This solicitation is for project 550-22-108 to replace the roof on Building 125 at a Veterans Affairs medical center. The solicitation number is 36C25223B0008 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The project involves replacing the roof on Building 125 using an invitation for bid procurement process. The description indicates the work includes replacing the existing roof. No further details on pricing, response dates, or terms are provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S05 Request for Information RFIs 36C25223B0008 - responses.pdf | ||
| 36C25223B0008 0001.docx | DOCX document | |
| Wage Determination 12 29 2022.pdf | ||
| 36C25223B0008_1.docx | DOCX document | |
| S02 550-22-108 specifications.pdf | ||
| S02 Wage Determination 12_02_2022.pdf | ||
| S02 550-22-108 SOW - Synopsis.docx | DOCX document | |
| Pre-Construction Checklist.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT OFFICER REPRESENTATIVE DATE
CHIEF OF ENGINEERING DATE
INTERIOR DESIGNER DATE
DEPARTMENT HEAD DATE
CONTRACT SPECIALIST DATE LEAD USER SIGNATURE DATE
B125 KEY PLAN
N
UPPER
LOWER
BUILDING 102
BUILDING 101
DARK SHADE
INDICATES AREA NOT
IN SCOPE, TYP
BUILDING 125
TRAMWAY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:0
A
M
GI000
COVER SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JG DMC
550-22-108
REPLACE ROOF BUILDING 125 AE
VA ILLIANA HEALTH CARE SYSTEM
1900 E Main St, Danville, IL 61832
100% BID DOCUMENTS
100% BID DOCUMENTS
FULLY SPRINKLERED
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GC101 CONSTRUCTION LOGISTICS
GC102 BID ALTERNATES
CIVIL
CI001 SITE GENERAL NOTES AND DETAILS
CS101 SITE LAYOUT PLAN
CJ101 EROSION CONTROL PLAN
ARCHITECTURAL
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AD100 OVERALL ROOF DEMOLITION PLAN
AD101 ROOF DEMOLITION PLAN - B125
AD102 ROOF DEMOLITION PLAN - TRAMWAY
AD201 DEMOLITION IMAGES
AE100 OVERALL ROOF PLAN
AE101 ROOF PLAN - B125
AE102 ROOF PLAN - TRAMWAY
AE501 ROOF DETAILS
AE502 ROOF DETAILS
ELECTRICAL
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
EP101 ROOF POWER PLAN
EP102 TRAMWAY POWER PLAN
EP501 ELECTRICAL DETAILS
EP502 ELECTRICAL DETAILS
Contact: Contact:
VA Illiana Health Care System
Von Poehlein@va.gov
COR
1900 E. Main St.
Danville, IL 61832 p: 217.554.5976 e: VonPoehlein@va.org
OWNER
GUIDON DESIGN INC.
Erin Sikorski
Project Manager/Architect
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 112 e: esikorski@guidondesign.com
ARCHITECT
VICINITY MAP
CAMPUS MAP
AREA MAP
PROJECT SITE
Contact:
GUIDON DESIGN INC
Ken Godwin
Electrical Engineer
ELECTRICAL ENGINEER
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 148 e: kgodwin@guidondesign.com
N
N
N
Contact:
GUIDON DESIGN INC.
Karuna Namburi
EIT
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 160 e: knamburi@guidondesign.com
CIVIL ENGINEER
Revisions: Date:
CONTRACTOR STAGING
B125
NOTE:
CONTRACTOR TO COORDINATE EXACT STAGING LOCATION WITH COR.
CONTRACTOR TO USE LOCATION FOR OFFICE TRAILER AND STAGING / LAYDOWN
IN ADDITION TO AREAS SHOWN AT BUILDING 125
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:0
A
M
GC101
CONSTRUCTION LOGISTICS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JG KM
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1" = 1'-0"GC101
1 CONSTRUCTION SITE
N
DEDUCT ALTERNATE A - ELIMINATE PORTION OF TRAMWAY
ELIMINATE THE DEMOLITION AND INSTALLATION OF NEW ROOFING
AT THE LOCATION SHOWN ON THE PLAN INDICATED BY THE HATCH.
THIS AREA OF ROOFING TO REMAIN AS EXISTING.
DEDUCT ALTERNATE B - ELIMINATE METAL ROOFING WORK
ELIMINATE THE DEMOLITION AND INSTALLATION OF NEW STANDING
SEAM METAL ROOF AT THE LOCATIONS SHOWN ON THE PLAN
INDICATED BY THE HATCH. THIS AREA OF ROOFING TO REMAIN AS
EXISTING.
BID ITEM #1: BASE BID.
BID ITEM #2: ALL WORK AS DESCRIBED FOR BID ITEM #1 ABOVE MINUS THAT
PORTION OF WORK SHOWN AS DEDUCT ALTERNATE A.
BID ITEM #3: ALL WORK DESCRIBED FOR BID ITEM #1 ABOVE MINUS THAT PORTION
OF WORK SHOWN AS DEDUCT ALTERNATE A AND DEDUCT ALTERNATE B.
STATEMENT OF BID ITEMS
B125 KEY PLAN
N
UPPER
LOWER
BUILDING 102
BUILDING 101
DARK SHADE
INDICATES AREA NOT
IN SCOPE, TYP
BUILDING 125
TRAMWAY
TR
A
M W
A Y
B
A
B
TR
A
M W
A Y
B
59' - 0 3/4"
15' - 10 1/4"
15' - 10 3/4"
15' - 3 1/2"
20' - 9 1/4"
81' - 1 1 3/4"
39' - 0 3/4"
38' - 2"
/2
7' - 1 1 1/2"
12' - 11 3/4"
10' - 3 1/2"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:0
A
M
GC102
BID ALTERNATES
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JG KM
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"GC102
1 BID ALTERNATES
SF
BI
M
.5
2.
R ep la ce R oo f B ui di ng
AE
/1 9.
.1 5_
A_ v2
1.
rv t 6/
9/
:4 3:
A
M
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 KJC KSN
100% BID DOCUMENTS
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Revisions: Date:
SITE GENERAL NOTES AND
DETAILS
CI001
8"
M
IN
4"
" M
IN
" M
IN
IP
2 49.42'
28.15'
25'
Contractor to allow FDC door Access at all the times.
Protect Structure in Place
0 4020
N
BI
M
.5
2.
R ep la ce
R oo f B ui di ng
AE
/1
9.
.1
5_ A_ v2 1.
rv t
6/ 9/
:4
3:
A M
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 KJC KSN
100% BID DOCUMENTS
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Revisions: Date:
SITE LAYOUT PLAN
CS101
SITE PLAN KEYNOTES
1. CONSTRUCTION FENCE
2. 50' x 25 ' EQUIPMENT LAYDOWN
AREA
SF
SF
SFSFSF
IP
IP
4 4
IP
1 3
49.42'
28.15'
3 50
25'
0 4020
N
BI
M
.5
2.
R ep la ce
R oo f B ui di ng
AE
/1
9.
.1
5_ A_ v2 1.
rv t
6/ 9/
:4
3:
A M
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 KJC KSN
100% BID DOCUMENTS
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Revisions: Date:
EROSION CONTROL PLAN
CJ101
EROSION CONTROL PLAN KEYNOTES
1. PERMANENT SEEDING
2. CONSTRUCTION LIMITS
3. SILT FENCE
4. INLET PROTECTION
SF
TRAMWAY
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
EXTENT OF REVISION
REVISION SET
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
A/E ARCHITECT/ENGINEER
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWS AMERICAN WELDING SOCIETY
BLDG BUILDING
CMU CONCRETE MASONRY UNIT
CTR CENTER
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG DRAWING
E EAST
EA EACH
EPA ENVIRONMENTAL PROTECTION AGENCY
EQ EQUAL
ETC AND SO FORTH OR ET CETERA
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
F FAHRENHEIT OR FEMALE
FEC FIRE EXTINGUISHER CABINET
FLEX FLEXIBLE
FOW FACE OF WALL
FT FEET OR FOOT
GA GAGE OR GYPSUM ASSOCIATION
GC GENERAL CONTRACTOR
GYP GYPSUM
HAZ MAT HAZARDOUS MATERIALS
IBC INTERNATIONAL BUILDING CODE
INFO INFORMATION
LED LIGHT EMITTING DIODE
MIN MINIMUM MINUTE OR MINUTE MINIMUM
mm MILLIMETER
MO MASONRY OPENING OR MOTOR OPERATED
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
OC ON CENTER
OZ OUNCE
PCF POUNDS PER CUBIC FOOT
PREFIN PREFINISH
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RO ROUGH OPENING
SF SQUARE FOOT (FEET)
SIM SIMILAR
S SOUTH
TEMP TEMPERATURE OR TEMPORARY
THRU THROUGH
TO TOP OF ___
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
V VOLT
VIF VERIFY IN FIELD
VOLT VOLTAGE
W/ WITH
W/O WITHOUT
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH
OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED
WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,
ACCESS CONTROL, ETC.
5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH
THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS
AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION
REQUIREMENTS.
7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE
FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK
THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF
WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY
CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING
AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN ROOF. ONLY U.L. APPROVED METHODS, MATERIALS AND
INSTALLATION ARE ACCEPTABLE.
10. ELECTRICAL DRAWINGS SHOW INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT
DIMENSIONING. THE GENERAL CONTRACTOR IS TO COORDINATE THE LOCATIONS OF
ALL MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE
ARCHITECTURAL AND STRUCTURAL DETAILING OF SHAFTS, CHASES, CEILING
CONSTRUCTION, ETC.
11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR
MISSING DIMENSIONS.
12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
13. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
14. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS UNLESS NOTED
OTHERWISE.
15. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
16. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
17. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
18. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND
EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DELIVERY AND ROUGH-IN.
19. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY
CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
20. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE
OWNER.
22. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT
CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE
CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE
CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO
COST TO THE OWNER.
24. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK, AS DETERMINED BY THE COR SHALL BE PROVIDED.
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
REVISION TO PLAN CALLOUT
PT-1
A
T
FINISH INDICATION
FRAME / WINDOW
GLAZING1
1 PLAN NOTE
1 DEMOLITION NOTE
ALTERNATE/BID DEDUCT ITEM
KEY NOTE SYMBOLS
CONSTRUCTION GENERAL NOTESARCHITECTURAL SYMBOLSARCHITECTURAL ABBREVIATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:5
A
M
AE001
ARCHITECTURAL SYMBOLS AND
ABBREVIATIONSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JG KM
100% BID DOCUMENTS
FULLY SPRINKLERED
T R
A M
W A
Y B
TR
A
M W
A Y
B
BUILDING 102
BUILDING 101
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE ROOF PLAN
AE101, AE102 AND ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
DEMOLITION GENERAL NOTES
B125 KEY PLAN
N
UPPER
LOWER
BUILDING 102
BUILDING 101
DARK SHADE
INDICATES AREA NOT
IN SCOPE, TYP
BUILDING 125
TRAMWAY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:4
A
M
AD100
OVERALL ROOF DEMOLITION
PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JG KM
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"AD100
1 OVERALL DEMOLITION ROOF PLAN
B125 KEY PLAN
UPPER
LOWER
BUILDING 102
BUILDING 101
DARK SHADE
INDICATES AREA NOT
IN SCOPE, TYP
BUILDING 125
TRAMWAY
TR
A
M W
A Y
B
T R
A M
W A
Y B
(1)
(2)
(3)
(4)
13' - 4" 88' - 3"
/2
1'
/2
0"
8'
/2
7'
/4
9'
21' - 5" 56' - 6"
2' - 7 1/4"
20' - 0"
21' - 3"
41' - 1 3/4"
20' - 11 1/4"
20' - 3"
19' - 11 1/4"
20' - 11 3/4"
(6)
(5)
11' - 11 3/4"
17' - 7 1/4"
15' - 1"
16' - 0 3/4"
TYP, ALL
LOCATIONS
TYP, ALL
LOCATIONS
101' - 7"
1/ 2"
/4
10' - 1"
16' - 11 3/4"
/4
/2
62' - 4 3/4"
100' - 6 1/4"
1. REMOVE COPING IN ITS ENTIRETY.
2. REMOVE MEMBRANE ROOFING ASSEMBLY BACK TO STRUCTURE.
3. REMOVE WALK PAD IN ITS ENTIRETY, TYP.
4. REMOVE EXISTING ROOF ACCESS LADDER - SAND AND PREP FOR NEW
PAINT.
5. REMOVE ROOF DRAIN. CONTRACTOR TO INSPECT INTEGRITY OF DRAIN
PIPE. PREP PIPE FOR EXTENSION.
6. DUCTWORK AND SUPPORT ASSEMBLY TO REMAIN AS EXISTING.
CONTRACTOR TO TEMPORARILY SUPPORT DUCTWORK FOR DEMOLITION
AND INSTALLATION OF ROOFING AND CURB CAP.
7. REMOVE STANDING SEAM METAL ROOFING ASSEMBLY BACK TO
STRUCTURE.
8. REMOVE EXHAUST FAN - SALVAGE FOR REINSTALLATION.
9. PLUMBING VENTS REMAIN AS EXISTING. PREP FOR NEW WORK
10. REMOVE ROOF MEMBRANE AND SHEET METAL CAP FROM EXISTING ROOF
CURB. TEMPORARILY SUPPORT PIPING FOR NEW WORK. TYPICAL AT ALL
PIPE CURB SUPPORTS.
11. REMOVE SCUPPER.
12. EXISTING ROOFTOP MOUNT, SATELLITE, AND ROOF CURBS TO REMAIN.
TEMPORARILY REMOVE TO INSTALL NEW ROOF MEMBRANE.
DEMOLITION PLAN NOTES
DEMOLITION SYMBOLS LEGEND
(X)IMAGE DIRECTION
IMAGE NUMBER
LOCATION OF EXISTING
CONDITION IMAGES,
REFER TO SHEETS AD201
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE ROOF PLAN
AE101, AE102 AND ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
DEMOLITION GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:4
A
M
AD101
ROOF DEMOLITION PLAN - B125
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JG KM
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AD101
1 ROOF DEMOLITION PLAN
UPPER
LOWER
BUILDING 102
BUILDING 101
DARK SHADE
INDICATES AREA NOT
IN SCOPE, TYP
BUILDING 125
TRAMWAY
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE ROOF PLAN
AE101, AE102 AND ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
DEMOLITION GENERAL NOTES
TR
A
M W
A Y
B
T R
A M
W A
Y B
BUILDING 101
8' - 3 1/2"
/2
37' - 8 3/4"
38' - 11 3/4"
81' - 1 1 3/4"
10' - 3 1/2"
13' - 0 3/4"
TYP, ALL
LOCATIONS
1. REMOVE COPING IN ITS ENTIRETY.
2. REMOVE MEMBRANE ROOFING ASSEMBLY BACK TO STRUCTURE.
3. DUCTWORK AND SUPPORT ASSEMBLY TO REMAIN AS EXISTING.
CONTRACTOR TO TEMPORARILY SUPPORT DUCTWORK FOR DEMOLITION
AND INSTALLATION OF ROOFING AND CURB CAP.
4. REMOVE FLASHING, PREP FOR NEW.
5. DASHED LINE INDICATES END OF ROOF AND COPING DEMOLITION WORK.
REFER TO AE102 FOR NEW WORK.
6. REMOVE GUTTER AND DOWNSPOUTS.
7. REMOVE ROOF MEMBRANE AND SHEET METAL CAP FROM EXISTING ROOF
CURB. TEMPORARILY SUPPORT PIPING FOR NEW WORK. TYPICAL AT ALL
PIPE CURB SUPPORTS.
DEMOLITION PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:4
A
M
AD102
ROOF DEMOLITION PLAN -
TRAMWAYGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JG KM
100% BID DOCUMENTS
FULLY SPRINKLERED
N
SCALE: 1/8" = 1'-0"AD102
3 DEMOLITION TRAMWAY PLAN
REMOVE MEMBRANE
ROOFING ASSEMBLY BACK
TO STRUCTURE.
PIPING AND SUPPORT ASSEMBLY TO
REMAIN AS EXISTING. CONTRACTOR
TO TEMPORARILY SUPPORT PIPING
FOR DEMOLITION AND
INSTALLATION OF ROOFING AND
CURB CAP.
MECHANICAL EXHAUST FAN TO
REMAIN EXISTING. CURB HEIGHT TO
BE INCREASED DUE TO ADDED
INSULATION - TYP.
PLUMBING VENT PIPE HEIGHT TO BE
INCREASED DUE TO ADDED
INSULATION - TYP.
REMOVE MOUNTING EQUIPMENT AND
BLOCK WEIGHTS. REMOVE SATELLITE
DISH FOR REINSTALLATION ON
EXISTING ROOFTOP MOUNT.
CONTRACTOR TO COORDINATE WITH
VA PRIOR TO REMOVAL.
REMOVE ROOF MEMBRANE AND
SHEET METAL CAP FROM EXISTING
ROOF CURB. TEMPORARILY
SUPPORT PIPING FOR NEW WORK.
TYPICAL AT ALL PIPE CURB
SUPPORTS.
PIPING AND SUPPORT ASSEMBLY TO
REMAIN AS EXISTING. CONTRACTOR TO
TEMPORARILY SUPPORT PIPING FOR
DEMOLITION AND INSTALLATION OF
ROOFING AND CURB CAP - TYP
REMOVE MEMBRANE ROOFING
ASSEMBLY BACK TO STRUCTURE.
REMOVE STANDING SEAM
METAL ROOFING ASSEMBLY
BACK TO STRUCTURE.
REMOVE METAL COPING, GUTTERS, AND
DOWNSPOUTS
REMOVE ROOF MEMBRANE AND
SHEET METAL CAP FROM EXISTING
ROOF CURB. TEMPORARILY
SUPPORT PIPING FOR NEW WORK.
TYPICAL AT ALL PIPE CURB
SUPPORTS.
ACCESS LADDER TO REMAIN
REMOVE WALKPADS
IN ITS ENTIRETY
MECHANICAL EXHAUST FAN TO
REMAIN EXISTING. CURB HEIGHT TO
BE INCREASED DUE TO ADDED
INSULATION - TYP.
PLUMBING VENT PIPE HEIGHT TO BE
INCREASED DUE TO ADDED
INSULATION - TYP.
REMOVE MEMBRANE ROOFING
ASSEMBLY BACK TO
STRUCTURE.
REMOVE ROOF DRAINS.
CONTRACTOR TO INSPECT
INTEGRITY OF DRAIN PIPE. PREP
FOR NEW ROOF DRAIN.
PIPING AND SUPPORT ASSEMBLY
TO REMAIN AS EXISTING.
CONTRACTOR TO TEMPORARILY
SUPPORT PIPING FOR DEMOLITION
AND INSTALLATION OF ROOFING
AND CURB CAP- TYP
REMOVE MEMBRANE ROOFING
ASSEMBLY BACK TO
STRUCTURE.
REMOVE DRAINS HEADS.
CONTRACTOR TO INSPECT
INTEGRITY OF DRAIN PIPE. PREP
FOR NEW DRAIN HEAD.
REMOVE MEMBRANE ROOFING
ASSEMBLY BACK TO STRUCTURE.
REMOVE STANDING SEAM
METAL ROOFING ASSEMBLY
BACK TO STRUCTURE.
REMOVE METAL COPING
REMOVE ROOF DRAIN.
CONTRACTOR TO INSPECT
INTEGRITY OF DRAIN PIPE. PREP
FOR NEW ROOF DRAIN.
EXISTING ROOFTOP MOUNT,
SATELLITE, AND ROOF CURBS TO
REMAIN. TEMPORARILY REMOVE FOR
INSTALLATION OF NEW ROOF
MEMBRANE. CONTRACTOR TO
COORDINATE WITH VA PRIOR TO
REMOVAL.
REMOVE MEMBRANE ROOFING
ASSEMBLY BACK TO
STRUCTURE.
REMOVE METAL COPING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:5
A
M
AD201
DEMOLITION IMAGES
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JG KM
100% BID DOCUMENTS
FULLY SPRINKLERED
NO SCALEAD201
1 DEMO IMAGE #1
NO SCALEAD201
2 DEMO IMAGE #2
NO SCALEAD201
3 DEMO IMAGE #3
NO SCALEAD201
4 DEMO IMAGE #4
SCALE: 1/8" = 1'-0"AD201
5 DEMO IMAGE #5
SCALE: 1/8" = 1'-0"AD201
6 DEMO IMAGE #8
BUILDING 102
BUILDING 101
T
R A
M W
A Y
B
TR
A
M W
A Y
B
A. ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL
ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED
CHANGES.
B. UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS
AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED
THE DETAILS SHOWN.
C. PROVIDE FLASHING AND SEALANT PER ROOFING MANUFACTURER
RECOMMENDATION AT ALL CONDUIT & HVAC LINES PENETRATING THE
ROOF.
D. CONTRACTOR & ALL SUBTRADES SHALL BE AWARE & EXERCISE THE
NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.
THIS SHALL INCLUDE ALL MATERIALS, TOOLS, DELETERIOUS MATERIALS.
E. REFERENCE PLUMBING AND ELECTRICAL FOR ITEMS. COORDINATE AS
REQUIRED INCLUDING NECESSARY FRAMING, BLOCKING, ETC.
F. VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND
REPORT DISCREPANCIES IMMEDIATELY
ROOF GENERAL NOTES
B125 KEY PLAN
N
UPPER
LOWER
BUILDING 102
BUILDING 101
DARK SHADE
INDICATES AREA NOT
IN SCOPE, TYP
BUILDING 125
TRAMWAY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:5
A
M
AE100
OVERALL ROOF PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JG KM
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"AE100
1 OVERALL ROOF PLAN
UPPER
LOWER
BUILDING 102
BUILDING 101
DARK SHADE
INDICATES AREA NOT
IN SCOPE, TYP
BUILDING 125
TRAMWAY
B
T R
A M
W A
Y
B
T R
A M
W A
Y
SLOPE: 1/4"=1'-0"
SLOPE: 1/4"=1'-0"
S
LO
P E
: 1/4"=1'-0"
S
LO
P E
: 1/4"=1'-0"
SLOPE:
1/4"=1'-0"
SLOPE:
1/4"=1'-0"
S
LO
P E
1/
4" =1
'-0
S
LO
P E
1/
4" =1
'-0
SLOPE: 1/4"=1'-0"SLOPE: 1/4"=1'-0"
S
LO
P E
: 1 /4
1'
-0
S
LO
P E
: 1 /4
1'
-0
SLOPE: 1/4"=1'-0"SLOPE: 1/4"=1'-0"
S
LO
P E
: 1 /4
1'
-0
S
LO
P E
: 1 /4
1'
-0
S
LO
P E
1/
4" =1
'-0
SLOPE:
1/4"=1'-0"
SLOPE:
1/4"=1'-0"
SLOPE: 1/4"=1'-0"SLOPE: 1/4"=1'-0"
S
LO
P E
: 1 /4
1'
-0
S
LO
P E
: 1 /4
1'
-0
S
LO
P E
1/
4" =1
'-0
S
LO
P E
1/
4" =1
'-0
S
LO
P E
: 1 /4
1'
-0
S
LO
P E
: 1 /4
1'
-0 " 2
S
LO
P E
: M A
T C
H E
X
IS
T
IN
G S
T R
U C
T U
R E
SLOPE: MATCH EXISTING STRUCTURE
S
LO
P E
: 1/4"=1'-0"
4' - 11 3/4"
6'
/2
RT-A
RT-A
RT-A
RT-B
RT-B
RT-B
RT-A
19' - 6 1/2"
20' - 3"
19' - 11 1/4"
20' - 11 3/4"
20' - 9 1/4"
41' - 7 3/4"
/2
13' - 4" 88' - 3"
9'
7'
/4
8'
/2
0"
1'
/2
11' - 11 3/4"
21' - 5" 56' - 4 3/4"
2' - 7 3/4"
19' - 11 1/2"
AE501
AE501
TYP
SIM
SIM
AE501
TYP
TYP, ALL
LOCATIONS
AE501
AE501
AE501
AE501
AE501
AE501
AE501
TYP
AE501
1 13
11 TYP, ALL
LOCATIONS
AE501
AE501
SIM
101' - 7"
/2
1/ 4"
/4
100' - 5"
62' - 5"
1/ 2"
A. ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL
ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED
CHANGES.
B. UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS
AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED
THE DETAILS SHOWN.
C. PROVIDE FLASHING AND SEALANT PER ROOFING MANUFACTURER
RECOMMENDATION AT ALL CONDUIT & HVAC LINES PENETRATING THE
ROOF.
D. CONTRACTOR & ALL SUBTRADES SHALL BE AWARE & EXERCISE THE
NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.
THIS SHALL INCLUDE ALL MATERIALS, TOOLS, DELETERIOUS MATERIALS.
E. REFERENCE PLUMBING AND ELECTRICAL FOR ITEMS. COORDINATE AS
REQUIRED INCLUDING NECESSARY FRAMING, BLOCKING, ETC.
F. VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND
REPORT DISCREPANCIES IMMEDIATELY
ROOF GENERAL NOTES
A. FULLY ADHERED 60 MIL WHITE TPO ROOFING MEMBRANE ON 1/2" COVER
BOARD ON TAPERED RIGID INSULATION - MIN 6" (R-29) ON VAPOR BARRIER
ON EXISTING METAL ROOF DECK
B. 1 1/2" x 12" WIDE PENCIL RIB STANDING SEAM METAL ROOFING ON 30 MIL
ROOF UNDERLAYMENT ON 6" RIGID INSULATION (R-29) ON VAPOR BARRIER
ON EXISTING METAL ROOF DECK
ROOF TYPE LEGEND RT-X
ROOF PLAN NOTES
1. INSTALL LIGHTNING PROTECTION. DASHED LINE INDICATES LOCATION OF
LIGHTING PROTECTION - REFER TO ELECTRICAL DRAWINGS FOR MORE
INFORMATION
2. INSTALL TAPERED RIGID INSULATION CRICKETS SLOPING 1/8" = 1'-0"
3. INSTALL 5" WIDE PREFORMED SCUPPER - REFER TO DETAIL 3/AE502
4. EXTEND CURB HEIGHT - REFER TO DETAIL 2/AE501
5. EXTEND PIPING FOR PLUMBING VENTS - REFER TO DETAIL 3/AE501
6. INSTALL WALKING PADS PER MANUFACTURERS INSTALLATION
INSTRUCTIONS
7. LOCATION OF EXISTING PIPING
8. INSTALL PREFINISHED METAL COPING - REFER TO DETAIL 4/AE501
9. INSTALL PREFINISHED GUTTER - REFER TO DETAIL 2/AE502
10. INSTALL ROOF DRAIN AND ASSOCIATED PIPING - REFER TO DETAIL 1/AE501
11. INSTALL TPO ROOFING MEMBRANE OVER EXISTING PIPING SUPPORT CURB.
REPLACE METAL SHEET CAP. REFER TO DETAIL 12/AE501
12. REINSTALL SALVAGED SATELLITE DISH AND ROOFTOP MOUNT.
COORDINATE WITH VA PRIOR TO AND SIGNAL POINTING/ LOCATING
13. PAINT SALVAGED ROOF ACCESS LADDER SAFETY YELLOW AND REINSTALL
IN EXISTING LOCATION
14. INSTALL PREFINISHED DOWNSPOUT - PROVIDE SPLASH BLOCK AT BASE OF
DOWNSPOUT
15. INSTALL PREFINISHED METAL COPING - REFER TO DETAIL 1/AE502
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:0
A
M
AE101
ROOF PLAN - B125
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JG KM
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AE101
1 ROOF PLAN
BUILDING 101
B
T R
A M
W A
Y
B
T R
A M
W A
Y
RT-A
S
LO
P E
: 1/4"=1'-0"
SLOPE: 1/4"=1'-0"
SLO
PE: 1/4"=1'-0"
S
LO
P E
: 1 /4
1'
-0
S
LO
P E
: 1/4"=1'-0"
8' - 3 1/2"
/2
37' - 8 3/4"
38' - 11 3/4"
81' - 1 1 1/2"
12' - 3 1/4"
9' - 7 1/4"
AE502
AE502
TYP, ALL
LOCATIONS
AE501 TYP
AE501
AE501
AE502
AE501
B125 KEY PLAN
N
UPPER
LOWER
BUILDING 102
BUILDING 101
DARK SHADE
INDICATES AREA NOT
IN SCOPE, TYP
BUILDING 125
TRAMWAY
A. ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL
ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED
CHANGES.
B. UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS
AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED
THE DETAILS SHOWN.
C. PROVIDE FLASHING AND SEALANT PER ROOFING MANUFACTURER
RECOMMENDATION AT ALL CONDUIT & HVAC LINES PENETRATING THE
ROOF.
D. CONTRACTOR & ALL SUBTRADES SHALL BE AWARE & EXERCISE THE
NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.
THIS SHALL INCLUDE ALL MATERIALS, TOOLS, DELETERIOUS MATERIALS.
E. REFERENCE PLUMBING AND ELECTRICAL FOR ITEMS. COORDINATE AS
REQUIRED INCLUDING NECESSARY FRAMING, BLOCKING, ETC.
F. VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND
REPORT DISCREPANCIES IMMEDIATELY
ROOF GENERAL NOTES
A. FULLY ADHERED 60 MIL WHITE TPO ROOFING MEMBRANE ON 1/2" COVER
BOARD ON TAPERED RIGID INSULATION - MIN 6" (R-29) ON VAPOR BARRIER
ON EXISTING METAL ROOF DECK
B. 1 1/2" x 12" WIDE PENCIL RIB STANDING SEAM METAL ROOFING ON 30 MIL
ROOF UNDERLAYMENT ON 6" RIGID INSULATION (R-29) ON VAPOR BARRIER
ON EXISTING METAL ROOF DECK
ROOF TYPE LEGEND RT-X
ROOF PLAN NOTES
1. INSTALL TPO ROOFING MEMBRANE OVER EXISTING PIPING SUPPORT CURB.
REPLACE METAL SHEET CAP. REFER TO DETAIL 12/AE501
2. INSTALL PREFINISHED METAL COPING - REFER TO DETAIL 1/AE502
3. INSTALL PREFINISHED GUTTER - REFER TO DETAIL 2/AE502
4. DASHED LINE INDICATES END OF ROOF AND COPING NEW WORK. LAP NEW
ROOFING MEMBRANE OVER EXISTING - MIN 12". REFER TO DETAIL 3/AE502.
5. LOCATION OF EXISTING PIPING
6. INSTALL REGLET AND FLASHING - REFER TO DETAIL 11/AE501
7. INSTALL PREFINISHED DOWNSPOUT. PROVIDE SPLASH BLOCK AT BASE OF
DOWNSPOUT
8. INSTALL LIGHTNING PROTECTION. DASHED LINE INDICATES LOCATION OF
LIGHTING PROTECTION - REFER TO ELECTRICAL DRAWINGS FOR MORE
INFORMATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:0
A
M
AE102
ROOF PLAN - TRAMWAY
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JG KM
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AE102
1 DEMOLITION TRAMWAY
EXISTING SHEET METAL COVER
SURFACED CAP SHEET
INTERPLY
1/2" PROTECTION BOARD
TAPERED RIGID INSULATION - 6" MIN
EXISTING WOOD BLOCKING
CANT STRIP
FULLY ADHERED 60 MIL WHITE
TPO ROOFING MEMBRANE
EXISTING METAL DECK
8" M
IN
EXISTING EXHAUST FAN/VENT
NEW FRT BLOCKING
V .I.
F
EXTEND EXISTING DUCTWORK FOR
ADDED ROOF THICKNESS
VAPOR BARRIER - TURN UP BLOCKING
1/2" PROTECTION BOARD
TAPERED RIGID INSULATION - 6" MIN
EXISTING METAL
DECKING
FULLY ADHERED 60 MIL WHITE
TPO ROOFING MEMBRANE
BOOT FLASHING - SEALED AROUND PIPE
CUT AND MODIFY EXISTING PIPING AS
REQUIRED FOR EXTENSION OF
EXISTING VENT THROUGH ROOF PIPING
8" M
IN
SEALANT, FULL PERIMETER
VAPOR BARRIER
NEW COMPRESSION RING AND
STRAINER BASKET
NEW CONTINUOUS BEAD OF
WATERBLOCK AROUND ROOF DRAIN
EXISTING METAL DECKING
NEW DEPRESSED NOTCHED CLAMPING
RING
FULLY ADHERED 60 MIL WHITE TPO
ROOFING MEMBRANE
1/2" PROTECTION BOARD
TAPERED RIGID INSULATION - MIN 6"
NEW ROOF DRAIN - REFER TO
SPECIFICATION SECTION 22 14 00
VAPOR BARRIER
CUT AND MODIFY EXISTING PIPING AS
REQUIRED FOR NEW ROOF DRAIN.
PROVIDE PIPING AS REQUIRED FOR
EXTENSION
1/2" PROTECTION BOARD
TAPERED RIGID INSULATION - MN 6"
FULLY ADHERED 60 MIL WHITE TPO
ROOFING MEMBRANE
EXISTING METAL DECK
EXISTING WALL
CONSTRUCTION
PREFINISHED ALUMINUM
GRAVEL STOP - DARK
BRONZE FINISH
CLEAT CLIP
1'
NEW FRT BLOCKING
LAP SEALANT, FULL PERIMETER
COUNTER FLASHING
VAPOR BARRIER
EXISTING BRICK VENEER
TO REMAIN
FILL VOID w/ BATT
INSULATION
1/
2"
3"
6 1/4"
TURN ROOF MEMBRANE
DOWN FACE OF WALL - 8"
MIN
EXISTING WALL
CONSTRUCTION
EXISTING METAL DECK
EXISTING WINDOW
EXISTING ROOF
STRUCTURE
EXISTING FLASHING
BASE FLASHING BY METAL ROOF
MANUF. - INSTALL UNDER EXISTING
FLASHING - DARK BRONZE FINISH
1 1/2" x 12" WIDE PENCIL RIB
STANDING SEAM METAL
ROOFING - DARK BRONZE FINISH
Z CLOSURE AND NEOPRERENE
CLOSURE BY METAL ROOF MANUF.
30 MIL ROOF UNDERLAYMENT
6" RIGID INSULATION
VAPOR BARRIER
EXISTING WALL
CONSTRUCTION
EXISTING METAL DECK
EXISTING ROOF
STRUCTURE
FRT BLOCKING
1 1/2" x 12" WIDE PENCIL RIB
STANDING SEAM METAL ROOFING -
DARK BRONZE FINISH - BRAKE METAL
PANEL AND TURN DOWN FASCIA TO
SOFFIT
EXISTING SOFFIT PANEL
EXISTING STEEL BEAM
DRIP EDGE FLASHING - FINISH
TO MATCH METAL ROOFING
EXISTING FRAMING
5/8" EXTERIOR GRADE
SHEATHING
VAPOR BARRIER - FULL
HEIGHT AND WIDTH OF
FASCIA
SNOW GUARD BY METAL
ROOF MANUF.
30 MIL ROOF UNDERLAYMENT -
TURN DOWN FASCIA
6" RIGID INSULATION
VAPOR BARRIER
TAPERED RIGID
INSULATION - MIN 6"
EXISTING METAL DECK EXISTING ROOF
STRUCTURE
PREFINISHED ALUMINUM GRAVEL
STOP - DARK BRONZE FINISH
BASE FLASHING BY METAL ROOF
MANUF. - INSTALL UNDER GRAVEL
STOP COPING - DARK BRONZE FINISH
1 1/2" x 12" WIDE PENCIL RIB STANDING
SEAM METAL ROOFING - DARK BRONZE
FINISH
Z CLOSURE AND NEOPRENE
CLOSURE BY METAL ROOF MANUF.
V .I.
F
3/
4"
/- 1/2" PROTECTION BOARD
FULLY ADHERED 60 MIL WHITE TPO
ROOFING MEMBRANE - TURN MEMBRANE
DOWN WALL OVER BASE FLASHING
LAP SEALANT, FULL PERIMETER
COUNTER FLASHING
6" METAL STUD WALL
FRAMING - FILL WITH BATT
INSULATION
FRT BLOCKING
TO DECK SLOPE CHANGE
1" +/- F.O.S.
VAPOR BARRIER - TURN
UP WALL
30 MIL ROOF UNDERLAYMENT
6" RIGID INSULATION
VAPOR BARRIER - TURN UP WALL
EXISTING METAL DECK
FULLY ADHERED 60 MIL WHITE
TPO ROOFING MEMBRANE -
TURN MEMBRANE UP WALL
6" RIGID INSULATION
VAPOR BARRIER
FRT BLOCKING
REGLET FLASHING ATTACHED w/
EXPANSION ANCHOR - DARK BRONZE
FINISH
SEALANT, FULL LENGTH
EXISTING WALL
CONSTRUCTION
EXISTING ROOF
STRUCTURE
M
IN8"
1/2" PROTECTION BOARD
EXISTING METAL DECK
1 1/2" x 12" WIDE PENCIL RIB
STANDING SEAM METAL
ROOFING - DARK BRONZE FINISH
BASE FLASHING BY METAL ROOF
MANUF. - SET IN SEALANT
REGLET FLASHING ATTACHED w/
EXPANSION ANCHOR - DARK BRONZE
FINISH
SEALANT, FULL LENGTH
EXISTING WALL
CONSTRUCTION
EXISTING ROOF
STRUCTURE
EXISTING STEEL BEAM
1/
2"
6" RIGID INSULATION
FRT BLOCKING
VAPOR BARRIER
30 MIL ROOF UNDERLAYMENT
SNAP-ON BATTEN
SHEET METAL CAP
SURFACED CAP SHEET
INTERPLY
1/2" PROTECTION BOARD
TAPERED RIGID INSULATION - 6" MIN
EXISTING CURB FRAMING
CANT STRIP
FULLY ADHERED 60 MIL WHITE
TPO ROOFING MEMBRANE
EXISTING METAL DECK
EXISTING UNISTRUT PIPING
SUPPORT ASSEMBLY - SET IN
SEALANT
VAPOR BARRIER TURN UP AND OVER
CURB
1 1/2" x 12" WIDE PENCIL RIB
STANDING SEAM METAL ROOFING -
DARK BRONZE FINISH
EXISTING FRAMING
5/8" EXTERIOR GRADE
SHEATHING
VAPOR BARRIER - FULL
HEIGHT AND WIDTH OF
FASCIA
CLOSURE CAP BY METAL
PANEL MANUF.
EXISTING WALL
CONSTRUCTIONBACKER ROD AND SEALANT
BRAKE PANEL UP INTO
CORNER - SET IN SEALANT
1 1/2"
1 1/2"
PLAN
1/2" PROTECTION BOARD
TAPERED RIGID INSULATION - MN 6"
FULLY ADHERED 60 MIL WHITE TPO
ROOFING MEMBRANE - TURN MEMBRANE
DOWN FASCIA
EXISTING METAL DECK
WELDED SEAM
MIN LAP
1' - 0"
EXISTING ROOF
CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:0
A
M
AE501
ROOF DETAILS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JG KM
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 3" = 1'-0"AE501
2 ROOF CURB DETAIL @ EXHAUST FAN/VENT
SCALE: 3" = 1'-0"AE501
3 THROUGH ROOF PIPING DETAIL
SCALE: 3" = 1'-0"AE501
1 ROOF DRAIN DETAIL
SCALE: 3" = 1'-0"AE501
4 TYPICAL ROOF COPING DETAIL @ BRICK VENEER
SCALE: 1 1/2" = 1'-0"AE501
6 WINDOW SILL DETAIL @ METAL ROOF
SCALE: 1 1/2" = 1'-0"AE501
7 METAL ROOF EDGE DETAIL
SCALE: 1 1/2" = 1'-0"AE501
8 METAL ROOF DETAIL @ ROOF TRANSITION
SCALE: 3" = 1'-0"AE501
11 ROOF FLASHING DETAIL @ MEMBRANE ROOF
SCALE: 3" = 1'-0"AE501
9 ROOF FLASHING DETAIL @ STANDING SEAM ROOF
SCALE: 3" = 1'-0"AE501
12 ROOF CURB DETAIL @ EXISTING PIPING
SCALE: 3" = 1'-0"AE501
10 METAL ROOF TERMINATION DETAIL
SCALE: 1 1/2" = 1'-0"AE501
5 LAP DETAIL @ EXISTING ROOF
1/2" PROTECTION BOARD
TAPERED RIGID INSULATION - MN 6"
FULLY ADHERED 60 MIL WHITE TPO
ROOFING MEMBRANE - TURN MEMBRANE
DOWN FASCIA
EXISTING METAL DECK
EXISTING METAL PANEL
WALL CONSTRUCTION
PREFINISHED ALUMINUM
GRAVEL STOP - DARK
BRONZE FINISH
CLEAT CLIP
1'
NEW FRT BLOCKING
LAP SEALANT, FULL PERIMETER
COUNTER FLASHING
2"
EXISTING METAL PANEL
WALL CONSTRUCTION
PREFINISHED ALUMINUM
DRIP EDGE - DARK
BRONZE FINISH
CLEAT CLIP
NEW FRT BLOCKING
PREFINISHED ALUMINUM
FASCIA - DARK BRONZE
FINISH
8"
LAP SEALANT, FULL
PERIMETER
1/2" PROTECTION BOARD
TAPERED RIGID INSULATION - MN 6"
FULLY ADHERED 60 MIL WHITE TPO
ROOFING MEMBRANE - TURN MEMBRANE
DOWN FASCIA
EXISTING METAL DECK
PREFINISHED 6"
ALUMINUM GUTTER -
DARK BRONZE FINISH
PREFINISHED 6" ALUMINUM
DOWNSPOUT - DARK BRONZE
FINISH. PROVIDE SPLASH BLOCK
AT BASE
1/2" PROTECTION BOARD
TAPERED RIGID INSULATION - MN 6"
FULLY ADHERED 60 MIL WHITE TPO
ROOFING MEMBRANE
EXISTING METAL DECK
EXISTING WALL
CONSTRUCTION
PREFORMED .064 ALUMINUM
SCUPPER w/ WELDED SEAMS BY
GRAVEL STOP COPING
MANUFACTURER - DARK BRONZE
FINISH
CLEAT CLIP
1'
NEW FRT BLOCKING
LAP SEALANT, FULL PERIMETER
COUNTER FLASHING
VAPOR BARRIER
EXISTING BRICK VENEER
TO REMAIN
FILL VOID w/ BATT
INSULATION
TURN ROOF MEMBRANE
DOWN FACE OF WALL -
8" MIN
1' -0
3"
5"
3"
1/ 2"
3/
4"
2 1/4"
6 1/2"
PREFORMED .064 ALUMINUM SCUPPER
w/ WELDED SEAMS BY GRAVEL STOP
COPING MANUFACTURER - DARK
BRONZE FINISH
3"
1"
1" DRIP EDGE - CLOSE AT BOTH
ENDS
2" MIN
SCUPPER PAN DETAIL
ALUMINUM GRAVEL STOP COPING -
DARK BRONZE FINISH
INSTALL SCUPPER PAN OVER GRAVEL
STOP COPING - OVERLAP COPING 2" MIN.
LAP DETAIL
2" MIN
1"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/1
.5
.1
R e p la c e R o o f B u id in g
A E
/1 .5
.1
A v
.r v t
/2
/2
:4
:0
A
M
AE502
ROOF DETAILS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE ROOF BUILDING 125 AE
1900 E Main St, Danville, IL 61832
550-22-108
09/29/2022 JLG DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 3" = 1'-0"AE502
1 ROOF COPING DETAIL @ METAL PANEL
SCALE: 3" = 1'-0"AE502
2 GUTTER DETAIL
SCALE: 3" = 1'-0"AE502
3 ROOF SCUPPER DETAIL
1PH SINGLE-PHASE
1P SINGLE POLE
2/C TWO-CONDUCTOR
3/C THREE-CONDUCTOR
3PH THREE-PHASE
4/C FOUR-CONDUCTOR
4W FOUR-WIRE
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
ADO AUTOMATIC DOOR OPENER
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
AMB OR A AMBIENT
ARCH ARCHITECT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BD BOARD
BFF BELOW FINISH FLOOR
BLDG BUILDING
BYP BY PASS
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
COMPT COMPARTMENT
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S REPRESENTATIVES
CTV CABLE TELEVISION
CU COPPER
CUR CURRENT
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISTR DISTRIBUTION
DN DOWN
DRSW DOOR SWITCH
DWG DRAWING
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EXIST EXISTING
FLEX FLEXIBLE METALLIC CONDUIT
FOUTT TELEPHONE FLOOR OUTLET
FP FIRE PROTECTION
FT FEET OR FOOT
FU SW FUSED SWITCH
G OR GND GROUND OR GENERATOR
GEN GENERATOR
GTB GROUND TERMINAL BOX
HOA HAND-OFF-AUTOMATIC
HT HEIGHT
HZ HERTZ
IMC INTERMEDIATE METAL CONDUIT
J-BOX JUNCTION BOX
LF LINEAR FEET (FOOT)
LTG LIGHTING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MT MOUNT
MTD MOUNTED
MTG MOUNTING
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEUT OR N NEUTRAL
NIC NOT IN CONTRACT
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
P POLE
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
RGS RIGID GALVANIZED STEEL
RM ROOM
REQD REQUIRED
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SURF SURFACE
SW SWITCH
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
WP WEATHERPROOF
ELECTRICAL / TECHNOLOGY ABBREVIATIONS
N ELECTRICAL PANEL
N = NAME
V = VOLTAGE
F = FRAME SIZE (AMPS)
B = BREAKER TYPE / RATING
F
T
FUSED DISCONNECT SWITCH
F = FRAME SIZE (AMPS)
T = FUSE SIZE (AMPS)
F
NON-FUSED DISCONNECT SWITCH
F = FRAME SIZE (AMPS)
F
T
CIRCUIT BREAKER
F = FRAME SIZE (AMPS)
T = TRIP SETTING (AMPS)
S
MOTOR STARTER
S = STARTER SIZE
AUTOMATIC TRANSFER SWITCH
VARIABLE FREQUENCY DRIVE
JUNCTION BOX
VFD
J
FUSE
S
N L
ELECTRICAL MOTOR
S = SIZE (HP)
N = NAME
L = ELECTRICAL LOAD (AMPS)
S
N L
ELECTRICAL DEVICE
S = SIZE (kW)
N = NAME
L = ELECTRICAL LOAD (AMPS)
N S
PV
SV
DELTA-Y DRY-TYPE TRANSFORMER
N = NAME
PV = PRIMARY VOLTAGE
S = SIZE (kW)
SV = SECONDARY VOLTAGE
EARTH GROUND
PUSHBUTTON SWITCH - NORMALLY CLOSED
PUSHBUTTON SWITCH - NORMALLY OPEN
CONTACT - NORMALLY OPEN
CONTACT - NORMALLY CLOSED
CURRENT TRANSFORMER
SOLENOID COIL
PILOT LIGHT
RC = RELAY COIL, NUMBER INDICATES RELAY TYPE
50 = INSTANTANEOUS OVERCURRENT OR RATE-OF-RISE
51 = AC-TIME OVERCURRENT
67 = AC-DIRECTIONAL OVERCURRENT
86 = LOCKING OUT
FLOOR
ROOM NAME & NO.
# FEEDER SIZE, REFER TO FEEDER SCHEDULE
F
T
CIRCUIT BREAKER
F = FRAME SIZE (AMPS)
T = FUSE SIZE (AMPS)
V F B
EXIST. EXISTING FEEDER TO REMAIN
DEMO. FEEDER TO BE REMOVED
SPECIAL RECEPTACLE / EQUIPMENT
DESCRIPTION 1
DESCRIPTION 2
N = NAME PLATE
L = ELECTRICAL LOAD (AMPS)
DESCRIPTION 1
DESCRIPTION 2
N
L
SWITCH
ONE-LINE DIAGRAM SYMBOL LEGEND
BRANCH CIRCUIT IS REPRESENTED WITH PANEL NAME AND NUMBER
OF CIRCUITS. REFER TO FLOOR PLANS AND PANELBOARD
SCHEDULES FOR ADDITIONAL INFORMATION.
KEYED NOTE, REFER TO DRAWINGS FOR NOTES
EXISTING DEVICE OR EQUIPMENT TO REMAIN
(E)
ELECTRICAL ITEMS SHOWN LIGHT WITH A SOLID LINETYPE ARE
EXISTING TO REMAIN UNLESS NOTED OTHERWISE.
PANEL: 1,3
ELECTRICAL ITEMS SHOWN BOLD WITH A HIDDEN LINETYPE ARE TO
BE REMOVED UNLESS NOTED OTHERWISE.
ELECTRICAL ITEMS SHOWN BOLD WITH A SOLID LINETYPE ARE NEW
UNLESS NOTED OTHERWISE.
EXISTING DEVICE OR EQUIPMENT TO BE RELOCATED (ER)
DETAIL NOTE, REFER TO DETAILS FOR NOTES AND ADDITIONAL
INFORMATION
ELECTRICAL GENERAL SYMBOL LEGEND
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
VIEW TITLE
N
NORTH ARROW
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
DRAWING SYMBOLS
XX-X X
EQUIPMENT NUMBER
BUILDING NO. WHERE EQUIPMENT IS LOCATED
EQUIPMENT ABBREVIATION
UNIT NUMBER TAG
480 / 277V PANEL, RECESSED OR SURFACE
MOUNTED
208 / 120V PANEL, RECESSED OR SURFACE
MOUNTED
POKE-THRU DEVICE, WITH POWER AND COMMUNICATIONS
REFER TO DIMENSIONS ON DRAWINGS FOR EXACT LOCATION
FLUSH MOUNTED IN-FLOOR BOX DEVICE FOR POWER.
REFER TO FURNITURE VENDOR'S DRAWING FOR DIMENSIONS.
ROUTE A 1" CONDUIT TO THE NEAREST COLUMN THEN TO
ABOVE AN ACCESSIBLE CEILING.
DUPLEX 120V, 20A RECEPTACLE
(MOUNT 18" AFF, UNLESS NOTED OTHERWISE)
GFCI = GROUND FAULT CIRCUIT INTERRUPTER
DED = DEDICATED CIRCUIT
WP = WEATHER PROOF
T = TAMPER-RESISTANT
SPECIAL 208V RECEPTACLE, REFER TO DRAWINGS
(MOUNT 18" AFF, UNLESS NOTED OTHERWISE)
DUPLEX 120V, 20A RECEPTACLE EMERGENCY OR
CRITICAL POWER (MOUNT 18" AFF, UNLESS NOTED
OTHERWISE)
QUAD 120V, 20A RECEPTACLE EMERGENCY OR CRITICAL POWER
(MOUNT 18" AFF, UNLESS NOTED OTHERWISE)
QUAD 120V, 20A RECEPTACLE
(MOUNT 18" AFF, UNLESS NOTED
OTHERWISE)
M
J
ELECTRIC MOTOR
JUNCTION BOX / OUTLET BOXJ
MR
STARTER, COMBINATION WITH DISCONNECT SWITCH
STARTER OR MOTOR CONTROLLER
T TRANSFORMER, FLOOR MOUNTED UNLESS NOTED OTHERWISE
NON-FUSED DISCONNECT SWITCH
F…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .