINTS ON OPPOSITE SIDES OF ROOM.

PAINT WALL ON PUBLIC SIDE.

TEMPORARY CONSTRUCTION FIRE BARRIER

EXISTING UNDERSIDE OF DECK

T1

1 HOUR RATED

FIRE-RATED SEALANT, BOTH SIDES

ICRA CLASS II PROJECT

PRECAUTIONS DURING CONSTRUCTION

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION

3. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE

4. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL FOR BARRIERS

5. SEAL UNUSED DOORS WITH DUCT TAPE IN THE CONSTRUCTION AREA

6. BLOCK OFF AND SEAL AIR VENTS IN THE CONSTRUCTION AREA

7. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA

8. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM

9. REMOVE CONSTRUCTION WASTE DAILY

10. PROVIDE TEMPORARY 1 HR. FIRE BARRIER PARTITIONS AS INDICATED AND SEAL UNUSED DOORS AT PERIMETER OF THE WORK AREA WITH PAINTER'S TAPE TO SEAL AREA FROM NON-WORK AREA BEFORE

CONSTRUCTION BEGINS

11. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA FILTER EQUIPPED AIR FILTRATION UNITS. COORDINATE LOCATION OF WINDOW AND ABOVE FLOOR PENETRATIONS WITH COR.

SPACE SHALL BE CONTINUOUSLY MONITORED. BALL IN THE WALL IS NOT ACCEPTABLE. PATCH FLOOR

PENETRATION AND REPLACE WINDOW GLAZING AFTER CONSTRUCTION AS REQUIRED TO MATCH

EXISTING.

12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS OR BY COVERING IN PLASTIC AND SEALING WITH DUCT TAPE. REMOVE WASTE DAILY EITHER AFTER 5 PM AND

BEFORE 7 AM

13. USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS THROUGH

THE FACILITY

14. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED

15. CONSTRUCT AN AIRTIGHT ONE-HOUR RATED ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR WEAR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE

16. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST

BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA THROUGH THE ANTEROOM

17. WORK OUTSIDE THE PRIMARY WORK AREA (AREA OF CONTAINMENT) WILL BE PERFORMED WITHIN A FIRE-RATED PLASTIC ENCLOSURE WITH NEGATIVE AIR HEPA FILTER SYSTEM TO CONTROL DUST.

ENCLOSURE TO BE CONSTRUCTED AND REMOVED DAILY AS REQUIRED BY THE COR. CONTRACTOR TO

SANITIZE WORK AREA PRIOR TO REMOVING PLASTIC CONTAINMENT AREA

GLAZING PANEL

REMOVAL

EXISTING WALL CONSTRUCTION TO REMAIN

EXISTING GLAZING PANEL TO BE REMOVED FROM

EXISTING WINDOW SYSTEM PRIOR TO START OF

ABATEMENT. GC TO STORE GLAZING PANEL IN A

SAFE LOCATION UNTIL WORK IS COMPLETE AND

REPLACE TO IT'S EXISTING CONDITION. IF

DAMAGED, GC WILL REPLACE TO MATCH EXISTING

EXISTING ALUMINUM FRAME TO REMAIN

HEPA EXHAUST

EXISTING WALL CONSTRUCTION TO REMAIN

PROVIDE HEPA FILTRATION EXHAUST DUCTING

THROUGH NEW TEMPORARY PLYWOOD PANEL

EXISTING ALUMINUM FRAME TO REMAIN

PROVIDE 3/4" FIRE TREATED PLYWOOD PANEL

WITHIN EXISTING ALUMINUM FRAME

NOTE:

1. GENERAL CONTRACTOR TO LOCATE PER

QUANTITIES REQUIRED.

PROVIDE DUCT SEALING TAPE AROUND

PENETRATION (TYPICAL)

EXTERIORINTERIOR EXTERIOR

INTERIOR

(NEGATIVE SPACE)

ACCESS ZIPPER

LINE OF FINISHED FLOOR, SEE ROOM FINISH

SCHEDULE FOR FLOOR & BASE TYPE

CONTINUOUSLY SEAL FIRE RETARDANT POLYSTYRENE

TO EXISTING FINISHED FLOOR.

6-MIL FIRE RETARDANT POLYSTYRENE, SEE

SPECIFICATIONS. PROVIDE ZIPPER ACCESS WHERE

REQUIRED

EXISTING UNDERSIDE OF DECK

T2

FIRE RETARDANT DUST CONTROL BARRIER

CONTINUOUSLY SECURE AND SEAL EDGE OF FIRE

RETARDANT POLYSTYRENE TO UNDERSIDE OF

DECK

EXISTING FINISHED CEILING SYSTEM. REMOVE AND

REINSTALL CEILING PANELS AS REQUIRED

CONTINUOUSLY SECURE FIRE RETARDANT

POLYSTYRENE SHEET TO UNDERSIDE OF METAL

CEILING TRACK AND ABOVE METAL CEILING TRACK

SECURE AND SEAL ALL SIDES OF

EXISTING DUCTS, CONDUIT, PIPES, ETC.

6-MIL FIRE RETARDANT

POLYSTYRENE

CONTINUOUSLY SECURE EDGE OF FIRE

RETARDANT POLYSTYRENE TO

EXISTING HOLLOW METAL FRAME

EXISTING HOLLOW METAL

FRAME

EXISTING DOOR SYSTEM

BEYOND

CONTINUOUSLY SECURE/SEAL FIRE RETARDANT

POLYSTYRENE TO EXISTING WALL. TYPICAL ALL WALLS AS

REQUIRED. PATCH/REPAIR EXISTING WALLS AS REQUIRED

TO MATCH EXISTING PRIOR TO CONSTRUCTION

T3

FIRE RETARDANT DUST CONTROL

DETAIL AT DOOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELA

C

U s e rs

\a k a n u s k y \D o c u m e n ts

\5 -1

-1

P ro s th e ti c s L a b V

A R

C

M

-0

-2 a k a n u s k y V

B N

S Y

.r v t

/1

/2

:3 :5

P

M

GI301

ICRA PLAN, DETAILS & NOTES

6/18/2021 JLH

VA NEW JERSEY HEALTH CARE SYSTEM - EAST ORANGE CAMPUS

561-19-160UPGRADE PROSTHETICS LABFINAL BID DOCUMENTS

A LEVEL KEY PLAN1/8" = 1'-0"1

ICRA PLAN

ICRA CONTROL POLICY

NOTE:

CONTRACTOR TO MAINTAIN NEGATIVE AIR

PRESSURE THROUGH-OUT THE DURATION

OF DEMOLITION & NEW WORK.

1" = 1'-0"A

TYPICAL HEPA FILTRATION THROUGH WINDOW DETAIL

Revisions: Date: Page 4 of 43

File details come from the government source that posted it. Updated .