This Sources Sought Notice is for the Department of Veterans Affairs (VA) Eastern Oklahoma VA Health Care System, seeking potential contractors to provide and install dual-stacked CO2 incubators for the new Tulsa VA Medical Center. The solicitation (No. 36C24W25Q0280) targets manufacturers in NAICS Code 334516 (Analytical Laboratory Instrument Manufacturing) with a size standard of 1,000 employees, and requires vendors to supply VWR Air Jacket CO2 Incubators or equivalent models.
Key requirements include delivering one dual-stacked CO2 incubator with 6.5 cu. ft. internal volume per unit, in-chamber HEPA filtration, long-lasting thermal conductivity CO2 sensors, and precise temperature/CO2 control. The contractor must provide installation, on-site training for 3-5 clinical staff, and digital equipment manuals. Delivery is specified for November 10-30, 2025, to the James Mountain Inhofe VA Medical Center in Tulsa, Oklahoma. Responses are due by July 21, 2025, and must be submitted via email to the contract specialist with detailed capabilities statements demonstrating past performance and technical qualifications.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sources Sought Notice
*= Required Field Sources Sought Notice
SUBJECT* CO2 Incubator 623 | Tulsa
GENERAL INFORMATION
CONTRACTING OFFICE’S ZIP CODE* 95652
SOLICITATION NUMBER* 36C24W25Q0280
RESPONSE DATE/TIME/ZONE 07-21-2025 12:00pm CENTRAL TIME, CHICAGO, USA
ARCHIVE 99 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS N
SET-ASIDE
PRODUCT SERVICE CODE* 6515
NAICS CODE* 334516
CONTRACTING OFFICE ADDRESS Department of Veterans Affairs
Regional Procurement Office West (RPOW) 3237 Peacekeeper Way Building 200 Suite 204 McClellan Park CA 95652
POINT OF CONTACT*
Contract Specialist Robert M. Clark Jr robert.clark15@va.gov 254-538-0487
PLACE OF PERFORMANCE
ADDRESS Department of Veterans Affairs Eastern Oklahoma VA Healthcare System James Mountain Inhofe VA Medical Center 440 S. Houston Ave Tulsa OK
POSTAL CODE 74401
COUNTRY USA
ADDITIONAL INFORMATION
AGENCY’S URL http:// www.va.gov URL DESCRIPTION Department of Veterans Affairs AGENCY CONTACT’S EMAIL ADDRESS robert.clark15@va.gov
EMAIL DESCRIPTION
DESCRIPTION
THIS IS A SOURCES SOUGHT NOTICE ONLY. THIS IS NOT A REQUEST FOR
PROPOSAL.
Disclaimer
This Sources Sought is issued solely for the purpose of identifying potential sources for a future requirement and does not constitute a solicitation. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate.
All information received in response to this notice will be treated as proprietary and will not be shared with other interested parties. Responders are solely responsible for all expenses associated with responding to this Sources Sought notice. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. This Sources Sought Notice does not obligate the Government to award a contract.
Any organization responding to this Sources Sought Notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or provide feedback to respondents with respect to any information submitted. The Government may or may not issue a solicitation as a result of this announcement. There is no solicitation available at this time.
Synopsis
This is not a solicitation announcement. This is a Sources Sought synopsis only with the purpose of gaining knowledge of potential qualified sources and their size classification relative to the appropriate North American Industry Classification System (NAICS) 334516, Analytical
Laboratory Instrument Manufacturing (Size Standard: 1,000 employees). Responses to this
Sources Sought synopsis will be used by the Government to make appropriate acquisition decisions and are not considered adequate responses to a potential future solicitation announcement. After reviewing all responses to this synopsis, a solicitation announcement may be published via the Contracting Opportunities website. Responses to this Sources Sought synopsis are not considered adequate responses to the anticipated solicitation announcement. All interested offerors will have to respond to the actual solicitation announcement, in addition to responding to this Sources Sought announcement.
The Department of Veterans Affairs is requesting the following information be provided below:
Company Name:
Address:
UEI (Unique Entity ID) Number:
Contact Name:
Phone No.:
Email:
Product Country of Origin:
Business Size Information - Select all that applies:
Small Business
Emerging Small Business
Small Disadvantaged Business
Certified under Section 8(a) of the Small Business Act
HUBZone
Woman Owned
Certified Service-Disabled Veteran Owned Small
Veteran Owned Small Business
Large Business
FSS/GSA Contract Holder Yes No
FSS/GSA Contract Number:
Effective Date/ Expiration Date:
The description of service contained herein does not constitute the complete description of the contractor’s anticipated obligations. Interested parties capable of providing the required service are asked to respond to this Sources Sought notice.
Responses to this notice should include a capabilities statement to include the following:
1. Company name, Address, Size Standard, DUNS, Cage Code, TIN
2. Point of contact (Name, Phone Number and e-Mail Address)
3. NAICS Code 334516 and Business Standard MUST be assigned to the company
4. Socioeconomic Status
5. Capabilities Statement
a. Provide proof of past performance (provide proof of contracts that you have provided and installed or of the company who will be performing the installation).
b. Proof must be provided on the specific service in request.
c. If you will NOT be performing the work, you MUST provide information on the company you intend to use. In addition, you must provide a Letter of Intent from the company you intend to use (explaining their agreement with you to perform the installations according to the solicitation), along with references of their past service installations.
d. Past performance must not be negative in any previous contracts, based on the
Contract Performance Assessment System and the Contracting Officer’s knowledge of past requirements.
Responses
The government intends to award a single contract to purchase the services listed above.
Responses to this notice shall be e-mailed to robert.clark15@va.gov. Subject line shall reflect
“Sources Sought, 36C24W25Q0280, Incubator Air Jacket TC Dual/your company name".
Responses must be received no later than July 21, 2025, 12:00 P.M. EST.
Responses must be received via e-mail only. Telephone, fax, or mail responses will not be accepted. This notice is to assist the VA in determining sources only. A solicitation is not currently available. If a solicitation is issued it will be announced at a later date and all interested parties must respond to that solicitation announcement separately from the responses to this announcement. Responses are not a request to be added to a prospective offeror’s list or to receive a copy of the solicitation.
End of Document
STATEMENT OF WORK (SOW)
Veterans Health Administration (VHA)
Eastern Oklahoma VA Health Care System (EOVAHCS)
Provision and Installation of CO2 Incubator
At the new Tulsa VA Medical Center
GENERAL
PURPOSE / OBJECTIVE:
Eastern Oklahoma VA Health Care System (EOVAHCS) requires a contractor to provide and install Dual-stacked CO2 incubators for the new Tulsa VA Medical Center, per the Delivery and
Location instructions in this SOW, in a cost-effective, efficient, and safe manner, while contributing to the VA Mission. CO2 incubators are for the laboratory to maintain an optimal environment for the incubation of tissue and cell samples by precisely controlling temperature, humidity and carbon dioxide levels. They are designed to maintain temperature and carbon dioxide levels as set by the operator as well as monitoring chamber relative humidity.
BACKGROUND: The Eastern Oklahoma VA Health Care System (EOVAHCS) is renovating a non-medical existing facility to be the new Tulsa VA Medical Center (VAMC). The facility requires new Dual-stacked CO2 incubators for the new laboratory. This is an Activation project and therefore, this equipment does not yet exist in the facility.
LOCATION:
Product Delivery, Installation, and Training: James Mountain Inhofe VA Medical Center, 440 S.
Houston Ave, Tulsa, Oklahoma 74127.
Secondary delivery address in case new hospital is unable to accept deliveries within timeframe outlined in SOW: Jack C Montgomery VA Medical Center, 1011 Honor Heights Drive, Muskogee, OK 74401
The contractor shall coordinate with the local POC (Point of Contact) before scheduling product delivery as these dates and addresses are subject to change due to ongoing development of the new hospital.
DELIVERY TIMES (PERFORMANCE PERIOD): The VA requires the Contractor to deliver the products no earlier than November 10, 2025, and no later than November 30, 2025.
The Contractor shall furnish all contract oversight, management, OEM authorizations to support provision and installation of OEM products, applicable licenses, shipping and delivery costs, and transportations necessary to provide the products, for EOVAHCS in accordance with this SOW.
Any services associated with this product are considered non-personal services. The Contractor, its employees, agents, and subcontractors shall not be considered VA employees for any purpose of fulfilling the SOW and shall be considered employees of the Contractor.
Contractors must provide products and perform in a professional manner and quality as recognized by commercial industry standards as good to excellent. Contractor must provide to the LOCAL
POC and CO, and maintain for the life of the contract, written certification from the Original
Equipment Manufacturer (OEM) that authorizes the Contractor to provide and assemble the products, as detailed in the Contractor’s quote and identified in this SOW.
Brand Name of Products, to include make and model numbers:
All mentions of Brand Name, Make/Model numbers, are provided only as a means of providing the minimum requirements.
SCOPE: EOVAHCS requires a contractor to provide products and assembly that meet or exceeds the physical, functional, and performance of the listed salient characteristics in the following sections. The equipment features are essential to the technical requirements to meet the VA’s needs. The VA’s needs assessment identified the type of products and components listed below as a suitable solution to fill the gap. However, these are only used as a guide and the VA’s basic, salient characteristics and critical minimum requirements define the type of product that is needed to ensure the Purpose of this SOW is satisfied. OEM part numbers/references, in the salient characteristics section, are used as a basis of design and are provided as a means to convey the minimum standard characteristics.
PHYSICAL CHARACTERISTICS: Contractor must provide one (1) Dual-Stacked CO2 incubator and associated components that meet or exceed the critical minimum requirements as well as the specifications in this SOW.
CRITICAL MINIMUM REQUIREMENTS
Contractors must provide Brand Name or Equal products to Avantor, Inc. with the following critical minimum requirements.
Manufacture: Avantor
Model: VWR Air Jacket Co2 Incubator
1. VWR Dual-Stacked Air jacketed CO2 Incubators (Brand Name or Equal)
a) 6.5 Cu. Ft. internal volume each, total 13 Cu. Ft.
b) In-chamber HEPA filtration airflow.
c) In-chamber probes and sensors.
d) Long lasting TC (Thermal Conductivity) CO2 sensor
e) Overnight 140 degree C sterilization cycle.
f) Temperature:
• Control: +/- 0.1 degree C Microprocessor PID Control
• Range: 5 degrees above ambient to 55 degrees C (131 degrees F)
• Uniformity: +/- 0.3 degrees C at 37 degrees C (98.6 degrees F)
• Tracking alarm: User-programmable high/low
• Digital: Digital, LED, 0.1°C increments
b) CO2
• Control: ±0.1% microprocessor PID control
• Sensor: T/C (Thermal Conductivity)
• Display: Digital LED, 0.1% increments
g) Must have four (4) shelves and removeable water pan for each.
• Shelves
i. Dimensions: 18.5” x 18.5” (47cm x 47cm)
ii. Construction: Stainless steel (belt sanded, both sides)
iii. Surface area: 2.4 sq. ft. (0.22 sq. m.) per shelf
iv. Max. per chamber: 38.4 sq. ft (3.6 sq. m.)
v. Loading: 35 lbs (16kg) slide in and out, 50 lbs (23kg) stationary
vi. Standard: 4
h) Construction
• Interior volume: 6.5 cu. ft. (184 liter)
• Dimensions
i. Exterior: 26.1” W x 39.5” H x 25.0” F-B; (66.3cm x 100.3cm x
63.5cm)
ii. Interior: 21.3” W x 26.8” H x 20.0” F-B; (54.0cm x 68.1cm x 50.8cm)
• Weight: Net 260 lbs (118 kg)
i) Electrical
• 115VAC, 50/60 Hz, (Operating range 90-125VAC)
• Power switch/circuit breaker: 2 Pole, 12.0 Amp
• 75 Watts maximum, 0.5ma leakage current
• Alarm contacts: Deviation of temperature, CO2, power, NO and NC
j) QTY: 1 (Dual stacked unit)
OTHER REQUIREMENTS:
Contractor is required to provide the following.
SPECIFICATIONS (including SALIENT CHARACTERISTICS)
The contractor must provide products that meet or exceed the Brand Name or Equal specifications in this table.
QTY Unit of
Issue
Model Numbers Item Description
1 EA 10811-00
VWR CO2 Incubator Air Jacket TC Dual
Each incubator should include:
• 1 Removable water pan
• 4 Shelves
1 EA Stacking Kit
Qualifications of Contractor OEM-Trained Technicians: Contractor shall document, in writing, their experience in working on the equipment listed in this SOW as well as the qualifications of individuals who will work on the equipment. Where the SOW requires OEM trained Technicians, demonstration of this will also be required in the documentation.
INSTALLATION AND TRAINING:
The contractor must provide product installation and training as part of this contract. Delivery, installation, and training must be coordinated with the LOCAL POC.
The contractor shall provide certified in-service training for clinical staff and Biomedical
(BESS) staff, in units where products will be used, at no additional cost to the
Government, for any equipment new to this facility.
This training shall include hands-on product use and be extensive enough to prepare participants to train others. Maintenance, repair, and annual certifications must be included in the training.
Dates to be coordinated with facility and LOCAL POC. Initial training is anticipated between October and December 2025.
Manuals: Contractor shall provide electronic, digital copies of the user manuals and repair manuals for each different product under this order or contract, at no additional cost to the government.
Contractor is required to provide training to 3-5 clinical staff in December 2025 –
January 2026. Training must be scheduled and coordinated with the local POC as these dates are subject to change due to onboarding of new staff. Training must be on-site at
James Mountain Inhofe VA Medical Center, 440 S. Houston Ave, Tulsa, OK 74127.
Rework or Remedy
Rework or Remedy is defined as replacing a product again until the Purpose of this SOW is achieved in full. This involves less than Satisfactory Products by the Contractor and as noted by the LOCAL POC. Rework or Remedy occurs at no additional cost to the
Government. Payment will be withheld until all replacement products are received to the
Satisfactory level in accordance with this SOW and as documented by the LOCAL POC.
DELIVERY:
Delivery and receipt of the proposed items are anticipated to be directed to the location identified in this SOW. Confirmation of delivery location will be provided by the VA LOCAL POC post-award. Delivery must be coordinated with VA LOCAL POC before any delivery attempts. Any item that has not been coordinated will be turned away and any additional charges will be the responsibility of the sender/transportation company.
Contractor is responsible for offloading the equipment from the truck, moving the equipment to the correct delivery location in the space, uncrating or unboxing the equipment, and removing all trash. Equipment, paperwork and warranty information must be handed to the VA receiving staff, as advised by the LOCAL POC.
INSPECTION: All equipment shall be tested after installation. Each resultant inspection shall be documented and provided to the LOCAL POC within 7 days of installation along with any inspection documentation or checklists required by the manufacturer. Any changes in inspection requirements during the period of installation will be communicated to the Contractor immediately.
Inspection and Acceptance of Products: The Government reserves the right to inspect and test products in accordance with this SOW and the Contract. The only individual authorized to officially accept products is the LOCAL POC. While inspection of products may be delegated by the LOCAL POC and a shared responsibility with departmental management staff, the LOCAL POC is ultimately the only authorized individual to approve and accept products on behalf of the VA.
STANDARD BUSINESS HOURS AND FEDERAL HOLIDAYS
Hours: Normal duty hours are between the hours of 0800 – 1500 CST, Monday through Friday, not including federal holidays. Whenever contact with a facility is required outside of normal duty hours, the Contractor shall coordinate these times with the designated LOCAL POC.
In accordance with 5 U.S.C. 6103, Executive Order 11582, and Public Law 94-97, the following national holidays are observed and for the purpose of this contract are defined as “Legal Federal official holidays.”
New Year’s Day January 1st
Martin Luther King’s Birthday Third Monday in January
President’s Day Last Monday in February
Memorial Day Last Monday in May
Juneteenth June 19th
Independence Day July 4th
Labor Day First Monday in September
Columbus Day Second Monday in October
Veteran’s Day November 11th
Thanksgiving Day Fourth Thursday in November
Christmas Day December 25th
In addition to the days designated as holidays, the Government observes the following days:
• Any other day designated by Federal Statute
• Any other day designated by Executive Order
• Any other day designated by the President of the United States to be a Federal holiday.
SAFETY AND COMPLIANCE
The Contractor must perform services and ensure equipment functions in accordance with:
a) local, state, and federal Occupational Safety and Health guidelines and legislation, to include Occupational Safety and Health Administration (OSHA), the American
National Standards Institute (ANSI) safety guidelines.
b) local, state, and federal Fire and Safety legislation and guidelines, to include VA
Health Care System directives and legislation on Fire and Safety, as well as the latest published edition of NFPA-99 (Health Care Facilities Code);
Medical Center Policies
Each VA Medical Center has policies that are updated from time to time. The LOCAL
POC can provide more detailed information to the contractor of these upon commencement of the contract and throughout the term of the contract, as needed, especially policies regarding parking, possession of weapons, cell phone use and photography as well as smoking on VA property. Violations of such policies may result in individual fines or citation answerable in the United States (Federal) District Court.
SECURITY:
Contract Personnel Security
Contractors must check in and out with COR when entering the VA and must be escorted while on VA premises.
END OF STATEMENT OF WORK
File details come from the government source that posted it. Updated .