S02 - 36C25222Q0742.docx
DOCX document 253 KB Posted
- Solicitation number
- 36C25222Q0742
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25222Q0742
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
578-22-1-6221-0008
09/01/2022
07/14/2022 Joni Dorr 414-844-4858 07/28/2022 10:00 am
CST
36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101
Milwaukee WI 53214-1476
X
238210 $16.5 Million
N/A
36C252 Edward Hines Jr. VA Hospital Joliet Community Base Outpatient Center
Multiple Addresses. See Delivery Schedule 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101
Milwaukee WI 53214-1476
Department of Veterans Affairs Financial Services Center PO Box 149971
Austin TX 78714-9971 877-353-9791 512-460-5540
See CONTINUATION Page Electrical Distribution System Inspection and Testing for Edward Hines Jr. VA Hospital located in Hines, IL and Joliet Community Based Outpatient Center located in Joliet, IL.
Period of Performance shall include a base year, and four
(4) one-year options.
See SOW for full details
See CONTINUATION Page
578-3620162-6121-855100-2543 010050190 one
Ashley Johnson Contracting Officer
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 PURCHASE ORDER ADMINISTRATION DATA (continuation from Standard Form 1449)
OFFERORS MUST COMPLETE AND RETURN ALL INFORMATION DESIGNATED HEREIN PRIOR TO THE TIME SPECIFIED IN BLOCK 8 OF SF 1449 IN ORDER TO BE CONSIDERED FOR AWARD.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO | DATE | |
| ______________________________ | __________________________ | |
| ______________________________ | __________________________ | |
| ______________________________ | __________________________ |
1. PURCHASE ORDER ADMINISTRATION: All purchase order administration matters will be handled by the following individuals:
a. CONTRACTOR:
| Contractor Name: | _________________________________________ | |
| Address: | _________________________________________ | |
| City-State-Zip: | _________________________________________ | |
| Point of Contact/Title: | _________________________________________ | |
| Phone Number: | _________________________________________ | |
| Fax Number: | _________________________________________ |
E-Mail Address:_________________________________________
| DUNS Number: | _________________________________________ |
| UEI Number: | _________________________________________ |
Contractor’s past performance point of contact (if different than above):
| Name: | _________________________________________ | |
| Email Address: | _________________________________________ |
b. GOVERNMENT: Joni Dorr, Contract Specialist Contracting Office Code: 36C252
| Department of Veterans Affairs |
| Great Lakes Acquisition Contracting |
| 115 S. 84th St., Ste 100 |
Milwaukee, Wi 53214 joni.dorr@va.gov
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
a. FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
3. INVOICES:
a. Invoices shall be submitted monthly in arrears in accordance with: 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)
b. Payments shall be made in arrears upon receipt of a properly prepared invoice.
c. The VA has mandated electronic invoice submission to the Veterans Affairs Financial Services Center (VAFSC). VAFSC has partnered with Tungsten Network e-Invoicing network, for submissions of all electronic invoices to VA. Tungsten Network electronic invoicing is free to all VA vendors. In order to submit electronic invoices, all VA vendors must register with Tungsten Network by submitting an email to VA.Registration@Tungsten-Network.com or calling 1-877-752-0900 option 2 for Enrollment.
d. Contractor shall submit an electronic invoice by the tenth (10th) of the following month services were performed to the Veterans Affairs Financial Services Center (VAFSC) e-Invoice through the website at https://portal.Tungsten-Network.com/Login.aspx. For questions regarding the submission of VA electronic invoices, Tungsten Network customer service may be contacted at 1-877-489-6135.
e. All invoices shall reference the vendor name and address, customer name, purchase order number, appropriate obligation/funding order number, description of services provided, quantity, unit price, and total invoice amount (any additional info). Invoices shall also include any payment discount terms.
4. GOVERNMENT INVOICE ADDRESS (See SF1449 Block 18):
a. All invoices from the contractor shall be submitted electronically in accordance with 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)
b. Facsimile, e-mail, and scanned documents are not acceptable forms of submission for payment requests.
c. VA’s Electronic Invoice Presentment and Payment System – The Veterans Affairs Financial Services Center (VAFSC) uses a third-party contractor, Tungsten Network e-Invoice, to transition vendors from paper to electronic invoice submission. Please go to this website: http://www.tungsten-network.com/customer-campaigns/veterans-affairs-us/ to begin submitting electronic invoices, free of charge.
d. As of July 1, 2020, the VA10091 form has been eliminated and the VAFSC is requiring our vendors to update and add their information in the Customer Engagement Portal (CEP) at https://www.cep.fsc.va.gov/. This is for new vendors being added to FMS only.
e. For assistance setting up e-Invoice, the below information is provided:
i. * Tungsten Network e-Invoice Setup Information: 1-877-489-6135
* Tungsten Network e-Invoice email: VA.Registration@Tungsten-Network.com
* FSC e-Invoice Contact Information: 1-877-353-9791
* FSC e-invoice email: vafsccshd@va.gov
5. ACQUISITION OF COMMERCIAL ITEMS:
This Request for Quote (RFQ) solicitation is issued under the authority of FAR Part 13.5 Simplified Procedures for Certain Commercial Items in which simplified acquisition procedures in FAR Part 13 will be used. FAR Part 14 and 15 will not be used. From this RFQ, the Government intends to award a firm fixed price purchase order where the contractor provides a price that is not subject to any adjustment on the basis of the contractor’s cost experience in performing the purchase order.
6. SITE VISIT:
It is strongly suggested and expected that the offeror inspect the campus to be serviced to fully understand the nature of the work and the conditions under which the work is to be performed. In no case shall failure to inspect the campus constitute grounds for a claim after purchase order award.
Site visit is scheduled for Thursday, July 21, 2022 at 10:00 am Local Time (Central). All interested parties to meet COR Tom Tziavragos, 708-202-8387 ext 25415
Please Note: Until further notice, while on campus, all persons will be required to wear masks inside any VAMC building and while traveling in vehicles for purposes of the site visit.
7. RFQ QUESTIONS:
In order to maintain integrity of this solicitation and subsequent award date, all offerors are advised that any question and answer requests must be submitted in a written form via e-mail to the Contract Specialist joni.dorr@va.gov no later than Monday, July 25, 2022 at 10:00 am Local Time (Central). Contracting will issue a consolidated response via solicitation amendment to https://beta.sam.gov Contract Opportunities within 2 business days to all parties.
8. CONTRACTING OFFICER AUTHORITY:
The Contracting Officer is the only person authorized to approve changes or modify any of the requirements under this purchase order. The Contractor shall communicate with the Contracting Officer on all matters pertaining to purchase order administration. Only the Contracting Officer is authorized to make commitment or issue changes that will affect price, quantity or quality of performance of this purchase order. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority and no adjustment will be made in the purchase order price to cover any increase in cost incurred thereof.
9. IDENTIFICATION, PARKING, SMOKING AND VA REGULATIONS:
a. All VA property is considered Federal Property and all Federal laws are applicable.
b. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. The VA will not invalidate or make reimbursement for parking violations of the Contractor under any conditions.
c. All VA facilities are drug free. Possession of drugs, to include Marijuana and all Marijuana bi-products are prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
d. All contractor personnel are required to adhere to all VA rules and regulations.
e. Smoking is prohibited on the entire campus, both inside and outside the VA Facility
f. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
g. Photographs may be taken of the work performed at the jobsite. However, photographs containing patients and/or staff are a violation of the Patient Privacy and hospital policy. Both violations are subject to penalties and dismissal. Permission from the EHVAH Public Affairs Officer (PAO) shall be required and shall be coordinated with the project COR.
h. VHA DIRECTIVE 1192: This Veterans Health Administration (VHA) directive establishes policy and provides guidance for the prevention of seasonal influenza in VHA facilities through the vaccination or masking of health care personnel (HCP). AUTHORITY: Title 38 United States Code (U.S.C.) 7301(b), 7318(b). Contractor is responsible in ensuring that all aspects of this directive are implemented, including providing face masks and influenza vaccines for all employees working at a VA facility.
i. While on campus, all persons shall be required to wear masks inside any VA Medical Center building, walking on the grounds, and while traveling in vehicles. Contractor shall confirm with COR before arrival of current mask mandate.
10. VHA SUPPLEMENTAL CONTRACT REQUIREMENTS FOR ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS:
Contractor employees who work in or travel to VHA locations must comply with the following:
a. Documentation requirements:
i. If fully vaccinated, shall show proof of vaccination NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.
ii. If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the FOOD and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test.
iii. Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.
iv. Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
b. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the following website: COVID-19 Screening Tool. Regularly check the website for updates.
i. Contractor employees who work away from VA locations, but who will have direct patient contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
c. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA facilities.
11. SECURITY & PRIVACY CONTROL:
The Authorization & Accreditation (A&A) requirements of VHA Handbook 6500.6 do not apply to this requirement, therefore, a Security Accreditation Package is not required. No A&A or MOU/ISA is required. Sensitive information exposure as part of this purchase order involves applicable security controls within the facility as part of the VA Information Security If there are any questions related to privacy, please have a member of your staff contact the VA Privacy Service at (202) 461-6309. If there are any questions related to the information security, please have a member of your staff contact the Office of Cyber Security at (304) 262-7733.
Non-PIV Card:
Applies to unsupervised, logical and/or physical access for less than 6 months OR less than 180 aggregate days in a one-year period
Defined in VA Directive 0735 as: “Non-PIV Credential: A VA ID card containing a photograph issued to persons who do not require a PIV Credential but need unaccompanied, infrequent access to VA facilities or information systems for a period not to exceed six (6) months.”
All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation commensurate with the level of access needed to perform in accordance with the statement of work is: Special Agreement Check (SAC). This requirement is applicable to all subcontractor personnel requiring the same access.
A SAC is an automated records check conducted by the Federal Bureau of Investigation in collaboration with the Office of Personnel Management.
The current Fiscal Year fees associated with background investigations: SAC is $22. This fee is the responsibility of the Contractor and will be billed accordingly.
B.2 STATEMENT OF WORK
The Contractor shall furnish all labor, management, materials, equipment to perform preventive maintenance, inspection, calibration, testing and documentation of the Electrical Distribution System and associated components at the Edward Hines Jr. VA Hospital (Hines VAMC) & Joliet Community Based Outpatient Center (Joliet CBOC). All maintenance and testing shall be documented and provided in a written report
VA DIRECTIVE 1028 - This Veterans Health Administration (VHA) directive provides policy regarding the installation, operation, testing, and maintenance of Facility Electrical Power Systems at Department of Veterans Affairs (VA) medical facilities. AUTHORITY: Executive Order 12196, dated February 26, 1980; Title 38 United States Code (U.S.C.) 7301(b); 40 U.S.C. 3312. Contractor shall be required to conform to this Directive.
The Electrical Distribution System at the Hines VAMC & the Joliet CBOC require annual preventative maintenance service. The last time this equipment was serviced was in 2016.
Contractor shall be expected to:
1) Test & Inspect Electrical Distribution System
2) Provide Preventative Maintenance & Calibration to the Electrical Distribution System
3) Maintain proper functionality & safe operation of Electrical Distribution System
4) Provide Summary Reports for all Maintenance and Testing conducted to COR
A. DESCRIPTION OF SERVICES
The Contractor shall provide equipment, labor, & materials to perform preventative maintenance, inspection, testing, calibration, and documentation of the Electrical Power Distribution System at Hines VAMC and the Joliet CBOC as described in this Statement of Work and per VA Directive 1028.
The work described in this specification shall be performed by qualified Electrical Contract Professionals. This SOW requires that all Maintenance and Testing is documented, compiled into a summary/executive report (to include recommendations), and delivered to the Contracting Officer Representative (COR). The Contractor shall not require access to VA sensitive information, therefore the “Certification and Accreditation” (C&A) requirement in accordance with (IAW) VA Handbook 6500.6 Contract Security does not apply.
Any item found to be out of tolerance, or in any other way defective as a result of the required testing, shall be reported to the COR or his/her designee immediately, no later than 4 hours upon discovery.
Procedure for repair and/or replacement shall be outlined at the time of discovery. Contractor may be asked to provide repair and/or replacement quote. A separate Purchase Order shall be provided for any repairs and/or replacements.
Generally, an electrician from Hines VAMC or Joliet CBOC shall be provided to at a minimum, locate equipment, arrange shutdowns, and disconnect loads. However, any labor incidental to the Purchase Order work items (e.g., opening buss compartments for the thermographic survey) shall be the responsibility of the Contractor. All required shutdowns or power disconnects must be scheduled in advance with the COR, and no later than 14 calendar days before service. Date and times shall be mutually agreed upon with the Contractor and COR.
B. PERIOD OF PERFORMANCE
| Base Year: | Sept 1, 2022 through Oct 31, 2023 |
| Option Year 1: | Sept 1, 2023 through Oct 31, 2024 |
| Option Year 2: | Sept 1, 2024 through Oct 31, 2025 |
| Option Year 3: | Sept 1, 2025 through Oct 31, 2026 |
| Option Year 4: | Sept 1, 2026 through Oct 31, 2027 |
C. PLACE OF PERFORMANCE:
Hines VAMC
Joliet VA
| Edward Hines Jr. VA Hospital |
| Community Based Outpatient Clinic (CBOC) |
5000 South 5th Avenue
1201 Eagle Street
Hines, Illinois 60141
Joliet, Illinois 60432
D. INVENTORY
Hines VA
INVENTORY
| BLDG |
| EQUIPMENT |
| RATING |
| DESCRIPTION |
| Notes |
| Qty |
| 1 |
| Switch |
| Feeder Switch |
| Outside Gear |
| 1 |
| 1A |
| XFMR - 1TA |
| 500 |
| 4160 / 120 / 208 |
| East of 1A |
| 1 |
| 1A |
| XFMR - 1TA-N |
| 300 |
| 4160 / 208 / 120 |
| Next to 1TA |
| 1 |
| 1B |
| XFMR - 1TB |
| 750 |
| 4160 / 120 / 208 |
| East of 1B |
| 1 |
| 1C |
| XFMR - 1TC |
| 500 |
| 4160 / 208 / 120 |
| East of 1C |
| 1 |
| 1C |
| XFMR - 1TC-S |
| 500 |
| 4160 / 208 / 120 |
| East of 1C |
| 1 |
| 1D |
| Monitor |
| Ground Break w/GF Trip |
| D 222 |
| 5 |
| 1D |
| Monitor |
| Ground Break w/GF Trip |
| D 222 |
| 13 |
| 1D |
| MVS |
| Medium Voltage Switches |
| D 222 |
| 2 |
| 1D |
| Panel Board |
| w/Versatrip |
| D 222 |
| 1 |
| 1D |
| Switch |
| 2000 A |
| Load Break w/VersaTrip |
| D 222 |
| 1 |
| 1D |
| Switchboard |
| 2 Sect (20 Molded Case CBs) |
| D 222 |
| 1 |
| 1D |
| XFMR - 1TD |
| 500 |
| 4160 / 120 / 208 |
| East of 1D |
| 1 |
| 1D |
| XFMR - 1TD-1 |
| 750 |
| 4160 / 460 / 265 |
| Inside D108 |
| 1 |
| 1D |
| XFMR - 1TD-3 |
| 500 |
| 4160 / 277 / 480 |
| West of 1D |
| 1 |
| 1E |
| Monitor |
| Ground Break w/GF Trip |
| E 234 |
| 13 |
| 1E |
| Monitor |
| Ground Break w/GF Trip |
| E 277 |
| 14 |
| 1E |
| Switch |
| 2000 A |
| Load Break w/VersaTrip |
| E 234 |
| 1 |
| 1E |
| Switch |
| 2000 A |
| Load Break w/VersaTrip |
| E 277 |
| 1 |
| 1E |
| Switchboard |
| 2 Sect (21 Molded Case CBs) |
| E 234 |
| 1 |
| 1E |
| Switchboard |
| 2 Sect (16 Molded Case CBs) |
| E 277 |
| 1 |
| 1E |
| XFMR - 1TE |
| 500 |
| 4160 / 120 / 208 |
| East of 1E |
| 1 |
| 1F |
| AKR |
| 1200 A |
| A-50 w/SST Trip Device |
| F 108 |
| 1 |
| 1F |
| Monitor |
| Ground Break w/GF Trip |
| F 108 |
| 4 |
| 1F |
| Switch |
| 5 Kv |
| Load Interrupter |
| F 108 |
| 1 |
| 1F |
| XFMR - 1TF |
| 300 |
| 4160 / 120 / 208 |
| SE of 1F |
| 1 |
| 1F |
| XFMR - 1TF-1 |
| 500 |
| 4160 / 208 / 120 |
| NE of 1F |
| 1 |
| 1G |
| Breaker |
| 2000 A |
| Power w/VersaTrip |
| G 240 |
| 1 |
| 1G |
| Breaker |
| 1200 A |
| Main Breaker |
| G 314 |
| 1 |
| 1G |
| Monitor |
| Ground Break w/GF Trip |
| G 240 |
| 14 |
| 1G |
| XFMR - 1TG |
| 500 |
| 4160 / 208 / 120 |
| East of 1G |
| 1 |
| 1G |
| XFMR - 1TG-2 |
| 300 |
| 4160 / 208 / 120 |
| SW of 222 |
| 1 |
| 2 |
| XFMR - 2T |
| 300 |
| 4160 / 208 |
| East side |
| 1 |
| 3 |
| XFMR - 3T |
| 112.5 |
| 4160 / 120 / 208 |
| West side |
| 1 |
| 4 |
| XFMR - 4T |
| 112.5 |
| 4160 / 208 |
| West side |
| 1 |
| 7 |
| XFMR - 7T |
| 275 |
| 4160 / 120 / 208 |
| Between 7 & 8 |
| 1 |
| 8 |
| XFMR - 8T |
| 300 |
| 4160 / 120 / 208 |
| Between 7 & 8 |
| 1 |
| 9 |
| XFMR - 9T |
| 300 |
| 4160 / 120 / 208 |
| South of 9 |
| 1 |
| 12 |
| XFMR - 12T |
| 1000 |
| 4160 / 277 / 480 |
| West of bldg |
| 1 |
| 14 |
| XFMR - 14T |
| 500 |
| 4160 / 208 |
| East of bldg |
| 1 |
| 16 |
| XFMR - 16T |
| 500 |
| 4160 / 480 |
| East of bldg |
| 1 |
| 17 |
| XFMR - 17T |
| 300 |
| 4160 / 208 |
| SE of bldg |
| 1 |
| 18 |
| XFMR - 18T |
| 500 |
| 4160 / 120 / 208 |
| East of bldg |
| 1 |
| 20 |
| Panel |
| 208 v |
| Distribution |
| North |
| 2 |
| 20 |
| Panel |
| 480 v |
| Distribution |
| North |
| 1 |
| 20 |
| Switch |
| 4160v |
| Fused Switch |
| North |
| 7 |
| 20 |
| XFMR - 20T-1 |
| 225 |
| 4160 / 480 / 277 |
| East of bldg |
| 1 |
| 20 |
| XFMR - 20T-2 |
| 500 |
| 4160 / 120 / 208 |
| East of bldg |
| 1 |
| 24 |
| XFMR - 24T |
| 100 |
| 4160 / 240 |
| South of bldg |
| 1 |
| 25 |
| XFMR - 25T |
| 167 |
| 4160 / 240 |
| SW of bldg |
| 1 |
| 29 |
| XFMR - 29T |
| 167 |
| 4160 / 240 |
| NW of bldg |
| 1 |
| 45 |
| XFMR - 45T |
| 300 |
| 4160 / 208 / 120 |
| West of bldg |
| 1 |
| 48 |
| Breaker |
| 2000 A |
| Main Breaker |
| Inside bldg |
| 1 |
| 48 |
| Incoming Bus |
| Section |
| Inside bldg |
| 1 |
| 48 |
| Load Interrupter |
| 15 Kv |
| Inside bldg |
| 1 |
| 48 |
| Panel Board |
| 480 v |
| w/18 Molded Case CBs |
| Inside bldg |
| 1 |
| 48 |
| Switch |
| 5Kv |
| in a 3R Enclosure |
| NE Corner |
| 1 |
| 48 |
| System |
| Ground Fault - Type GP |
| Inside bldg |
| 1 |
| 48 |
| XFMR - 48T |
| 1500 |
| 4160 / 480 / 277 |
| NE of bldg |
| 1 |
| 53 |
| XFMR - 53T |
| 750 |
| 4160 / 208 |
| South of bldg |
| 1 |
| 113 |
| Breaker |
| 1000 A |
| Mold Case w/Digitrip 510 |
| Inside bldg |
| 1 |
| 113 |
| Meter |
| Power |
| Inside bldg |
| 1 |
| 113 |
| Switch |
| Transfer 480 / 277v |
| Inside bldg |
| 2 |
| 113 |
| XFMR - 113T |
| 750 |
| 4160 / 277 / 480 |
| NW of bldg |
| 1 |
| 128 |
| Battery Cell |
| 1 & 128 |
| 20 |
| 128 |
| Battery Charger |
| 24 v |
| 1 & 128 |
| 1 |
| 128 |
| Breaker |
| 1200 A |
| Mold Case w/Digitrip 310 |
| Inside bldg |
| 1 |
| 128 |
| Breaker |
| 800 A |
| Mold Case w/2ndary Inject |
| Inside bldg |
| 1 |
| 128 |
| Meter |
| Power |
| Inside bldg |
| 1 |
| 128 |
| XFMR - 128T |
| 1000 |
| 4160 / 277 / 480 |
| NW of bldg |
| 1 |
| 200 |
| ATS |
| 400A |
| C017 |
| 1 |
| 200 |
| Battery Cell |
| sbm43-3 |
| C017 |
| 45 |
| 200 |
| Battery Charger |
| SLR120-12 |
| C017 |
| 1 |
| 200 |
| Breaker |
| w/ Digitrip 810's |
| C014 |
| 34 |
| 200 |
| Breaker |
| w/ IPONI |
| C014 |
| 34 |
| 200 |
| Breaker |
| Digitrip Monitor II's w/ IPONI |
| C014 |
| 2 |
| 200 |
| Breaker |
| DSII 516 Molded Case |
| C014 |
| 26 |
| 200 |
| Breaker |
| DSII 850 w/ Digitrip 810's |
| C014 |
| 4 |
| 200 |
| Breaker |
| 0811 840 w/Digitrip 810's |
| C017 |
| 3 |
| 200 |
| Breaker |
| 50-VCP-W-250 |
| C017 |
| 3 |
| 200 |
| Breaker |
| Low Voltage |
| C017 |
| 11 |
| 200 |
| Breaker |
| Digitrip 3000 |
| C017 |
| 6 |
| 200 |
| Breaker |
| Digitrip Monitor II's w/ IPONI |
| C017 |
| 2 |
| 200 |
| Breaker |
| DSII 516 w/Digitrip 810 |
| C017 |
| 33 |
| 200 |
| Breaker |
| 50-VCP-W-250 |
| Outside |
| 8 |
| 200 |
| Breaker |
| CH-FP 5000 |
| Outside |
| 4 |
| 200 |
| Breaker |
| Digitrip 3000 |
| Outside |
| 4 |
| 200 |
| Inputs |
| Control Point - EMCS |
| C017 |
| 130 |
| 200 |
| Meter |
| 6000 Analyzer w/ IPONI |
| C014 |
| 2 |
| 200 |
| Meter |
| 6000 Analyzer w/ IPONI |
| C017 |
| 3 |
| 200 |
| Meter |
| 6000 Analyzer w/ IPONI |
| C017 |
| 2 |
| 200 |
| Network Protect |
| C017 |
| 4 |
| 200 |
| Network Protect |
| CM 22's on 4Kv XFMR |
| C017 |
| 4 |
| 200 |
| Relay |
| Protective |
| C014 |
| 12 |
| 200 |
| Switch |
| 5Kv |
| Selector Switch WLI |
| C017 |
| 2 |
| 200 |
| Switchgear |
| On the A-Board |
| C017 |
| 4 |
| 200 |
| Switchgear |
| On the B-Board |
| C017 |
| 3 |
| 200 |
| UPS |
| Standard |
| C014 |
| 3 |
| 200 |
| UPS |
| Standard |
| Outside |
| 2 |
| 200 |
| XFMR - 200T-1 |
| 2000 |
| 4160 / 480 |
| Basement, S |
| 1 |
| 200 |
| XFMR - 200T-2 |
| 2000 |
| 4160 / 480 |
| Basement, S |
| 1 |
| 200 |
| XFMR - 200T-3 |
| 2000 |
| 4161 / 480 |
| Basement, S |
| 1 |
| 200 |
| XFMR - 200T-4 |
| 2000 |
| 4162 / 480 |
| Basement, S |
| 1 |
| 202 |
| ATS |
| 260A |
| ASCO940 - 480v |
| Substation |
| 1 |
| 202 |
| Battery Cell |
| FNC308L |
| Substation |
| 94 |
| 202 |
| Battery Charger |
| Substation |
| 1 |
| 202 |
| Breaker |
| 50-VCP-W-250 |
| Substation |
| 20 |
| 202 |
| Breaker |
| 800-VCP-W-250 (Indoor) |
| Substation |
| 3 |
| 202 |
| Breaker |
| Digitrip 3000 |
| Substation |
| 23 |
| 202 |
| Breaker |
| Protective Relay |
| Substation |
| 12 |
| 202 |
| Meter |
| 6000 Analyzer w/ IPONI |
| Substation |
| 23 |
| 202 |
| UPS |
| Standard |
| Substation |
| 1 |
| 205 |
| XFMR - 205T |
| 1000 |
| 4160 / 480 |
| Inside Bldg |
| 1 |
| 215 |
| Breaker |
| 50-VCP-W-250 |
| Outside |
| 8 |
| 215 |
| Breaker |
| CH-FP 5000 |
| Outside |
| 4 |
| 215 |
| Breaker |
| Digitrip 3000 |
| Outside |
| 4 |
| 215 |
| Inputs |
| Control Point - EMCS |
| Outside |
| 8 |
| 215 |
| UPS |
| Standard |
| Outside |
| 2 |
| 217 |
| Line up |
| Cat# PMH |
| Inside bldg |
| 1 |
| 217 |
| Panel |
| 800 A |
| Generator Feed |
| Inside bldg |
| 1 |
| 217 |
| Switch |
| 1200 A |
| Hi-pressure 480v |
| Outside |
| 1 |
| 217 |
| Switchboard |
| 800A |
| 3 Section |
| Inside bldg |
| 1 |
| 217 |
| XFMR - 217T |
| 1000 |
| 4160 / 480 |
| SW of bldg |
| 1 |
| 218 |
| ATS |
| Inside bldg |
| 1 |
| 218 |
| Battery Cell |
| Inside bldg |
| 20 |
| 218 |
| Battery Charger |
| Inside bldg |
| 1 |
| 218 |
| Breaker |
| Inside bldg |
| 2 |
| 218 |
| Panel |
| 400 A |
| Inside bldg |
| 1 |
| 218 |
| Panel |
| 200 A |
| Inside bldg |
| 1 |
| 220 |
| ATS |
| Inside bldg |
| 1 |
| 220 |
| ATS |
| Inside bldg |
| 3 |
| 220 |
| Battery Cell |
| Inside bldg |
| 10 |
| 220 |
| Battery Cell |
| 2 Cells Excide |
| Inside bldg |
| 2 |
| 220 |
| Battery Charger |
| 12v |
| Inside bldg |
| 1 |
| 220 |
| Battery Charger |
| Inside bldg |
| 1 |
| 220 |
| Breaker |
| Mold Case w/MicroVersaTrip |
| Inside bldg |
| 1 |
| 220 |
| Breaker |
| DS416 w/ Amptector 1-A |
| Inside bldg |
| 1 |
| 220 |
| XFMR - 220T |
| 500 |
| 4160 / 480 / 277 |
| North of bldg |
| 1 |
| 221 |
| ATS |
| Inside bldg |
| 1 |
| 221 |
| Battery Cell |
| Inside bldg |
| 10 |
| 221 |
| Battery Charger |
| Inside bldg |
| 1 |
| 221 |
| Switch |
| Feeder Switch |
| Inside bldg |
| 2 |
| 221 |
| Switchboard |
| 208/120v |
| 2 Sect (9 Molded Case CBs) |
| Inside bldg |
| 1 |
| 221 |
| XFMR - 221T |
| 500 |
| 4160 / 208 / 120 |
| SW of bldg |
| 1 |
| 222 |
| Battery Cell |
| Inside bldg |
| 20 |
| 222 |
| Battery Charger |
| Inside bldg |
| 1 |
| 222 |
| Breaker |
| 1200 A |
| Mold Case w/MicroVersaTrip |
| Inside bldg |
| 1 |
| 222 |
| Breaker |
| 1200 A |
| Mold Case w/Seltronic NC |
| Inside bldg |
| 1 |
| 223 |
| Battery Cell |
| Inside bldg |
| 20 |
| 223 |
| Battery Charger |
| Inside bldg |
| 1 |
| 223 |
| Breaker |
| 1200 A |
| Mold Case w/MicroVersaTrip |
| Inside bldg |
| 1 |
| 223 |
| Breaker |
| 1200 A |
| Mold Case w/Seltronic NC |
| Inside bldg |
| 1 |
| 224 |
| Battery Cell |
| Inside bldg |
| 20 |
| 224 |
| Battery Charger |
| 24v |
| Series YCCC |
| Inside bldg |
| 1 |
| 224 |
| Breaker |
| 1200 A |
| Molded Case w/Versatrip |
| Inside bldg |
| 1 |
| 225 |
| Battery Cell |
| Inside bldg |
| 20 |
| 225 |
| Battery Charger |
| 24v |
| Inside bldg |
| 1 |
| 225 |
| Breaker |
| 1200 A |
| Molded Case w/Versatrip |
| Inside bldg |
| 1 |
| 226 |
| ATS |
| 400 A |
| 480 v |
| Inside bldg |
| 1 |
| 226 |
| Battery Cell |
| FNC218x (20 Battery/gen) |
| Inside bldg |
| 20 |
| 226 |
| Battery Charger |
| Inside bldg |
| 5 |
| 226 |
| Breaker |
| DSII 815 w/Digitrip 810 |
| Inside bldg |
| 6 |
| 226 |
| Breaker |
| DSII 850 w/Digitrip 810 |
| Inside bldg |
| 2 |
| 226 |
| Inputs |
| Control Point - EMCS |
| Inside bldg |
| 320 |
| 226 |
| Meter |
| 6000 Analyzer w/ IPONI |
| Inside bldg |
| 10 |
| 226 |
| Relay |
| Basler |
| Inside bldg |
| 6 |
| 226 |
| Relay |
| Basler |
| Inside bldg |
| 6 |
| 226 |
| Relay |
| BE-1-27/59 |
| Inside bldg |
| 1 |
| 226 |
| UPS |
| Standard |
| Inside bldg |
| 1 |
| 227 |
| ATS |
| Inside bldg |
| 1 |
| 227 |
| ATS |
| Inside bldg |
| 1 |
| 227 |
| Battery Cell |
| Inside bldg |
| 2 |
| 227 |
| Battery Cell |
| Inside bldg |
| 20 |
| 227 |
| Battery Charger |
| Inside bldg |
| 1 |
| 227 |
| Battery Charger |
| 32v, Series YCCC |
| Inside bldg |
| 1 |
| 227 |
| Breaker |
| 1200 A |
| Mold Case w/MicroVersaTrip |
| Inside bldg |
| 1 |
| 227 |
| XFMR - 227T |
| 1000 |
| 4160 / 277 / 480 |
| Gen bldg |
| 1 |
| 228 |
| Battery Cell |
| Inside bldg |
| 20 |
| 228 |
| Battery Charger |
| 24v |
| Inside bldg |
| 1 |
| 228 |
| Breaker |
| 800 A |
| Inside bldg |
| 1 |
| 228 |
| Breaker |
| 1000 A |
| Medium voltage |
| Inside bldg |
| 3 |
| 228 |
| Distribution |
| 2000 A |
| Electrical |
| Inside bldg |
| 1 |
| 228 |
| XFMR - 228T-1 |
| 1500 |
| 4160 / 480 / 277 |
| South of bldg |
| 1 |
| 228 |
| XFMR - 228T-2 |
| 1500 |
| 4161 / 480 / 277 |
| South of bldg |
| 1 |
| 229 |
| ATS |
| Inside bldg |
| 1 |
| 229 |
| MCC |
| 3 Section |
| Inside bldg |
| 1 |
| 229 |
| Switchboard |
| 4 Section Mold Case CBs |
| Inside bldg |
| 1 |
| 229 |
| XFMR - 229T |
| 300 |
| 4160 / 120 / 208 |
| West of bldg |
| 1 |
| PHT |
| XFMR - PHT |
| 150 |
| 4160 / 208 |
| NE of 113 |
| 1 |
| Various |
| Air Switches |
| 5 KV |
| Various Locations |
| Various |
| 4 |
| Various |
| Oil Switches |
| 5 KV |
| Various Locations |
| Various |
| 25 |
| Various |
| Oil Switches - VFI |
| 5 KV |
| Various Locations |
| Various |
| 25 |
| Various |
| Sectionalizers |
| 5 KV |
| Various Locations |
| Various |
| 60 |
Joliet CBOC
EQUIPMENT
| XFMR |
| DEVICE |
| RATING |
| DESCRIPTION |
| NOTES |
| Qty |
| Joliet |
| ATS |
| 7000 Series |
| CBOC |
| 2 |
| Joliet |
| Breaker |
| Molded Case |
| CBOC |
| 30 |
| Joliet |
| Switchboard |
| w/Disconnect |
| CBOC |
| 1 |
E. SCHEDULED FREQUENCY
This section identifies the scheduled frequency of preventative maintenance for the Electrical Distribution System.
Annual Maintenance Items – Performed each year
| Automatic 5 kV transfer switch equipment |
| Infrared Thermographic Inspection |
Disconnects - oil immersed for network XFMRs
Transformers - Network Type, oil-filled - 5kv & up
Dielectric Test of Oil
Transformers - Power, oil filled - 5kv & up
Automatic 5KV distribution - Bldg 200
| Power Transformers - Dry Type |
| Ventilation Inspection |
| Power Transformers - Oil Filled |
| Internal & External Enclosure Inspection |
| Switchgear Control Building |
| Visual Inspection - Operator Rounds (1x per month) |
| DC System |
| Battery & Battery Charger Inspection |
2 Year Cycle Maintenance Items (Base Year, Option Year 2, Option Year 4)
| Automatic 5 kV throw-over/transfer switch |
| Functional & Protective Relay Check |
| Automatic 5 kV distribution - Bldg 200 |
| Calibration & Functional Checks |
| Protective Equipment (Relays) |
| Calibration & Functional Checks |
Including all Annual Maintenance Items
3 Year Cycle Maintenance Items (Base Year, Option Year 3)
5Kv Switchgear Circuit Breakers (Vacuum) Inspection of Circuit Breaker Condition
Mechanical system Maintenance
Circuit Breaker Enclosure Maintenance
Including all Annual Maintenance Items
5 Year Cycle Maintenance Items (Base Year only)
| Network Protectors on 5kV Transformers |
| Mechanism & Motor Checks |
Relay Calibration & Functional Checks
Including all Annual Maintenance Items
F. GENERAL REQUIREMENTS
1. CLEAN ALL EQUIPMENT:
Contractor shall perform the following:
a. Vacuum inside of case and floor
b. Vacuum transformer core and coils
c. Blow out horizontal and vertical ducts with dry nitrogen (maxi pressure of 25 psi)
d. Loosen attached particles and vacuum them away
e. Wipe all porcelain and other insulating materials with a clean, dry, lint free rag
f. Clean grooves
g. Re-vacuum inside surfaces
h. Inspect equipment anchorage & equipment alignment
i. Check all heater elements for operation and control
j. Lubricate equipment per manufacturer's recommendations
k. Inspect for physical damage and abnormal mechanical and electrical conditions
l. Compare equipment nameplate info w/latest one-line diagram & report discrepancies
m. Verify proper auxiliary device operation and indicators
n. Check tightness of accessible bolted electrical joints (Use torque wrench method)
o. Thoroughly examine equipment for shipping brackets, insulation, packing, etc.
p. Thoroughly examine equipment for a collection of dirt or other forms of debris that may have collected in equipment during normal operation
2. INFRARED SCANNING
Contractor shall perform the following:
Prior to Scanning:
a. Inspect the electrical equipment for physical, electrical, and mechanical condition
b. Visually inspect for proper bus alignment
c. Remove all necessary covers prior to scanning
Scan the following equipment:
a. Automatic transfer switches
b. Transformers
c. Batteries
d. VFI’s
e. Sectionalizers
f. 480 Bus (C014 & C017)
g. All 5Kva & 480/208V Distribution Connection points (i.e., Main Breakers, MCC Gear, fused disconnects for equipment)
Provide a report indicating the following:
a. Problem area(s) & location of hot spot(s)
b. Indicate the temperature rise between "hot spot(s)" & normal or reference area
c. Indicate cause of heat rise
d. Indicate phase unbalance if present
e. Index of areas scanned
f. Report any problem areas to the COR immediately, within 4 hours of discovery, for corrective work to be initiated
3. CIRCUIT BREAKERS & CUBICLES
Contractor shall perform the following:
Prior to testing:
a. Inspect anchorage
b. Inspect for physical damage and cleanliness
c. Mechanical operator and contact alignment tests shall be performed on both the breaker and its operating mechanism IAW the manufacturer's instructions
d. Check tightness of the bolted bus joints by calibrated torque wrench method.
e. Check cell fit and element alignment, including the circuit breaker and bus stabs
f. Check the lowering/raising mechanism, or horizontal levering-in mechanism
g. Verify the primary and secondary contact wipe and other dimensions, which are vital to satisfactory operation of the circuit breaker using the manufacturer's instruction book
h. Install contact lubricant on all mating electrical contacts
i. Verify availability of all maintenance devices for servicing & operating the equipment
j. Check all heater elements for operation and control
Cleaning - Completely clean the interior of all cubicle sections including all bus work and insulators using the following methods:
a. Vacuum the inside of the switchgear and enclosure
b. Loosen attached particles and vacuum them away
c. Wipe all porcelain and all other insulating materials with a clean, dry lint free rag
d. Clean all grooves
e. Re-vacuum inside of switchgear enclosure
f. Remove, strip down, inspect, clean, re-lubricate and rebuild circuit breaker units
g. Check and/or replace all arcing contacts
h. Check, clean and/or replace all arc chutes
i. Inspect and correct the on-off indicators
j. Inspect and correct the spring charge indicators
k. Inspect and correct the mechanical/electrical interlocks
l. Inspect and correct the operation counters for proper operation
m. Inspect and correct the operation of the safety shutters
n. Measure the contact resistance
o. Perform minimum pickup voltage tests on the trip and close coils
p. Perform DC over-potential test at 3X rated voltage w/breaker in closed position
q. Tests shall be made on each pole for 5-minute duration w/all other poles grounded
r. If charging motors are used, Check condition and operation of brushes and limit switches
s. With breaker in test position, trip and close the breaker with the control switch
t. With breaker in test position, trip each breaker by operating protective relays manually
u. Measure the insulation resistance
v. With contacts open, test between line and load side of each phase
w. With contacts closed, test each pole to other poles and each pole to ground
x. Perform an insulation resistance test at 1,000 volts DC on all control wiring
y. DO NOT perform this test on wiring connected to solid-state relays
Oil Type Medium & Low Voltage Circuit breakers
a. Perform power factor tests on each pole with breaker open and each pair of bushings with the breaker closed.
b. Perform power factor tests on each bushing. Use conductive straps and hot collar procedures if the bushings are not equipped with a power factor tap
c. Sample and laboratory test the insulating fluid for:
i. Dielectric breakdown voltage, ASTM D-877
ii. Color, ASTM D-1500
iii. Power factor, ASTM D-924
iv. Visual condition, ASTM D-1524
v. Acid neutralization number, ASTM D-974
vi. Moisture content
Vacuum Type Medium Voltage Oil Type Circuit breakers
a. DO NOT exceed maximum voltage stipulated for this test
b. DO NOT perform test unless contact displacement of interrupter shall be within the manufacturer’s tolerance
c. Perform contact displacement tests on each interrupter IAW manufacturer’s instructions
d. Perform an AC or DC over-potential test across each vacuum bottle with the breaker in the open position in strict accordance with the manufacturer's instruction
e. Provide adequate barriers and protection against x-radiation during this test
f. Perform power factor tests on each pole with the breaker open and each pair of bushings with the breaker closed. Tank loss index shall be determined
g. Perform power factor tests on each bushing. Use conductive straps and hot collar procedures if bushings are not equipped with a power factor tap
4. LOAD BREAK MEDIUM VOLTAGE SWITCHES (5 KV)
Contractor shall perform the following:
a. Check blade alignment and arc interrupter operation
b. Checks fuse linkage and element for proper holder and current rating
c. Check each fuse holder for adequate mechanical support of each fuse
d. Verify interlocks and proper key distribution
e. Perform insulation resistance test on each phase from phase-to-phase & phase-to-ground
f. Perform contact resistance test across each switchblade and fuse holder
g. Lubricate with contact lubricant all moving, current carrying parts
h. Apply appropriate lubrication on all other moving and sliding surfaces
i. Verify proper phase barrier, materials, and installation
5. PROTECTIVE RELAYS
Contractor shall perform the following:
a. DO NOT perform this test on solid-state relays
b. All relays shall be inspected for physical damage
c. Inspect cover gaskets & cover glass for presence of foreign material or moisture & clean
d. Inspect spiral spring, disc, and contacts for condition and rust
e. Check disc for clearance
f. Check mechanically for freedom of movement, proper travel & alignment, and tightness of mounting hardware & tap screws
g. Apply prescribed settings
h. Perform insulation resistance test on each circuit branch to frame
i. Test and adjust the parameters on each operating element
j. Timing tests shall be made at two points on each time dial curve
k. Test the target trip current and seal-in units
l. Perform instantaneous tests corresponding to the timing test values
m. Test the tripping circuit by itself and with the circuit breaker
n. Perform special tests of directional restraint per manufacture's instruction manuals
o. Perform phase angle and magnitude contribution tests on all differential and directional type relays after energization to vectorially prove proper polarity and connections
p. Provide as found and as left test reports for all equipment
6. BATTERY SYSTEMS
Contractor shall perform the following:
a. Inspect for physical damage and evidence of corrosion
b. Clean units
c. Check inter-cell bus link integrity
d. Measure system charging voltage and each individual cell voltage
e. Measure the electrolyte specific gravity and level
f. Measure the voltage drop across the individual cells
g. Perform Infra-Red scan on batteries during discharge and recharge cycles (Observing inter-cell connectors, battery links and plates)
h. Verify proper charging rates from charger during recharge mode
i. Verify individual cell acceptance of charge during recharge mode
j. Verify and compare measured values with manufacturer's specifications
7. LIQUID FILLED TRANSFORMERS (OIL)
Contractor shall perform the following:
a. Insulation resistance tests shall be performed winding-to-winding and winding-to-ground
b. Appropriate guard circuit shall be utilized over all bushings
c. A turns ratio test shall be performed between windings at all service tap settings
d. Turns ratio test results shall not deviate more than 0.5% from the calculated ratio
e. Verify that the tap settings/changer shall be at the desired ratio
f. Exciting current tests shall be performed on each phase
g. Winding resistance test shall be made for each winding at the in-service tap
h. Test and adjust cooling fans, pump controls and alarm function
i. Test and adjust automatic tap changer
j. Insulating oil shall be sampled in accordance with ASTM D-923.
k. Samples from both transformers and automatic load tap changers shall be laboratory tested:
l. Dielectric strength
m. Acid Neutralization number
n. Interfacial tension
o. Color
p. Power Factor
q. PPM water
8. DRY TYPE TRANSFORMER
Contractor shall perform the following:
a. Insulation resistance tests shall be performed winding-to-winding and winding-to-ground
b. A turns ratio test shall be performed between windings at all service tap settings
c. Over potential test shall be made on all medium and low voltage windings to ground
d. Winding resistance tests shall be made for each winding at the in-service tap
e. Test and adjust the cooling fans, controls, and alarm functions
f. Verify that the tap settings/changer shall be at the desired ratio
g. Measure secondary voltage phase-to-phase & phase-to-ground after final energization
h. Verify and/or connect transformer "XO" to ground, load side of "WYE" systems
i. Clean and Vacuum unit to remove all dust
9. SWITCHBOARDS DRAWOUT CIRCUIT BREAKERS
Contractor shall perform the following:
Visual and Mechanical Inspection:
a. Inspect for physical, electrical, and mechanical conditions
b. Re-torque all bolted connections
c. Compare equipment nameplate info w/latest single line diagram & report discrepancies
d. Inspect for proper alignment, anchorage, and grounding
e. All doors, panels, and sections shall be inspected for paint, dents, scratches, and fit
f. All active components shall be cleaned where possible and shall be exercised
g. All indicating devices shall be inspected for proper operation
h. Inspect, lubricate, & clean switchboard enclosure using the following methods:
i. Vacuum inside of switchgear enclosure
ii. Loosen attached particles and vacuum them away
iii. Wipe all porcelain and other insulating materials with a clean, dry, lint-free rag
iv. Clean all grooves
v. Re-vacuum inside of switchgear enclosure
vi. Lubricate per manufacturer's recommendations
Electrical Tests:
a. Insulation resistance tests
b. Measure insulation resistance for bus section phase-to-phase and phase-to-ground for (1) min
c. Auxiliary protective devices such as ground fault or undervoltage relays shall be activated to insure operation of shunt trip devices
d. Circuit breakers - power type solid state trip:
e. Contact resistance test shall be performed
f. Insulation resistance test shall be performed at 1,000 volts DC for 1-minute from pole-to- pole and across open contacts of each phase
g. Minimum pickup current shall be determined by primary current injection
h. Long-time delay shall be determined by primary injection at 300% pickup current
· Short-time pickup & time delay shall be determined by injection of current
· Instantaneous pickup current shall be determined by injection
i. Trip unit reset characteristics shall be verified
j. Provide adjustments for final settings in accordance w/Engineer's prescribed settings
Switchboard Specific Testing:
a. Provide Annual full load test utilizing portable test bank for 4 hours minimum.
b. Simulate power failure including operation of transfer switch, automatic staring cycle, automatic shutdown, and return to normal.
c. Test alarm and shutdown circuits by simulating conditions
d. Adjust generator output voltage, frequency, and engine speed
e. Record in 15-minute intervals during 4-hour test:
i. Kilowatts
ii. Amperage
iii. Voltage
iv. Coolant Temperature
v. Room Temperature
vi. Frequency
vii. Oil Pressure
G. TESTING REQUIREMENTS
1. TESTING CONSULTANT QUALIFICATIONS
All testing shall be performed by an independent Testing Consultant (T.C.) who shall be engaged in electrical testing as a major portion of his/her business. The Testing Consultant shall have field personnel who have successfully demonstrated their knowledge and experience with electrical distribution systems medium and low voltage testing. The Testing Consultant shall be capable of:
a. Testing, assessing, evaluating, servicing, and reconditioning components
b. Assuring equipment performs safely, reliably, & acceptable for intended purpose
c. Identifying defective equipment, potential safety problems, hazards, or code violation
d. Proving a minimum of two (2) years of experience on similar testing projects
2. TESTING EQUIPMENT / INSTRUMENT TRACEABILITY
Prior to commencement of work on this Purchase Order, the Contractor shall provide Hines VAMC and Joliet CBOC with a copy of the current calibration certification of all test equipment, which shall be used by the Contractor on Hines VAMC and Joliet CBOC equipment. This certification shall also be provided on a periodic basis when requested by the COR or designee. Test equipment calibration shall be traceable to the National Institute of Standards & Technology (NIST), previously known as the National Bureau of Standards (NBS). The Contractor shall have a calibration program which maintains all applicable test instrumentation within rated accuracy. The accuracy shall be traceable to the NIST / NSB in an unbroken chain.
a. Dated calibration labels shall be visible on all test equipment.
b. Records must be updated to show date & results of all instruments calibrated or tested
c. Up-to-date instrument calibration instruction & procedure shall be maintained for each test instrument
3. TESTING REPORTS
All equipment shall be tested and inspected in accordance with the latest applicable National Electrical Testing Association (NETA) standards and manufacturers' instructions. All individual components of an assembly shall be tested with the component in its final connected stage to confirm the actual intended operation of the device. The test report shall include the following:
a. Summary-of project
b. Description of test
c. Description of equipment tested
d. Test results
e. Conclusions and recommendations
f. Appendix, including appropriate test forms
g. List of test equipment used and calibration date
Submit four (4) copies of all test reports on N.E.T.A. or similar printed forms and submit to the COR no later than thirty (30) calendar days after completion of the testing and inspection unless directed otherwise.
H. REPORTS & DOCUMENTATION
Contractor shall provide reports stating what items were serviced & document the quality of the service. Upon completion of services, Contractor shall provide documentation to include detailed descriptions of all services performed. Documentation & Reports shall be on Contractor's letterhead. Reports shall be legible and easy to understand and signed by the Supervisor and/or authorized representative of the Contractor.
Any item found to be out of tolerance, or in any other way defective as a result of the required services, shall be reported to the CO and/or COR within four (4) hours upon discovery. Procedure for repair or replacement shall be outlined. Contractor may be asked to provide repair and/or replacement quote. A separate Purchase Order shall be provided for any repairs and/or replacements.. All existing equipment, apparatus, and work shall be tested to insure its proper & safe operation in accordance with the specifications and manufacturer standards.
NOTE: ANY ADDITIONAL CHARGES CLAIMED MUST BE APPROVED BY THE COR BEFORE SERVICE SHALL BE COMPLETED!
I. QUALIFICATIONS
1. Contractors shall be experienced Electrical Contractors/Professionals and be properly licensed and trained to perform the proposed work. Electrical Contracting (i.e. construction, repair, testing, and maintenance of industrial & commercial electrical distribution systems) shall be the primary specialty of the Contractor’s business.
2. Contractors shall be certified by the InterNational Electrical Testing Association (NETA) or equivalent certifying organization as certified technicians, with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour Construction Outreach Training or General Industry Outreach Training.
3. Contractors shall have technical training and evident track records of working experience in Maintenance and Testing of electrical power distribution systems and related components in healthcare, industrial, educational, or commercial facilities. Electrical components on which Contractors have experience shall include at minimum, switchboards & switchgear (low and medium voltage), low voltage controls, oil filled disconnects, medium voltage distribution sub-stations, dry & oil filled transformers (medium voltage), switchgear circuit breakers (medium voltage), motor control centers, infrared thermographic inspections, arch flash testing, battery & battery charger inspections, ventilation inspections, external & internal enclosure inspections, calibration & functional checks, dielectric tests of oil, and other electrical appurtenances.
4. Contractors shall possess and utilize all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform all work safely, effectively, and timely. Tools, equipment, and PPE shall comply with OSHA Standard 29 CFR 1910, (Subpart I), and NFPA 70E. Prior to initiating work, the Contractor shall provide documentation demonstrating that all instruments, test equipment, tools, and PPE possess current calibration and safety inspections. Dated calibration and safety inspection labels shall be visible on all equipment as applicable.
5. Contractors shall have safety training (on-the-job or classroom type) in electrical safety outlined in the OSHA Standard 29 Code of Federal regulations 1910 Subpart S (Electrical), and the NFPA 70E Standard for Electrical Safety in the Workplace. Training certificates or documentation (from the employer) shall be submitted to the Contracting Officer (CO) prior to commencing work.
6. Contractors shall comply with and have ready access to the latest versions of the following references:
a. NFPA 70, National Electric Code
b. NFPA 70B, Recommended Practice for Electrical Equipment Maintenance
c. NFPA 70E, Standard for Electrical Safety in the Workplace
d. NFPA 99, Health Care Facilities Code, Latest Edition
e. NFPA 101, Life Safety Code, Latest Edition
f. NFPA 110, Standard for Emergency and Standby Power Systems 7) The Joint Commission Accreditation Manual for Hospitals, Latest Edition.
g. OSHA Standard 29 CFR Part 1910, Subparts: I, J, R, & S.
h. OSHA - Safety and Health Regulations for Construction Part 1926 Subpart K - Electrical
i. InterNational Electrical Testing Association (NETA) – Maintenance & Testing Specifications
j. Operating/Maintenance manuals and specifications of all components of the Electrical Power Distribution System. These documents may be obtained from the Edward Hines Jr. VA Hospital COR or the equipment manufacturers.
k. VHA Directive 1028 (July 25, 2014)
7. If Subcontractor(s) are used, they must be approved by the CO; the Contractor shall submit any proposed change in Subcontractor(s) to the CO for approval/disapproval. Please refer to Clause 852.219-77 - VA NOTICE OF LIMITATIONS ON SUBCONTRACTING— CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION).
J. HOURS OF COVERAGE
Normal hours of coverage are Monday through Friday from 07:00 AM to 04:00PM Central Time (“normal business hours”), excluding Federal holidays. All service, labor including preventive maintenance, inspections, and testing shall be performed during normal business hours of coverage unless requested by the COR and approved by the CO.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .